CN212984166U - Portable fixed steel structure of petrochemical engineering project building - Google Patents

Portable fixed steel structure of petrochemical engineering project building Download PDF

Info

Publication number
CN212984166U
CN212984166U CN202021426757.4U CN202021426757U CN212984166U CN 212984166 U CN212984166 U CN 212984166U CN 202021426757 U CN202021426757 U CN 202021426757U CN 212984166 U CN212984166 U CN 212984166U
Authority
CN
China
Prior art keywords
fixedly connected
bracing piece
steel structure
piece
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021426757.4U
Other languages
Chinese (zh)
Inventor
颉爱静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Feiya Steel Structure Engineering Co ltd
Original Assignee
Jia Aijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jia Aijing filed Critical Jia Aijing
Priority to CN202021426757.4U priority Critical patent/CN212984166U/en
Application granted granted Critical
Publication of CN212984166U publication Critical patent/CN212984166U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model discloses a portable fixed steel structure of petrochemical engineering project building, the sliders are symmetrically sleeved at the two side positions of the outer end of a first supporting rod, one end of each slider is rotatably connected with a fastening bolt, the position of one side of the top end of each slider is provided with a clamping groove, a second supporting rod is sleeved inside the clamping groove, one end of each first supporting rod is fixedly connected with a screw rod, and the outer end of each screw rod is in threaded connection with a mounting frame, the time required for workers to install the fixed steel structure is saved.

Description

Portable fixed steel structure of petrochemical engineering project building
Technical Field
The utility model relates to a steel construction field specifically is a fixed steel construction of portable of petrochemical engineering project building.
Background
One of the main building structure types of steel structure engineering is one of the more common structure forms in modern building engineering, China is the country which uses iron to manufacture a bearing structure at the earliest time, the steel structure engineering is a structure which mainly uses steel to manufacture, China does not start to adopt a modern steel structure until the end of 19 th century, and after a new China is established, the application of the steel structure is greatly developed, and the top surface of the temporary greenhouse building is supported and reinforced by a common steel structure in quantity or quality far beyond the past;
however, in the conventional fixing steel structure for petrochemical engineering project buildings, due to the fact that splicing and installation of steel cannot be carried out conveniently and rapidly, in the actual application process, the work of installing the steel by workers is difficult to carry out, and a large amount of time is wasted, so that the portable fixing steel structure for the petrochemical engineering project buildings is necessary to overcome the defects in the prior art for avoiding the technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a fixed steel construction of portable of petrochemical engineering project building can effectively solve and provide among the above-mentioned background art because unable convenient splices the installation to the steel to make at the in-process of actual use, the work that the staff carries out the installation to the steel is difficult to go on, thereby the problem of extravagant a large amount of time.
In order to achieve the above object, the utility model provides a following technical scheme: a portable fixed steel structure of a petrochemical engineering project building comprises a first supporting rod, wherein sliding blocks are symmetrically sleeved at two side positions of the outer end of the first supporting rod, one end of each sliding block is rotatably connected with a fastening bolt, a clamping groove is formed in one side position of the top end of each sliding block, a second supporting rod is sleeved in each clamping groove, one end of each first supporting rod is fixedly connected with a screw, the outer end of each screw is in threaded connection with a mounting frame, a bearing seat is rotatably connected at the middle position of the outer end of each mounting frame, and a stop block is fixedly connected to the inner wall of each bearing seat;
the utility model discloses a quick-witted including first bracing piece, third bracing piece, conversion piece top joint have a first dead lever, solid fixed ring has been cup jointed at first dead lever middle part, solid fixed ring outer end equidistance fixedly connected with fourth bracing piece, fourth bracing piece one end fixedly connected with lantern ring, second bracing piece outer end is located lantern ring one side position fixedly connected with of department and places the piece, lantern ring bottom fixedly connected with installation piece, installation piece top equidistance is inlayed and is had the hexagon socket head cap screw.
Preferably, the bottom of the outer end of the second support rod is provided with a threaded hole, one end of the fastening bolt is in threaded connection with the threaded hole, and the screw threads at the two ends of the bearing seat are opposite in rotating direction.
Preferably, a round hole is formed in the outer end of the conversion block, a bayonet is fixedly connected to the inner wall of the round hole, and one end of the third support rod is clamped with the bayonet.
Preferably, one end of the inner hexagonal screw penetrates through the bottom end of the mounting block, and one end of the inner hexagonal screw is in threaded connection with the top end of the placing block.
Preferably, the conversion block top is kept away from first dead lever one side position department joint and is had the second dead lever, second dead lever top end fixedly connected with fixed block, fixed block top fixedly connected with mounting panel, the inside rotation of mounting panel is connected with the pivot, pivot top fixedly connected with connecting rod, connecting rod top fixedly connected with fixed plate, the installing port has been seted up to fixed plate top equidistance.
Preferably, the inner wall of the mounting plate is fixedly connected with a limiting block at one side of the top end of the rotating shaft.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model has the advantages of being scientific and reasonable in structure, convenience safe in utilization:
1. be provided with slider, fastening bolt, draw-in groove, screw rod, bearing frame and dog, through slider and draw-in groove cooperation for the second bracing piece is in quick installation, and the fastening bolt of being convenient for fixes the second bracing piece, simultaneously, through screw rod and screw rod cooperation, makes the quick both sides of rotating the dog of two first bracing pieces, carries out quick equipment with this to first bracing piece in order to save the required time of staff's installation fixed steel construction.
2. Be provided with solid fixed ring, the lantern ring, place the piece, installation piece and interior hexagonal screw, through solid fixed ring and the cooperation of lantern ring, be convenient for consolidate the support to the second bracing piece, make at the in-service use in-process, the second bracing piece possesses higher support nature, and through placing piece, installation piece and the cooperation of interior hexagonal screw, be convenient for carry out spacing fixed to the lantern ring, when the second bracing piece is installed, be convenient for carry out quick installation to the lantern ring and dead lever.
3. Be provided with pivot, connecting rod, fixed plate and installing port, through the installing port, be convenient for fix this structure installation in required reinforced (rfd) position, simultaneously, when installing this structure, through the pivot, be convenient for rotate the fixed plate to the adjustment installing port makes it aim at required fixed position department, carries out quick installation with this to whole steel construction.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention.
In the drawings:
fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a schematic structural view of the screw of the present invention;
FIG. 3 is a schematic structural view of the collar of the present invention;
FIG. 4 is a schematic structural view of the rotating shaft of the present invention;
reference numbers in the figures: 1. a first support bar; 2. a slider; 3. fastening a bolt; 4. a card slot; 5. a second support bar; 6. a screw; 7. a mounting frame; 8. a bearing seat; 9. a stopper; 10. a third support bar; 11. a conversion block; 12. a first fixing lever; 13. a fixing ring; 14. a fourth support bar; 15. a collar; 16. placing the blocks; 17. mounting blocks; 18. a hexagon socket head cap screw; 19. a second fixing bar; 20. a fixed block; 21. mounting a plate; 22. a rotating shaft; 23. a connecting rod; 24. a fixing plate; 25. and (7) installing the opening.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
Example (b): as shown in figures 1-4, the utility model provides a technical scheme, a portable fixed steel structure of petrochemical engineering project building, comprising a first supporting rod 1, sliding blocks 2 are symmetrically sleeved at two sides of the outer end of the first supporting rod 1, one end of the sliding block 2 is rotationally connected with a fastening bolt 3, a clamping groove 4 is arranged at one side of the top end of the sliding block 2, a second supporting rod 5 is sleeved inside the clamping groove 4, one end of the first supporting rod 1 is fixedly connected with a screw rod 6, in order to facilitate the installation of the screw 6, a threaded hole is formed in the bottom position of the outer end of the second support rod 5, one end of the fastening bolt 3 is in threaded connection with the threaded hole, the thread turning directions of the screw 6 at two ends of the bearing block 8 are opposite, the outer end of the screw 6 is in threaded connection with an installation frame 7, the bearing block 8 is rotatably connected in the middle position of the outer end of the installation frame 7, and a stop block 9 is fixedly connected to the inner wall of the;
the inner side of the first supporting rod 1 is symmetrically and fixedly connected with a third supporting rod 10, one end of the third supporting rod 10 is sleeved with a conversion block 11, in order to facilitate the joint of third bracing piece 10, the round hole has been seted up to conversion piece 11 outer end, round hole inner wall fixedly connected with bayonet socket, 10 one end of third bracing piece and bayonet socket joint, 11 top joints of conversion piece have first dead lever 12, solid fixed ring 13 has been cup jointed at first dead lever 12 middle part, gu fixed ring 13 outer end equidistance fixedly connected with fourth bracing piece 14, 14 one end fixedly connected with lantern ring 15 of fourth bracing piece, 5 outer ends of second bracing piece are located lantern ring 15 one side position fixedly connected with of department place and place piece 16, 15 bottom fixedly connected with installation pieces 17 of lantern ring, 17 top equidistance of installation pieces are inlayed and are had interior hexagonal screw 18, be convenient for fix installation pieces 17, interior hexagonal screw 18 one end runs through installation pieces 17 bottom, and interior hexagonal screw 18 one end with place 16.
The joint of 12 one side positions department of first dead lever is kept away from on 11 tops of conversion block has second dead lever 19, 19 top fixedly connected with fixed blocks 20 of second dead lever, 20 top fixedly connected with mounting panels 21 of fixed block, the inside rotation of mounting panels 21 is connected with pivot 22, be convenient for carry on spacingly to pivot 22, the mounting panels 21 inner wall is located 22 top one side positions department fixedly connected with stopper of pivot, pivot 22 top fixedly connected with connecting rod 23, connecting rod 23 top fixedly connected with fixed plate 24, installing port 25 has been seted up to fixed plate 24 top equidistance, be convenient for adjust the angle of installing port 25.
The utility model discloses a theory of operation and use flow: the steel structure is suitable for the top end of a greenhouse temporarily built in a petrochemical engineering project, firstly, two first supporting rods 1 are inserted into an installation frame 7, a bearing seat 8 is rotated by hands, so that every two adjacent first supporting rods 1 rotate towards the inside of the installation frame 7, when one ends of the two first supporting rods 1 are contacted with the outer end surface of a stop block 9, the first supporting rods 1 are conveniently and rapidly installed, then, the outer ends of the first supporting rods 1 are sleeved with sliding blocks 2, and second supporting rods 5 are inserted into clamping grooves 4, so that threaded holes in the outer ends of the second supporting rods 5 are overlapped with threaded holes of the first supporting rods 1, and the second supporting rods 5 are conveniently installed by rotating fastening bolts 3;
secondly, the reinforcing component is sleeved at the outer end of the second supporting rod 5 and comprises a fixing ring 13, a fourth supporting rod 14 and a lantern ring 15, the reinforcing component is connected with the second supporting rod in a crossed mode through the fourth supporting rod 14, so that the second supporting frame has higher stability, the bottom end of the reinforcing component is in contact with the top end of the placing block 16, then, the mounting block 17 is sleeved, the bottom end of the mounting block 17 is in contact with the top end of the reinforcing component, the inner hexagonal screw 18 is rotated, limiting and fixing of the reinforcing component are facilitated, and meanwhile, the reinforcing component is used for enabling the steel structure to have higher stability in the actual application process;
in addition, the reinforcing component, the first supporting rod 1 and the second supporting rod 5 are conveniently and rapidly assembled, so that the steel structure has high convenience in the actual installation process, and the time for workers to install the steel structure is saved;
when the steel construction is installed with the big-arch shelter, rotate pivot 22 for pivot 22 drives connecting rod 23 and rotates, thereby makes connecting rod 23 drive fixed plate 24 and rotates, with this angle of adjustment fixed plate 24 of being convenient for, makes fixed plate 24 install through installing port 25 and big-arch shelter, thereby is convenient for install fixed plate 24 fixedly, with this be convenient for carry out quick installation to whole steel construction.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a fixed steel construction of portable of petrochemical engineering project building, includes first bracing piece (1), its characterized in that: the two sides of the outer end of the first supporting rod (1) are symmetrically sleeved with sliding blocks (2), one end of each sliding block (2) is rotatably connected with a fastening bolt (3), a clamping groove (4) is formed in one side of the top end of each sliding block (2), a second supporting rod (5) is sleeved inside each clamping groove (4), one end of each first supporting rod (1) is fixedly connected with a screw rod (6), the outer end of each screw rod (6) is in threaded connection with a mounting frame (7), the middle position of the outer end of each mounting frame (7) is rotatably connected with a bearing seat (8), and a stop block (9) is fixedly connected to the inner wall of each bearing seat (;
first bracing piece (1) inboard position department symmetry fixedly connected with third bracing piece (10), conversion piece (11) have been cup jointed to third bracing piece (10) one end, conversion piece (11) top joint has first dead lever (12), solid fixed ring (13) have been cup jointed at first dead lever (12) middle part, gu fixed ring (13) outer end equidistance fixedly connected with fourth bracing piece (14), fourth bracing piece (14) one end fixedly connected with lantern ring (15), second bracing piece (5) outer end is located lantern ring (15) one side position department fixedly connected with and places piece (16), lantern ring (15) bottom fixedly connected with installation piece (17), hexagonal screw (18) are inlayed to installation piece (17) top equidistance.
2. The portable fixed steel structure of petrochemical engineering project building according to claim 1, characterized in that: threaded holes are formed in the bottom of the outer end of the second supporting rod (5), one end of the fastening bolt (3) is in threaded connection with the threaded holes, and the threads of the screw rods (6) located at the two ends of the bearing block (8) are opposite in rotating direction.
3. The portable fixed steel structure of petrochemical engineering project building according to claim 1, characterized in that: the round hole has been seted up to conversion piece (11) outer end, round hole inner wall fixedly connected with bayonet socket, third bracing piece (10) one end and bayonet socket joint.
4. The portable fixed steel structure of petrochemical engineering project building according to claim 1, characterized in that: one end of the inner hexagonal screw (18) penetrates through the bottom end of the mounting block (17), and one end of the inner hexagonal screw (18) is in threaded connection with the top end of the placing block (16).
5. The portable fixed steel structure of petrochemical engineering project building according to claim 1, characterized in that: conversion piece (11) top is kept away from first dead lever (12) one side position department joint and is had second dead lever (19), second dead lever (19) top fixedly connected with fixed block (20), fixed block (20) top fixedly connected with mounting panel (21), mounting panel (21) inside rotation is connected with pivot (22), pivot (22) top fixedly connected with connecting rod (23), connecting rod (23) top fixedly connected with fixed plate (24), installing port (25) have been seted up to fixed plate (24) top equidistance.
6. The portable fixed steel structure of petrochemical engineering project building according to claim 5, characterized in that: the inner wall of the mounting plate (21) is fixedly connected with a limiting block at one side of the top end of the rotating shaft (22).
CN202021426757.4U 2020-07-20 2020-07-20 Portable fixed steel structure of petrochemical engineering project building Active CN212984166U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021426757.4U CN212984166U (en) 2020-07-20 2020-07-20 Portable fixed steel structure of petrochemical engineering project building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021426757.4U CN212984166U (en) 2020-07-20 2020-07-20 Portable fixed steel structure of petrochemical engineering project building

Publications (1)

Publication Number Publication Date
CN212984166U true CN212984166U (en) 2021-04-16

Family

ID=75428222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021426757.4U Active CN212984166U (en) 2020-07-20 2020-07-20 Portable fixed steel structure of petrochemical engineering project building

Country Status (1)

Country Link
CN (1) CN212984166U (en)

Similar Documents

Publication Publication Date Title
CN212984166U (en) Portable fixed steel structure of petrochemical engineering project building
CN218192824U (en) Cutting device for color steel tile production
CN214785880U (en) Connection structure of clear water concrete outer wall and external scaffolding
CN214816070U (en) Web member clamping mechanism for standard knot
CN213710503U (en) Steel structure bearing frame for building engineering
CN209705642U (en) A kind of building safety monitoring equipment
CN214696440U (en) Steel frame crossbeam for steel structure factory building
CN219931612U (en) Novel external corner stay cable
CN221609112U (en) Parallel link plate convenient to installation is dismantled
CN221236410U (en) Building templates fixed knot constructs
CN221031546U (en) Assembled prefabricated member alignment device
CN220451222U (en) Steel construction with conveniently splice adapting unit
CN220868809U (en) Frame post template reinforcing apparatus is built in room
CN221194932U (en) Hinge connector of folding ladder
CN220705164U (en) Template fixing device
CN221095562U (en) Arc steel construction support frame
CN219012174U (en) Novel stainless steel net frame structure
CN220184287U (en) Air connecting device for steel structure
CN204960341U (en) A erecting tool for connecting reinforcement and swivel nut
CN218403427U (en) Tower machine standard festival convenient to transportation dismouting
CN219973772U (en) Assembled green new forms of energy building wallboard
CN220117722U (en) Novel wall connecting piece
CN213945408U (en) Positioning welding auxiliary device for central air conditioner
CN219993092U (en) Integrated combined template with disassembling structure
CN218541644U (en) Reinforced concrete reinforced structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20231001

Address after: No. 10 Jingsi Road, High tech Industrial Development Zone, Changji City, Changji Hui Autonomous Prefecture, Xinjiang Uygur Autonomous Region, 831100

Patentee after: Xinjiang Feiya Steel Structure Engineering Co.,Ltd.

Address before: 050000 NO.666 Jianguo Road, Qiaoxi District, Shijiazhuang City, Hebei Province

Patentee before: Jia Aijing

TR01 Transfer of patent right