CN213062508U - Green assembled building wall - Google Patents

Green assembled building wall Download PDF

Info

Publication number
CN213062508U
CN213062508U CN202021370340.0U CN202021370340U CN213062508U CN 213062508 U CN213062508 U CN 213062508U CN 202021370340 U CN202021370340 U CN 202021370340U CN 213062508 U CN213062508 U CN 213062508U
Authority
CN
China
Prior art keywords
layer
building wall
protection mechanism
reinforced concrete
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021370340.0U
Other languages
Chinese (zh)
Inventor
孙帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021370340.0U priority Critical patent/CN213062508U/en
Application granted granted Critical
Publication of CN213062508U publication Critical patent/CN213062508U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a green assembled building wall, including reinforced concrete layer, protection machanism, fire prevention sheet layer, shock attenuation bed course, insulation board layer, dampproofing sheet layer, place shell, standing groove, fixing bolt, draw-in groove, connecting plate, through-hole and fixed awl point. This kind of green assembled building wall body novel in design, moreover, the steam generator is simple in structure, under the effect through the protection machanism that sets up, improve the holistic dampproofing of wall body, fire prevention, shock attenuation and heat preservation effect, improve the holistic practicality of building wall body, satisfy worker's operation demand, convenient to use, under the effect through the coupling mechanism who sets up, the worker of being convenient for carries out stable connection with two protection machanism, be convenient for simultaneously will fix the protection machanism who connects on the reinforced concrete surface through coupling mechanism, the worker of being convenient for operates simultaneously, the practicality value is higher, and is suitable for being generalized to use.

Description

Green assembled building wall
Technical Field
The utility model relates to an assembly type structure wall body specifically is a green assembly type structure wall body, belongs to assembly type structure wall body application technical field.
Background
The wall body mainly comprises a bearing wall and a non-bearing wall, and mainly plays a role in enclosing and separating space; the wall body of the wall bearing structure building integrates bearing and enclosure, and the function of the framework structure system building wall body is enclosure and space separation. The wall body has enough strength and stability and has the capabilities of heat preservation, heat insulation, sound insulation, fire prevention and water prevention; the wall bodies are various, and comprise a single-material wall body and a composite-material wall body; the factors of enclosure, bearing, energy conservation, beauty and the like are comprehensively considered, and a reasonable wall scheme is designed, so that the method is an important task of building construction.
At present there are a lot of problems in building the wall body use, if some building wall bodies are not convenient for assemble at present, influence assembly efficiency, and some building wall body simple structure, building wall body function singleness influences the worker and operates, reduces building wall body's practicality, is not convenient for the worker to use. Therefore, the green fabricated building wall is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a green assembled building wall just lies in order to solve above-mentioned problem.
The utility model realizes the purpose through the following technical proposal, a green assembly type building wall, which comprises a reinforced concrete layer, a protection mechanism, a placing shell and a connecting mechanism; the surface of the top side of the reinforced concrete layer is attached with a protection mechanism, and the surface of the outer side of the protection mechanism is fixedly connected with a placing shell; a placing groove is formed in the surface of the front side of the placing shell; the two opposite sides of the protection mechanism are provided with clamping grooves;
the protection mechanism comprises a damp-proof plate layer, a heat preservation plate layer, a damping cushion layer and a fireproof plate layer, and the damp-proof plate layer is attached to the reinforced concrete layer; the top side of the moisture-proof plate layer is fixedly connected with a heat-insulation plate layer made of reinforced fibers, and the top side of the heat-insulation plate layer is fixedly connected with a damping cushion layer made of resin materials; the top side of the shock absorption cushion layer is fixedly connected with a fireproof plate layer;
the connecting mechanism comprises a connecting plate, a through hole, a fixing bolt and a fixing conical tip, and the connecting plate is clamped and connected in the clamping groove; the surface of the connecting plate is provided with a through hole; the surface of the protection mechanism is in threaded connection with a fixing bolt, and the tail end of the fixing bolt penetrates through a through hole in connection with the bottom side surface of the protection mechanism; the fixed bolt end is fixedly connected with a fixed cone point, and the tail end of the fixed cone point penetrates through the reinforced concrete layer.
Preferably, the number of the clamping grooves is two, the two clamping grooves are internally connected with a connecting plate in a clamping mode, and the width of each clamping groove is half of the width of the connecting plate.
Preferably, the contact surfaces of the moisture-proof plate layer, the heat-preservation plate layer, the shock absorption cushion layer and the fireproof plate layer are tightly attached.
Preferably, two lines of through holes distributed in a straight line shape are formed in the surface of the connecting plate, and the two lines of through holes distributed in the straight line shape are symmetrically distributed.
Preferably, the protection machanism positive side surface protrusion end is square piece, protection machanism dorsal side surface recess is square groove, square piece and square groove cooperation setting.
Preferably, the placing shell is vertically and fixedly connected with the surface of the fire-proof plate layer on the outermost side of the protection mechanism.
The utility model has the advantages that:
1. this kind of green assembled building wall body novel in design, simple structure, through the effect of the protection machanism who sets up under, improve holistic dampproofing, fire prevention, shock attenuation of wall body and heat preservation effect, improve the holistic practicality of building wall body, satisfy worker's operation demand, convenient to use.
2. When using, under coupling mechanism's effect through setting up, the worker of being convenient for carries out stable connection with two protection machanism, is convenient for simultaneously to fix the protection machanism who will connect through coupling mechanism on the reinforced concrete surface, and the worker of being convenient for simultaneously operates, and the practicality value is higher, is fit for using widely.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without inventive exercise.
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the connection structure between the protection mechanism and the connection plate in a top view;
fig. 3 is a schematic side sectional view of the connection structure of the protection mechanism of the present invention.
In the figure: 1. reinforced concrete layer, 2, safeguard mechanism, 201, fire prevention sheet layer, 202, shock-absorbing cushion layer, 203, heat preservation sheet layer, 204, dampproofing sheet layer, 3, place the shell, 301, standing groove, 4, fixing bolt, 5, draw-in groove, 6, connecting plate, 7, through-hole, 8, fixed awl point.
Detailed Description
In order to make the objects, features and advantages of the present invention more obvious and understandable, the drawings in the embodiments of the present invention are combined below to clearly and completely describe the technical solutions in the embodiments of the present invention, and obviously, the embodiments described below are only some embodiments of the present invention, but not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
The technical solution of the present invention is further explained by the following embodiments with reference to the accompanying drawings.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Referring to fig. 1-3, a green fabricated building wall includes a reinforced concrete layer 1, a protection mechanism 2, a housing 3 and a connection mechanism; the top side surface of the reinforced concrete layer 1 is attached with a protection mechanism 2, and the outer side surface of the protection mechanism 2 is fixedly connected with a placing shell 3; a placing groove 301 is formed in the surface of the front side of the placing shell 3; two opposite sides of the protection mechanism 2 are provided with clamping grooves 5;
the protection mechanism 2 comprises a moisture-proof plate layer 204, a heat-preservation plate layer 203, a shock absorption cushion layer 202 and a fireproof plate layer 201, and the moisture-proof plate layer 204 is attached to the reinforced concrete layer 1; the top side of the damp-proof plate layer 204 is fixedly connected with a heat-insulating plate layer 203 made of reinforced fibers, and the top side of the heat-insulating plate layer 203 is fixedly connected with a shock-absorbing cushion layer 202 made of resin materials; the top side of the shock absorption cushion layer 202 is fixedly connected with a fireproof plate layer 201;
the connecting mechanism comprises a connecting plate 6, a through hole 7, a fixing bolt 4 and a fixing conical tip 8, and the connecting plate 6 is connected in the clamping groove 5 in a clamping manner; the surface of the connecting plate 6 is provided with a through hole 7; the surface of the protection mechanism 2 is in threaded connection with a fixing bolt 4, and the tail end of the fixing bolt 4 penetrates through a through hole 7 in connection with the bottom side surface of the protection mechanism 2; 4 end fixedly connected with fixed awl point 8 of fixing bolt, and 8 ends of fixed awl point run through to reinforced concrete layer 1.
The number of the clamping grooves 5 is two, the two clamping grooves 5 are connected with the connecting plates 6 in a clamping mode, and the width of each clamping groove 5 is half of that of each connecting plate 6, so that the connecting plates 6 can be placed conveniently; the contact surfaces of the moisture-proof board layer 204, the heat-preservation board layer 203, the shock absorption cushion layer 202 and the fireproof board layer 201 are tightly attached, so that the moisture-proof board layer 204, the heat-preservation board layer 203, the shock absorption cushion layer 202 and the fireproof board layer 201 are placed compactly, and the practicability is improved; two rows of through holes 7 distributed in a straight line shape are formed in the surface of the connecting plate 6, and the two rows of through holes 7 distributed in the straight line shape are symmetrically distributed, so that the through holes 7 can be conveniently used; the convex end of the surface of the front side of the protection mechanism 2 is a square block, the groove of the surface of the back side of the protection mechanism 2 is a square groove, and the square block and the square groove are arranged in a matched mode, so that the protection mechanism 2 can be placed conveniently; place shell 3 and the perpendicular fixed connection in fire prevention sheet layer 201 surface of the protection machanism 2 outside, place green plant cultivated in a pot in the standing groove 301 of placing shell 3 of being convenient for.
When the utility model is used, the protection mechanism 2 is placed on the surface of the reinforced concrete layer 1, then the connecting plate 6 is clamped and connected in the clamping groove 5 at one side of the protection mechanism 2, then the fixing bolt 4 penetrates through the through hole 7 on the surface of the connecting plate 6, meanwhile, the fixing cone point 8 at the tail end of the fixing bolt 4 is clamped with the reinforced concrete layer 1, under the matching action of the fixing bolt 4 and the fixing cone point 8, the adjacent protection mechanism 2 is convenient to be connected, meanwhile, the protection mechanism 2 is convenient to be fixed on the surface of the reinforced concrete layer 1, the stability of the protection mechanism 2 is improved, simultaneously, the lug at one side of the protection mechanism 2 is clamped with the groove of another protection mechanism 2, the protection mechanism 2 is arranged on the surface of the reinforced concrete layer 1, under the action of the fireproof plate layer 201 forming the protection mechanism 2, the fireproof effect of the wall, under 202 effects of shock attenuation bed course through constituting protection machanism 2, improve the shock attenuation effect of wall body, under the effect of the heat preservation sheet layer 203 through constituting protection machanism 2, be convenient for improve the heat preservation effect of wall body, under the effect of the dampproofing sheet layer 204 through constituting protection machanism 2, improve the dampproofing effect of wall body, satisfy worker's user demand.
It is well within the skill of those in the art to implement, without undue experimentation, the present invention does not relate to software and process improvements, as related to circuits and electronic components and modules.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
The above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention in its corresponding aspects.

Claims (6)

1. The utility model provides a green assembled building wall which characterized in that: comprises a reinforced concrete layer (1), a protection mechanism (2), a placing shell (3) and a connecting mechanism; the top side surface of the reinforced concrete layer (1) is attached with a protection mechanism (2), and the outer side surface of the protection mechanism (2) is fixedly connected with a placing shell (3); a placing groove (301) is formed in the surface of the front side of the placing shell (3); clamping grooves (5) are formed in two opposite sides of the protection mechanism (2);
the protection mechanism (2) comprises a moisture-proof plate layer (204), a heat-preservation plate layer (203), a shock absorption cushion layer (202) and a fireproof plate layer (201), and the moisture-proof plate layer (204) is attached to the reinforced concrete layer (1); the top side of the moisture-proof plate layer (204) is fixedly connected with a heat-insulating plate layer (203) made of reinforced fibers, and the top side of the heat-insulating plate layer (203) is fixedly connected with a shock-absorbing cushion layer (202) made of resin materials; the top side of the shock absorption cushion layer (202) is fixedly connected with a fireproof plate layer (201);
the connecting mechanism comprises a connecting plate (6), a through hole (7), a fixing bolt (4) and a fixing conical tip (8), and the connecting plate (6) is connected in the clamping groove (5) in a clamping mode; the surface of the connecting plate (6) is provided with a through hole (7); the surface of the protection mechanism (2) is in threaded connection with a fixing bolt (4), and the tail end of the fixing bolt (4) is in through connection with a through hole (7) and the bottom side surface of the protection mechanism (2); the tail end of the fixing bolt (4) is fixedly connected with a fixing cone tip (8), and the tail end of the fixing cone tip (8) penetrates through the reinforced concrete layer (1).
2. The green fabricated building wall of claim 1, wherein: the number of the clamping grooves (5) is two, the clamping grooves (5) are connected with the connecting plates (6) in a clamping mode, and the width of each clamping groove (5) is half of the width of each connecting plate (6).
3. The green fabricated building wall of claim 1, wherein: the contact surfaces of the moisture-proof board layer (204), the heat-preservation board layer (203), the shock absorption cushion layer (202) and the fireproof board layer (201) are tightly attached.
4. The green fabricated building wall of claim 1, wherein: two lines of through holes (7) distributed in a straight line shape are formed in the surface of the connecting plate (6), and the two lines of through holes (7) distributed in the straight line shape are symmetrically distributed.
5. The green fabricated building wall of claim 1, wherein: protection machanism (2) positive side surface protrusion end is square piece, protection machanism (2) dorsal part surface recess is square groove, square piece sets up with square groove cooperation.
6. The green fabricated building wall of claim 1, wherein: the placing shell (3) is vertically and fixedly connected with the surface of the fireproof plate layer (201) on the outermost side of the protection mechanism (2).
CN202021370340.0U 2020-07-13 2020-07-13 Green assembled building wall Expired - Fee Related CN213062508U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021370340.0U CN213062508U (en) 2020-07-13 2020-07-13 Green assembled building wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021370340.0U CN213062508U (en) 2020-07-13 2020-07-13 Green assembled building wall

Publications (1)

Publication Number Publication Date
CN213062508U true CN213062508U (en) 2021-04-27

Family

ID=75572387

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021370340.0U Expired - Fee Related CN213062508U (en) 2020-07-13 2020-07-13 Green assembled building wall

Country Status (1)

Country Link
CN (1) CN213062508U (en)

Similar Documents

Publication Publication Date Title
CN213062508U (en) Green assembled building wall
CN210976070U (en) Connecting structure of concrete beam column
CN101906818B (en) Assembled earthquake-proof board room
CN207801809U (en) Solar panel with safeguard structure
CN216766249U (en) Assembled building element based on BIM
CN215167479U (en) Transition type external wall insulation board
CN213015117U (en) Panel mounting structure for building decoration
CN212562016U (en) Energy-saving green building structure
CN208501890U (en) A kind of full bolt assembling type node connector and modular cabinet
CN212001736U (en) Steel construction assembled wallboard
CN218622768U (en) Wallboard mosaic structure of assembled space capsule
CN203296252U (en) Novel heat-absorbing wallboard for integrated housing
CN211396250U (en) Green building light composite wall panel
CN210563552U (en) Cold-formed thin-walled movable board house
CN212001872U (en) House building foundation anti-seismic building block
CN201730909U (en) Connecting piece with honeycomb structure for mounting veneer
CN219060425U (en) Assembled movable sound insulation cover
CN217379372U (en) Wood structure support and assembled wood structure building wall
CN212584073U (en) Hidden connecting piece of furniture
CN213524407U (en) Multipurpose combined cabinet metal frame
CN212176259U (en) Suspended ceiling for building decoration
CN212896848U (en) Light steel house building structure connecting piece
CN213038741U (en) Building engineering keeps warm and decorates baffle
CN215551420U (en) Composite aluminum honeycomb furniture board
CN220666589U (en) Assembled partition wall that practicality is high

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210427