CN213011424U - Construction elevator adheres to frame fixing device - Google Patents

Construction elevator adheres to frame fixing device Download PDF

Info

Publication number
CN213011424U
CN213011424U CN202021959280.6U CN202021959280U CN213011424U CN 213011424 U CN213011424 U CN 213011424U CN 202021959280 U CN202021959280 U CN 202021959280U CN 213011424 U CN213011424 U CN 213011424U
Authority
CN
China
Prior art keywords
connecting piece
transverse connecting
transverse
construction elevator
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021959280.6U
Other languages
Chinese (zh)
Inventor
何俊
易毅
李沙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction First Bureau Group North China Construction Co Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction First Bureau Group North China Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction First Bureau Group North China Construction Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202021959280.6U priority Critical patent/CN213011424U/en
Application granted granted Critical
Publication of CN213011424U publication Critical patent/CN213011424U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model provides a construction elevator adheres to frame fixing device, including horizontal fixed unit and vertical fixed unit, horizontal fixed unit is used for fixing the construction elevator in the building main part, horizontal fixed unit includes first transverse connection spare, first transverse connection spare sets up the building main part orientation one side of construction elevator, horizontal installation component is fixed to be set up the top of vertical fixed unit, vertical fixed unit passes through horizontal installation component will horizontal fixed unit's load is transmitted to ground, is applicable to the condition that construction elevator setting does not have fixed position in the centre of building main parts such as structure post, has the beneficial effect that improves construction elevator and adheres to factor of safety, satisfies site operation needs, avoids later stage contradiction, reduce cost.

Description

Construction elevator adheres to frame fixing device
Technical Field
The application relates to the field of high-rise building structure construction, in particular to a construction elevator attachment frame fixing device.
Background
The construction elevator is a common vertical transportation tool in buildings, and is mainly used in scenes such as secondary structure construction of high-rise building engineering and the like which need to use the construction elevator as personnel, masonry and other materials. The attachment frame of the construction hoist is a structure for ensuring the stability and safety of the construction hoist, and is generally arranged on the construction hoist at intervals along the vertical direction, and the construction hoist is firmly connected with a building through the attachment frame.
In order to connect the construction elevator with the building, the prior art generally adopts a mode of arranging embedded parts in a structure to carry out attachment connection on the construction elevator, but because the attachment distance of the construction elevator and the length and the form of the counterfort are relatively fixed, the construction elevator has the defects of insufficient flexibility and poor adaptability.
Along with the continuous development of building engineering, structural style is more various, and the floor height also increases to some extent, and traditional construction elevator adheres to the scheme and can't satisfy actual need yet. For example: when the construction lifter is arranged in the middle of the frame structure column, the height of the floor is large, and the attachment distance between two adjacent floors exceeds the use requirement, the attachment frame of the construction lifter has no fixed position; for another example, when the construction hoist is deployed in a civil air defense area, a prestressed structure and the like, the attachment frame of the construction hoist cannot be punched; therefore, it is required to develop a fixing device for an attachment frame of a construction elevator, which solves the problem that the conventional attachment frame is difficult to fix.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model aims at solving the problem that the construction elevator adheres to the frame and is difficult to fix provides a construction elevator adheres to a frame fixing device that can erect in the place that does not have an adhesion frame fixed position or structure such as in the middle of the structure post.
The utility model provides a construction elevator adheres to frame fixing device, includes horizontal fixed unit and vertical fixed unit, horizontal fixed unit is used for fixing construction elevator in the building main part, horizontal fixed unit includes first transverse connection spare, first transverse connection spare sets up the building main part orientation one side of construction elevator, first transverse connection spare's length is greater than the width that adheres to the frame, first transverse connection spare can with adhere to a fixed connection, horizontal fixed unit still includes horizontal installation component, horizontal installation component with first transverse connection spare fixed connection, horizontal installation component is fixed to be set up the top of vertical fixed unit, vertical fixed unit passes through horizontal installation component will the load of horizontal fixed unit transmits floor board or ground.
Preferably, the transverse mounting assembly comprises a second transverse connecting piece, a third transverse connecting piece and a fourth transverse connecting piece, two ends of the first transverse connecting piece are connected with one end of the second transverse connecting piece and one end of the third transverse connecting piece respectively, and the fourth transverse connecting piece is arranged between the second transverse connecting piece and the third transverse connecting piece.
Preferably, the building main body comprises a square building structure column, the first transverse connecting member is arranged on one side of the building structure column facing the construction hoist, the second transverse connecting member, the third transverse connecting member and the fourth transverse connecting member wrap around the other three sides of the building structure column, and the lengths of the second transverse connecting member, the third transverse connecting member and the fourth transverse connecting member are matched with the width of the side of the connected building structure column.
Preferably, the first transverse connecting piece, the second transverse connecting piece, the third transverse connecting piece and the fourth transverse connecting piece are channel steel arranged along the horizontal direction.
Preferably, a diagonal brace is arranged between the first transverse connecting piece and the second and third transverse connecting pieces.
Preferably, the building structure column is provided with structure column reinforcing steel bars, and the space between the structure column reinforcing steel bars is smaller than the size of the embedded connecting piece of the attachment frame.
Preferably, both ends of the first transverse connecting member exceed the width of the building main body along the length direction thereof, and the longitudinal fixing unit includes a longitudinal support pillar disposed at a position in the middle of the length of the first transverse connecting member exceeding the building main body.
Preferably, the length of the longitudinal support column is the distance between the bottom of the first transverse connector and the ground.
Preferably, the bottom of longitudinal support post is provided with supporting steel plate, the size of supporting steel plate is greater than the cross sectional dimension of longitudinal support post, supporting steel plate is provided with fixing bolt, fixing bolt will supporting steel plate fixes on ground.
Preferably, still be provided with time horizontal fixed unit between longitudinal support post and the building main part, time horizontal fixed unit includes a plurality of transverse connection spare, transverse connection spare sets up along the horizontal direction building main part side, transverse connection spare end to end connection each other and with the building main part encloses including, be close to the transverse connection spare of longitudinal support post one side with longitudinal support post fixed connection.
Compared with the prior art, the utility model discloses following beneficial effect has: the utility model discloses construction elevator adheres to frame fixing device is applicable to the condition that construction elevator setting does not have fixed position in the centre of building main parts such as structure post, compares in utilizing building main body structure built-in fitting to carry out the correlation technique of connecting, and this construction elevator adheres to frame fixing device can solve building main body structure post effectively and has been under construction and finish, the reinforcing bar interval is little can't be pre-buried in advance, the design is not allowed to punch the operation, and the construction elevator who adopts built-in fitting and expansion bolts when connecting adheres to frame fixed problem, the utility model discloses construction elevator adheres to frame fixing device has the beneficial effect that improves construction elevator and adheres to factor of safety, satisfies the site operation needs, avoids later stage contradiction, reduce cost.
Drawings
Fig. 1 is a plan view of the construction elevator attachment frame fixing device of the present invention;
FIG. 2 is an elevation view of the construction elevator attachment bracket fixing device of the present invention;
the reference numbers are as follows: a transverse fixing unit-1; a first transverse link-101; a second transverse link-102; a third transverse link-103; a fourth transverse link-104; a diagonal strut-105; a longitudinal fixing unit-2; a longitudinal support post-201; a supporting steel plate-202; building main body-3; and a secondary transverse fixing unit-4.
Detailed Description
The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments. All other embodiments obtained by a person of ordinary skill in the art based on the embodiments of the present application without any creative effort belong to the protection scope of the present application.
As shown in fig. 1 and 2, in order to provide a construction elevator attachment frame fixing device which can be erected at a place without an attachment frame fixing position or structure, such as the middle of a structural column, the construction elevator attachment frame fixing device of the present embodiment includes a lateral fixing unit 1 and a longitudinal fixing unit 2, the lateral fixing unit 1 is used to fix a construction elevator on a building main body 3, the lateral fixing unit 1 includes a first lateral connecting member 101, the first lateral connecting member 101 is disposed at a side of the building main body 3 facing the construction elevator, the length of the first lateral connecting member 101 is greater than the width of the attachment frame, the first lateral connecting member 101 can be fixedly connected with the attachment frame, the lateral fixing unit 1 further includes a lateral mounting member which is fixedly connected with the first lateral connecting member 101, the lateral mounting member is fixedly disposed at the top of the longitudinal fixing unit 2, the longitudinal fixing unit 2 transfers the load of the lateral fixing unit 1 to the floor panel or the ground through the lateral installation assembly.
The utility model discloses construction elevator adheres to frame fixing device is applicable to the condition that the construction elevator setting does not have fixed position in the centre of building main part 3 such as structure post, compares in the correlation technique that utilizes building main part 3 structure built-in fitting to connect, and this construction elevator adheres to frame fixing device can solve building main part 3 structure post effectively and has been under construction and finish, the reinforcing bar interval is little can't be pre-buried in advance, the design is not allowed to punch the operation, and the construction elevator that adopts when built-in fitting and expansion bolts connect adheres to frame fixed problem, the utility model discloses construction elevator adheres to frame fixing device has the beneficial effect that improves construction elevator and adheres to factor of safety, satisfies the site operation needs, avoids later stage contradiction, reduce cost.
The transverse installation component in the construction elevator attachment bracket fixing device of the embodiment further comprises a second transverse connecting member 102, a third transverse connecting member 103 and a fourth transverse connecting member 104, two ends of the first transverse connecting member 101 are respectively connected with one end of the second transverse connecting member 102 and one end of the third transverse connecting member 103, the fourth transverse connecting member 104 is arranged between the second transverse connecting member 102 and the third transverse connecting member 103, the building main body 3 in the embodiment comprises a square building structure column, the first transverse connecting member 101 is arranged on one side of the building structure column facing the construction elevator, the second transverse connecting member 102, the third transverse connecting member 103 and the fourth transverse connecting member 104 are wrapped on the other three sides of the building structure column, the lengths of the second transverse connecting member 102, the third transverse connecting member 103 and the fourth transverse connecting member 104 are matched with the width of the side of the connected building structure column, wherein, first transverse connection 101, second transverse connection 102, third transverse connection 103 and fourth transverse connection 104 are the channel-section steel that sets up along the horizontal direction, for example, use 20# a channel-section steel as above-mentioned transverse connection, adopt the material purchase and processing of unified model being convenient for, in order to make transverse installation component's atress more even reliable reasonable, be provided with diagonal brace 105 between first transverse connection 101 and second transverse connection 102 and the third transverse connection 103, as a preferred implementation mode, the building structure post is provided with the structure post reinforcing bar, structure post reinforcing bar interval is less than the size of the pre-buried connecting piece of attached frame, this moment because the reinforcing bar interval is little can't pre-buried conventional attached frame connecting piece, make this embodiment have strong adaptability's beneficial effect.
The longitudinal fixing unit 2 in the construction elevator attachment frame fixing device of the embodiment includes a longitudinal supporting column 201, and in order to facilitate construction procurement processing, the longitudinal supporting column 201 may adopt a channel steel structure same as that of the aforementioned transverse connecting member, for example, a 20# a channel steel is used as the longitudinal supporting column 201, both ends of the first transverse connecting member 101 exceed the width of the building main body 3 along the length direction thereof, the longitudinal supporting column 201 is disposed at a middle position of the length of the portion of the first transverse connecting member 101 exceeding the building main body 3, and specifically, the length of the longitudinal supporting column 201 is a distance between the bottom of the first transverse connecting member 101 and the ground so as to play a role of supporting stress.
In some embodiments, the floor slab or the ground below the longitudinal fixing unit 2 can be perforated, in which case, the bottom of the longitudinal supporting column 201 is provided with a supporting steel plate 202, the size of the supporting steel plate 202 is larger than the cross-sectional size of the longitudinal supporting column 201, the supporting steel plate 202 is provided with a fixing bolt, and the fixing bolt fixes the supporting steel plate 202 on the ground or the floor slab to achieve the fixed installation.
In some embodiments, the floor slab or the ground under the vertical fixing unit 2 cannot be perforated, in this case, a secondary horizontal fixing unit 4 is further disposed between the vertical supporting column 201 and the building body 3, the secondary horizontal fixing unit 4 includes a plurality of horizontal connecting members, as an embodiment, the secondary horizontal fixing unit 4 has the same structure as the horizontal fixing unit 1, the specific size is differently set according to the actual construction situation, the horizontal connecting members are disposed at the side of the building body 3 along the horizontal direction, the horizontal connecting members are connected end to end and enclose the building body 3, the horizontal connecting member near the vertical supporting column 201 is fixedly connected to the vertical supporting column 201, the construction elevator attachment fixing device of the present embodiment takes into consideration and satisfies two situations that the floor slab can be perforated through the two modes, and can erect construction where no attachment fixing position or structure can be preset in the middle of the structural column or the like The fixing device of the elevator attaching frame solves the problem that the construction elevator attaching frame is difficult to fix.
The installation process of the construction elevator attaching frame fixing device of the embodiment is as follows:
determining the attachment elevation: and determining the installation elevation of the attachment frame according to the actual condition of the project.
The structural column is poured to complete and reach the design strength: the structural column at the position of the attachment frame is poured and finished, and the design strength is achieved, otherwise, the strength of the structural column is not enough and is easy to break, and safety and quality accidents are caused.
Popping up an attachment elevation: the attachment frame is marked on the column according to the elevation according to the scheme.
Installing a first horizontal channel steel: the transverse fixing unit 1 is provided with a 20# a channel steel facing one side of the construction elevator, and the length of the channel steel is +800mm of the width of the attachment frame; the other three sides of the horizontal channel steel are also provided with 20# a channel steel, the models are uniform, the material is convenient to purchase and process, the length of the channel steel is the size of a column, the channel steel is welded, and the horizontal channel steel is respectively provided with two inclined struts on the left side and the right side by taking the column as the center;
installing vertical channel steel: and the longitudinal fixing unit 2 is formed by two 20# a channel steel, is connected with the 20# a channel steel, is arranged in the middle of the length of the picked column, is the length from the ground to the first horizontal channel steel, and is provided with 200 x 150 x 8 steel plates at the bottom of the vertical channel steel for supporting.
Installing a secondary transverse fixing unit 4 (in the case of floor plates which cannot be punched)/arranging a fixing bolt (in the case of floor plates which can be punched); when the ground at the position where the fixing device of the attachment frame of the construction elevator is located does not allow punching, a second horizontal channel steel, namely a secondary transverse fixing unit 3 is arranged about 1m above the ground, mainly used for connecting the vertical channel steel and fixing the vertical channel steel on a column to carry out column holding, and used for stabilizing the whole device; when the ground was allowed to perforate, four M20 chemical bolts were used to secure to 200 x 150 x 8 steel plates.
And finally, completing the installation of the attachment frame: the attachment brackets are bolted or welded to the transverse fixing unit 1.
While preferred embodiments of the present application have been described, additional variations and modifications in those embodiments may occur to those skilled in the art once they learn of the basic inventive concepts. Therefore, it is intended that the appended claims be interpreted as including the preferred embodiment and all changes and modifications that fall within the true scope of the embodiments of the present application.
It is apparent that those skilled in the art can make various changes and modifications to the embodiments of the present application without departing from the spirit and scope of the embodiments of the present application. Thus, if such modifications and variations of the embodiments of the present application fall within the scope of the claims of the embodiments of the present application and their equivalents, the embodiments of the present application are also intended to include such modifications and variations.

Claims (10)

1. The utility model provides a construction elevator adheres to frame fixing device which characterized in that: including horizontal fixed unit and vertical fixed unit, horizontal fixed unit is used for fixing the construction elevator on the building main part, horizontal fixed unit includes first transverse connection spare, first transverse connection spare sets up the building main part orientation one side of construction elevator, first transverse connection spare's length is greater than the width of adhering to the frame, first transverse connection spare can with adhere to a frame fixed connection, horizontal fixed unit still includes horizontal installation component, horizontal installation component with first transverse connection spare fixed connection, horizontal installation component is fixed to be set up the top of vertical fixed unit, vertical fixed unit passes through horizontal installation component will the load of horizontal fixed unit transmits floor board or ground.
2. The construction elevator attachment frame fixing device according to claim 1, wherein: the transverse mounting assembly comprises a second transverse connecting piece, a third transverse connecting piece and a fourth transverse connecting piece, two ends of the first transverse connecting piece are connected with one end of the second transverse connecting piece and one end of the third transverse connecting piece respectively, and the fourth transverse connecting piece is arranged between the second transverse connecting piece and the third transverse connecting piece.
3. The construction elevator attachment frame fixing device according to claim 2, wherein: the building main body comprises a square building structure column, the first transverse connecting piece is arranged on one side, facing the construction lifter, of the building structure column, the second transverse connecting piece, the third transverse connecting piece and the fourth transverse connecting piece wrap the other three sides of the building structure column, and the lengths of the second transverse connecting piece, the third transverse connecting piece and the fourth transverse connecting piece are matched with the width of the side face of the connected building structure column.
4. The construction elevator attachment frame fixing device according to claim 3, wherein: the first transverse connecting piece, the second transverse connecting piece, the third transverse connecting piece and the fourth transverse connecting piece are channel steel arranged along the horizontal direction.
5. The construction elevator attachment frame fixing device according to claim 3, wherein: inclined support rods are arranged among the first transverse connecting piece, the second transverse connecting piece and the third transverse connecting piece.
6. The construction elevator attachment frame fixing device according to claim 3, wherein: the building structure post is provided with the structure post reinforcing bar, the interval of structure post reinforcing bar is less than adhere to the size of the pre-buried connecting piece of frame.
7. The construction elevator attachment frame fixing device according to claim 3, wherein: the two ends of the first transverse connecting piece exceed the width of the building main body along the length direction of the first transverse connecting piece, and the longitudinal fixing unit comprises a longitudinal supporting column which is arranged in the middle of the length of the first transverse connecting piece exceeding the building main body.
8. The construction elevator attachment frame fixing device according to claim 7, wherein: the length of the longitudinal support column is the distance between the bottom of the first transverse connector and the ground.
9. The construction elevator attachment frame fixing device according to claim 7, wherein: the bottom of longitudinal support post is provided with supporting steel plate, the size of supporting steel plate is greater than the cross sectional dimension of longitudinal support post, supporting steel plate is provided with fixing bolt, fixing bolt will supporting steel plate fixes on ground.
10. The construction elevator attachment frame fixing device according to claim 7, wherein: still be provided with time horizontal fixed unit between longitudinal support post and the building main part, time horizontal fixed unit includes a plurality of transverse connection spare, transverse connection spare sets up along the horizontal direction building main part side, transverse connection spare end to end connection each other and with including the building main part encloses, be close to the transverse connection spare of longitudinal support post one side with longitudinal support post fixed connection.
CN202021959280.6U 2020-09-09 2020-09-09 Construction elevator adheres to frame fixing device Expired - Fee Related CN213011424U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021959280.6U CN213011424U (en) 2020-09-09 2020-09-09 Construction elevator adheres to frame fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021959280.6U CN213011424U (en) 2020-09-09 2020-09-09 Construction elevator adheres to frame fixing device

Publications (1)

Publication Number Publication Date
CN213011424U true CN213011424U (en) 2021-04-20

Family

ID=75476393

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021959280.6U Expired - Fee Related CN213011424U (en) 2020-09-09 2020-09-09 Construction elevator adheres to frame fixing device

Country Status (1)

Country Link
CN (1) CN213011424U (en)

Similar Documents

Publication Publication Date Title
US7727446B1 (en) Concrete floor manufacturing station and method of manufacturing a concrete floor
JP5097313B2 (en) Suspended scaffold and its installation method
CN102251699B (en) Residential building system with cast-in-situ beam columns and prefabricated sandwich concrete wall panels and construction method
US7165370B1 (en) Method of transport
US6270057B1 (en) Reuseable multi-story building construction guardrail system
CN109809277A (en) Existing building uses the additional elevator structure of assembled and its construction method
CN107882244A (en) A kind of construction method of steel bar truss floor support plate
CN113202185B (en) Energy-saving building steel structure system and installation process thereof
CN108412187B (en) Construction device and construction method for outer frame structure of ultra-high conjoined group tower
CN213011424U (en) Construction elevator adheres to frame fixing device
US6018921A (en) Transverse truss for building structure
CN218149656U (en) Operating platform in lighting well
JPH04269229A (en) Space frame structural body
CN211447707U (en) Cantilever type steel coupling beam construction supporting platform
CN211143324U (en) Be suitable for steel construction module connection structure for building
CN209907886U (en) Adjustable assembled stair construction platform
CN107558607B (en) Tower crane system arranged on existing concrete structure and construction method thereof
CN219118718U (en) Climbing frame horizontal protection
CN103114712B (en) Buckle steel platform support system and construction method thereof
CN217151146U (en) Super 5 meters girder steel subassembly of encorbelmenting of concrete form support system that encorbelments
CN215054690U (en) Temporary steel wall-attached frame for roof on construction elevator
CN210798265U (en) Climb frame and adhere to drawknot reinforcerment system
CN212478095U (en) Steel bar processing shed with detachable field
CN218597748U (en) Pull rod type overhanging type steel formwork support system
CN213390847U (en) Prefabricated convex beam for assembly type building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210420

Termination date: 20210909

CF01 Termination of patent right due to non-payment of annual fee