CN213015400U - Novel constructional column is pour device - Google Patents

Novel constructional column is pour device Download PDF

Info

Publication number
CN213015400U
CN213015400U CN202020661846.0U CN202020661846U CN213015400U CN 213015400 U CN213015400 U CN 213015400U CN 202020661846 U CN202020661846 U CN 202020661846U CN 213015400 U CN213015400 U CN 213015400U
Authority
CN
China
Prior art keywords
positioning
plates
partition
pouring
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020661846.0U
Other languages
Chinese (zh)
Inventor
廖威
丁江勇
刘宇飞
朱柯仲
高雪林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202020661846.0U priority Critical patent/CN213015400U/en
Application granted granted Critical
Publication of CN213015400U publication Critical patent/CN213015400U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a novel constructional column pouring device, which comprises pouring molds arranged at two sides of the section of a wall body, wherein the pouring molds are arranged at two sides of the section of the wall body; the pouring die comprises a first partition plate, screw caps, positioning plates, positioning rods and connecting plates, wherein the first partition plate is rectangular, the positioning rods are arranged at the bottoms of two side surfaces of the section of the wall body respectively, the positioning rods penetrate through the two positioning plates, threads are arranged at two ends of each positioning rod, and the screw caps are arranged at two ends of each positioning rod; the two ends of the pouring die are both the positioning plates, a plurality of first partition plates are arranged between the positioning plates at the two ends, the positioning plates are connected with the first partition plates and the two adjacent first partition plates through the positioning pieces, and the problems that the positioning cannot be carried out by secondary use and other buildings in the prior art due to the fact that the wood boards are cut freely are solved.

Description

Novel constructional column is pour device
Technical Field
The utility model relates to a building tool field especially relates to a novel constructional column is pour device.
Background
In the existing construction column casting process, a wood plate is usually used for enclosing a position to be cast to form a casting mold, the length of the wood plate is usually cut according to actual use requirements to form a proper size, so that the secondary use rate of the wood plate is low, and meanwhile, the wood plate is fixed with a wall body or other objects to be positioned integrally, so that other buildings are easy to damage.
SUMMERY OF THE UTILITY MODEL
To the problem, the utility model provides a novel constructional column is pour device has the advantage that can utilize many times and protect other buildings.
The technical scheme of the utility model is that:
a novel constructional column pouring device comprises pouring molds arranged on two sides of a wall body section, wherein the pouring molds are arranged on two sides of the wall body section;
the pouring die comprises a first partition plate, screw caps, positioning plates, positioning rods and connecting plates, wherein the first partition plate is rectangular, the positioning rods are arranged at the bottoms of two side surfaces of the section of the wall body respectively, the positioning rods penetrate through the two positioning plates, threads are arranged at two ends of each positioning rod, and the screw caps are arranged at two ends of each positioning rod;
the two ends of the pouring die are both the positioning plates, a plurality of first partition plates are arranged between the positioning plates at the two ends, and the positioning plates are connected with the first partition plates and the two adjacent first partition plates through the connecting plates.
The working principle of the technical scheme is as follows:
through the connection between the first partition boards and the positioning boards, the required size of the die can be freely combined, so that the problem that the secondary use cannot be realized due to the fact that the size of the wood board is freely cut is solved; meanwhile, the positioning plates and the first partition plates are connected into a whole through the connecting plates, the first partition plates and the first partition plates are connected into a whole through the connecting plates, the positioning plates on two sides of the section of the wall body are connected into a whole through the positioning rods and the nuts, and the problem that positioning is carried out by means of other buildings in the prior art is solved.
In a further technical scheme, the pouring die further comprises a second partition plate, a slide way and a cover plate, wherein a through hole is formed in the second partition plate, the slide way is arranged on each of two sides of the through hole, the cross section of each slide way is L-shaped, and two ends of the cover plate are located in the slide ways.
The working principle of the technical scheme is as follows:
the second partition plate is arranged on the upper sky street of the pouring die, and the through holes are formed in the second partition plate, so that the problem that a vibrating rod is not properly positioned when the vibrating rod is needed is solved.
In a further technical scheme, two positioning rods are arranged on the positioning plate.
The working principle of the technical scheme is as follows:
two positioning rods are arranged on the positioning plate, so that the bearing capacity of the first partition plate and the positioning plate is enhanced.
In a further technical scheme, the cover plate is square, and the side length of the cover plate is larger than the diameter of the through hole.
The working principle of the technical scheme is as follows: the problem of the practical back of accomplishing of vibrting spear, through-hole department omits the concrete is solved.
The utility model has the advantages that:
1. through the connection between the first partition boards and the positioning boards, the required size of the die can be freely combined, so that the problem that the secondary use cannot be realized due to the fact that the size of the wood board is freely cut is solved; meanwhile, the positioning plates and the first partition plates are connected into a whole by the connecting plates, the first partition plates and the first partition plates are connected into a whole by the connecting plates, and the positioning plates on two sides of the section of the wall body are connected into a whole by the positioning rods and the nuts, so that the problem of positioning by other buildings in the prior art is solved;
2. a second partition plate is arranged on the casting mold, and is provided with a through hole, so that the problem that a lower rod in a proper position is not arranged when a vibrating rod is needed is solved;
3. two positioning rods are arranged on the positioning plate, so that the bearing capacity of the first partition plate and the positioning plate is enhanced;
4. the problem of the practical back of accomplishing of vibrting spear, through-hole department omits the concrete is solved.
Drawings
Fig. 1 is an installation schematic diagram of a novel constructional column pouring device of the present invention;
fig. 2 is a schematic structural view of the novel constructional column pouring device of the present invention;
fig. 3 is the utility model discloses a novel constructional column is pour device's right side and is looked the sketch map.
Description of reference numerals:
10. a wall body; 20. pouring a mold; 21. positioning a plate; 22. a nut; 23. a connecting plate; 241. a second separator; 242. a cover plate; 243. a through hole; 244. a slideway; 25. a first separator; 26. and (5) positioning the rod.
Detailed Description
The embodiments of the present invention will be further explained with reference to the drawings.
Example (b):
as shown in fig. 1, 2 and 3, a novel constructional column pouring device comprises a wall 10 and pouring molds 20, wherein the pouring molds 20 are arranged on two sides of the cross section of the wall 10, and the two sides of the cross section of the wall 10 are a front side and a back side;
the pouring mold 20 comprises a first partition plate 25, screw caps 22, positioning plates 21, positioning rods 26 and positioning sheets, wherein the first partition plate 25 and the positioning plates 21 are in the shape of the same platy cuboid, a plurality of positioning plates 21 are respectively arranged on the front side surface and the rear side surface of the section of the wall body 10, the positioning plates 21 are arranged on two sides of the section of the wall body 10, the positioning rods 26 are cylindrical, threads are arranged at two ends of each positioning rod 26, one end of each positioning rod 26 penetrates through the positioning plate 21 on the front side surface of the box body, the other end of each positioning rod 26 penetrates through the positioning plate 21 on the rear side surface of the wall body 10, the screw caps 22 are respectively assembled at two ends of each positioning rod 26, the two positioning plates 21 are fixed at the bottom of the wall body 10 by utilizing the positioning rods 26, the screw caps 22 and the front side surface and the rear;
a plurality of first partition plates 25 are arranged between the positioning plate 21 at the upper part of the wall 10 and the positioning plate 21 at the lower side of the wall 10, one end of each connecting plate 23 is fixed on one side of each first partition plate 25 and one side of each positioning plate 21, two ends of each first partition plate 25 are tightly attached to the side surface of the wall 10, the two adjacent first partition plates 25, the positioning plates 21 and the first partition plates 25 are integrally installed through the connecting plates 23, and all the positioning plates 21 and the first partition plates 25 form a plate-shaped cuboid;
through the connection between the first partition boards 25 and the positioning board 21, the required size of the die can be freely combined, so that the problem that the secondary use cannot be realized due to the fact that the size of the board is freely cut is solved; meanwhile, the positioning plates 21 and the first partition plates 25 are connected into a whole by the connecting plates 23, the first partition plates 25 and the first partition plates 25 are connected into a whole by the connecting plates 23, and the positioning plates 21 on two sides of the section of the wall 10 are connected into a whole by the positioning rods 26 and the screw caps 22, so that the problem of positioning by means of other buildings in the prior art is solved.
In another embodiment:
as shown in fig. 2, the casting mold 20 further includes a second partition 241, a slide 244 and a cover plate 242, the size of the second partition 241 is equal to that of the first partition 25, a through hole 243 is formed in the middle of the second partition 241, the slide 244 is long-strip-shaped, the cross section of the slide 244 is L-shaped, the length direction of the slide 244 is in the horizontal direction, the slide 244 is arranged on two sides of the through hole 243, and the cover plate 242 can slide in the slide 244, so that the through hole 243 is opened and closed;
in the use of on-spot, pour the mould 20 in the pump and go into behind the concrete, need use the vibrting spear with the concrete tap, at this moment, in the vibrting spear can get into the concrete from through-hole 243, realizes the tap, after practical the completion, utilizes apron 242 to cover through-hole 243, can avoid the concrete from leading to the problem that flows out, above-mentioned technical scheme has solved the problem that does not have suitable position lower stick when needing to use the vibrting spear.
In another embodiment:
as shown in fig. 2, two positioning rods 26 are disposed on the positioning plates 21 at the upper portion and the lower portion of the wall 10, respectively, so as to enhance the pressure-bearing capacity of the first partition plate 25 and the positioning plates 21.
In another embodiment:
the cover plate 242 has a square shape, and the side length of the cover plate 242 is greater than the diameter of the through hole 243, so that the cover plate 242 can move and cover the through hole 243 well.
The above-mentioned embodiments only express the specific embodiments of the present invention, and the description thereof is specific and detailed, but not construed as limiting the scope of the present invention. It should be noted that, for those skilled in the art, without departing from the spirit of the present invention, several variations and modifications can be made, which are within the scope of the present invention.

Claims (4)

1. The novel constructional column pouring device is characterized by comprising pouring molds arranged on two sides of the section of a wall body, wherein the pouring molds are arranged on two sides of the section of the wall body;
the pouring die comprises a first partition plate, screw caps, positioning plates, positioning rods and connecting plates, wherein the first partition plate is rectangular, the positioning rods are arranged at the bottoms of two side surfaces of the section of the wall body respectively, the positioning rods penetrate through the two positioning plates, threads are arranged at two ends of each positioning rod, and the screw caps are arranged at two ends of each positioning rod;
the two ends of the pouring die are both the positioning plates, a plurality of first partition plates are arranged between the positioning plates at the two ends, and the positioning plates are connected with the first partition plates and the two adjacent first partition plates through the connecting plates.
2. The novel constructional column pouring device as claimed in claim 1, wherein the pouring mold further comprises a second partition plate, a slide way and a cover plate, the second partition plate is provided with a through hole, the slide way is respectively arranged on two sides of the through hole, the cross section of the slide way is L-shaped, and two ends of the cover plate are located in the slide way.
3. The novel constructional column pouring device as claimed in claim 1, wherein two positioning rods are arranged on the positioning plate.
4. The novel constructional column pouring device as claimed in claim 2, wherein the cover plate is square, and the side length of the cover plate is larger than the diameter of the through hole.
CN202020661846.0U 2020-04-27 2020-04-27 Novel constructional column is pour device Expired - Fee Related CN213015400U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020661846.0U CN213015400U (en) 2020-04-27 2020-04-27 Novel constructional column is pour device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020661846.0U CN213015400U (en) 2020-04-27 2020-04-27 Novel constructional column is pour device

Publications (1)

Publication Number Publication Date
CN213015400U true CN213015400U (en) 2021-04-20

Family

ID=75483454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020661846.0U Expired - Fee Related CN213015400U (en) 2020-04-27 2020-04-27 Novel constructional column is pour device

Country Status (1)

Country Link
CN (1) CN213015400U (en)

Similar Documents

Publication Publication Date Title
CN113155565A (en) Rock-like material test piece preparation device and use method
CN203593951U (en) Seismic mitigation and absorption support with pre-bias devices
CN213015400U (en) Novel constructional column is pour device
CN109537890B (en) Wall-penetrating bolt positioning system and building template construction method
CN107030862A (en) Pier shaft pinner embedded hole hole-forming device
CN211572618U (en) Constructional column pouring device
CN206599989U (en) The formwork erecting structure of shear wall
CN220058554U (en) Shaping template with disassembly-free assembly for cast-in-situ concrete beam
CN219281262U (en) Floor mould capable of being quickly spliced and combined
CN209903505U (en) Concrete experiment model pouring mold
CN109505263B (en) Adjustable bent cap die
CN216865981U (en) Double-layer assembled constructional column template device
CN204571289U (en) A kind of construction formwork of overhang layer exterior wall preformed hole
CN211386481U (en) Subway part stamping device
CN208534034U (en) One kind can turnover type constructional column steel form
CN207789277U (en) A kind of mold that can be used for inside and outside wall board production of Parameter adjustable
CN206678139U (en) A kind of detachable cuboid test block mould for being easy to the demoulding
CN203430022U (en) Die for forming coping above wall body
CN206510182U (en) Pier shaft pinner embedded hole hole-forming device
CN206599885U (en) A kind of aluminium alloy wall
CN208999194U (en) Make the tooling of railway Self-adhesive waterproof material disbonded test sample
CN216893522U (en) Aluminum mould K plate reinforcing back edge
CN210685440U (en) Multifunctional traction device for constructional engineering
CN213330009U (en) Steel mould for toilet
CN209699417U (en) It is a kind of for producing the vertical die backform of prefabricated components

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210420

CF01 Termination of patent right due to non-payment of annual fee