CN213087644U - Installation structure of extrusion molding cement board enclosing wall - Google Patents

Installation structure of extrusion molding cement board enclosing wall Download PDF

Info

Publication number
CN213087644U
CN213087644U CN202021461884.8U CN202021461884U CN213087644U CN 213087644 U CN213087644 U CN 213087644U CN 202021461884 U CN202021461884 U CN 202021461884U CN 213087644 U CN213087644 U CN 213087644U
Authority
CN
China
Prior art keywords
wallboard
enclosure
installation structure
groove
basis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021461884.8U
Other languages
Chinese (zh)
Inventor
贺征
李波
杨家利
朱桂忠
李春雨
孙晓军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Laiyin Environmental Protection New Technology Development Co ltd
Original Assignee
Tianjin Laiyin Environmental Protection New Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Laiyin Environmental Protection New Technology Development Co ltd filed Critical Tianjin Laiyin Environmental Protection New Technology Development Co ltd
Priority to CN202021461884.8U priority Critical patent/CN213087644U/en
Application granted granted Critical
Publication of CN213087644U publication Critical patent/CN213087644U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

The utility model discloses an installation structure of an extrusion molding cement board enclosure wall, which comprises brick columns, a matched coping, a wallboard and an enclosure wall foundation; the utility model discloses a unit is the example, explains the installation method of whole wall. Wallboard, supporting coping and enclosure basis are installed between two brick posts, and half of enclosure basis buries under the terrace, and half exposes ground, and the wallboard adopts the preparation of extrusion moulding cement board to form, and the wallboard adopts to fix the board inslot in enclosure basis top according to the mode of inserting perpendicularly to fill the bottom with the little expanded fine aggregate concrete, in order to reach the effect of fixed wallboard. The technical scheme of this utility model provides a with low costs, light in weight, mounting means is simple, with low costs and the high enclosure mounting means of load.

Description

Installation structure of extrusion molding cement board enclosing wall
Technical Field
The utility model relates to an installation structure of siding wall, especially an installation structure of extrusion moulding cement board enclosure.
Background
The application of the plate wall in daily life and industrial production is extremely wide, and the use scenes are different. In the aspect of industrial use, most factories are set in suburban areas, or plants are set in places with severe natural environments due to the particularity of related fields. Therefore, various natural environmental factors need to be considered when building the plant enclosure. For example, some enterprise buildings are located in strong wind areas, and then a strong wind resistant installation design is required for the enclosing wall; in areas with heavy rain, the waterproof and drainage functions of the enclosure wall need to be considered. In addition to this, the production costs, transportation costs and installation difficulties of the enclosure are also taken into account.
In most of the prior art, the installation structure of the enclosing wall adopts a wall column inserting plate type or a bolt fixing installation method. The installation structure of the prior enclosure wall is highly dependent on the stability of the upright post, so that the upright post becomes a main stress point of the enclosure wall in the horizontal direction. Under extreme weather conditions, such as high winds, the wall studs are often stressed beyond their load, and thus overturning of the enclosure is likely to occur.
To foretell problem, the utility model provides a reasonable technical scheme solves.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a novel installation structure of extrusion moulding cement board enclosure for the enclosure can have bigger load, reduces the installation degree of difficulty simultaneously, reduces installation and cost of transportation.
In order to achieve the above object, the present invention provides the following technical solutions: an installation structure of an extruded cement board enclosing wall comprises brick columns, a matched coping, a wallboard and an enclosing wall foundation. Be provided with the enclosure basis between per two brick posts, enclosure basis top is fixed with the wallboard, the supporting coping is installed to the wallboard top.
Preferably, the lower end of the brick column is buried under the floor.
By adopting the scheme, the scheme that the brick columns are buried underground is beneficial to more firmly fixing the brick columns, and further the stability of the enclosing wall foundation and the wallboard is improved.
Preferably, the lower half part of the enclosure foundation is buried under the terrace, and the upper half part of the plate groove is arranged on the ground.
Adopt above-mentioned scheme, the enclosure basis can be by more firm terrace of being fixed in, and with the even dispersion of stress point at the terrace, the first half board groove is placed on ground and is favorable to the installation and the change of wallboard.
Preferably, the connecting part of the brick column and the fence foundation is buried under the floor.
Adopt above-mentioned scheme, the position of being connected of brick post and enclosure basis is arranged in under the terrace and is favorable to avoiding the complicated environmental factor in terrace top, moreover, soil itself has inside pressure to the object of burying to protect and fix corresponding relation of connection.
Preferably, the wall board is formed by vacuum extrusion molding cement board with the thickness of 80 mm.
By adopting the scheme, the wallboard has the same strength, reduces the weight, reduces the acting force on the enclosure foundation and prolongs the service life.
Preferably, the left long edge and the right long edge of the wallboard are respectively provided with a connecting bulge and a connecting groove.
Adopt above-mentioned scheme, can adopt to piece the connected mode of inserting to connect between the wallboard, simplify equipment and dismantlement mode between the wallboard, consolidated the connection between the wallboard simultaneously.
Preferably, the wallboard mounting means is, the wallboard inserts the board inslot of enclosure basis, adjusts the wallboard to vertical position, fills up the gap between wallboard and the board groove with little expanded fine aggregate concrete.
Adopt above-mentioned scheme, the installation can be simplified to the mounting means that the wallboard inserted the board groove, fills the gap with little inflation pea gravel concrete and can fix the wallboard, and this fixed mode has increased the area of stress on wallboard and enclosure basis, can make more firm the fixing on the enclosure basis of wallboard, so increased the atress load of wallboard.
Preferably, the top end of the wallboard is provided with a matched coping, and the bottom of the matched coping is provided with a clamping groove.
Adopt above-mentioned scheme, supporting coping relies on self weight to give the decurrent effort of wallboard on the one hand for the wallboard can be more stable firm fix in the enclosure basis, and on the other hand, supporting coping can consolidate the connection between the wallboard, prevents dislocation around between the wallboard.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) being connected between wallboard and the enclosure basis for take out the formula of inserting and fill with the fine aggregate concrete of micro-expansion, the installation has been simplified to this mounting means, makes the area of stress increase on wallboard and enclosure basis simultaneously, and the atress is more even, and the installation is more firm.
(2) The bottom of enclosure basis is buried under the terrace, and this kind of fixed mode of partly burying is favorable to consolidating the stability of enclosure basis.
(3) The wallboard is made of extrusion molding cement board, and the wallboard is high in strength, light in weight, low in manufacturing cost and convenient to transport.
Drawings
Fig. 1 is a side view of the structure of the present invention;
FIG. 2 is a front view of the structure of the present invention;
fig. 3 is a top view of the structure of the present invention;
FIG. 4 is a schematic view of the supporting structure of the present invention;
fig. 5 is a schematic view of the structure of the wall plate of the present invention;
fig. 6 is a schematic view of the enclosure foundation structure of the present invention;
fig. 7 is an assembly diagram of the present invention.
In the figure: 1-brick column, 2-matched coping, 201-clamping groove, 3-wallboard, 301-connecting bulge, 302-connecting groove, 4-enclosing wall foundation and 401-board groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-7, the present invention provides a novel installation structure of extruded cement fence, which comprises: brick post 1, supporting coping 2, wallboard 3 and enclosure basis 4 are provided with enclosure basis 4 between per two brick posts 1, enclosure basis 4 top is fixed with wallboard 3, supporting coping 2 is installed to wallboard 3 top, brick post 1 sets up in enclosure basis 4 both sides, brick post 1 and enclosure basis 4 sticky fixed, wallboard 3 is installed in the board groove 401 of enclosure basis 4 top, supporting coping 2 sets up in the top of wallboard 3, wallboard 3 and brick post 1 are through sealed glue connection.
The working principle is as follows: when the enclosing wall is assembled and built, firstly, a tunnel is pre-dug on a building path, the depth of the tunnel needs to be about 800mm, the enclosing wall foundation 4 and the brick column 1 are placed in the tunnel and are bonded, and the brick column 1 and the enclosing wall foundation 4 are adjusted to be vertical. Then landfill soil to the terrace is the same height, and this moment, it has 200mm to reserve enclosure basis 4 on the terrace about. Inserting the wall board 3 into the board slot 401 above the wall foundation 4, adjusting the wall board 3 to the vertical position, filling the gap of the wall board 3 in the board slot 401 with micro-expansion fine stone concrete, when the wall board 3 installed later is inserted into the board slot 401, aligning the left connecting bulge 301 with the connecting slot 302 of the previous wall board 3, aligning and pressing the two wall boards 3, installing and fixing each wall board 3 in sequence according to the method, and then fixing and bonding the side of the wall board 3 with the brick column 1 by sealant. When all the wall boards 3 are installed in place, the matched coping 2 is required to be installed at the top ends of the wall boards 3. When the matched coping 2 is installed, the clamping groove 201 at the bottom end of the matched coping 2 needs to be aligned and fixed at the upper end of the wallboard 3, the upper end of the wallboard 3 enters and is fixed in the clamping groove 201, and the matched coping 2 is bonded with the wallboard 3 by sealant. And standing the micro-expansion fine aggregate concrete and the sealant to a dry state, and then normally using the enclosure wall.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes may be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides an installation structure of extrusion moulding cement board enclosure which characterized in that: including brick post (1), supporting coping (2), wallboard (3) and enclosure basis (4), be provided with enclosure basis (4) between per two brick posts (1), enclosure basis (4) top is fixed with wallboard (3), supporting coping (2) is installed to wallboard (3) top.
2. The installation structure of an extruded cementitious panel enclosure as defined in claim 1, wherein: the both sides at wallboard (3) are installed in brick post (1), the bottom part of brick post (1) buries under the terrace, the latter half and enclosure basis (4) fixed connection of brick post (1).
3. The installation structure of an extruded cementitious panel enclosure as defined in claim 1, wherein: the lower half of the enclosing wall foundation (4) is fixed under the terrace in a landfill mode, the upper portion of the enclosing wall foundation (4) is provided with a plate groove (401), and the top of the plate groove (401) is exposed on the terrace.
4. The installation structure of an extruded cementitious panel enclosure as defined in claim 1, wherein: wallboard (3) are vacuum extrusion moulding cement board, and the width is 495mm, and thickness is 80mm, and the shape is the rectangle, wallboard (3) one side is provided with connects protruding (301), wallboard (3) opposite side is provided with spread groove (302).
5. The installation structure of an extruded cementitious panel enclosure as defined in claim 1, wherein: the short edge of the wallboard (3) is inserted into the board groove (401) on the enclosure foundation (4).
6. The installation structure of an extruded cementitious panel enclosure as defined in claim 1, wherein: a plurality of wall boards (3) are vertically arranged in the board groove (401) in sequence.
7. The installation structure of an extruded cementitious panel enclosure as defined in claim 1, wherein: the wallboard (3) is bonded with the brick column (1) through sealant.
8. The installation structure of an extruded cementitious panel enclosure as defined in claim 1, wherein: supporting coping (2) overall structure is rectangular design, supporting coping (2) bottom is provided with draw-in groove (201), the width and wallboard (3) thickness of draw-in groove (201) equal, supporting coping (2) are fixed with wallboard (3) through bottom surface draw-in groove (201).
CN202021461884.8U 2020-07-22 2020-07-22 Installation structure of extrusion molding cement board enclosing wall Expired - Fee Related CN213087644U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021461884.8U CN213087644U (en) 2020-07-22 2020-07-22 Installation structure of extrusion molding cement board enclosing wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021461884.8U CN213087644U (en) 2020-07-22 2020-07-22 Installation structure of extrusion molding cement board enclosing wall

Publications (1)

Publication Number Publication Date
CN213087644U true CN213087644U (en) 2021-04-30

Family

ID=75626257

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021461884.8U Expired - Fee Related CN213087644U (en) 2020-07-22 2020-07-22 Installation structure of extrusion molding cement board enclosing wall

Country Status (1)

Country Link
CN (1) CN213087644U (en)

Similar Documents

Publication Publication Date Title
CN105696706B (en) A kind of plug-in type assembled house
CN202866321U (en) Slope roof lightweight steel construction mobile home
CN202925931U (en) Flat roof lightweight steel construction simply building
CN109555153B (en) Assembled ecological gravity type retaining wall
CN106609562A (en) Double-pitch-roof mobile house with base
KR20050005877A (en) Temporary wall for construction site and its installation method
CN213087644U (en) Installation structure of extrusion molding cement board enclosing wall
CN218713213U (en) Assembled basis for stereo garage
KR101670576B1 (en) Bottom foundation base construction method of small scale prefabricated storage
CN207144563U (en) A kind of assembled communication base station room
CN209874039U (en) Basement deformation joint structure
CN210529916U (en) Low-rise assembled steel concrete structure building
CN109778895B (en) External elevator's pin-connected panel basis
CN112878483A (en) Assembled building balcony
CN221255534U (en) Assembled gravity retaining wall
KR20200132176A (en) Facility parts manufacturing method and facility method according to the installation of triangular structure of solar collector panel
CN220184353U (en) Wall frame type light movable enclosing wall
CN217300059U (en) Assembled steel structure for high seismic region
CN220746950U (en) Novel assembled foundation pit continuous wall sheet pile
KR20030014965A (en) Structure of Block type retaining wall and Construction Method thereof
CN214659278U (en) Windproof dust suppression net for limestone stock ground
CN220666653U (en) Market board post structure
CN211873429U (en) Shallow foundation landscape wall structure above top plate of basement
CN216664710U (en) Quick splicing structure of storehouse board
CN214615639U (en) Rural assembled house

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210430