CN212957572U - Guide rail pair replacing piece - Google Patents
Guide rail pair replacing piece Download PDFInfo
- Publication number
- CN212957572U CN212957572U CN202021080039.6U CN202021080039U CN212957572U CN 212957572 U CN212957572 U CN 212957572U CN 202021080039 U CN202021080039 U CN 202021080039U CN 212957572 U CN212957572 U CN 212957572U
- Authority
- CN
- China
- Prior art keywords
- reinforcing plate
- guide rail
- riser
- horizontal reinforcing
- vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
Abstract
The utility model discloses a guide rail is to changing, including two vertical angle irons of arranging, every angle iron all includes first riser and second riser, all is equipped with the mounting hole on first riser and second riser, and the first riser orientation of two angle irons is opposite and in same vertical plane, and the second riser orientation of two angle irons is opposite, is equipped with first horizontal reinforcing plate between two angle irons, is equipped with two oblique reinforcing plates in the upper and lower both sides of first horizontal reinforcing plate, still is equipped with the horizontal reinforcing plate of second in the outside of every oblique reinforcing plate. The utility model discloses attaching the wall point when elevator guide just at the terminal surface of the shear force wall of structure, wearing the unable pre-buried of wall screw rod, when needing to remove elevator guide's position, can carry out appropriate removal adjustment to elevator guide's position through the guide rail to changing, it is big to avoid adjacent elevator guide interval deviation, guarantees that the support body atress is balanced.
Description
Technical Field
The utility model relates to an attached lifting scaffold field, especially guide rail are to changing.
Background
The attached lifting scaffold, commonly called climbing frame, is a new scaffold technology rapidly developed in the early century of this century, and has important influence on the building construction technology in China. The attached lifting scaffold is erected at a certain height and attached to an engineering structure, and can climb or descend layer by layer along with the engineering structure by depending on a lifting device of the attached lifting scaffold. The multifunctional hanging rack changes high-altitude operation into low-altitude operation and changes suspended operation into operation inside the rack body, and has the characteristics of overturn prevention, falling prevention, economy, safety, convenience and the like.
Some current buildings, especially residential buildings require that the building type daylighting is good, ventilate well, so what present residential building pursue is that the appearance is diversified, the negative and positive angle is also corresponding more, some elevating guide's the minimum distance that attaches the wall point just at the terminal surface of the shear force wall of structure, it can't be pre-buried to wear the wall screw, just so need remove elevating guide's position, because current elevating guide fixes in the pole setting, elevating guide's the minimum distance of adjusting at every turn is exactly the interval between two pole settings, lead to elevating guide's interval deviation big, the support body atress is uneven, can cause the serious deformation of support body structure, there is very big potential safety hazard.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the not enough of above-mentioned prior art and providing one kind and can carry out appropriate adjustment to lifting guide's position, the interval deviation of avoiding appearing adjacent lifting guide is big, guarantees that support body atress is balanced guide rail to changing.
In order to achieve the purpose, the utility model discloses a guide rail is to changing piece, including two vertical angle irons of arranging, every angle iron all includes riser and secondary riser, all is equipped with the mounting hole on riser and secondary riser, and the riser of two angle irons is opposite and in same vertical plane, and the secondary riser of two angle irons is opposite in orientation, is equipped with first horizontal reinforcing plate between two angle irons, the one end welding of first horizontal reinforcing plate is on the riser of left side angle iron, and the other end welding is on the secondary riser of right side angle iron, is equipped with two oblique reinforcing plates of symmetrical arrangement in the upper and lower both sides of first horizontal reinforcing plate, and the one end welding of oblique reinforcing plate is on the secondary riser of left side angle iron, and the other end welding is on the secondary riser of right side angle iron, still is equipped with second horizontal reinforcing plate in the outside of every oblique reinforcing plate, and the one end welding of second horizontal reinforcing plate is on the secondary riser of left side angle iron, The other end is welded on the first vertical plate of the right angle iron.
In order to make the whole structure more compact, the included angle between two oblique reinforcing plates is an acute angle.
The utility model discloses the guide rail that obtains is to changing, and its technical effect is that attaching the wall point when elevating rail just at the terminal surface of the shear force wall of structure, and it is unable pre-buried to wear the wall screw rod, when needing to remove elevating rail's position, can carry out appropriate removal adjustment to elevating rail's position through the guide rail to changing, installs elevating rail between two pole settings, avoids elevating rail interval deviation big, guarantees that the support body atress is balanced.
Drawings
FIG. 1 is a schematic view showing a configuration of a rail pair replacement in embodiment 1;
FIG. 2 is a schematic view of the connection between the main frame of the guide rail and the vertical rod via the rail interchanger;
FIG. 3 is an enlarged view of portion A of FIG. 2;
FIG. 4 is another schematic view of the guide rail main frame and the vertical rod connected by the guide rail pair change member;
FIG. 5 is an enlarged view of portion B of FIG. 5;
figure 6 is a schematic view of the arrangement of the lifting rail fixed between two uprights.
In the figure: angle bar 1, first riser 2, second riser 3, mounting hole 4, first horizontal reinforcing plate 5, oblique reinforcing plate 6, second horizontal reinforcing plate 7, lifting guide 8, guide rail main frame 9, pole setting 10, first slotted hole 11, second slotted hole 12.
Detailed Description
The present invention will be further explained with reference to the drawings and examples.
Example 1:
as shown in fig. 1, the guide rail replacing part provided by this embodiment includes two vertically arranged angle irons 1, the upper and lower ends of the two angle irons 1 are flush with each other, each angle iron 1 includes a first vertical plate 2 and a second vertical plate 3, mounting holes 4 are provided on the first vertical plate 2 and the second vertical plate 3, the first vertical plates 2 of the two angle irons 1 face opposite directions and are located in the same vertical plane, the second vertical plates 3 of the two angle irons 1 face opposite directions, a first horizontal reinforcing plate 5 is provided between the two angle irons 1, one end of the first horizontal reinforcing plate 5 is welded on the first vertical plate 2 of the left angle iron 1, the other end is welded on the second vertical plate 3 of the right angle iron 1, two symmetrically arranged oblique reinforcing plates 6 are provided on the upper and lower sides of the first horizontal reinforcing plate 5, one end of the reinforcing plate 6 is welded on the second vertical plate 3 of the left angle iron 1, the other end is welded on the second vertical plate 3 of the right angle iron 1, and a second horizontal reinforcing plate 7 is further arranged on the outer side of each inclined reinforcing plate 6, one end of each second horizontal reinforcing plate 7 is welded to the second vertical plate 3 of the left angle iron 1, and the other end of each second horizontal reinforcing plate 7 is welded to the first vertical plate 2 of the right angle iron 1.
The included angle between the two oblique reinforcing plates 6 is an acute angle.
As shown in fig. 2-5, under the prior art, the lifting guide rail 8 and the guide rail main frame 9 are integrated, and only the guide rail main frame 9 needs to be fixed when being fixed, when in specific use, the guide rail main frame 9 is fixed on one side of the vertical rod 10 through the guide rail replacing piece, the angle iron 1 on the left side of the guide rail replacing piece is fixed with the corresponding vertical rod 10, the angle iron 1 on the right side of the guide rail replacing piece is fixed with the guide rail main frame 9, the angle iron 1 on the side fixed with the vertical rod 10 is respectively matched with the first slotted holes 11 on two adjacent faces of the vertical rod 10 through the mounting holes 4 on the two vertical plates and then is fastened by using bolts, and the angle iron 1 on the side fixed with the guide rail main frame 9 is respectively matched with the second slotted holes 12 on two adjacent faces of the guide rail main frame.
In the specific implementation process, according to the requirement of the distance adjusted by the lifting guide rail, the guide rail pair changing piece is designed with different installation width specifications (the installation width refers to the distance from the lifting guide rail to the corresponding upright post after the lifting guide rail is installed on the corresponding upright post through the guide rail pair changing piece), and the guide rail pair changing piece can be installed on the left side or the right side of the upright post 10 according to the actual situation on site.
As shown in fig. 6, it is assumed that the right vertical rod 10 faces the end surface of the shear wall of the structure, the lifting guide rail 8 needs to be installed on the right vertical rod 10, which results in the wall attachment point of the lifting guide rail 8 being just at the end surface of the shear wall of the structure, the wall-through screw cannot be pre-embedded, the wall attachment point is moved according to the existing frame structure, the lifting guide rail 8 needs to be installed on the left vertical rod 10, the moving span is large, the interval deviation of the lifting guide rail is large, at this time, the guide rail pair with the appropriate specification can be selected according to the width of the shear wall, the lifting guide rail 8 is installed between the two vertical rods 10, so that the lifting guide rail 8 can be installed perfectly, and the interval deviation of the lifting.
Claims (2)
1. The guide rail replacing part comprises two vertically-arranged angle irons (1), and is characterized in that each angle iron (1) comprises a first vertical plate (2) and a second vertical plate (3), mounting holes (4) are formed in the first vertical plate (2) and the second vertical plate (3), the first vertical plates (2) of the two angle irons (1) face oppositely and are located in the same vertical plane, the second vertical plates (3) of the two angle irons (1) face oppositely, a first horizontal reinforcing plate (5) is arranged between the two angle irons (1), one end of the first horizontal reinforcing plate (5) is welded to the first vertical plate (2) of the left angle iron (1), the other end of the first horizontal reinforcing plate is welded to the second vertical plate (3) of the right angle iron (1), two symmetrically-arranged oblique reinforcing plates (6) are arranged on the upper side and the lower side of the first horizontal reinforcing plate (5), one end of each oblique reinforcing plate (6) is welded to the second vertical plate (3) of the left angle iron (1), and one end of each oblique reinforcing plate is welded to the second vertical plate (3), The other end is welded on a second vertical plate (3) of the right angle iron (1), a second horizontal reinforcing plate (7) is further arranged on the outer side of each inclined reinforcing plate (6), one end of each second horizontal reinforcing plate (7) is welded on the second vertical plate (3) of the left angle iron (1), and the other end of each second horizontal reinforcing plate is welded on a first vertical plate (2) of the right angle iron (1).
2. A guide rail pair change according to claim 1, characterized in that the angle between the two oblique reinforcing plates (6) is acute.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021080039.6U CN212957572U (en) | 2020-06-12 | 2020-06-12 | Guide rail pair replacing piece |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021080039.6U CN212957572U (en) | 2020-06-12 | 2020-06-12 | Guide rail pair replacing piece |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212957572U true CN212957572U (en) | 2021-04-13 |
Family
ID=75385444
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021080039.6U Active CN212957572U (en) | 2020-06-12 | 2020-06-12 | Guide rail pair replacing piece |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212957572U (en) |
-
2020
- 2020-06-12 CN CN202021080039.6U patent/CN212957572U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2020052291A1 (en) | Construction elevator wall-attaching frame mounting platform attached to steel platform formwork and method therefor | |
CN211499713U (en) | All-steel attached lifting scaffold | |
CN210263861U (en) | Attached lifting scaffold protective device | |
CN113323365A (en) | Elevator shaft protection platform and construction method | |
CN202099993U (en) | Lift type external scaffold made of square steel pipes | |
CN212957572U (en) | Guide rail pair replacing piece | |
CN212836630U (en) | All-steel integrated operation scaffold | |
CN213626572U (en) | Tool type external cantilever operation platform | |
CN111851982A (en) | Scaffold frame liftable prevents weighing down safety device | |
CN206646409U (en) | Bridge construction scaffold in a kind of cast-in-place T beams | |
CN210393320U (en) | Novel rope clamping device installation device | |
CN210685334U (en) | Assembly type building external hanging platform | |
CN110723647B (en) | Movable hoisting device capable of being accurately matched for bridge construction | |
CN210530363U (en) | Gradual change formula triangle-shaped curtain skeleton construction operation platform | |
CN210084690U (en) | Hoistway with elevator | |
CN210086058U (en) | Matching type operating platform | |
CN206126696U (en) | A detachable indoor hoist for buckling restrained brace | |
CN217759915U (en) | Steel platform for installing and operating column base of steel column of independent column of electronic factory building | |
CN217840301U (en) | Support-free assembled type elevator shaft concrete member | |
CN210713769U (en) | Wall-attached support for attached lifting scaffold | |
CN214246549U (en) | Fabricated climbing frame for constructional engineering | |
CN210316498U (en) | Scaffold board bracket and connecting system of scaffold board bracket and guide rail | |
CN210263768U (en) | High-strength, positioning and quick-mounting type elevator shaft steel structure | |
CN220058774U (en) | Split heads hanging basket suspension | |
CN211473311U (en) | Movable adjustable tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |