CN213022058U - Tunnel primary lining stress inspection device - Google Patents

Tunnel primary lining stress inspection device Download PDF

Info

Publication number
CN213022058U
CN213022058U CN202022309422.0U CN202022309422U CN213022058U CN 213022058 U CN213022058 U CN 213022058U CN 202022309422 U CN202022309422 U CN 202022309422U CN 213022058 U CN213022058 U CN 213022058U
Authority
CN
China
Prior art keywords
motor
primary lining
stress inspection
lead screw
stress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022309422.0U
Other languages
Chinese (zh)
Inventor
戴天文
胡云霞
廖彦富
邓仰群
陈越越
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Kewei Structural Engineering Technology Co ltd
Original Assignee
Jiangxi Kewei Structural Engineering Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Kewei Structural Engineering Technology Co ltd filed Critical Jiangxi Kewei Structural Engineering Technology Co ltd
Priority to CN202022309422.0U priority Critical patent/CN213022058U/en
Application granted granted Critical
Publication of CN213022058U publication Critical patent/CN213022058U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a tunnel is lining stress inspection device just, the technical scheme of adoption is, including the bottom plate, from the driving wheel, turn to platform, wheel, electric telescopic handle, backup pad, slide, end cover, lead screw base, controlling means, signal transmission module, slider, second motor, action wheel, axis of rotation, stress inspection module, first motor, lead screw, follow driving wheel. The device can be controlled by an external control device, and the device is controlled to move to the position below a primary lining needing stress inspection, so that the entering and exiting of workers can be avoided, and the safety of the workers is ensured; the stress inspection module can move up and down and rotate left and right, so that the stress inspection module is better suitable for the position of the primary lining inspection point and the inspection work.

Description

Tunnel primary lining stress inspection device
Technical Field
The utility model belongs to the tunnel construction field relates to a tunnel is lining stress inspection device just.
Background
In the construction process of the mountain tunnel, the primary lining is easy to collapse, and a primary lining structure needs to be monitored and checked by using monitoring modules such as a camera and the like on the primary lining. The primary lining is required to be checked after being installed according to the requirement, and particularly, the stress check of the primary lining is required after a period of time so as to ensure the construction safety.
Most inspection devices use fixed monitoring devices, are not convenient for remove, need personnel to get into and just line the below and carry out fixed mounting moreover, have certain risk to personnel's safety.
Disclosure of Invention
In view of the problems existing in the prior art, the utility model discloses a technical scheme be: comprises a bottom plate, two groups of electric telescopic rods are fixedly arranged at one end above the bottom plate, a supporting plate is fixedly arranged above the two groups of electric telescopic rods, a slideway is fixedly arranged in the middle above the supporting plate, an end cover and a screw rod base are respectively and fixedly arranged at two ends of the slideway, a first motor is fixedly arranged on the inner side of the end cover, a lead screw is fixedly arranged on the first motor, the other end of the lead screw is rotatably arranged on a lead screw base, the thread part of the screw rod is engaged with a sliding block which is arranged in the slideway in a sliding way, a second motor is fixedly arranged at one end above the sliding block, a driving wheel is fixedly arranged on the second motor, the driving wheel is engaged with a driven wheel II, the driven wheel II is fixedly arranged at the upper part of the outer side of the rotating shaft, the rotating shaft is rotatably arranged at the other end above the sliding block, and the stress inspection module is fixedly arranged above the rotating shaft.
As a preferred scheme of the utility model, bottom plate top other end fixed mounting has controlling means, controlling means top fixed mounting has signal of telecommunication transmission module.
As a preferred scheme of the utility model, bottom plate below one end fixed mounting has two sets of follow driving wheel I, bottom plate below other end fixed mounting has the platform that turns to, turn to the platform both ends and rotate and install the wheel, it has motor module to turn to the platform built-in.
As a preferred scheme of the utility model, stress inspection module embeds there are stress sensor and camera group.
As an optimized scheme of the utility model, controlling means with electric telescopic handle first motor with the second motor becomes electric connection.
As an optimized scheme of the utility model, signal of telecommunication transmission module passes through signal of telecommunication connection with outside controlling means.
The utility model discloses a tunnel is lining stress inspection device beneficial effect just: the device can be controlled by an external control device, and the device is controlled to move to the position below a primary lining needing stress inspection, so that the entering and exiting of workers can be avoided, and the safety of the workers is ensured; the stress inspection module can move up and down and rotate left and right, so that the stress inspection module is better suitable for the position of the primary lining inspection point and the inspection work.
Drawings
Fig. 1 is a front structural view of a tunnel primary lining stress inspection device according to the present invention;
FIG. 2 is a diagram of a structure of a slideway of the tunnel primary lining stress inspection device of the present invention;
FIG. 3 is a gear structure diagram of the tunnel primary lining stress inspection device of the present invention;
in the figure: the device comprises a base plate 1, a driven wheel 2, a steering table 3, wheels 4, an electric telescopic rod 5, a supporting plate 6, a slideway 7, an end cover 8, a screw rod base 9, a control device 10, an electric signal transmission module 11, a sliding block 12, a second motor 13, a driving wheel 14, a rotating shaft 15, a stress inspection module 16, a first motor 17, a screw rod 18 and a driven wheel 19.
Detailed Description
Example 1
As shown in fig. 1 to 3, the utility model discloses a tunnel primary lining stress inspection device, which adopts the technical scheme that the tunnel primary lining stress inspection device comprises a bottom plate 1, wherein two groups of electric telescopic rods 5 are fixedly arranged at one end above the bottom plate 1, a supporting plate 6 is fixedly arranged above the two groups of electric telescopic rods 5, a slide 7 is fixedly arranged at the middle part above the supporting plate 6, an end cover 8 and a lead screw base 9 are respectively and fixedly arranged at two ends of the slide 7, a first motor 17 is fixedly arranged at the inner side of the end cover 8, a lead screw 18 is fixedly arranged on the first motor 17, the other end of the lead screw 18 is rotatably arranged on the lead screw base 9, the thread part of the lead screw 18 is engaged and arranged on a slide block 12, the slide block 12 is slidably arranged inside the slide 7, a second motor 13 is fixedly arranged at one end above, the driving wheel 14 is provided with a driven wheel II 19 in a meshed mode, the driven wheel II 19 is fixedly mounted on the upper portion of the outer side of the rotating shaft 15, the rotating shaft 15 is rotatably mounted at the other end of the upper portion of the sliding block 12, and the stress inspection module 16 is fixedly mounted above the rotating shaft 15.
The other end of the upper part of the bottom plate 1 is fixedly provided with a control device 10, and an electric signal transmission module 11 is fixedly arranged above the control device 10.
1 below one end fixed mounting of bottom plate has two sets of follow driving wheels I2, 1 below other end fixed mounting of bottom plate has a platform 3 that turns to, 3 both ends of platform that turn to are rotated and are installed wheel 4, it has motor module to turn to platform 3 embeds.
The stress inspection module 16 is provided with a stress sensor and a camera set inside.
The control device 10 is electrically connected with the electric telescopic rod 5, the first motor 17 and the second motor 13.
The electric signal transmission module 11 is connected with an external control device through an electric signal.
The utility model discloses a tunnel is lining stress inspection device theory of operation just: when the device is used, an external worker operates the control device to generate a signal, the signal is transmitted to the electric signal transmission module 11 and fed back to the control device 10, the control device is moved, the steering table 3 drives the wheels 4 to rotate and steer, the driven wheel I2 rotates along with the rotation of the wheels 4 and starts to be positioned after moving to a measuring position, the camera group in the stress inspection module 16 carries out visual capture and feeds back to an operator, the electric telescopic rod 5 extends to drive the lead screw 18 to rotate on the lead screw base 9 when reaching the inspection position, the driving slide block 12 slides in the slide way 7 and slides to a set position of control, the second motor 13 rotates to drive the driving wheel 14 to rotate and is meshed with the driven wheel II 19 to rotate the rotating shaft 15 and drive the stress inspection module 16 to rotate to a monitoring angle, the angle is adjusted, the electric telescopic rod 5 extends continuously, the stress sensor in the stress inspection module 16 is made to be attached to the primary lining, and data monitoring work is carried out. The driven wheel I, the steering table, the wheel, the electric telescopic rod, the slide way, the screw rod base, the control device, the electric signal transmission module, the slide block, the second motor, the driving wheel, the rotating shaft, the stress inspection module, the first motor, the screw rod and the driven wheel II, and the modules in the control device are all products which can be easily bought in the market, and the technical staff in the field of the connection mode and the function of pins can refer to related technical manuals or teaching materials and obtain technical inspiration through limited tests. Wherein the electric signal transmission module uses electromagnetic wave transmission.
Components not described in detail herein are prior art.
Although the present invention has been described in detail with reference to the specific embodiments, the present invention is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge range of those skilled in the art, and modifications or variations without creative efforts are still within the scope of the present invention.

Claims (6)

1. A tunnel primary lining stress inspection device is characterized in that: the electric telescopic handle comprises a bottom plate (1), wherein one end of the top of the bottom plate (1) is fixedly provided with two groups of electric telescopic handles (5), the top of each electric telescopic handle is fixedly provided with a supporting plate (6), the middle of the top of the supporting plate (6) is fixedly provided with a slide (7), the two ends of each slide (7) are respectively fixedly provided with an end cover (8) and a lead screw base (9), the inner side of each end cover (8) is fixedly provided with a first motor (17), a lead screw (18) is fixedly provided with the first motor (17), the other end of the lead screw (18) is rotatably arranged on the lead screw base (9), the thread part of the lead screw (18) is meshed with a slide block (12), the slide block (12) is slidably arranged inside the slide (7), one end of the top of the slide block (12) is fixedly provided with a second motor, the driving wheel (14) is meshed with a driven wheel II (19), the driven wheel II (19) is fixedly mounted on the upper portion of the outer side of the rotating shaft (15), the rotating shaft (15) is rotatably mounted at the other end of the upper portion of the sliding block (12), and a stress checking module (16) is fixedly mounted on the upper portion of the rotating shaft (15).
2. The tunnel primary lining stress inspection device according to claim 1, characterized in that: the other end of the upper part of the bottom plate (1) is fixedly provided with a control device (10), and an electric signal transmission module (11) is fixedly arranged on the upper part of the control device (10).
3. The tunnel primary lining stress inspection device according to claim 1, characterized in that: bottom plate (1) below one end fixed mounting has two sets of driven wheels I (2), bottom plate (1) below other end fixed mounting turns to platform (3), turn to platform (3) both ends and rotate and install wheel (4), it has motor module to turn to platform (3) built-in.
4. The tunnel primary lining stress inspection device according to claim 1, characterized in that: the stress inspection module (16) is internally provided with a stress sensor and a camera set.
5. The tunnel primary lining stress inspection device according to claim 2, characterized in that: the control device (10) is electrically connected with the electric telescopic rod (5), the first motor (17) and the second motor (13).
6. The tunnel primary lining stress inspection device according to claim 2, characterized in that: the electric signal transmission module (11) is connected with an external control device through an electric signal.
CN202022309422.0U 2020-10-17 2020-10-17 Tunnel primary lining stress inspection device Active CN213022058U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022309422.0U CN213022058U (en) 2020-10-17 2020-10-17 Tunnel primary lining stress inspection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022309422.0U CN213022058U (en) 2020-10-17 2020-10-17 Tunnel primary lining stress inspection device

Publications (1)

Publication Number Publication Date
CN213022058U true CN213022058U (en) 2021-04-20

Family

ID=75480891

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022309422.0U Active CN213022058U (en) 2020-10-17 2020-10-17 Tunnel primary lining stress inspection device

Country Status (1)

Country Link
CN (1) CN213022058U (en)

Similar Documents

Publication Publication Date Title
US2861701A (en) Remote controlled handling unit
CN103995495B (en) A kind of main equipment assembling and setting Multifunctional adjustment table hybrid control system
CN103895035B (en) Based on the collapsible explorer mechanical arm of triangle configuration link transmission
CN110370247A (en) A kind of travelling robot walking device
CN108163785A (en) A kind of moveable attitude adjustment platform
CN104943843B (en) Mechanical full-rotating controlling handle used for ships
CN107458615B (en) Unmanned aerial vehicle carrying device
CN213022058U (en) Tunnel primary lining stress inspection device
CN102350549A (en) Wire cutting machine
CN201580005U (en) Double-loop control mechanism for regulating die-filling height of sliding block
CN208297094U (en) A kind of camera detection machine
CN106270670B (en) It is a kind of to be used for the industrial milling machine with temperature protection function
CN109443283A (en) A kind of portable free clearance detection device of aircraft
CN211955752U (en) Coal mine electromechanical operation vibration monitoring equipment
CN202333419U (en) Coding detection mechanism of wire stripper machine
CN113558654A (en) Adjustable radiology department testing platform of protection stereotype formula
CN206323064U (en) A kind of overhead transmission line Shockproof hammer restorer executing agency
CN212537190U (en) Mining intrinsic safety type transmission substation device
CN218124157U (en) Automatic laying tool of underground garage crane span structure cable
CN215066970U (en) Electromagnetic environment detects uses field strength appearance
CN114216028B (en) Automatic lifting device of camera for inspection robot
CN213121741U (en) Flaw detection device for inner wall of irregular forged part
CN207534811U (en) A kind of auxiliary power mechanical arm based on outside control
CN217343337U (en) Vertical bar bending machine head
CN219065318U (en) Gearbox gear defect detection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant