CN213062008U - Pile foundation deviation correcting device - Google Patents

Pile foundation deviation correcting device Download PDF

Info

Publication number
CN213062008U
CN213062008U CN202021182468.4U CN202021182468U CN213062008U CN 213062008 U CN213062008 U CN 213062008U CN 202021182468 U CN202021182468 U CN 202021182468U CN 213062008 U CN213062008 U CN 213062008U
Authority
CN
China
Prior art keywords
plate
side frame
pile foundation
deviation
frame plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021182468.4U
Other languages
Chinese (zh)
Inventor
徐树生
唐协成
汪俊
吴波
许可
鲍超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Shanshui Urban Design Co ltd
Original Assignee
Anhui Shanshui Urban Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Shanshui Urban Design Co ltd filed Critical Anhui Shanshui Urban Design Co ltd
Priority to CN202021182468.4U priority Critical patent/CN213062008U/en
Application granted granted Critical
Publication of CN213062008U publication Critical patent/CN213062008U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model provides a pile foundation deviation correcting device. Pile foundation deviation correcting device includes: the abutting panel is arranged on the top of the ground; the two side frame plates are arranged at the top of the abutting plate; the two deviation measuring mechanisms are respectively arranged on the two side frame plates; and the two deviation rectifying mechanisms are respectively arranged on the two side frame plates. The utility model provides a pile foundation deviation correcting device has the discovery of being convenient for slightly the deviation, can in time rectify, application scope is wider advantage.

Description

Pile foundation deviation correcting device
Technical Field
The utility model relates to a technical field that rectifies especially relates to a pile foundation deviation correcting device.
Background
The pile foundation is a deep foundation consisting of piles and pile bearing platforms connected with the pile tops or a single pile foundation connected with the pile foundation through the piles, and if the pile bodies are completely buried in the soil and the bottom surfaces of the bearing platforms are in contact with the soil body, the pile foundation is called a low bearing platform pile foundation; if pile shaft upper portion exposes ground and the cushion cap bottom is located more than ground, then be called high cushion cap pile foundation, the building pile foundation is low cushion cap pile foundation usually, among the high-rise building, the pile foundation uses extensively, in the erectting of pile foundation, can use with deviation correcting device cooperation usually to can guarantee the axiality that the pile foundation erect, and then guarantee the normal clear of follow-up work.
But present deviation correcting device is when using, judges whether the pile foundation is beat partially with people's visual observation usually, and this will lead to hardly discovering some slight deviations to hardly carry out timely effectual correction after the discovery, in addition, the deviation correcting device of a traditional specification can only carry out the work of rectifying to the pile foundation of a diameter size mostly, and accommodation is narrower, and is inconvenient to use.
Therefore, it is necessary to provide a pile deviation rectifying device to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a technical problem provide a pile foundation deviation correcting device convenient to discover more slight deviation, can in time rectify, application scope is wider.
In order to solve the technical problem, the utility model provides a pile foundation deviation correcting device, include: the abutting panel is arranged on the top of the ground;
two side frame plates; the two side frame plates are respectively arranged at two sides of the abutting panel;
the two deviation measuring mechanisms are respectively arranged on the two side frame plates;
the two deviation rectifying mechanisms are respectively arranged on the two side frame plates;
the deviation measuring mechanism comprises two sliding connection rods, a contact plate, a linkage plate and two pressure springs, the two sliding connection rods are both slidably mounted on the corresponding side frame plates, the contact plate is fixedly mounted at one ends of the two sliding connection rods, the linkage plate is fixedly mounted at the other ends of the two sliding connection rods, the linkage plate is in contact with the corresponding side frame plates, the two pressure springs are respectively sleeved on the two sliding connection rods, one ends of the pressure springs are fixedly connected with the contact plate, and the other ends of the pressure springs are fixedly connected with the side frame plates;
mechanism of rectifying includes opening, annular connection plate, first screw rod, arc push pedal and two guide bars, the opening is seted up one side of side frame plate, annular connection plate fixed mounting be in the inner wall of opening, first screw rod screw thread is installed the intra-annular of annular connection plate, first screw rod runs through the opening, the arc push pedal sets up one side of side frame plate, the one end of first screw rod with the arc push pedal rotates to be connected, two the guide bar all slides and wears to establish on the annular connection plate, the one end of guide bar with arc push pedal fixed connection.
Preferably, the side frame plate with the top fixed connection who supports the panel, the last mouth of wearing of having seted up of linkage board, set up on the contact plate and let the mouth, wear the mouth with let the mouth all with opening looks adaptation, the guide bar runs through wear the mouth, first screw rod is kept away from the one end fixed mounting of arc push pedal has first turning handle.
Preferably, the top fixed mounting who supports the panel has four to erect the board, corresponding two erect one side that the board is close to each other and rotate and install the second screw rod, the second screw rod runs through corresponding the side frame plate, the bottom fixed mounting of side frame plate has the mark head, corresponding two erect the limited slide bar of one side fixed mounting that the board is close to each other, the limit slide bar runs through the side frame plate and with side frame plate sliding connection.
Preferably, the top of the abutting panel is fixedly provided with scale marks, and the header is matched with the scale marks.
Preferably, one end of the second screw is fixedly provided with a second rotating handle.
Compared with the prior art, the utility model provides a pile foundation deviation correcting device has following beneficial effect:
the utility model provides a pile foundation deviation correcting device, when the pile foundation has more slight deviation, the gap between the linkage plate and the side frame plate can be easily observed according to the naked eye, at the moment, the deviation of the pile foundation is known to appear, the corresponding first rotating handle is rotated immediately, the corresponding arc-shaped push plate is enabled to be close to the reverse direction of the pile foundation, when the arc-shaped push plate is contacted with the pile foundation, the pile foundation can be pushed, when the linkage plate is contacted with the side frame plate again, the first rotating handle is stopped rotating, the pile foundation is pushed to the correct axis, then the pile driving work can be continued, through observing the gap between the linkage plate and the side frame plate, whether the more slight deviation of the pile foundation appears can be easily known, and through rotating the first rotating handle, the pile foundation can be easily corrected, when the deviation correcting work is carried out to the smaller pile foundation, only two second rotating handles are required to be rotated forwardly in sequence, so that the second screw rod drives the corresponding side frame plate, until adjust to the concrete size position of pile foundation can, improved the application scope of this device then through this adjustable mode, and the mark head and the scale mark that set up, can make the position change of two side frame plates can be comparatively unanimous, improved the accuracy nature of follow-up work of rectifying.
Drawings
Fig. 1 is a schematic front view of a pile foundation deviation correcting device according to a first embodiment of the present invention;
FIG. 2 is an enlarged schematic view of portion A shown in FIG. 1;
fig. 3 is a schematic front view of a pile foundation deviation correcting device according to a second embodiment of the present invention;
FIG. 4 is an enlarged schematic view of portion B shown in FIG. 3;
fig. 5 is the utility model provides a structural schematic is overlooked to panel in the pile foundation deviation correcting device second embodiment.
Reference numbers in the figures: 1. a ground surface; 2. abutting the panel; 3. side frame plates; 4. a sliding connection rod; 5. a contact plate; 6. a linkage plate; 7. a pressure spring; 8. a port; 9. annular connector plates; 10. a first screw; 11. an arc-shaped push plate; 12. a guide bar; 13. yielding; 14. erecting a plate; 15. a second screw; 16. a header; 17. a slide limiting rod; 18. scale lines are marked.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
First embodiment
Referring to fig. 1-2, in a first embodiment of the present invention, a pile deviation rectifying device includes: a propping panel 2 arranged on the top of the ground 1; the two side frame plates 3 are respectively arranged at two sides of the abutting plate 2; two deviation measuring mechanisms which are respectively arranged on the two side frame plates 3; and the two deviation rectifying mechanisms are respectively arranged on the two side frame plates 3.
Deviation survey mechanism includes two friction links 4, contact plate 5, linkage board 6 and two pressure springs 7, two the equal slidable mounting of friction link 4 is corresponding on the side frame plate 3, 5 fixed mounting of contact plate is two the one end of friction link 4, 6 fixed mounting of linkage board is two the other end of friction link 4, linkage board 6 with correspond side frame plate 3 contacts, two pressure spring 7 overlaps respectively to be established two on the friction link 4, the one end of pressure spring 7 with 5 fixed connection of contact plate, the other end of pressure spring 7 with 3 fixed connection of side frame plate.
Mechanism of rectifying includes opening 8, annular connection plate 9, first screw rod 10, arc push pedal 11 and two guide bars 12, opening 8 sets up one side of side frame plate 3, annular connection plate 9 fixed mounting be in the inner wall of opening 8, first screw rod 10 screw thread is installed annular connection plate 9's intra-annular, first screw rod 10 runs through opening 8, arc push pedal 11 sets up one side of side frame plate 3, the one end of first screw rod 10 with arc push pedal 11 rotates to be connected, two guide bars 12 all slides and wears to establish annular connection plate 9 is last, the one end of guide bar 12 with arc push pedal 11 fixed connection.
The linkage plate 6 is provided with a through hole, the contact plate 5 is provided with a yielding hole 13, the through hole is matched with the yielding hole 13 and the through hole 8, the guide rod 12 penetrates through the through hole, the first screw rod 10 penetrates through the through hole, and the first screw rod 10 is far away from one end of the arc-shaped push plate 11 and is fixedly provided with a first rotating handle.
The utility model provides a pile foundation deviation correcting device's theory of operation as follows:
in the device, the top of the abutting plate 2 is provided with a mounting through hole, before use, the mounting through hole on the abutting plate 2 penetrates through the pile foundation and is fixed on the ground 1, and the contact plate 5 is in contact with the pile foundation;
in the process of piling, the pile foundation sinks into the ground a little bit, when the pile foundation has a slight deviation, the pile foundation contacts the corresponding contact plate 5 along the deviation direction, the contact plate 5 retracts and begins to extrude the pressure spring 7, the linkage plate 6 is separated from the corresponding side frame plate 3, at this time, the gap between the linkage plate 6 and the side frame plate 3 is easily observed according to naked eyes, at this time, the deviation of the pile foundation is known, the corresponding first rotating handle is rotated immediately, the corresponding first screw rod 10 is driven to rotate, the arc push plate 11 approaches towards the direction of the pile foundation, the two guide rods 12 are arranged to enable the arc push plate 11 to move more stably, when the arc push plate 11 contacts the pile foundation, the pile foundation is pushed, the pile foundation gradually restores the original axial position, under the action of the pressure spring 7, the linkage plate 6 approaches the corresponding side frame plate 3 gradually, and when the linkage plate 6 completely contacts the side frame plate 3, the first rotating handle is stopped rotating, the pile foundation is pushed to the correct axis at the moment, and then the piling operation can be continued.
Compared with the prior art, the utility model provides a pile foundation deviation correcting device has following beneficial effect:
when more slight deviation appears in the pile foundation, observe the clearance very easily according to the naked eye between linkage plate 6 and the side frame plate 3, know this moment that the deviation appears in the pile foundation, rotate corresponding first turning handle immediately, make the arc push pedal 11 that corresponds reverse near of pile foundation, after arc push pedal 11 contacts the pile foundation, just can promote the pile foundation, after linkage plate 6 contacts side frame plate 3 again, the first turning handle of stall, just push away the pile foundation to correct axle center, then alright continue pile driving work, through observing the clearance between linkage plate 6 and the side frame plate 3, alright the pile foundation know very easily whether more slight deviation appears, and through rotating first turning handle, alright easily rectify the deviation with the pile foundation.
Second embodiment:
based on the pile foundation deviation correcting device that the first embodiment of this application provided, the second embodiment of this application provides another kind of pile foundation deviation correcting device. The second embodiment is merely a preferred way of the first embodiment, and the implementation of the second embodiment does not affect the implementation of the first embodiment alone.
The second embodiment of the present invention will be further explained with reference to the drawings and the embodiments.
Referring to fig. 3-5, the pile foundation deviation correcting device further includes four erection plates 14, the four erection plates 14 are all fixedly mounted on the top of the abutting plate 2, a second screw 15 is rotatably mounted on a side of each of the two corresponding erection plates 14 close to each other, the second screw 15 penetrates through the corresponding side frame plate 3, a header 16 is fixedly mounted at the bottom of the side frame plate 3, a limit slide bar 17 is fixedly mounted on a side of each of the two corresponding erection plates 14 close to each other, and the limit slide bar 17 penetrates through the side frame plate 3 and is slidably connected with the side frame plate 3.
The top of the abutting panel 2 is fixedly provided with a scale mark 18, and the header 16 is matched with the scale mark 18.
And a second rotating handle is fixedly arranged at one end of the second screw rod 15.
When the work of rectifying a deviation to less pile foundation, only need in proper order forward to rotate two second turning handles for second screw rod 15 drives the side frame plate 3 that corresponds and is close to the pile foundation, until adjust to the concrete size position of pile foundation can, improved the application scope of this device then through this adjustable mode, and the mark head 16 and the scale mark 18 that set up, can make two side frame plates 3's position change can be comparatively unanimous, improved the accuracy nature of follow-up work of rectifying a deviation.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.

Claims (5)

1. A pile foundation deviation correcting device, its characterized in that includes:
the abutting panel is arranged on the top of the ground;
two side frame plates; the two side frame plates are respectively arranged at two sides of the abutting panel;
the two deviation measuring mechanisms are respectively arranged on the two side frame plates;
the two deviation rectifying mechanisms are respectively arranged on the two side frame plates;
the deviation measuring mechanism comprises two sliding connection rods, a contact plate, a linkage plate and two pressure springs, the two sliding connection rods are both slidably mounted on the corresponding side frame plates, the contact plate is fixedly mounted at one ends of the two sliding connection rods, the linkage plate is fixedly mounted at the other ends of the two sliding connection rods, the linkage plate is in contact with the corresponding side frame plates, the two pressure springs are respectively sleeved on the two sliding connection rods, one ends of the pressure springs are fixedly connected with the contact plate, and the other ends of the pressure springs are fixedly connected with the side frame plates;
mechanism of rectifying includes opening, annular linkage plate, first screw rod, arc push pedal and two guide bars, the opening is seted up one side of side frame plate, annular linkage plate fixed mounting be in the inner wall of opening, first screw rod screw thread is installed the intra-annular of annular linkage plate, first screw rod runs through the opening, the arc push pedal sets up one side of side frame plate, the one end of first screw rod with the arc push pedal rotates to be connected, two the guide bar all slides and wears to establish on the annular linkage plate, the one end of guide bar with arc push pedal fixed connection.
2. The pile foundation rectifying device according to claim 1, wherein the side frame plate is fixedly connected to the top of the abutting plate, the linkage plate is provided with a through hole, the contact plate is provided with an out hole, the through hole and the out hole are both adapted to the through hole, the guide rod penetrates through the through hole, the first screw penetrates through the through hole, and a first rotating handle is fixedly mounted at one end of the first screw, which is far away from the arc-shaped pushing plate.
3. The pile foundation rectifying device according to claim 1, wherein four erection plates are fixedly installed at the top of the abutting plate, a second screw is rotatably installed at a side of two corresponding erection plates close to each other, the second screw penetrates through the corresponding side frame plate, a header is fixedly installed at the bottom of the side frame plate, and a limit slide bar is fixedly installed at a side of two corresponding erection plates close to each other, the limit slide bar penetrates through and is slidably connected with the side frame plate.
4. The pile foundation deviation rectifying device of claim 3, wherein a scale mark is fixedly installed on the top of the abutting plate, and the header is matched with the scale mark.
5. The pile foundation deviation rectifying device of claim 3, wherein a second rotating handle is fixedly installed at one end of the second screw rod.
CN202021182468.4U 2020-06-23 2020-06-23 Pile foundation deviation correcting device Active CN213062008U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021182468.4U CN213062008U (en) 2020-06-23 2020-06-23 Pile foundation deviation correcting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021182468.4U CN213062008U (en) 2020-06-23 2020-06-23 Pile foundation deviation correcting device

Publications (1)

Publication Number Publication Date
CN213062008U true CN213062008U (en) 2021-04-27

Family

ID=75570247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021182468.4U Active CN213062008U (en) 2020-06-23 2020-06-23 Pile foundation deviation correcting device

Country Status (1)

Country Link
CN (1) CN213062008U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113756304A (en) * 2021-09-03 2021-12-07 中交基础设施养护集团有限公司 Steel pipe pile sinking construction method of overwater steel trestle

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113756304A (en) * 2021-09-03 2021-12-07 中交基础设施养护集团有限公司 Steel pipe pile sinking construction method of overwater steel trestle
CN113756304B (en) * 2021-09-03 2022-12-02 中交基础设施养护集团有限公司 Steel pipe pile sinking construction method of overwater steel trestle

Similar Documents

Publication Publication Date Title
CN213062008U (en) Pile foundation deviation correcting device
CN104499945A (en) Static pile driver and reaming and pile sinking machine combination
CN210180722U (en) Geotechnical engineering sampler
CN105064992A (en) Axial knocking type drilling and sampling device
CN105900542A (en) Deformable garden tool
CN103590749B (en) Drilling bucket and rotary drilling rig
DE102006000168A1 (en) tool holder
RU2023814C1 (en) Device for baring of longitudinal reinforcement of projecting part of concrete pile
CN212508284U (en) Double dynamical first soil sampling ware
CN209120588U (en) A kind of function garden shovel
CN209251028U (en) A kind of citrus plantation digging apparatus convenient for adjusting diameter and controlling depth
CN207314338U (en) It is portable quickly to determine stake device
CN201056697Y (en) Folding sleeve type piling erection device and its cooperating pile
CN216553839U (en) Drill rod pulling device
CN212512963U (en) Pile foundation bottom sediment thickness detects instrument
CN114215488A (en) Drill rod pulling device
CN203467131U (en) Paddy field beating and leveling device
CN113502865A (en) Double-wheel milling guide device and method thereof
CN208845095U (en) A kind of construction piling equipment
CN209780749U (en) Cylindrical telescopic arm for rotary drilling rig
CN212588814U (en) Bean shelf puncher
CN210702669U (en) Special drilling tool of portable electromechanical device
CN215829463U (en) Foundation pile structure
CN116047033B (en) Afforestation environmental monitoring equipment
CN205961762U (en) Single -disc colter

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant