CN213062043U - Broken massif stock is in milk and is piled up plant biological bag and replanting green device - Google Patents

Broken massif stock is in milk and is piled up plant biological bag and replanting green device Download PDF

Info

Publication number
CN213062043U
CN213062043U CN202021150884.6U CN202021150884U CN213062043U CN 213062043 U CN213062043 U CN 213062043U CN 202021150884 U CN202021150884 U CN 202021150884U CN 213062043 U CN213062043 U CN 213062043U
Authority
CN
China
Prior art keywords
massif
stock
plant
laid
bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021150884.6U
Other languages
Chinese (zh)
Inventor
熊显震
李芬
李刚
欧阳春霞
陈玉双
周文君
沈海明
谢小松
刘桑妮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guilin Shishan Greening Experimental Station
Original Assignee
Guilin Shishan Greening Experimental Station
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guilin Shishan Greening Experimental Station filed Critical Guilin Shishan Greening Experimental Station
Priority to CN202021150884.6U priority Critical patent/CN213062043U/en
Application granted granted Critical
Publication of CN213062043U publication Critical patent/CN213062043U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Of Plants (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model discloses a damaged massif stock grout piles up plant and grows bag greening device, including massif domatic body, the one end of stock is squeezed into to the inside of massif domatic body, various steel tile is laid to the other end upper surface of stock, the rubble bed course is laid to the upper surface of various steel tile, the plant that a plurality of was filled with soil is laid to the upper surface of rubble bed course and is grown the bag. The device can carry out planting technique to on the steep domatic in the massif to reach damaged massif ecological remediation, avoid the condition of massif landslide to take place simultaneously, squeeze into the stock through the inside at the massif, and erect various steel tile, form the construction operation face, can conveniently place the vegetation bag on the operation face, so that plant green planting at the massif facade, through laying the rubble bed course on various steel tile, can make the discharge of operation face ponding, avoid planting the damage to green.

Description

Broken massif stock is in milk and is piled up plant biological bag and replanting green device
Technical Field
The utility model belongs to the technical field of the mountain body is compound green, concretely relates to damaged mountain body stock is in milk and is piled up plant biological bag and compound green device.
Background
Landscape restoration and ecological management are carried out on abandoned quarries and mines, and the device is an important component for the management of rock desertification in the northwest bay area, but the slope of the damaged face of the rocky mountain is steep, planting matrixes cannot be reserved on smooth side slopes, green plants are directly planted at the position of the damaged face of the rocky mountain, the green plants cannot survive, the expected effect cannot be achieved, resources and time are wasted, and therefore the damaged rocky mountain anchor rod grouting, stacking, planting and bag greening device is provided to solve the problems.
Disclosure of Invention
An object of the utility model is to provide a damaged massif stock is in milk and is piled up plant and give birth to bag compound green device to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a damaged massif stock grout piles up plant and grows bag and replenishes green device, includes the domatic body of massif, the one end of stock is squeezed into to the inside of the domatic body of massif, various steel tile is laid to the upper surface of stock, the rubble bed course is laid to the upper surface of various steel tile, the plant of a plurality of filling with soil is grown the bag to the upper surface of rubble bed course.
Preferably, the anchor rod sets up to a plurality of, the even a plurality of various steel tile of laying of upper surface of anchor rod.
Preferably, the distance between the anchor rods is less than two thirds of the length of the plant growing bag.
Preferably, the plant growing bags are arranged in a plurality of numbers and are stacked on the upper surface of the gravel cushion.
The utility model discloses a technological effect and advantage: the utility model provides a damaged massif stock grout piles up plant living bag and regreens device, through the inside fixed connection stock at the domatic body of massif, can conveniently lay various steel tile on the stock, form the construction operation face, so as to lay other material, through set up the rubble bed course on the operation face, can conveniently be to the discharge of domatic ponding, avoid green ponding of planting, influence growth, through setting up plant living bag, can arrange planting soil in the construction operation face effectively, make things convenient for follow-up planting green to plant, thereby regreen the massif, the device can regreen the massif, guarantee the survival of green planting, save resources, effectively administer abandonment quarry, the damaged massif rock desertification phenomenon in mine, and is convenient for operation and simple.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view of a stacking structure of plant growth bags.
In the figure: 1. a mountain slope body; 2. an anchor rod; 3. color steel tiles; 4. a gravel cushion layer; 5. a plant growing bag.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a as shown in fig. 1-2 damaged massif stock grout piles up plant biological bag and regreens device, including massif domatic body 1, the one end of stock 2 is squeezed into to massif domatic body 1's inside, various steel tile 3 is laid to stock 2's upper surface, rubble bed course 4 is laid to various steel tile 3's upper surface, the plant biological bag 5 that a plurality of was filled with soil is laid to rubble bed course 4's upper surface.
The stock 2 sets up to a plurality of, the even a plurality of various steel tile 3 of laying of upper surface of stock 2 can be to the stable upper surface of placing at various steel tile 3 of rubble bed course 4 and plant living bag 5. The interval between 2 stock is less than the two-thirds of the 5 length of plant biological bags, can stably place plant biological bags, avoids dropping.
The plant growth bags 5 are arranged into a plurality of bags and are stacked on the upper surface of the gravel cushion 4.
When the special water drainage device is used, the working personnel firstly remove and level the redundant sundries such as broken stone soil and the like on the mountain slope body 1, then the working personnel perforate the surface of the mountain slope body, then the hole is cleaned, the sundries are removed, one end of the anchor rod 2 extends into the hole, then M30 pure cement is used for filling, the anchor rod 2 is firmly fixed in the mountain, then the color steel tiles 3 are laid on a plurality of anchor rods 2, the color steel tiles 3 are uniformly laid on the anchor rods 2, then the upper surface of the color steel tiles 3 is laid with a broken stone cushion layer 4 with the thickness of 5-8cm so as to drain the slope, then the vegetation bags 5 are planted on the upper surface of the broken stone cushion layer 4, the vegetation bags 5 are filled with mixed matrixes such as arbor, shrub, grass, mixed seeds, planting soil and the like, 10 percent of turfy soil, 10 percent of water retention agent and 500g/M compound fertilizer are properly added in the planting soil, then will plant and grow the bag from top to bottom and evenly pile up in the upper surface of rubble bed course 4, all step on with the foot after every pile up one row and compress tightly and continue to pile up on the net again, then plant green planting according to the design requirement on planting the bag, accomplish the operation, the device can be to the mountain body green again, guarantees the survival of green planting, saves the resource, effectively avoids the phenomenon of mountain body landslide, convenient operation, simple.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (4)

1. The utility model provides a damaged massif stock grouting piles up plant biological bag and replys green device, includes domatic body (1) of massif, its characterized in that: the one end of stock (2) is squeezed into to the inside of mountain slope surface body (1), various steel tile (3) are laid to the upper surface of stock (2), rubble bed course (4) are laid to the upper surface of various steel tile (3), plant biological bag (5) that a plurality of was filled with soil are laid to the upper surface of rubble bed course (4).
2. The damaged mountain anchor rod grouting and stacking plant biological bag greening device of claim 1, wherein: the anchor rod (2) is arranged to be a plurality of, and a plurality of color steel tiles (3) are evenly laid on the upper surface of the anchor rod (2).
3. The damaged mountain anchor rod grouting and stacking plant biological bag greening device of claim 1, wherein: the distance between the anchor rods (2) is less than two thirds of the length of the plant growth bag (5).
4. The damaged mountain anchor rod grouting and stacking plant biological bag greening device of claim 1, wherein: the plant growth bags (5) are arranged into a plurality of bags and are stacked on the upper surface of the gravel cushion (4).
CN202021150884.6U 2020-06-19 2020-06-19 Broken massif stock is in milk and is piled up plant biological bag and replanting green device Active CN213062043U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021150884.6U CN213062043U (en) 2020-06-19 2020-06-19 Broken massif stock is in milk and is piled up plant biological bag and replanting green device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021150884.6U CN213062043U (en) 2020-06-19 2020-06-19 Broken massif stock is in milk and is piled up plant biological bag and replanting green device

Publications (1)

Publication Number Publication Date
CN213062043U true CN213062043U (en) 2021-04-27

Family

ID=75568272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021150884.6U Active CN213062043U (en) 2020-06-19 2020-06-19 Broken massif stock is in milk and is piled up plant biological bag and replanting green device

Country Status (1)

Country Link
CN (1) CN213062043U (en)

Similar Documents

Publication Publication Date Title
CN101502223A (en) Slope soil-establishing greening apparatus and method
CN106759399B (en) A kind of side slope vegetation ecological recovery system and method
CN206599772U (en) A kind of cover type biological checkboard
CN202187355U (en) Grass-planting and supporting structure used within lattice girder on steep slope
CN203530993U (en) Steel-bar mesh planting hole
CN102677651A (en) Method for ecological restoration of mountain
CN211909788U (en) Ecological protective structure of impaired abrupt slope plant-growing bag
CN113431062A (en) Slope restoration ecological buffer belt structure and construction method thereof
CN213062043U (en) Broken massif stock is in milk and is piled up plant biological bag and replanting green device
CN203546738U (en) Palm reinforcing slope protection structure
CN217905344U (en) Prevent side and ooze field bank
CN111485565A (en) Integrated reinforcing method for green ecological side slope
CN203827827U (en) Apocarya nutrition bag seedling water cultivating seedbed
CN215926021U (en) High steep slope greening structure based on geocell
CN213539018U (en) River side slope protection soil stabilization structure
CN207099963U (en) The vertical greening system of compartment on pole abrupt slope
CN106233845A (en) A kind of salt-soda soil phytoremediation structure and method thereof
CN110387892A (en) A kind of multiple method for green of ladder bed structure
CN216087990U (en) Middle weathered rock slope plant shrub structure
CN217078806U (en) Ecological stake of ecological bank protection of cliff side slope
CN206529792U (en) A kind of retaining wall
CN215925895U (en) Connecting device for ecological bag building drainage ditch
CN205188905U (en) Ecological slope protection structure of mountain area stone riprap river course river bank step
CN214784542U (en) Novel cut slot structure
CN216948354U (en) Ecological protection structure for steep rock slope

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant