CN213084634U - Bicycle saddle production water line - Google Patents

Bicycle saddle production water line Download PDF

Info

Publication number
CN213084634U
CN213084634U CN202022005633.5U CN202022005633U CN213084634U CN 213084634 U CN213084634 U CN 213084634U CN 202022005633 U CN202022005633 U CN 202022005633U CN 213084634 U CN213084634 U CN 213084634U
Authority
CN
China
Prior art keywords
containing box
plate
screw
bicycle saddle
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022005633.5U
Other languages
Chinese (zh)
Inventor
耿军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Huaguan Bicycle Accessories Co ltd
Original Assignee
Tianjin Huaguan Bicycle Accessories Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Huaguan Bicycle Accessories Co ltd filed Critical Tianjin Huaguan Bicycle Accessories Co ltd
Priority to CN202022005633.5U priority Critical patent/CN213084634U/en
Application granted granted Critical
Publication of CN213084634U publication Critical patent/CN213084634U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cleaning In General (AREA)

Abstract

The utility model discloses a bicycle saddle production water line, comprising a base plate, bottom plate top both ends are all through bolt installation supporting leg, and the supporting leg top all through bolt installation locating plate, locating plate top surface corner is through reserving screw hole installation screw rod, and the locating plate top all is equipped with the loading board, the locating board bottom surface turning goes out and sets up the spacing groove corresponding with the screw rod, and the screw rod top is located the spacing inslot, the bottom plate top is equipped with containing box and dust collection box, and the containing box is located dust collection box one side, the electronic displacement platform of screw installation is passed through to the bottom in the containing box, and electronic displacement platform removes the end top and passes through bolt and connecting plate installation montant in one side, the montant top is passed through the movable plate that screw installation and containing box correspond, the dust collection box top is equipped with the conveyer. The utility model relates to a bicycle saddle production water line, it is rational in infrastructure, it is convenient to use, is fit for being extensively promoted and uses.

Description

Bicycle saddle production water line
Technical Field
The utility model relates to a saddle production technical field, in particular to bicycle saddle production water line.
Background
The saddle is the part that supplies people to ride on the seat on the bicycle, and it is the more important component part of bicycle, and the saddle quality directly influences the use travelling comfort of bicycle.
The common bicycle saddle production line has the following defects: 1. in the production process, the unfinished product of a large amount of saddles is piled up at operating position, can influence personnel's operation, 2, in the production process, can't adjust work plane's height according to corresponding personnel's height, increased personnel's the work degree of difficulty, 3, after long-time the use, conveying mechanism surface adhesion dust easily needs personnel frequent cleanness, has increased personnel's work load.
Disclosure of Invention
A primary object of the present invention is to provide a bicycle saddle production line, which can effectively solve the problems of the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a bicycle saddle production line comprises a bottom plate, wherein supporting legs are installed at two ends of the top of the bottom plate through bolts, positioning plates are installed at the tops of the supporting legs through bolts, screws are installed at corners of the surfaces of the tops of the positioning plates through reserved threaded holes, a bearing plate is arranged at the tops of the positioning plates, limiting grooves corresponding to the screws are formed in the corners of the surfaces of the bottoms of the bearing plates, the tops of the screws are located in the limiting grooves, a containing box and a dust collecting box are arranged at the top of the bottom plate and located on one side of the dust collecting box, an electric displacement platform is installed at the bottom of the containing box through screws, a vertical rod is installed at the top of a moving end on one side of the electric displacement platform through bolts and a connecting plate, a moving plate corresponding to the containing box is installed at the top of the dust collecting box, and the top of the positioning rod is provided with a cleaning brush corresponding to the conveying belt through a connecting plate and a bolt.
Furthermore, a servo controller is installed on one side of the containing box through screws, and a current output end of the servo controller is electrically connected with a current input end of the electric displacement platform through a lead.
Further, the bottom plate is connected through bolt and dead lever in conveyer belt both sides, and conveyer belt one side is located containing box top one end.
Further, the screw rod and the limiting groove are both specifically provided with multiple groups.
Further, the top surface of the bearing plate is electroplated with a wear-resistant metal chromium layer.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. through setting up the containing box, electronic displacement platform and conveyer belt, when using, the personnel of one preceding process can place the saddle that its process has been accomplished at the conveyer belt top, at this moment, the conveyer belt can drive the saddle and remove, make it drop inside the containing box, afterwards, the personnel of one back process can be according to the pile up height of the inside saddle of containing box, manual electronic displacement platform of servo controller control that passes through, make its removal end pass through the position of montant adjustment movable plate, thereby make the saddle of the inside highest point of containing box personnel of taking, this formula can be placed the saddle inside the box that corresponds, prevent that it from piling up at work plane, influence personnel's operation, and, personnel can adjust the height of the inside saddle of containing box, make its personnel of being convenient for take, both cooperate, can effectively improve work efficiency.
2. Through setting up the screw rod, spacing groove and loading board, when using, personnel can take away the loading board from the screw rod top earlier, afterwards, personnel can be according to the height, manual rotatory screw rod to the height at adjusting screw rod top, afterwards, personnel can place the loading board that corresponds at the top of screw rod, and guarantee that the top of screw rod is located the spacing inslot portion, this mode can be according to adjusting of personnel's demand to the loading board, so that its work demand that satisfies personnel.
3. Through setting up cleaning brush and dust collection box, when using, cleaning brush contacts with the conveyer belt, and when the conveyer belt carries out the during operation, cleaning brush can handle the adhesion at the surperficial dust of conveyer belt, makes it fall into inside the dust collection box to need not frequent the conveying belt of personnel and clean, with reduction personnel's work load, and, personnel can be regularly remove the dust collection box from the bottom plate, thereby handle its inside impurity.
Drawings
Fig. 1 is the utility model relates to a bicycle saddle production water line's overall structure schematic diagram.
Fig. 2 is the utility model relates to a bicycle saddle production water line's electronic displacement platform, montant and movable plate position structure schematic diagram.
Fig. 3 is the schematic view of the position structure of the positioning rod and the cleaning brush of the bicycle saddle production line of the present invention.
In the figure: 1. a base plate; 2. positioning a plate; 3. a screw; 4. a limiting groove; 5. a carrier plate; 6. a servo controller; 7. moving the plate; 8. a vertical rod; 9. an electric displacement platform; 10. a storage box; 11. cleaning the brush; 12. a conveyor belt; 13. positioning a rod; 14. a dust collection box; 15. and (5) supporting legs.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in figures 1-3, a bicycle saddle production line comprises a bottom plate 1, wherein supporting legs 15 are installed at two ends of the top of the bottom plate 1 through bolts, positioning plates 2 are installed at the tops of the supporting legs 15 through bolts, screw rods 3 are installed at corners of the top surface of the positioning plates 2 through reserved threaded holes, bearing plates 5 are arranged at the tops of the positioning plates 2, limiting grooves 4 corresponding to the screw rods 3 are formed in corners of the bottom surface of the bearing plates 5, the tops of the screw rods 3 are located in the limiting grooves 4, a containing box 10 and a dust collecting box 14 are arranged at the top of the bottom plate 1, the containing box 10 is located on one side of the dust collecting box 14, an electric displacement platform 9 is installed at the bottom of the containing box 10 through screws, a vertical rod 8 is installed at the top of a moving end on one side of the electric displacement platform 9 through bolts and a connecting plate, and a, the top of the dust collection box 14 is provided with a conveyor belt 12, a positioning rod 13 is arranged in the dust collection box 14 through a screw, and the top of the positioning rod 13 is provided with a cleaning brush 11 corresponding to the conveyor belt 12 through a connecting plate and a bolt.
Wherein, the storage box 10 is provided with a servo controller 6 on one side through a screw, and the current output end of the servo controller 6 is electrically connected with the current input end of the electric displacement platform 9 through a lead.
In this embodiment, as shown in fig. 1, a person may control the displacement distance of the electric displacement platform 9 through the servo controller 6, so as to facilitate the use of the person.
The two sides of the conveyor belt 12 are connected with the bottom plate 1 through bolts and fixing rods, and one side of the conveyor belt 12 is located at one end of the top of the containing box 10.
In this embodiment, as shown in fig. 1, the conveyor 12 can transfer the saddle in the previous step into the storage box 10, thereby preventing the saddle from being stacked on the work plane.
Wherein, screw rod 3 and spacing groove 4 all specifically are equipped with the multiunit.
In this embodiment, as shown in fig. 1, the multiple sets of screws 3 and the limiting grooves 4 can make the fixing of the bearing plate 5 more stable.
Wherein, the top surface of the bearing plate 5 is electroplated with a wear-resistant metal chromium layer.
In this embodiment, as shown in fig. 1, the wear-resistant metal chromium layer can prolong the service life of the bearing plate 5.
It should be noted that the utility model relates to a bicycle saddle production line, during operation, personnel can take away the loading board 5 from the screw rod 3 top earlier, subsequently, personnel can be according to height, manual rotatory screw rod 3, thereby the height at adjustment screw rod 3 top, subsequently, personnel can place the corresponding loading board 5 at the top of screw rod 3, and guarantee that the top of screw rod 3 is located inside spacing groove 4, this formula can be according to personnel's demand to the adjustment of loading board 5, so that it satisfies personnel's work demand, on the next step, personnel connect electric displacement platform 9 (the producer is Suzhou Mingkun technology limited, model is MK) and the external connection line of conveyer belt 12 with external power supply mechanism first, on the next step, during the use, the personnel of previous process can place the saddle that its process has been accomplished on the top of conveyer belt 12, on this moment, the conveying belt 12 drives the saddle to move, so that the saddle falls into the containing box 10, and then, personnel in the next process can manually control the electric displacement platform 9 through the servo controller 6 (the manufacturer is Suzhou Mingkun technology Co., Ltd., model ZK) according to the stacking height of the saddle in the containing box 10, so that the moving end of the electric displacement platform can adjust the position of the moving plate 7 through the vertical rod 8, and the saddle at the highest position in the containing box 10 can be conveniently taken by the personnel, the saddle is further treated, and next, when the conveyor belt 12 is operated, the cleaning brush 11 can treat the dust adhered to the surface of the conveyor belt 12, so that the dust falls into the dust box 14, so that the belt 12 is not frequently cleaned by a person to reduce the workload of the person, and the person can periodically remove the dust box 14 from the base plate 1 to dispose of the foreign materials therein.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides a bicycle saddle production water line, includes bottom plate (1), its characterized in that: the two ends of the top of the bottom plate (1) are respectively provided with a supporting leg (15) through bolts, the tops of the supporting legs (15) are respectively provided with a positioning plate (2) through bolts, the corners of the surface of the top of the positioning plate (2) are provided with a screw (3) through reserved threaded holes, the top of the positioning plate (2) is provided with a bearing plate (5), the corners of the surface of the bottom of the bearing plate (5) are provided with a limiting groove (4) corresponding to the screw (3), the top of the screw (3) is positioned in the limiting groove (4), the top of the bottom plate (1) is provided with a containing box (10) and a dust collecting box (14), the containing box (10) is positioned on one side of the dust collecting box (14), the bottom of the containing box (10) is provided with an electric displacement platform (9) through screws, the top of the moving end on one side of the electric displacement platform (9) is provided with a vertical bar (8), the top of the dust collection box (14) is provided with a conveyor belt (12), a positioning rod (13) is installed in the dust collection box (14) through a screw, and the top of the positioning rod (13) is provided with a cleaning brush (11) corresponding to the conveyor belt (12) through a connecting plate and a bolt.
2. The bicycle saddle production line of claim 1, wherein: a servo controller (6) is installed on one side of the containing box (10) through screws, and a current output end of the servo controller (6) is electrically connected with a current input end of the electric displacement platform (9) through a lead.
3. The bicycle saddle production line of claim 1, wherein: the two sides of the conveyor belt (12) are connected with the bottom plate (1) through bolts and fixing rods, and one side of the conveyor belt (12) is located at one end of the top of the containing box (10).
4. The bicycle saddle production line of claim 1, wherein: the screw rod (3) and the limiting groove (4) are both specifically provided with multiple groups.
5. The bicycle saddle production line of claim 1, wherein: and the top surface of the bearing plate (5) is electroplated with a wear-resistant metal chromium layer.
CN202022005633.5U 2020-09-15 2020-09-15 Bicycle saddle production water line Active CN213084634U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022005633.5U CN213084634U (en) 2020-09-15 2020-09-15 Bicycle saddle production water line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022005633.5U CN213084634U (en) 2020-09-15 2020-09-15 Bicycle saddle production water line

Publications (1)

Publication Number Publication Date
CN213084634U true CN213084634U (en) 2021-04-30

Family

ID=75635241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022005633.5U Active CN213084634U (en) 2020-09-15 2020-09-15 Bicycle saddle production water line

Country Status (1)

Country Link
CN (1) CN213084634U (en)

Similar Documents

Publication Publication Date Title
CN210635386U (en) Sheet material carrying device for production of double-screw air compressor
CN213084634U (en) Bicycle saddle production water line
CN201849973U (en) Fully automatic feeding machine of photovoltaic solar silicon plate
CN213102909U (en) Online cleaning device for transfer type coating rubber roll
CN213266679U (en) Dustproof mechanism for coating film chamber
CN218745895U (en) Welding device for mechanical equipment production
CN102296333A (en) Pull plating machine cathode conveying device
CN111070053A (en) Four-axis full-automatic pressure regulating brush mill
CN216425852U (en) Automatic feeding mechanism
CN206686283U (en) A kind of transformer station's wireless monitoring device
CN212767487U (en) Waste incineration slag brick conveying device
CN202201998U (en) Cathode conveying device of pull plating machine
CN219239139U (en) Lifting device convenient for continuous conveying and processing of studs
CN216582777U (en) Section bar turnover frame
CN220223397U (en) Online material buffer memory device and lithium battery production line
CN211077651U (en) Flat material conveyor
CN202411831U (en) Swallow-tail type big support plate
CN221115047U (en) High stability turnover case support frame
CN216425913U (en) Multifunctional cache device applied to automation line
CN215202496U (en) Special thrust module is corrected in floor processing
CN215545740U (en) Projection welding tool capable of being switched rapidly
CN213219231U (en) Rounding machine auxiliary device is used in production of stainless steel basin for pharmacy
CN213595405U (en) Be suitable for automation line's transport truss
CN218776336U (en) Steel sheet rust cleaning mechanism with side rust cleaning
CN204566129U (en) For hello the sheet manipulator automatically of silicon wafer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant