CN213061875U - River-crossing bridge floor cleaning system for ice and snow or foggy weather - Google Patents

River-crossing bridge floor cleaning system for ice and snow or foggy weather Download PDF

Info

Publication number
CN213061875U
CN213061875U CN202021319723.5U CN202021319723U CN213061875U CN 213061875 U CN213061875 U CN 213061875U CN 202021319723 U CN202021319723 U CN 202021319723U CN 213061875 U CN213061875 U CN 213061875U
Authority
CN
China
Prior art keywords
river
water
snow
ice
crossing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021319723.5U
Other languages
Chinese (zh)
Inventor
凌叶娟
谢百庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Fengfei Environmental Construction Co ltd
Original Assignee
Shaoxing Fengfei Environmental Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Fengfei Environmental Construction Co ltd filed Critical Shaoxing Fengfei Environmental Construction Co ltd
Priority to CN202021319723.5U priority Critical patent/CN213061875U/en
Application granted granted Critical
Publication of CN213061875U publication Critical patent/CN213061875U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a bridge floor clearance system of crossing a river to ice and snow or fog weather, this bridge floor clearance system of crossing a river to ice and snow or fog weather mainly sets up the road both sides on crossing a river bridge. Comprises a base box, a supporting column, a water spraying head and a water pump arranged in the base box. The support column is arranged on the base box. This bridge floor clearance system of crossing a river to ice and snow or fog weather can utilize south river more, and the river can reach the characteristics below zero very rarely, continues to take out the river under the bridge of crossing a river and spouts the river again. The principle of heat conduction that water is better at transferring heat than air is utilized, so that the sprayed water can melt ice and snow on the road surface, and the ice and snow can be removed in winter in south. The weight of the combination of dust particles and water or water drops and ice crystals suspended in the atmosphere can be increased by utilizing the principle of the gravity of the earth, and the combination or the water drops and the ice crystals are forced to fall to the ground by utilizing water spray, so that the defogging effect is achieved.

Description

River-crossing bridge floor cleaning system for ice and snow or foggy weather
Technical Field
The utility model relates to a cleaning equipment technical field of highway bridge floor of crossing a river specifically is a bridge floor clearance system of crossing a river to ice and snow or weather of fogging.
Background
In China, after each time of snowfall in winter, related departments need to clean the accumulated snow on the expressway in time in order to ensure the safe operation of vehicles, in order to improve the snow cleaning efficiency, industrial salt is generally sprayed on the ground to prevent the snow from being frozen, or a snow cleaning vehicle is used for directly collecting and transporting the snow, and even a vortex snow blowing vehicle consisting of an aircraft engine is used for cleaning.
However, the cost of salt spreading and snow removing is low, but the disadvantages are not few, for example, the snow treatment land after salt spreading can be salinized in a large scale, pollute the underground water, erode the asphalt pavement, and the snow cleaning vehicle used has the disadvantages of high oil consumption, large noise, high cleaning cost and the like although the snow is cleaned quickly and thoroughly. In the south which is completely different from the snowing environment in the north, because the south has the characteristics of small snowing amount, more rivers, less river water which can reach the subzero environmental temperature and the like, the two snow removing modes are not environment-friendly enough and consume a large amount of manpower and material resources.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a to characteristics such as less, the river is more of southern snowfall volume cross a river bridge floor clearance system to ice and snow or weather of fogging to the river.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a river-crossing bridge floor cleaning system for ice and snow or foggy weather is arranged on two sides of a road on a river-crossing bridge. Comprises a base box, a supporting column, a water spraying head and a water pump arranged in the base box. The support column is arranged on the base box. The sprinkler bead sets up the top at the support column. The input end of the water pump is arranged in the river, and the output end of the water pump is communicated with the sprinkler head through a guide pipe. The device also comprises a detection mechanism arranged in the base box. The detection mechanism comprises a single chip microcomputer, a water surface distance measuring sensor and a battery. The water surface ranging sensor is arranged on one side, close to the lane, of the base box. The single chip microcomputer and the battery are arranged in the base box. The water surface distance measuring sensor, the single chip microcomputer and the battery are connected in series. The single chip microcomputer is electrically connected with the water pump.
Preferably, the vehicle body further comprises a position adjusting assembly, and the position adjusting assembly is arranged on one side, close to the lane, of the base box. The position adjusting assembly comprises a detection plate, and the detection plate is arranged on one side, close to the lane, of the base box. The detection plate is provided with a groove. The water surface distance measuring sensor is in up-and-down sliding fit on the groove.
Preferably, the adjustment position assembly further comprises a dimension, the dimension being disposed on the detection plate. The water surface distance measuring sensor positioned in the groove corresponds to the scale.
Preferably, the position adjustment assembly further comprises a slide. The slide way is arranged in the groove along the vertical direction of the detection plate. The water surface ranging sensor is in sliding fit with the slide way.
(III) advantageous effects
The utility model provides a cross river bridge floor clearance system to ice and snow or weather of fogging. The method has the following beneficial effects:
1. this river-crossing bridge floor clearance system to ice and snow or fog weather through the cooperation of base case, support column, sprinkler bead and the water pump of setting in the base case. Make the utility model discloses can utilize south river more, can reach subzero ambient temperature's characteristics very little will cross the river under the river bridge river and take out again with the river blowout, utilize water to be good at the heat-conduction principle of heat transfer than the air for the ice and snow on the water that spouts out melts the ice and snow on the road surface, plays the effect that removes ice and snow in south winter. And the device continuously sprays water to the road surface through the water spray head, so that water flow on the road surface is forced to be continuous, and the effect of preventing the road surface from being frozen can be achieved.
Drawings
FIG. 1 is a perspective view of the present invention;
FIG. 2 is a front cross-sectional view of the present invention;
fig. 3 is an enlarged view of a portion a in fig. 2 according to the present invention.
In the figure: the water surface distance measuring device comprises a base box 1, support columns 2, a water spraying head 3, a groove 4, a water surface distance measuring sensor 5, a detection plate 6, a detection mechanism 7, a detection mechanism 8, a water pump 9, a guide pipe 10, a battery 11, a singlechip 12, a slideway 13 and a position adjusting assembly 14.
Detailed Description
The embodiment of the utility model provides a bridge floor clearance system strides a river to ice and snow or weather of fogging, as shown in fig. 1-3, set up the road both sides on the bridge of crossing a river. Comprises a base box 1, a support column 2, a water spray head 3 and a water pump 9 arranged in the base box 1. The support column 2 is provided on the base box 1. The sprinkler head 3 is arranged on top of the support column 2. The input end of the water pump 9 is arranged in the river, and the output end of the water pump is communicated with the sprinkler head 3 through a conduit 10. And a detection mechanism 8 arranged in the base box 1. The detection mechanism 8 comprises a single chip microcomputer 12, two water surface distance measuring sensors 5 and a battery 11. The water surface distance measuring sensor 5 is arranged on one side of the base box 1 close to the lane. The single chip microcomputer 12 and the battery 11 are arranged in the base box 1. The water surface distance measuring sensor 5, the singlechip 12 and the battery 11 are connected in series. The singlechip 12 is electrically connected with the water pump 9.
The utility model discloses a so will set up on crossing the river bridge because the convenience is through the water pump directly from the river at the bottom of the bridge water intaking, draw materials on the spot, and then can effectively reduce the operation cost.
The utility model discloses a to spraying water in the sky, utilize the earth gravitation principle, and then increase the dust particle of suspension in the atmosphere and the combination of water or the weight of water droplet, ice crystal, force the combination or water droplet, ice crystal to fall to the ground, reach the effect of defogging. (the water vapor contained in the air is more than the saturated water vapor amount under a certain temperature condition, the excessive water vapor can be condensed out, when enough water molecules are combined with tiny dust particles in the air, and the water molecules are mutually bonded, so that the water molecules become small water drops or ice crystals which are suspended in the atmosphere to form fog).
And temperature can keep in the southern less for a long time at below zero, especially near the zone of Zhejiang river, its rivers subsection is more, and then makes its bridge also very much, consequently, the utility model discloses utilize this characteristics, when having the snow that floats on the bridge floor, through spraying water to the bridge floor, wash the bridge floor with snow, and then play the effect of snow removing.
And the possibility of icing the residual water on the bridge deck can be prevented as long as the fluidity of the water on the bridge deck is ensured, namely the water spray heads 3 spray water uninterruptedly.
An adjusting position assembly 14 is further included, and the adjusting position assembly 14 is arranged on one side, close to the lane, of the base box 1. The adjusting position assembly 14 includes a detection plate 6, and the detection plate 6 is disposed on a side of the base box 1 near the lane. The detection plate 6 is provided with a groove 4. The water surface distance measuring sensor 5 is in up-and-down sliding fit on the groove 4.
Because the utility model discloses a to the mode snow removing defogging of bridge floor water spray, if the bridge floor ponding is when less, the ability of grabbing of car can not receive the influence. However, excessive water accumulation inevitably causes certain negative effects on the driving of the automobile. Because the bridge floor drainage is through the drain pipe drainage more, in case the drain pipe blocks up must influence the discharge of bridge floor ponding, and then makes originally should only less ponding become more and more. At this moment the utility model discloses a surface of water distance measuring sensor 5, to the flow through the utility model discloses a ponding measures its ponding height, and then passes through the critical value that personnel set for at singlechip 12, when ponding highly reaches the critical value, 9 out of work water pumps, and then let ponding discharge from the outlet, reduce its ponding height.
The adjustment position assembly 14 further comprises a dimension 7, the dimension 7 being arranged on the detection plate 6. The water level distance measuring sensor 5 located in the groove 4 corresponds to the dimension 7.
The adjustment position assembly 14 also includes a slide 13. The slideway 13 is arranged in the groove 4 along the up-down direction of the detection plate 6. The water surface distance measuring sensor 5 is in sliding fit with the slideway 13.
Through the yardstick 7 and the slide 13 that set up, be for the convenience personnel according to the different condition on different bridge road surfaces, adjust the installation to surface of water range sensor 5.
The working principle is as follows: during the use, when the foggy weather appears, take out river water through water pump 9 to send into sprinkler bead 3, to crossing the overhead water jet of river bridge, and then increased moisture content in the air, increase the weight of the little water droplet of floating in the air, and then let it drop under the influence of gravity, play the defogging effect. When the accumulated snow on the bridge floor needs to be cleared, the water spray head 3 is used for spraying water to the bridge floor. The accumulated snow is washed away by the flowing of water and is discharged back to the river through the drainage facility on the bridge floor, and meanwhile, the bridge floor can be continuously washed by water flow, so that the possibility of icing caused by low temperature of accumulated water on the bridge floor is prevented. And when the ponding of bridge floor is too much, surface of water range finding sensor 5 detects the critical value, sends signal to detection mechanism 8. At this moment, the detection mechanism 8 works, the water pump 9 stops working, the accumulated water is continuously reduced along with the time, and the water pump 9 normally works at the moment.
In conclusion, the river-crossing bridge floor cleaning system aiming at ice, snow or foggy weather is matched with the base box 1, the supporting columns 2, the water spraying heads 3 and the water pump 9 arranged in the base box 1. Make the utility model discloses can utilize south river more, can reach subzero ambient temperature's characteristics very little will cross the river under the river bridge river and take out again with the river blowout, utilize water to be good at the heat-conduction principle of heat transfer than the air for the ice and snow on the water that spouts out melts the ice and snow on the road surface, plays the effect that removes ice and snow in south winter. And the device continuously sprays water to the road surface through the water spray 3 to force the water flow on the road surface to be continuous, thereby playing the effect of preventing the road surface from freezing.

Claims (4)

1. The utility model provides a bridge floor clearance system of crossing a river to ice and snow or fog weather sets up the road both sides on crossing a river bridge, its characterized in that: comprises a base box (1), a supporting column (2), a sprinkler head (3) and a water pump (9) arranged in the base box (1), wherein the supporting column (2) is arranged on the base box (1), the sprinkler head (3) is arranged at the top of the supporting column (2), the input end of the water pump (9) is arranged in a river, the output end of the water pump is communicated with the sprinkler head (3) through a conduit (10), the sprinkler head also comprises a detection mechanism (8) arranged in the base box (1), the detection mechanism (8) comprises a singlechip (12), a water surface distance measuring sensor (5) and a battery (11), the water surface distance measuring sensor (5) is arranged on one side of the base box (1) close to a lane, the singlechip (12) and the battery (11) are arranged in the base box (1), and the water surface distance measuring sensor (5), the singlechip (12) and the battery (11) are connected in series, the single chip microcomputer (12) is electrically connected with the water pump (9).
2. A river-crossing deck cleaning system for icy snow or foggy weather as claimed in claim 1, wherein: still include adjusting position subassembly (14), adjusting position subassembly (14) set up on base case (1) is close to one side in lane, adjusting position subassembly (14) include pick-up plate (6), pick-up plate (6) set up on base case (1) is close to one side in lane, set up fluted (4) on pick-up plate (6), sliding fit is on recess (4) from top to bottom in surface of water range finding sensor (5).
3. A river-crossing deck cleaning system for icy snow or foggy weather as claimed in claim 2, wherein: the position adjusting assembly (14) further comprises a scale (7), the scale (7) is arranged on the detection plate (6), and the water surface distance measuring sensor (5) located in the groove (4) corresponds to the scale (7).
4. A river-crossing deck cleaning system for icy snow or foggy weather as claimed in claim 2, wherein: the position adjusting assembly (14) further comprises a slide way (13), the slide way (13) is arranged in the groove (4) along the vertical direction of the detection plate (6), and the water surface distance measuring sensor (5) is in sliding fit with the slide way (13).
CN202021319723.5U 2020-07-08 2020-07-08 River-crossing bridge floor cleaning system for ice and snow or foggy weather Active CN213061875U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021319723.5U CN213061875U (en) 2020-07-08 2020-07-08 River-crossing bridge floor cleaning system for ice and snow or foggy weather

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021319723.5U CN213061875U (en) 2020-07-08 2020-07-08 River-crossing bridge floor cleaning system for ice and snow or foggy weather

Publications (1)

Publication Number Publication Date
CN213061875U true CN213061875U (en) 2021-04-27

Family

ID=75572410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021319723.5U Active CN213061875U (en) 2020-07-08 2020-07-08 River-crossing bridge floor cleaning system for ice and snow or foggy weather

Country Status (1)

Country Link
CN (1) CN213061875U (en)

Similar Documents

Publication Publication Date Title
US5515623A (en) Snowplow with deicer spray attachment
US3911601A (en) Snow blower vehicle
CN110158459B (en) Intelligent comprehensive recycling method for rainwater of urban viaduct
KR101244928B1 (en) Liquid spray apparatus in a road part having many lanes and installation method therefor
CN205223963U (en) Snow blade is used in track snow removing
CN106930225B (en) It is a kind of to be exclusively used in the snow melt locomotive system that wartime quickly removes railway accumulated snow
CN104594278B (en) A kind of speedway mist, haze cleaning system and purification method
CN109537516A (en) A kind of overline bridge step sweeps away snow deicer and the matched de-icing method that sweeps away snow
CN109024450A (en) A kind of automobile Shovelling appts
CN106638440A (en) Snow clearing and deicing vehicle
CN213061875U (en) River-crossing bridge floor cleaning system for ice and snow or foggy weather
CN213805163U (en) Special vehicle for removing ice-water mixture on road surface
CN108487166B (en) Fixed defogging anti-icing spraying control system with brightening alarm function
CN109131433A (en) It takes the micro- sand injecting type high-speed train bogie of heat and quickly removes accumulated snow anti-icing system and method
CN219753125U (en) Snow removing device for winter road
CN209652855U (en) A kind of overline bridge step sweeps away snow deicer
CN206655177U (en) Airport distribution vehicle
CN206256418U (en) Snow sweeper and its snow-removing device
CN208501609U (en) A kind of snow-removing device for highway
CN208121670U (en) A kind of pavement maintenance truck applied widely that economizes on resources
CN214939794U (en) Elevated pavement structure safe in driving under low-temperature weather condition
CN218765548U (en) Weighing weighbridge capable of automatically cleaning foreign matters on surface
KR102510388B1 (en) On-line management system to control apparatus for spraying deicing agent
CN212335882U (en) Road surface deicing vehicle
CN108978377A (en) Anti-fall snow quickly removes rain high speed slope surface

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant