CN213062099U - Pipe gallery template strutting arrangement - Google Patents

Pipe gallery template strutting arrangement Download PDF

Info

Publication number
CN213062099U
CN213062099U CN202021015789.5U CN202021015789U CN213062099U CN 213062099 U CN213062099 U CN 213062099U CN 202021015789 U CN202021015789 U CN 202021015789U CN 213062099 U CN213062099 U CN 213062099U
Authority
CN
China
Prior art keywords
template
support
limiting
piece
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021015789.5U
Other languages
Chinese (zh)
Inventor
解鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202021015789.5U priority Critical patent/CN213062099U/en
Application granted granted Critical
Publication of CN213062099U publication Critical patent/CN213062099U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a pipe corridor template strutting arrangement, including setting up between bank protection and template and being used for transmitting the pressure from the template to the first supporting mechanism of bank protection. The utility model discloses a piping lane template strutting arrangement sets up between bank protection and template, utilizes the bank protection to the lateral pressure that the template produced when offsetting concreting, improves the stability at concreting in-process template.

Description

Pipe gallery template strutting arrangement
Technical Field
The utility model belongs to the technical field of the construction, specifically speaking, the utility model relates to a pipe corridor template strutting arrangement.
Background
The special combined shaping steel template for the pipe gallery is a template with a quick formwork supporting and a good forming effect, a frame adopts square steel pipes of 40 multiplied by 80mm and 40 multiplied by 60mm, the square steel pipes of 30 multiplied by 40mm are used as supports, a panel is made of a thick steel plate of 3mm, and a template connecting piece adopts straight bolts, hook head bolts, fasteners, fastening bolts and the like.
The method is characterized in that steel templates are adopted as outer templates when the pipe gallery bottom plate and the wall plate are poured, and how to avoid the conditions of steel template die running, die reversing and the like caused by concrete lateral pressure when the pipe gallery bottom plate and the wall plate are poured, the existing construction method is to fill the deficient soil at two sides of the steel templates, dig the deficient soil at two sides of a fertilizer groove after the pipe gallery wall plate is poured, fill the soil in layers again and tamp the soil, the steps of the method are repeated, the shift cost and the construction period of a mechanical platform are increased, a certain gap is reserved between the deficient soil, and the steel templates can slightly deviate due to the lateral pressure when the concrete is poured.
SUMMERY OF THE UTILITY MODEL
The utility model discloses aim at solving one of the technical problem that exists among the prior art at least. Therefore, the utility model provides a pipe corridor template strutting arrangement, the purpose improves the stability at concreting in-process template.
In order to realize the purpose, the utility model discloses the technical scheme who takes does: piping lane template strutting arrangement is including setting up between bank protection and template and being used for transmitting the first supporting mechanism to the bank protection from the pressure of template.
First supporting mechanism including set up in pass power piece on the bank protection and set up and pass between power piece and the template and be used for transmitting the pressure from the template to the first support piece that passes power piece.
Pass power piece with first support piece is the level setting, and the one end of passing power piece is inserted inside the bank protection, the one end of first support piece and the other end fixed connection who passes power piece, the other end of first support piece with the template is inconsistent.
The pipe gallery formwork support device further comprises a second support mechanism connected with the first support mechanism and a third support mechanism connected with the first support mechanism and the first support mechanism.
The first supporting mechanism is horizontally arranged, the second supporting mechanism is vertically arranged, the third supporting mechanism is obliquely arranged, the upper end of the second supporting mechanism is connected with the first supporting mechanism, the lower end of the second supporting mechanism is connected with the lower end of the third supporting mechanism, and the upper end of the third supporting mechanism is connected with the first supporting mechanism.
The pipe gallery formwork supporting device further comprises a limiting mechanism connected with the formwork, the limiting mechanism is provided with a limiting groove, the end part of the first supporting mechanism is inserted into the limiting groove, and the second supporting mechanism is located in the limiting groove.
The limiting mechanism comprises a first limiting part and a second limiting part which are connected with the template, the first limiting part and the second limiting part are vertically arranged, and the limiting groove is located between the first limiting part and the second limiting part.
The first limiting part and the second limiting part are detachably connected with the template.
The first limiting part and the second limiting part are connected with the template through bolts.
The utility model discloses a piping lane template strutting arrangement sets up between bank protection and template, utilizes the bank protection to the lateral pressure that the template produced when offsetting concreting, improves the stability at concreting in-process template.
Drawings
The description includes the following figures, the contents shown are respectively:
fig. 1 is a schematic view of the usage state of the pipe gallery formwork support device of the present invention;
fig. 2 is a front view of the pipe gallery formwork support apparatus of the present invention;
FIG. 3 is a schematic view of the installation of the force transmitting member;
FIG. 4 is a schematic view of the connection of the first support mechanism to the revetment and formwork;
FIG. 5 is a schematic view showing a state where the first supporting mechanism is completely mounted;
fig. 6 is a schematic view of a state where the second support mechanism is mounted;
FIG. 7 is a schematic view of the stop mechanism coupled to the die plate;
FIG. 8 is a schematic structural view of a spacing mechanism;
labeled as: 1. a template; 2. a force transfer member; 3. a first support member; 4. a second support member; 5. a third support member; 6. slope protection; 7. a first limit piece; 8. a second limiting member; 9. a limiting groove.
Detailed Description
The following detailed description of the embodiments of the present invention will be given with reference to the accompanying drawings, for the purpose of helping those skilled in the art to understand more completely, accurately and deeply the conception and technical solution of the present invention, and to facilitate its implementation.
It should be noted that, in the following embodiments, the terms "first", "second" and "third" do not denote absolute differences in structure and/or function, nor do they denote a sequential order of execution, but rather are used for convenience of description.
As shown in fig. 1-8, the utility model provides a pipe corridor template strutting arrangement, including setting up between bank protection and template and being used for transmitting the pressure from the template to the first supporting mechanism of bank protection.
Specifically speaking, as shown in fig. 1, the template is vertical state and installs in the piping lane foundation ditch, the utility model discloses a piping lane template strutting arrangement sets up between bank protection and template, utilizes the bank protection to the lateral pressure that the template produced when offsetting concreting, improves the stability at concreting in-process template, and the template position is difficult to take place the skew. And the triangular support structure is not physically connected with the steel template, and the template only needs to be lifted out when the template is removed.
As shown in fig. 1 to 5, the first supporting mechanism is arranged between the revetment and the formwork, and in the process of pouring concrete, the first supporting mechanism provides a supporting function for the formwork, and the pressure applied to the formwork is transmitted to the revetment through the first supporting mechanism. The first supporting mechanism comprises a force transmission piece 2 arranged on the slope protection and a first supporting piece 3 arranged between the force transmission piece 2 and the template and used for transmitting the pressure from the template to the force transmission piece 2. Pass power piece 2 and first support piece 3 and be the level setting, pass inside the slope protection was inserted to the one end of power piece 2, the one end of first support piece 3 and the other end fixed connection who passes power piece 2, the other end and the template of first support piece 3 are inconsistent. Pass power piece 2 and first support piece 3 and be adopting the metal material to make, pass the inside that stretches into the bank protection behind the domatic of bank protection is passed to the one end on the length direction of power piece 2, pass power piece 2 and be pre-buried in the inside of bank protection, the length of the part that passes power piece 2 and stretch into the inside of bank protection is 600mm ~ 800mm, the length of the part that passes power piece 2 and first support piece 3 are connected is 30mm ~ 50 mm. Pass the one end fixed connection on the length direction of the ascending other end of length direction of power piece 2 and first support piece 3, and both are welded connection, the other end on the length direction of first support piece 3 contacts with the outer wall of template, this outer wall of template is the domatic vertical plane of face slope protection, first support piece 3 parallels with the length direction who passes power piece 2 with first direction, first direction is the outer wall looks of horizontal direction and first direction and template perpendicular, first direction parallels with the template thickness direction. The length direction of the template is parallel to a second direction, the second direction is a horizontal direction, and the second direction is vertical to the first direction.
As shown in fig. 1 to 6, the pipe gallery formwork support device of the present invention further includes a second support mechanism connected to the first support mechanism and a third support mechanism connected to the first support mechanism and the first support mechanism. The first supporting mechanism is horizontally arranged, the second supporting mechanism is vertically arranged, the third supporting mechanism is obliquely arranged, the upper end of the second supporting mechanism is connected with the first supporting mechanism, the lower end of the second supporting mechanism is connected with the lower end of the third supporting mechanism, and the upper end of the third supporting mechanism is connected with the first supporting mechanism, so that a right-angled triangle supporting structure is formed, and a stable supporting effect can be provided for the template.
As shown in fig. 1 to 6, the second supporting mechanism includes a second supporting member 4, the second supporting member 4 is vertically disposed, the second supporting member 4 is located between the formwork and the slope surface of the slope protection, the length direction of the second supporting member 4 is perpendicular to the first direction and the second direction, and the second supporting member 4 is made of metal material. The second support 4 extends towards the lower part of the first support 3, and the upper end of the second support 4 is fixedly connected with the end part of the first support 3 and is in welded connection with the end part of the first support 3. The third supporting mechanism comprises a third supporting piece 5, the third supporting piece 5 is arranged in an inclined mode, the length direction of the third supporting piece 5 is perpendicular to the second direction, an included angle is formed between the length direction of the third supporting piece 5 and the first direction, and the included angle is an acute angle. The third supporting piece 5 is made of metal materials, the third supporting piece 5 is located below the first supporting piece 3, the lower end of the third supporting piece 5 is fixedly connected with the lower end of the second supporting piece 4, the third supporting piece 5 and the second supporting piece are welded, the upper end of the third supporting piece 5 is fixedly connected with the end portion of the first supporting piece 3, the third supporting piece 5 and the first supporting piece 3 are welded, and the force transferring piece 2 and the third supporting piece 5 are fixedly connected with the same end of the first supporting piece 3.
As shown in fig. 1 and 6-8, the utility model discloses a piping lane template strutting arrangement still includes the stop gear who is connected with the template, and stop gear has spacing groove 9, and during first supporting mechanism's tip inserted spacing groove 9, second supporting mechanism was located spacing groove 9. The limiting mechanism has a limiting effect on the first supporting mechanism and the second supporting mechanism, so that the end part of the first supporting mechanism can be always abutted against the outer wall surface of the template at a set position, and the reliability is improved.
As shown in fig. 1 and 6 to 8, the limiting mechanism is located between the mold plate and the slope surface of the slope protection, the limiting mechanism includes a first limiting member 7 and a second limiting member 8 connected with the mold plate, the first limiting member 7 and the second limiting member 8 are vertically disposed, the first limiting member 7 and the second limiting member 8 are located on the same straight line parallel to the second direction, a certain distance is provided between the first limiting member 7 and the second limiting member 8, and the limiting groove 9 is located between the first limiting member 7 and the second limiting member 8. The first limiting part 7 and the second limiting part 8 are made of angle steel, the length direction of the first limiting part 7 and the length direction of the second limiting part 8 are parallel to the length direction of the second supporting part 4, the limiting groove 9 is a rectangular groove, the end part of the first supporting part 3 is inserted between the first limiting part 7 and the second limiting part 8, and the second supporting part 4 is also located between the first limiting part 7 and the second limiting part 8.
The length of the first limiting part 7 is the same as that of the second limiting part 8, two ends of the first limiting part 7 in the length direction of the second limiting part 8 are aligned with each other, the first limiting part 7 and the second limiting part 8 are tightly attached to the outer wall surface of the template, and the first limiting part 7 and the second limiting part 8 are detachably connected with the template.
Preferably, in this embodiment, the first limiting member 7 and the second limiting member 8 are connected to the formwork through bolts, so as to facilitate assembly and disassembly. Moreover, the first limiting part 7 and the second limiting part 8 are connected with the template through a plurality of bolts.
The installation process of the pipe gallery formwork support device with the structure comprises the following steps:
s1, mounting a first supporting mechanism on the revetment to enable the template to abut against the first supporting mechanism;
s2, mounting a second supporting mechanism;
and S3, installing a third supporting mechanism, wherein the third supporting mechanism is in an inclined state, the upper end of the second supporting mechanism is connected with the first supporting mechanism, the lower end of the second supporting mechanism is connected with the lower end of the third supporting mechanism, and the upper end of the third supporting mechanism is connected with the first supporting mechanism.
In above-mentioned step S1, will pass power piece 2 pre-buried on the bank protection, the one end of passing power piece 2 is located the outside of bank protection, passes the inside that the other end of power piece 2 inserted the bank protection, then with the one end of first support piece 3 and the tip welding of passing power piece 2, contacts the other end terminal surface of first support piece 3 and the outer wall of template.
In the above step S1, the template is mounted with the limiting mechanism, the end of the first support 3 contacting the template is inserted into the limiting groove 9 of the limiting mechanism, the width of the end of the first support is the same as the width of the limiting groove 9, and the width direction of the end of the first support and the width direction of the limiting groove 9 are parallel to the second direction.
In the above step S2, the second support member 4 is inserted into the stopper groove 9 of the stopper mechanism, the second support member 4 is in a vertical state, and the upper end of the second support member 4 is welded to the first support member 3.
In the above step S3, the third support 5 is placed below the first support 3, the lower end of the third support 5 is welded to the lower end of the second support 4, and the upper end of the third support 5 is welded to the end of the first support 3.
When the installation, pipe gallery template strutting arrangement installs a plurality ofly, and pipe gallery template strutting arrangement arranges in proper order along the length direction of template, and the interval control between two adjacent pipe gallery template strutting arrangement is between 1500mm ~ 2000 mm.
The invention has been described above by way of example with reference to the accompanying drawings. Obviously, the specific implementation of the present invention is not limited by the above-described manner. Various insubstantial improvements are made by adopting the method conception and the technical proposal of the utility model; or without improvement, the above conception and technical solution of the present invention can be directly applied to other occasions, all within the protection scope of the present invention.

Claims (8)

1. The pipe gallery formwork supporting device is characterized by comprising a first supporting mechanism which is arranged between a revetment and a formwork and is used for transmitting pressure from the formwork to the revetment;
first supporting mechanism including set up in pass power piece on the bank protection and set up and pass between power piece and the template and be used for transmitting the pressure from the template to the first support piece that passes power piece.
2. The pipe gallery formwork support device of claim 1, wherein the force transmission member and the first support member are both horizontally disposed, one end of the force transmission member is inserted into the slope protection, one end of the first support member is fixedly connected with the other end of the force transmission member, and the other end of the first support member is in contact with the formwork.
3. The tube lane template support apparatus of claim 1 or 2, further comprising a second support mechanism connected to the first support mechanism and a third support mechanism connected to the first and second support mechanisms.
4. The tube lane formwork support apparatus of claim 3, wherein the first support mechanism is horizontally disposed, the second support mechanism is vertically disposed, the third support mechanism is obliquely disposed, an upper end of the second support mechanism is connected with the first support mechanism, a lower end of the second support mechanism is connected with a lower end of the third support mechanism, and an upper end of the third support mechanism is connected with the first support mechanism.
5. The tube lane template support apparatus of claim 3, further comprising a stop mechanism connected to the template, the stop mechanism having a stop slot, the end of the first support mechanism being inserted into the stop slot, the second support mechanism being located in the stop slot.
6. The tube lane template support apparatus of claim 5, wherein the limiting mechanism comprises a first limiting member and a second limiting member connected to the template, the first limiting member and the second limiting member are vertically disposed, and the limiting slot is located between the first limiting member and the second limiting member.
7. The tube lane template support apparatus of claim 6, wherein the first and second stop members are removably connected to the template.
8. The tube lane template support apparatus of claim 7, wherein the first stop and the second stop are connected to the template by bolts.
CN202021015789.5U 2020-06-05 2020-06-05 Pipe gallery template strutting arrangement Active CN213062099U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021015789.5U CN213062099U (en) 2020-06-05 2020-06-05 Pipe gallery template strutting arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021015789.5U CN213062099U (en) 2020-06-05 2020-06-05 Pipe gallery template strutting arrangement

Publications (1)

Publication Number Publication Date
CN213062099U true CN213062099U (en) 2021-04-27

Family

ID=75566673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021015789.5U Active CN213062099U (en) 2020-06-05 2020-06-05 Pipe gallery template strutting arrangement

Country Status (1)

Country Link
CN (1) CN213062099U (en)

Similar Documents

Publication Publication Date Title
CN112144509A (en) Construction method of underground continuous wall, joint and connection structure thereof
CN103835303B (en) A kind of cast-type armored concrete shearing resistance method and structure
CN204282140U (en) A kind of self-compacting concrete perfusion gate-type crimping device
CN106968692B (en) Tunnel excavation supporting structure and construction method thereof
CN111519662A (en) Pipe gallery formwork supporting device and supporting method
CN213062099U (en) Pipe gallery template strutting arrangement
CN204098061U (en) Wall led by steel plate
CN114032965A (en) Force transmission belt structure of blocking wall of subway station and construction method thereof
CN213682129U (en) Deep foundation pit unilateral die carrier
CN212054725U (en) Cast-in-place reinforced concrete arch-covering formwork system
CN210768793U (en) Two-lining construction system at intersection of main tunnel and double-layer construction transverse channel
CN213267905U (en) Box structure for building foundation pit construction support
CN211849399U (en) Water stop joint of precast sheet pile
CN210562705U (en) Finished post-pouring belt
CN206053128U (en) A kind of special-shaped speed connects formula steel column
CN219794259U (en) Welding-free anti-deviation water steel plate structure
CN212612566U (en) Seepage-proofing joint device for underground continuous wall
CN208010365U (en) A kind of gateway opening type light section lining shuttering support system
CN206174444U (en) Porous prefabricated profiled child mould
CN213653470U (en) Novel support power transmission device
CN212507418U (en) Tool type beam construction joint interception structure
CN218027862U (en) Stagnant water steel sheet locator card and concrete underground continuous wall construction joint waterproof construction
CN218406490U (en) Small-bore plastic-coated pipe town buttress pours simple and convenient template
CN214784217U (en) Basement outer wall post-cast strip seals steel form device
CN212405109U (en) Perpendicular route stop device is backfilled to medium-sized steel joint of diaphragm wall construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant