CN213004946U - Energy-concerving and environment-protective type pipe fitting processing equipment for construction - Google Patents

Energy-concerving and environment-protective type pipe fitting processing equipment for construction Download PDF

Info

Publication number
CN213004946U
CN213004946U CN202021651933.4U CN202021651933U CN213004946U CN 213004946 U CN213004946 U CN 213004946U CN 202021651933 U CN202021651933 U CN 202021651933U CN 213004946 U CN213004946 U CN 213004946U
Authority
CN
China
Prior art keywords
plate
fixed
side wall
environment
energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021651933.4U
Other languages
Chinese (zh)
Inventor
胡定祥
刘玲
赵金萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Wanggao Engineering Project Management Co ltd
Original Assignee
Chongqing Wanggao Engineering Project Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Wanggao Engineering Project Management Co ltd filed Critical Chongqing Wanggao Engineering Project Management Co ltd
Priority to CN202021651933.4U priority Critical patent/CN213004946U/en
Application granted granted Critical
Publication of CN213004946U publication Critical patent/CN213004946U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses an energy-concerving and environment-protective type pipe fitting processing equipment for construction, comprises a fixed bench, the top lateral wall of fixed station is fixed with the support long slab that the symmetry set up, set up the first through-hole that runs through about on the support long slab, first recess has been seted up to the top lateral wall of fixed station, the both sides lateral wall sliding connection of first recess has the sliding block, be fixed with the regulating plate between the sliding block, and set up perpendicularly between regulating plate and the sliding block, one side lateral wall of first recess rotates and is connected with first connecting axle, the one end of first connecting axle extends to first recess external fixation has the rotor plate, and set up perpendicularly between rotor plate and the first connecting axle, the guiding hole that the symmetry set up is seted up to one side lateral wall that first connecting axle was kept away from to the rotor plate. The utility model discloses can carry out quick jack-up to the pipe fitting fixed, can extrude fixedly to the pipe fitting of certain limit according to the processing demand, wholly need not electric device and assist fixedly, whole low in production cost, the simple operation.

Description

Energy-concerving and environment-protective type pipe fitting processing equipment for construction
Technical Field
The utility model relates to a construction technical field especially relates to an energy-concerving and environment-protective type pipe fitting processing equipment for construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite.
Current pipe fitting adds man-hour, need install fixedly to the pipe fitting, and traditional fixed is fixed through carrying out many places extrusion to the pipe fitting, often fixes through a little electric device, and overall cost is higher, and it is also not convenient enough to adjust simultaneously, for this reason, we have provided an energy-concerving and environment-protective type pipe fitting processing equipment for construction.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing energy-saving and environment-friendly pipe fitting processing equipment for building construction.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
an energy-saving and environment-friendly pipe fitting processing device for building construction comprises a fixed table, wherein supporting long plates which are symmetrically arranged are fixed on the side wall of the top end of the fixed table, first through holes which penetrate through the supporting long plates from left to right are formed in the supporting long plates, a first groove is formed in the side wall of the top end of the fixed table, sliding blocks are connected with the side walls of the two sides of the first groove in a sliding mode, an adjusting plate is fixed between the sliding blocks, the adjusting plate and the sliding blocks are vertically arranged, a first connecting shaft is rotatably connected to the side wall of one side of the first groove, a rotating plate is fixed to the outer portion of the first groove at one end of the first connecting shaft, the rotating plate and the first connecting shaft are vertically arranged, guide holes which are symmetrically arranged are formed in the side wall of the rotating plate, which is far away from the first connecting shaft, clamping rods are slidably sleeved in the guide holes, and connecting, the connecting long plate and the clamping rod are vertically arranged.
Preferably, the vertical section of the connecting long plate is strip-shaped, the connecting long plate and the rotating plate are arranged in parallel, and a return spring is fixed between the connecting long plate and the rotating plate.
Preferably, a limit groove is formed in the side wall of one side of the fixing table in the circumferential direction, and the limit groove and the clamping rod are clamped.
Preferably, a rack is arranged on the side wall of one side, close to the first connecting shaft, of the adjusting plate in the vertical direction, a gear is sleeved on the outer side wall of the first connecting shaft in a tight fit mode, and the gear and the rack are in meshing transmission connection.
Preferably, the one end of regulating plate extends to first recess external fixation and has the roof, sets up perpendicularly between roof and the regulating plate, one side lateral wall that the regulating plate was kept away from to the roof is connected with the foam-rubber cushion.
Compared with the prior art, the beneficial effects of the utility model are that:
the pipe fitting jacking and fixing device is characterized in that symmetrically arranged support long plates are fixed on the side wall of the top end of the fixing table, first through holes penetrating left and right are formed in the support long plates, a first groove is formed in the side wall of the top end of the fixing table, sliding blocks are connected with the side wall of two sides of the first groove in a sliding mode, an adjusting plate is fixed between the sliding blocks, the adjusting plate and the sliding blocks are vertically arranged, a first connecting shaft is rotatably connected to the side wall of one side of the first groove, a rotating plate is fixed to one end of the first connecting shaft and extends to the outside of the first groove, a rotating plate is vertically arranged between the rotating plate and the first connecting shaft, symmetrically arranged guide holes are formed in the side wall of the rotating plate, which is far away from the first connecting shaft, clamping rods are slidably sleeved inside the guide holes, a connecting long plate is jointly fixed to the outside of the guide holes, and is vertically arranged between the connecting long plates and, can extrude fixedly to the pipe fitting of certain limit according to the processing demand, wholly need not electric device and assist fixedly, whole low in production cost, the simple operation.
Drawings
Fig. 1 is the utility model provides a structure elevation view of energy-concerving and environment-protective type pipe fitting processing equipment for construction.
Fig. 2 is the utility model provides an energy-concerving and environment-protective type pipe fitting processing equipment's for construction regulating plate and gear cooperation schematic structure.
Fig. 3 is the utility model provides a structural side view of energy-concerving and environment-protective type pipe fitting processing equipment for construction.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, an energy-saving and environment-friendly pipe processing device for building construction comprises a fixed table 1, wherein a supporting long plate 2 is fixed on the top side wall of the fixed table 1, the supporting long plate 2 is symmetrically provided with a first through hole 3 which penetrates left and right, the top side wall of the fixed table 1 is provided with a first groove 4, the side walls of the two sides of the first groove 4 are slidably connected with sliding blocks 5, an adjusting plate 6 is fixed between the sliding blocks 5, the adjusting plate 6 and the sliding blocks 5 are vertically arranged, one side wall of the first groove 4 is rotatably connected with a first connecting shaft 8, one end of the first connecting shaft 8 extends to the outside of the first groove 4 and is fixedly provided with a rotating plate 9, the rotating plate 9 and the first connecting shaft 8 are vertically arranged, one side wall of the rotating plate 9, which is far away from the first connecting shaft 8, is provided with symmetrically arranged guide holes, and a clamping rod 10 is slidably sleeved inside the guide holes, and one end of the clamping rod 10 extends to the outside of the guide hole and is jointly fixed with a connecting long plate 11, and the connecting long plate 11 and the clamping rod 10 are vertically arranged.
The vertical section of the connecting long plate 11 is long-strip-shaped, the connecting long plate 11 and the rotating plate 9 are arranged in parallel, a reset spring 12 is fixed between the connecting long plate 11 and the rotating plate 9, a limit groove is formed in the side wall of one side of the fixed table 1 in the circumferential direction, and the limit groove and the clamping rod 10 are clamped.
Adjusting plate 6 is close to one side lateral wall of first connecting axle 8 and has been seted up rack 14 along vertical direction, gear 13 has been cup jointed to the lateral wall tight fit of first connecting axle 8, and meshes the transmission between gear 13 and the rack 14 and be connected, adjusting plate 6's one end extends to first recess 4 external fixation and has roof 7, sets up perpendicularly between roof 7 and the adjusting plate 6, one side lateral wall that adjusting plate 6 was kept away from to roof 7 is connected with foam-rubber cushion 15.
The working principle is as follows: when the pipe fitting is installed and processed, the pipe fitting is moved to enable the pipe fitting to penetrate through the two first through holes 3, the pipe fitting falls on the surface of the sponge cushion 15, then the connecting long plate 11 is pulled, the connecting long plate 11 drives the clamping rod 10 to be separated from the limiting groove, then the rotating plate 9 is rotated, the rotating plate 9 drives the first connecting shaft 8 to rotate, the first connecting shaft 8 drives the gear 13 to rotate, the gear 13 and the rack 14 are in meshing transmission to drive the adjusting plate 6 to move, the adjusting plate 6 drives the top plate 7 to move, the top plate 7 drives the pipe fitting to be jacked upwards to fix the pipe fitting, then the connecting long plate 11 is loosened, the clamping rod 10 is clamped with the limiting groove under the elastic force of the reset spring 12 to complete installation and fixation, then the pipe fitting is processed, after the connecting long plate 11 is pulled, the clamping rod 10 is separated from the limiting groove, the rotating plate 9 is rotated reversely, and the top plate, and (5) completing the disassembly.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. An energy-saving and environment-friendly pipe fitting processing device for building construction comprises a fixed table (1) and is characterized in that supporting long plates (2) which are symmetrically arranged are fixed on the side wall of the top end of the fixed table (1), first through holes (3) which penetrate left and right are formed in the supporting long plates (2), first grooves (4) are formed in the side wall of the top end of the fixed table (1), sliding blocks (5) are connected to the side walls of two sides of each first groove (4) in a sliding mode, adjusting plates (6) are fixed between the sliding blocks (5), the adjusting plates (6) and the sliding blocks (5) are vertically arranged, one side wall of each first groove (4) is rotatably connected with a first connecting shaft (8), one end of each first connecting shaft (8) extends to the outside of the corresponding first groove (4) and is fixedly provided with a rotating plate (9), and the rotating plates (9) and the first connecting shafts (8) are vertically arranged, the side wall of one side, far away from first connecting axle (8), of rotor plate (9) sets up the guiding hole that the symmetry set up, and the inside slip cover of guiding hole is equipped with kelly (10), and the one end of kelly (10) extends to the guiding hole outside and is fixed with jointly and connects long slab (11), sets up perpendicularly between connection long slab (11) and kelly (10).
2. The energy-saving and environment-friendly pipe machining equipment for building construction as claimed in claim 1, wherein the vertical section of the long connecting plate (11) is long, the long connecting plate (11) and the rotating plate (9) are arranged in parallel, and a return spring (12) is fixed between the long connecting plate (11) and the rotating plate (9).
3. The energy-saving and environment-friendly pipe machining equipment for building construction as claimed in claim 2, wherein a limiting groove is formed in a side wall of one side of the fixed table (1) along the circumferential direction, and the limiting groove and the clamping rod (10) are clamped.
4. The energy-saving and environment-friendly pipe machining equipment for building construction as claimed in claim 1, wherein a rack (14) is formed in a side wall of one side, close to the first connecting shaft (8), of the adjusting plate (6) in a vertical direction, a gear (13) is sleeved on an outer side wall of the first connecting shaft (8) in a tight fit manner, and the gear (13) is in meshing transmission connection with the rack (14).
5. The energy-saving and environment-friendly pipe machining equipment for building construction as claimed in claim 1, wherein one end of the adjusting plate (6) extends to the outside of the first groove (4) and is fixed with a top plate (7), the top plate (7) and the adjusting plate (6) are vertically arranged, and a sponge pad (15) is connected to one side wall of the top plate (7) far away from the adjusting plate (6).
CN202021651933.4U 2020-08-11 2020-08-11 Energy-concerving and environment-protective type pipe fitting processing equipment for construction Active CN213004946U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021651933.4U CN213004946U (en) 2020-08-11 2020-08-11 Energy-concerving and environment-protective type pipe fitting processing equipment for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021651933.4U CN213004946U (en) 2020-08-11 2020-08-11 Energy-concerving and environment-protective type pipe fitting processing equipment for construction

Publications (1)

Publication Number Publication Date
CN213004946U true CN213004946U (en) 2021-04-20

Family

ID=75465258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021651933.4U Active CN213004946U (en) 2020-08-11 2020-08-11 Energy-concerving and environment-protective type pipe fitting processing equipment for construction

Country Status (1)

Country Link
CN (1) CN213004946U (en)

Similar Documents

Publication Publication Date Title
CN211499913U (en) Low-energy-consumption prefabricated house
CN207668644U (en) A kind of valve deck processing unit (plant) of fast positioning clamping
CN213004946U (en) Energy-concerving and environment-protective type pipe fitting processing equipment for construction
CN215262494U (en) Be used for dustproof sampling equipment that punches of building subject
CN212002116U (en) Civil engineering troweling device
CN210849262U (en) Auxiliary tool for pipeline cutting
CN105019670A (en) Position-adjusting device for precast concrete wall panel
CN216277277U (en) Green construction noise reduction isolation device in aspect of building construction technology
CN102581965B (en) Back-bolt type drilling machine and method for machining back-bolt hole by using same
CN213104224U (en) Steel bar cutting equipment for bridge
CN212127270U (en) Rapid construction structure for hoisting steel frame column beam simultaneously in coordination of multiple machines
CN213625632U (en) Slope protection device for hydraulic and hydroelectric engineering
CN213174388U (en) Combined plate for cast-in-place concrete hollow floor
CN210358633U (en) Temporary fixing and straightening device for water supply and drainage pipes in building engineering construction
CN112276163A (en) Self-balancing backplate processingequipment for construction scene
CN206733158U (en) A kind of tubing cuts facing attachment
CN216949419U (en) Green construction equipment of assembly type structure outer wall
CN219464889U (en) Multifunctional pipeline cutting device for building engineering
CN105690965A (en) Production device of punching sound-absorbing sandwich board
CN214488899U (en) Environment-friendly drilling device for building construction
CN219599433U (en) Auxiliary installation equipment for building water supply and drainage pipes
CN219003885U (en) Building templates cleaning device
CN214314479U (en) Water conservancy construction pipe laying thread fixing device
CN110681886A (en) Drilling equipment is used in processing of building carrier plate
CN213837167U (en) Assembled building wallboard connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant