CN213086791U - Pile fixing device for construction site - Google Patents

Pile fixing device for construction site Download PDF

Info

Publication number
CN213086791U
CN213086791U CN202021272999.2U CN202021272999U CN213086791U CN 213086791 U CN213086791 U CN 213086791U CN 202021272999 U CN202021272999 U CN 202021272999U CN 213086791 U CN213086791 U CN 213086791U
Authority
CN
China
Prior art keywords
fixedly connected
sleeve
base
outside
threaded rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021272999.2U
Other languages
Chinese (zh)
Inventor
李会香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Yuanda Construction And Installation Engineering Co ltd
Original Assignee
Guangxi Yuanda Construction And Installation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Yuanda Construction And Installation Engineering Co ltd filed Critical Guangxi Yuanda Construction And Installation Engineering Co ltd
Priority to CN202021272999.2U priority Critical patent/CN213086791U/en
Application granted granted Critical
Publication of CN213086791U publication Critical patent/CN213086791U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model belongs to the technical field of pile fixing for building sites, in particular to a pile fixing device for building sites, which comprises a base, wherein the inner side of the base is rotationally connected with a first threaded rod through a rotating shaft, the outer side of the first threaded rod is spirally connected with a sliding block, the top end of the sliding block is fixedly connected with a first supporting plate, two first supporting plates are rotationally connected with a first sleeve through the rotating shaft, the top end of the first sleeve is fixedly connected with a supporting rod, the top end of the supporting rod is fixedly connected with a second sleeve, the left and right ends of the second sleeve are rotationally connected with a second supporting plate through the rotating shaft, the outer side of the second supporting plate is fixedly connected with a mounting ring, four directions of the mounting ring are adjusted, so that the mounting ring is adjusted to be horizontally placed, thereby a pile body can be conveniently inserted into the mounting ring for auxiliary mounting operation, and different terrains, the application range of the device is expanded, and the convenience of pile body installation is improved.

Description

Pile fixing device for construction site
Technical Field
The utility model belongs to the technical field of the building site is fixed with the stake, concretely relates to building site is with stake fixing device.
Background
The low-bearing-platform pile foundation is characterized by comprising a deep foundation (shown in a figure) consisting of piles and pile bearing platforms (bearing platforms for short) connected with pile tops or a single-pile foundation connected with the piles by columns, namely a pile foundation for short, wherein if a pile body is completely buried in soil, the bottom surface of the bearing platform is in contact with the soil body, the low-bearing-platform pile foundation is called; if the upper part of the pile body is exposed out of the ground and the bottom of the pile cap is positioned above the ground, the pile body is called a high pile cap foundation, the building pile foundation is usually a low pile cap pile foundation, and the pile foundation is widely applied in high-rise buildings.
The prior art has the following problems:
1. the traditional pile fixing device for the construction site is troublesome in fixing operation and inconvenient in installation and limiting operation, and because each position on the ground is not a plane, the traditional pile fixing device is inconvenient to install, time-consuming and labor-consuming, and cannot be supported in advance;
2. traditional pile fixing device for building site skids with ground easily when using with pile body fixing device, uses insecurity, and stability is relatively poor, and the result of use is not good.
In order to solve the above problems, a pile fixing device for a construction site is provided in the present application.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a building site uses stake fixing device has the convenient pile body installation operation of carrying on and the convenient characteristics of carrying out the fixed operation to installation device.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building site is with stake fixing device, includes the base, the inboard of base is rotated through the pivot and is connected with first threaded rod, the outside screwed connection of first threaded rod has the slider, the first backup pad of top fixedly connected with of slider, two rotate through the pivot between the first backup pad and be connected with first sleeve, first telescopic top fixedly connected with bracing piece, the top fixedly connected with second sleeve of bracing piece, both ends all are rotated through the pivot about the second sleeve and are connected with the second backup pad, the outside fixedly connected with collar of second backup pad.
As a preferred utility model relates to a pile fixing device for building site, the spacing groove has been seted up to the inboard of base, the outside of slider with the spacing groove sliding connection of base, the quantity of base is four, the group number of first backup pad is four groups, the group number of second backup pad is four groups.
As the utility model relates to a building site is with stake fixing device preferred, the outside fixedly connected with mounting bar of base, the bottom inboard of mounting bar is rotated through the pivot and is connected with the inserted bar, the outside fixedly connected with connecting strip of inserted bar, the top fixedly connected with thread bush of mounting bar, thread bush's inboard screwed connection has the second threaded rod, the outside of second threaded rod is rotated and is connected with the regulating block, the bottom fixedly connected with regulation pole of regulating block.
As the utility model relates to a pile fixing device is preferred for the building site, the group number of inserted bar is four groups, every group the quantity of inserted bar is ten, the connecting hole has been seted up to the inboard of connecting strip, the outside of inserted bar with the connecting hole sliding connection of connecting strip, adjust the pole the bottom with connecting strip fixed connection, the thread bush group number is four groups, every group the thread bush quantity is two, the threaded hole has been seted up to the thread bush inboard, the outside of second threaded rod with thread bush's screw hole screwed connection, the spout has been seted up to the inboard of regulating block, adjust the pole the outside with the spout sliding connection of regulating block.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the four directions of the mounting ring are adjusted, so that the mounting ring is adjusted to be horizontally placed, the pile body is conveniently inserted into the mounting ring to assist in installation operation, the mounting ring can adapt to different terrains when being convenient to install, the application range of the device is expanded, and the convenience in installation of the pile body is improved.
2. The adjusting rod drives the connecting strip to move left and right, so that the inserting rod is driven to rotate left and right, the inserting rod is adjusted as required, and therefore greater supporting force is provided for the base after the inserting rod is inserted into the ground, and the base is prevented from sliding on the ground.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the mounting structure of the slider in the present invention;
fig. 3 is a schematic view of the mounting structure of the second threaded rod of the present invention;
fig. 4 is a schematic structural diagram of a in fig. 1 of the present invention.
In the figure: 1. a base; 2. a first threaded rod; 3. a slider; 4. a first support plate; 5. a first sleeve; 6. a support bar; 7. a second sleeve; 8. a second support plate; 9. a mounting ring; 10. mounting a bar; 11. inserting a rod; 12. a connecting strip; 13. a threaded bushing; 14. a second threaded rod; 15. an adjusting block; 16. and adjusting the rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
As shown in fig. 1, 2 and 4;
FIG. 1 is a schematic view of the overall structure;
FIG. 2 is a schematic view of a slider mounting structure;
fig. 4 is a schematic structural view of a portion a of fig. 1.
The utility model provides a pile fixing device for building site, the on-line screen storage device comprises a base 1, base 1's inboard is rotated through the pivot and is connected with first threaded rod 2, the outside screwed connection of first threaded rod 2 has slider 3, the first backup pad 4 of top fixedly connected with of slider 3, rotate through the pivot between two first backup pads 4 and be connected with first sleeve 5, the top fixedly connected with bracing piece 6 of first sleeve 5, the top fixedly connected with second sleeve 7 of bracing piece 6, both ends all are rotated through the pivot about second sleeve 7 and are connected with second backup pad 8, the outside fixedly connected with collar 9 of second backup pad 8.
In this embodiment: rotate first threaded rod 2, spacing groove through base 1 is spacing to slider 3, first threaded rod 2 drives slider 3 motion, thereby adjust the angle of collar 9, when four bases 1 are not in same horizontal plane, through 2 adjusting the position of slider 3 of first threaded rod, slider 3 drives the motion of first backup pad 4, first backup pad 4 drives the motion of first sleeve 5, thereby drive the motion of second sleeve 7 through bracing piece 6, thereby second sleeve 7 rotates four positions to collar 9 on second backup pad 8 and adjusts, thereby adjust collar 9 and place to the level.
As shown in fig. 1, 2 and 4;
FIG. 1 is a schematic view of the overall structure;
FIG. 2 is a schematic view of a slider mounting structure;
fig. 4 is a schematic structural view of a portion a of fig. 1.
In an optional embodiment, the inner side of the base 1 is provided with a limit groove, the outer side of the slide block 3 is slidably connected with the limit groove of the base 1, the number of the bases 1 is four, the number of the first support plates 4 is four, and the number of the second support plates 8 is four.
In this embodiment: adjust collar 9 to the level and place to the pile body that conveniently inserts in collar 9 assists the installation operation, can adapt to different topography in the time of easy to assemble, extends the application range of device, improves the convenience of pile body installation.
As shown in fig. 1 and 3;
FIG. 1 is a schematic view of the overall structure;
fig. 3 is a schematic view of the mounting structure of the second threaded rod.
In an alternative embodiment, a mounting bar 10 is fixedly connected to the outer side of the base 1, an inserting rod 11 is rotatably connected to the inner side of the bottom end of the mounting bar 10 through a rotating shaft, a connecting bar 12 is fixedly connected to the outer side of the inserting rod 11, a threaded sleeve 13 is fixedly connected to the top end of the mounting bar 10, a second threaded rod 14 is spirally connected to the inner side of the threaded sleeve 13, an adjusting block 15 is rotatably connected to the outer side of the second threaded rod 14, and an adjusting rod 16 is fixedly connected to the bottom end of the adjusting block 15.
In this embodiment: adjust pole 16 and drive connecting strip 12 side-to-side movement to drive inserted bar 11 side-to-side rotation, adjust inserted bar 11 as required, thereby make inserted bar 11 insert and provide bigger holding power to base 1 after ground, avoid base 1 to slide subaerial.
As shown in fig. 1 and 3;
FIG. 1 is a schematic view of the overall structure;
fig. 3 is a schematic view of the mounting structure of the second threaded rod.
In an optional embodiment, the number of the groups of the inserted rods 11 is four, the number of each group of inserted rods 11 is ten, the inner side of the connecting strip 12 is provided with connecting holes, the outer side of the inserted rods 11 is slidably connected with the connecting holes of the connecting strip 12, the bottom end of the adjusting rod 16 is fixedly connected with the connecting strip 12, the number of the groups of the threaded sleeves 13 is four, the number of each group of the threaded sleeves 13 is two, the inner side of the threaded sleeves 13 is provided with threaded holes, the outer side of the second threaded rod 14 is spirally connected with the threaded holes of the threaded sleeves 13, the inner side of the adjusting block 15 is provided with a sliding groove, and the outer side of the adjusting rod 16 is.
In this embodiment: the inserted link 11 provides bigger holding power to base 1 after inserting ground, avoids base 1 to slide subaerial, improves the stability that the device used, improves the security that the device used, improves device result of use.
The utility model discloses a theory of operation and use flow: when the device is used, the first threaded rod 2 is rotated to limit the slide block 3 through the limiting grooves of the bases 1, the first threaded rod 2 drives the slide block 3 to move so as to adjust the angle of the mounting ring 9, when the four bases 1 are not positioned at the same horizontal plane, the position of the slide block 3 is adjusted through the first threaded rod 2, the slide block 3 drives the first supporting plate 4 to move, the first supporting plate 4 drives the first sleeve 5 to move so as to drive the second sleeve 7 to move through the supporting rod 6, the second sleeve 7 rotates on the second supporting plate 8 so as to adjust four directions of the mounting ring 9, so that the mounting ring 9 is adjusted to be horizontally placed, a pile body can be conveniently inserted into the mounting ring 9 for auxiliary mounting operation, the device can adapt to different terrains when being convenient to mount, the application range of the device is expanded, the convenience of pile body mounting is improved, and the device can be mounted according to the inclination degree of the ground before being mounted, through rotating second threaded rod 14 on threaded sleeve 13, second threaded rod 14 drives regulating block 15 motion, and regulating block 15 drives regulation pole 16 side-to-side motion, adjusts pole 16 and drives connecting strip 12 side-to-side motion to drive inserted bar 11 side-to-side rotation, adjust inserted bar 11 as required, thereby make inserted bar 11 insert provide bigger holding power to base 1 after ground, avoid base 1 to slide subaerial.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (4)

1. A pile fixing device for construction site, includes base (1), its characterized in that: the inboard of base (1) is rotated through the pivot and is connected with first threaded rod (2), the outside threaded connection of first threaded rod (2) has slider (3), the first backup pad (4) of top fixedly connected with of slider (3), two rotate through the pivot between first backup pad (4) and be connected with first sleeve (5), the top fixedly connected with bracing piece (6) of first sleeve (5), the top fixedly connected with second sleeve (7) of bracing piece (6), both ends all are connected with second backup pad (8) through the pivot rotation about second sleeve (7), the outside fixedly connected with collar (9) of second backup pad (8).
2. The pile fixing device for construction sites according to claim 1, wherein: the limiting groove has been seted up to the inboard of base (1), the outside of slider (3) with the limiting groove sliding connection of base (1), the quantity of base (1) is four, the group number of first backup pad (4) is four groups, the group number of second backup pad (8) is four groups.
3. The pile fixing device for construction sites according to claim 1, wherein: the utility model discloses a quick-witted support structure, including base (1), the outside fixedly connected with mounting bar (10) of base (1), the bottom inboard of mounting bar (10) is rotated through the pivot and is connected with inserted bar (11), the outside fixedly connected with connecting strip (12) of inserted bar (11), the top fixedly connected with thread bush (13) of mounting bar (10), the inboard screwed connection of thread bush (13) has second threaded rod (14), the outside of second threaded rod (14) is rotated and is connected with regulating block (15), the bottom fixedly connected with of regulating block (15) adjusts pole (16).
4. A pile fixing device for construction sites according to claim 3, wherein: the group number of inserted bar (11) is four groups, every group the quantity of inserted bar (11) is ten, the connecting hole has been seted up to the inboard of connecting strip (12), the outside of inserted bar (11) with the connecting hole sliding connection of connecting strip (12), adjust the bottom of pole (16) with connecting strip (12) fixed connection, the group number of threaded sleeve (13) is four groups, every group the quantity of threaded sleeve (13) is two, the inboard screw hole that has seted up of threaded sleeve (13), the outside of second threaded rod (14) with the screw hole screwed connection of threaded sleeve (13), the spout has been seted up to the inboard of regulating block (15), adjust the outside of pole (16) with the spout sliding connection of regulating block (15).
CN202021272999.2U 2020-07-01 2020-07-01 Pile fixing device for construction site Expired - Fee Related CN213086791U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021272999.2U CN213086791U (en) 2020-07-01 2020-07-01 Pile fixing device for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021272999.2U CN213086791U (en) 2020-07-01 2020-07-01 Pile fixing device for construction site

Publications (1)

Publication Number Publication Date
CN213086791U true CN213086791U (en) 2021-04-30

Family

ID=75622238

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021272999.2U Expired - Fee Related CN213086791U (en) 2020-07-01 2020-07-01 Pile fixing device for construction site

Country Status (1)

Country Link
CN (1) CN213086791U (en)

Similar Documents

Publication Publication Date Title
CN206513311U (en) Jumbolter
CN111504286A (en) Fixed point surveying and mapping tool for building planning
CN213204957U (en) Building engineering roof template supporting component
CN213086791U (en) Pile fixing device for construction site
CN212249291U (en) Temporary supporting structure for construction
CN219045676U (en) Vertical mapping device of geographical survey and drawing convenient to it is fixed
CN108797580B (en) Height-adjustable building pile
CN208445519U (en) A kind of solar-electricity board mount
CN215055643U (en) Reinforced structure of building roof beam
CN214940066U (en) Pile foundation construction platform
CN212080345U (en) Temporary support frame for constructional engineering
CN217378974U (en) Splicing supporting structure for protecting miniature pile foundation
CN215562563U (en) Prestressed concrete tubular pile cap
CN221094993U (en) Water conservancy construction template supporting mechanism
CN219318145U (en) Detection support frame that steadiness is high and is convenient for carry
CN213597555U (en) Jacking device capable of being adjusted in two directions
CN212335893U (en) Hydraulic engineering hinders silt guardrail with simple and easy antidetonation type of construction
CN221194166U (en) Anti-tilting scaffold
CN215569093U (en) Surveying and mapping device for informatization management of natural resources
CN216892428U (en) Environment-friendly excavation supporting device
CN216952366U (en) Support frame for civil engineering of convenient regulation
CN212052781U (en) Foundation pit supporting structure for excavation of foundation pit
CN219867035U (en) Novel mapping equipment rack
CN218235152U (en) Temporary support frame for coal mining excavation roadway
CN220775715U (en) Photovoltaic panel installing support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210430