CN212960185U - Factory building post integral type roofing pipeline bracket - Google Patents

Factory building post integral type roofing pipeline bracket Download PDF

Info

Publication number
CN212960185U
CN212960185U CN202021780650.XU CN202021780650U CN212960185U CN 212960185 U CN212960185 U CN 212960185U CN 202021780650 U CN202021780650 U CN 202021780650U CN 212960185 U CN212960185 U CN 212960185U
Authority
CN
China
Prior art keywords
factory building
pipeline
bracket
roof
pipeline bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021780650.XU
Other languages
Chinese (zh)
Inventor
鲁英东
赵杰红
明正勇
李响
彭瑶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wisdri Engineering and Research Incorporation Ltd
Original Assignee
Wisdri Engineering and Research Incorporation Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wisdri Engineering and Research Incorporation Ltd filed Critical Wisdri Engineering and Research Incorporation Ltd
Priority to CN202021780650.XU priority Critical patent/CN212960185U/en
Application granted granted Critical
Publication of CN212960185U publication Critical patent/CN212960185U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model belongs to the technical field of the pipeline, concretely relates to factory building post integral type roofing pipe support, including pipe support main part and pipe support additional structure, factory building roof system is stretched out on the top of factory building post, and the part that the factory building post stretches out factory building roof system is as the pipe support main part, the top of pipe support main part is provided with the pipe support additional structure that is used for installing the pipeline bracket. The utility model provides a factory building post integral type roofing pipeline bracket is direct to stretch out the part of factory building room lid system with the top of factory building post as the pipe bracket main part to set up the pipe bracket additional structure at the top of pipe bracket main part and expand the structure as the structure outward, an installation need for satisfying the pipeline bracket, make roofing pipeline bracket and factory building post merge into a whole, utilize the great rigidity of factory building post directly to bear the vertical power and the horizontal force of roofing pipeline transmission, compare in the conventional pipeline bracket of arranging on the room lid system, the biography power route is more succinct, the structure atress is more reasonable.

Description

Factory building post integral type roofing pipeline bracket
Technical Field
The utility model belongs to the technical field of the pipeline, concretely relates to factory building post integral type roofing pipeline bracket for factory building roofing major diameter pipeline.
Background
In a metallurgical industry factory building, a dust removal pipe network is often required to be arranged on the roof of the factory building according to the requirements of dust removal points and pipeline arrangement. In particular to an electric furnace steelmaking process, a large amount of smoke and dust is generated in the production process, the dedusting air quantity is large, a large dedusting cover is required to be arranged on a roof, and the diameter of a roof dedusting pipeline is often more than 5 m. The roof pipeline arrangement needs to be provided with corresponding pipeline supports, the roof pipeline supports are conventionally arranged on roof purlines, the supports need to meet the stress requirements, and related purlines, roof trusses and other members in a roof system at the support are required to be reinforced.
Conventional roofing conduit supports have a number of adverse effects on plant structural design: firstly, a pipeline support is arranged on a roof purline, and a support, the roof purline, a roof truss and a roof support system have complex force transmission paths and influence each other, so that difficulty is brought to refined design; secondly, pipeline load acts on the roof system through the pipeline support, and related components of the roof system need to be strengthened, so that the steel consumption of the roof system is increased.
In addition, for large-diameter roof pipelines, because the external rigidity of the plane of the roof system is limited, and the rigidity of members such as roof trusses, purlins and the like is different, the support can be unevenly settled under the action of pipeline load when the roof pipeline support is conventionally arranged on the roof system. The rigidity of the large-diameter pipeline per se even far exceeds the rigidity of each component of the roof system, the deformability is limited, the deformation caused by the support settlement is not coordinated, additional stress can be generated on the pipeline body, and the large-diameter pipeline is extremely unfavorable for normal use.
Disclosure of Invention
In order to overcome the deficiencies in the prior art, the utility model aims at providing a factory building post integral type roofing pipeline bracket that is used for factory building roofing major diameter pipeline to set up, the biography power route is more succinct, and the structure atress is more reasonable.
In order to achieve the purpose, the technical scheme of the utility model be a factory building post integral type roofing pipe support, including pipe support main part and pipe support additional structure, factory building roof system is stretched out on the top of factory building post, and the part that the factory building post stretches out factory building roof system is as the pipe support main part, the top of pipe support main part is provided with the pipe support additional structure that is used for installing the pipeline bracket.
Further, the pipeline bracket auxiliary structure is two expansion components arranged on two sides of the pipeline bracket main body, and the inner side of each expansion component is fixedly connected with the outer wall of the pipeline bracket main body.
Furthermore, the bottom surface of the expansion member is fixedly connected with the outer wall of the pipe bracket main body through a stiffening plate.
Furthermore, the top surface of the extension member is flush with the top surface of the pipeline bracket main body, and a pipeline bracket for installing a roof pipeline is arranged on the top surfaces of the extension member and the pipeline bracket main body.
Furthermore, the top surface of the pipeline bracket is provided with an arc-shaped bracket for mounting the roof pipeline, and the inner diameter of the arc-shaped bracket is matched with the outer diameter of the roof pipeline.
Further, factory building room lid system includes roof boarding, roofing purlin and main body frame, main body frame with factory building post is connected, be equipped with the roofing purlin on the main body frame top surface, the roof boarding set up in on the roofing purlin, the part that the factory building post stretches out the roof boarding is as the conduit bracket main part.
Furthermore, a waterproof structure is arranged between the pipeline bracket main body and the roof panel.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the utility model provides a factory building post integral type roofing pipeline bracket directly is as the pipeline bracket main part with the part that factory building post's top stretches out factory building roof system to set up pipeline bracket additional structure at the top of pipeline bracket main part and expand the structure outward for satisfy the installation needs of pipeline bracket, make roofing pipeline bracket and factory building post merge into a whole, utilize the great rigidity of factory building post directly to bear the vertical force and the horizontal force of roofing pipeline transmission, compare the pipeline bracket of conventional arrangement on the roof system, the biography power route is more succinct, the structural force is more reasonable;
(2) the plant-house column integrated roof pipeline bracket provided by the utility model completely separates the roof pipeline bracket from the plant house cover system, reduces the load acting on the roof panel, and is beneficial to the fine design of the plant house cover system;
(3) the utility model provides a factory building post integral type roofing pipeline bracket utilizes the big and little and even characteristic of settlement volume of the vertical rigidity of factory building post, has reduced roofing pipeline bracket's inhomogeneous settlement, and simultaneously, roofing pipeline bracket and factory building room lid system throw off, has also avoided the adverse effect that roofing pipeline and factory building room lid system component warp uncoordinated production to the roofing pipeline.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a schematic structural diagram of a plant-building column integrated roof pipeline bracket according to an embodiment of the present invention;
in the figure: 1. factory building post, 2, factory building roof system, 3, conduit bracket main part, 4, conduit bracket additional structure, 5, pipeline bracket, 6, roofing pipeline.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on those shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, are not to be construed as limiting the present invention.
The terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature; in the description of the present invention, "a plurality" means two or more unless otherwise specified.
As shown in fig. 1, the embodiment of the utility model provides a factory building post integral type roofing pipe support, including pipe support main part 3 and pipe support additional structure 4, factory building roof system 2 is stretched out on the top of factory building post 1, and the part that factory building post 1 stretches out factory building roof system 2 is as pipe support main part 3, the top of pipe support main part 3 is provided with pipe support additional structure 4 that is used for installing pipeline bracket 5. The direct part that stretches out factory building roof system 2 with the top of factory building post 1 of this embodiment is as conduit bracket main part 3, and set up conduit bracket additional structure 4 at the top of conduit bracket main part 3 and expand the structure outward as the structure, an installation need for satisfying pipeline bracket 5, make roofing conduit bracket and factory building post 1 merge into a whole, utilize the vertical power and the horizontal force of the direct roof pipeline 6 transmission of bearing of 1 great rigidity of factory building post, compare in the conventional conduit bracket of arranging on the roof system, the biography power route is more succinct, the structural stress is more reasonable.
In one embodiment, the pipe bracket attachment structure 4 is two extension members disposed on two sides of the pipe bracket main body 3, and the inner side of each extension member is fixedly connected to the outer wall of the pipe bracket main body 3, so that the pipe bracket attachment structure 4 and the pipe bracket main body 3 form a whole.
Furthermore, the bottom surfaces of the extension members are fixedly connected with the outer wall of the pipe support main body 3 through stiffening plates, so that the overall stability of the pipe support auxiliary structure 4 and the pipe support main body 3 is further improved.
Furthermore, the top surface of the extension member is flush with the top surface of the pipe bracket main body 3, and a pipe bracket 5 for installing a roofing pipe 6 is arranged on the top surface of the extension member and the pipe bracket main body 3. As shown in fig. 1, the pipe bracket attachment structure 4 of the present embodiment is flush with the top surface of the pipe bracket body 3 to facilitate installation of the pipe bracket 5.
Furthermore, the top surface of the pipe bracket 5 is provided with an arc-shaped bracket for installing the roofing pipe 6, and the inner diameter of the arc-shaped bracket is matched with the outer diameter of the roofing pipe 6 so as to be beneficial to the stability of the roofing pipe 6.
Further, factory building room lid system 2 includes roof boarding, roofing purlin and main body frame, main body frame with factory building post 1 is connected, be equipped with the roofing purlin on the main body frame top surface, the roof boarding set up in on the roofing purlin, factory building post 1 stretches out the part of roof boarding is as pipeline bracket main part 3. The big and little and even characteristic of settlement volume of the 1 vertical rigidity of factory building post of utilization of this embodiment, reduced roofing pipe support's inhomogeneous settlement, simultaneously, roofing pipe support and factory building roof system 2 of this embodiment are thrown off completely, have reduced the load that acts on the roof boarding, are favorable to factory building roof system 2 to design more meticulously, have also avoided the adverse effect that roofing pipeline 6 produced to roofing pipeline 6 with the component deformation discordance of factory building roof system 2.
Furthermore, a waterproof structure is arranged between the pipeline bracket main body 3 and the roof panel, and the waterproof structure can be achieved according to a conventional method, so that the waterproof performance of the factory building roof system 2 is improved.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The utility model provides a factory building post integral type roofing pipeline bracket which characterized in that: including pipeline bracket main part and pipeline bracket additional structure, factory building roof system is stretched out on the top of factory building post, and the part that factory building post stretches out factory building roof system is as the pipeline bracket main part, the top of pipeline bracket main part is provided with the pipeline bracket additional structure who is used for installing the pipeline bracket.
2. The plant-building-column integrated roof pipeline bracket as claimed in claim 1, wherein: the auxiliary structure of the pipeline bracket is two expansion components arranged on two sides of the pipeline bracket main body, and the inner side of each expansion component is fixedly connected with the outer wall of the pipeline bracket main body.
3. The plant-building-column integrated roof pipeline bracket as claimed in claim 2, wherein: the bottom surfaces of the expansion components are fixedly connected with the outer wall of the pipeline bracket main body through stiffening plates.
4. The plant-building-column integrated roof pipeline bracket as claimed in claim 2, wherein: the top surface of extension member with the top surface of conduit bracket main part is flush, the extension member with be provided with the pipeline bracket that is used for installing the roofing pipeline on the top surface of conduit bracket main part.
5. The plant-building-column integrated roof duct support of claim 4, wherein: the top surface of the pipeline bracket is provided with an arc-shaped bracket for mounting the roof pipeline, and the inner diameter of the arc-shaped bracket is matched with the outer diameter of the roof pipeline.
6. The plant-building-column integrated roof pipeline bracket as claimed in claim 1, wherein: the factory building roof system comprises a roof panel, a roof purline and a main body frame, wherein the main body frame is connected with the factory building column, the roof purline is arranged on the top surface of the main body frame, the roof panel is arranged on the roof purline, and the part, extending out of the roof panel, of the factory building column is used as a pipeline support main body.
7. The plant-building-column integrated roof pipeline bracket as claimed in claim 6, wherein: and a waterproof structure is arranged between the pipeline bracket main body and the roof panel.
CN202021780650.XU 2020-08-24 2020-08-24 Factory building post integral type roofing pipeline bracket Active CN212960185U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021780650.XU CN212960185U (en) 2020-08-24 2020-08-24 Factory building post integral type roofing pipeline bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021780650.XU CN212960185U (en) 2020-08-24 2020-08-24 Factory building post integral type roofing pipeline bracket

Publications (1)

Publication Number Publication Date
CN212960185U true CN212960185U (en) 2021-04-13

Family

ID=75357674

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021780650.XU Active CN212960185U (en) 2020-08-24 2020-08-24 Factory building post integral type roofing pipeline bracket

Country Status (1)

Country Link
CN (1) CN212960185U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116856709A (en) * 2023-07-18 2023-10-10 中国二十二冶集团有限公司 Method for transversely moving, pushing and installing pipelines on roof of factory building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116856709A (en) * 2023-07-18 2023-10-10 中国二十二冶集团有限公司 Method for transversely moving, pushing and installing pipelines on roof of factory building
CN116856709B (en) * 2023-07-18 2024-04-19 中国二十二冶集团有限公司 Method for transversely moving, pushing and installing pipelines on roof of factory building

Similar Documents

Publication Publication Date Title
CN212960185U (en) Factory building post integral type roofing pipeline bracket
CN212428026U (en) Regularization support is used in hanging flower basket installation
CN216616607U (en) Support structure of steel gutter
CN212200935U (en) Assembled steel structure concrete side fascia, assembled steel structure girder steel and couple formula lightweight concrete side fascia node
RU189656U1 (en) MULTIFUNCTIONAL STOP PAVILION OF PUBLIC TRANSPORT
CN207368934U (en) Roofing photovoltaic stent easy to connect
CN207228708U (en) A kind of folding communication computer room
CN209345068U (en) A kind of house photovoltaic mounting bracket
CN206164449U (en) Adjustable couple of photovoltaic support
CN209676155U (en) A kind of solar photovoltaic bracket guide rail
CN205611081U (en) For military use control cabinet of carbon fiber
CN216920872U (en) Roofing curtain with waterproof construction
CN215172775U (en) Rainwater pipe mounting structure of factory building
CN219863548U (en) Truss switching structure of metal and stone curtain wall
CN216239430U (en) Photovoltaic roof
CN220327817U (en) Novel keep off cigarette vertical wall strengthening mechanism
CN219508929U (en) Curtain wall installation structure integrally designed with main body steel structure
CN216215224U (en) Weak current engineering equipment mounting bracket
CN216042058U (en) Roofing module suitable for novel industrialization modular housing construction system
CN214220768U (en) Industrial building room convenient to dismantle of installation
CN219732558U (en) Photovoltaic support and photovoltaic system
CN212408897U (en) Air conditioner supporting mechanism for smart city
CN213508908U (en) Stable low-pollution steel structure
CN213572695U (en) Freely loose water steel constructs factory building roofing eaves mouth node construction
CN216949647U (en) Simply supported purlin reinforced structure