CN212945293U - Steadiness template for steel construction - Google Patents

Steadiness template for steel construction Download PDF

Info

Publication number
CN212945293U
CN212945293U CN202021653227.3U CN202021653227U CN212945293U CN 212945293 U CN212945293 U CN 212945293U CN 202021653227 U CN202021653227 U CN 202021653227U CN 212945293 U CN212945293 U CN 212945293U
Authority
CN
China
Prior art keywords
baffle
seted
steel construction
template
fixed plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021653227.3U
Other languages
Chinese (zh)
Inventor
张�浩
陈凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Acura Machinery Manufacturing Co ltd
Original Assignee
Nanjing Acura Machinery Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Acura Machinery Manufacturing Co ltd filed Critical Nanjing Acura Machinery Manufacturing Co ltd
Priority to CN202021653227.3U priority Critical patent/CN212945293U/en
Application granted granted Critical
Publication of CN212945293U publication Critical patent/CN212945293U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a steadiness template for steel construction, including baffle A and baffle B, the draw-in groove has been seted up at baffle A upper and lower both ends, and baffle A right-hand member surface is seted up flutedly, and the draw-in groove has been seted up at baffle B upper and lower both ends, and baffle B pours the front end and is equipped with the lug, and both ends are equipped with the fixed plate through the bolt fastening about the baffle surface, and the fixed plate has seted up the fixed orifices, and the fixed plate surface is equipped with the connecting rod through the welding, and the connecting rod lower extreme is equipped with the electromagnetism piece through the welding, baffle A and baffle B all pour to form for cement, and baffle A all sets up flutedly about baffle A, the lug has all been seted up at both ends about baffle B, and baffle A and baffle B are long wide the same, and baffle A is connected through the buckle, The time-saving advantage is built, and the problems in the prior art are solved.

Description

Steadiness template for steel construction
Technical Field
The utility model discloses steel construction steadiness template technical field, concretely relates to is a steadiness template for steel construction.
Background
At present steel construction pour the in-process, need utilize cement to make a template frame in advance, later pour the molten steel in the frame, and then pour the steel construction, but present template frame sets up and need consume a large amount of time, and be unfavorable for dismantling, and the damage efficiency is high, and the adoption of being not convenient for to above-mentioned problem, we propose a high and detachable steel construction template of installation stability.
In the prior art, the steel structure stability formwork is not easy to disassemble, high in damage efficiency, complex in structure and time-consuming for erecting the formwork frame, so that the steel structure stability formwork is needed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a steadiness template for steel construction has possessed and has done benefit to the dismantlement, not fragile, simple structure, builds the advantage of saving time, has solved prior art's problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a steadiness template for steel construction, includes baffle A and baffle B, the draw-in groove has been seted up at baffle A upper and lower both ends, baffle A right-hand member surface is seted up flutedly, the draw-in groove has been seted up at baffle B upper and lower both ends, baffle B front end is pour and is equipped with the lug, both ends are equipped with the fixed plate through the bolt fastening about the baffle surface, the fixed orifices has been seted up to the fixed plate, the fixed plate surface is equipped with the connecting rod through the welding, the connecting rod lower extreme is equipped with the electromagnetism.
Preferably, the baffle A and the baffle B are both formed by pouring cement.
Preferably, both ends all set up the lug that both ends are equal around recess and baffle B about baffle A, the suit is connected, baffle A and baffle B length and width are the same.
Preferably, the bumps are rectangular in shape.
Preferably, the connecting rod is L-shaped.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model provides a steadiness template for steel construction, is fixed through the buckle through controlling baffle A and front and back baffle B, and the draw-in groove has all been seted up at both ends about the baffle, simple structure, and convenient the dismantlement, baffle A and baffle B all adopt cement to make, and is firm stable, not fragile.
2. The utility model provides a steadiness template for steel construction, passes through the fixed orifices fixed electromagnet on the fixed plate through the baffle surface, conveniently dismantles the maintenance, and the terminal electromagnetism piece of connecting rod can automatic actuation when circular telegram, strengthens the stability of heightening the baffle, builds laborsaving saving time.
Drawings
Fig. 1 is a schematic view of an overall cross-sectional structure of a stable formwork for a steel structure according to the present invention;
fig. 2 is a structural view of a left baffle and a right baffle of the stability template for the steel structure of the utility model;
fig. 3 is a structural view of the left and right baffle plates of the stability formwork for the steel structure of the present invention;
fig. 4 is the utility model relates to an electric structure chart of steadiness template for steel construction.
The figures are labeled as follows: 1. a baffle A; 2. a baffle B; 3. a card slot; 4. a groove; 5. a bump; 6. a fixing hole; 7. a connecting rod; 8. an electromagnetic block; 9. and (7) fixing the plate.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative work belong to the protection scope of the present invention based on the embodiments of the present invention.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Example 1:
referring to fig. 1, 2, 3 and 4, a stability formwork for a steel structure comprises a baffle plate a1 and a baffle plate B2, wherein the upper end and the lower end of a baffle plate a1 are provided with clamping grooves 3, the right end surface of a baffle plate a1 is provided with a groove 4, the upper end and the lower end of a baffle plate B2 are provided with clamping grooves 3, the front end of a baffle plate B2 is poured with a lug 5, the upper end and the lower end of the surfaces of a baffle plate a1 and a baffle plate B2 are fixedly provided with fixing plates 9 through bolts, the fixing plates 9 are provided with fixing holes 6, the four end surfaces of the fixing plates 9 are provided with connecting rods 7 through welding, the lower ends of the connecting rods 7 are provided with electromagnetic blocks 8 through welding, the baffle plate a1 and the baffle plate B2 are both formed by cement pouring, the left end and the right end of the baffle plate a1 are provided with grooves 4 and the;
specifically, pass through the buckle through baffle A1 and front and back baffle B2 about through, form a rectangle, baffle A1 all is equipped with recess 4 about, make things convenient for the molten steel to form, surfacing, baffle B2 is all pour and is equipped with lug 5 around, it is convenient to make the cross section of pouring, surfacing, draw-in groove 3 has all been seted up from top to bottom to the baffle, it is fixed to conveniently increase the baffle, the baffle surface all is fixed on the surface through fixed orifices 6 that fixed plate 9 was seted up, fixed plate 9 surfacing is equipped with connecting rod 7, for the convenience fixed electromagnet piece 8. The additional installation of the electromagnetic block 8 is a baffle for strengthening, fixing and heightening, and the upper part and the lower part of all the baffles are provided with clamping grooves 3.
The working principle is as follows: the utility model provides a steadiness template for steel construction, baffle A1 is connected with baffle B2 buckle around through controlling, form a rectangle, baffle A1 is the recess 4 at both ends about, be for the steel construction both ends thickening, the lug 5 at both ends around the baffle B2, be connected for steel construction cross section and control both ends, the steel construction of messenger is as an organic whole, it is more durable to make the steel construction, draw-in groove 3 on the baffle, it is fixed for heightening the baffle, also be for the steel construction not so big arch of junction when shaping, the baffle surface is through the fixed electro-magnet of fixed orifices 6 on the fixed plate 9, the maintenance is dismantled to the convenience, 7 terminal electromagnetism pieces 8 of connecting rod can automatic actuation during the circular telegram, strengthen the stability of heightening the baffle.
Having shown and described the basic principles and principal features of the invention and advantages thereof, it will be apparent to those skilled in the art that the invention is not limited to the details of the foregoing exemplary embodiments, but is capable of other specific forms without departing from the spirit or essential characteristics thereof; the present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein, and any reference signs in the claims are not intended to be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. The utility model provides a steadiness template for steel construction which characterized in that: including baffle A (1) and baffle B (2), draw-in groove (3) have been seted up at both ends about baffle A (1), baffle A (1) right-hand member surface is seted up flutedly (4), draw-in groove (3) have been seted up at both ends about baffle B (2), baffle B (2) front end is pour and is equipped with lug (5), baffle A (1) and baffle B (2) both ends are equipped with fixed plate (9) through the bolt fastening about the surface, fixed orifices (6) have been seted up in fixed plate (9), four end surfaces of fixed plate (9) are equipped with connecting rod (7) through the welding, connecting rod (7) lower extreme is equipped with electromagnetic block (8) through the welding.
2. The stability formwork of claim 1, wherein: the baffle A (1) and the baffle B (2) are both formed by pouring cement.
3. The stability formwork of claim 1, wherein: both ends all set up about baffle A (1) protruding block (5) that both ends are equal around recess (4) and baffle B (2), the suit is connected, and baffle A (1) is the same with baffle B (2) length and width.
4. The stability formwork of claim 1, wherein: the projection (5) is rectangular in shape.
5. The stability formwork of claim 1, wherein: the connecting rod (7) is L-shaped.
CN202021653227.3U 2020-08-11 2020-08-11 Steadiness template for steel construction Active CN212945293U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021653227.3U CN212945293U (en) 2020-08-11 2020-08-11 Steadiness template for steel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021653227.3U CN212945293U (en) 2020-08-11 2020-08-11 Steadiness template for steel construction

Publications (1)

Publication Number Publication Date
CN212945293U true CN212945293U (en) 2021-04-13

Family

ID=75351509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021653227.3U Active CN212945293U (en) 2020-08-11 2020-08-11 Steadiness template for steel construction

Country Status (1)

Country Link
CN (1) CN212945293U (en)

Similar Documents

Publication Publication Date Title
CN212945293U (en) Steadiness template for steel construction
CN214834713U (en) Die carrier that side wall and bottom plate were pour simultaneously
CN215717143U (en) Concrete placement steel form system of adjustable size
CN202831617U (en) Large-scale integrated steel template
CN210562223U (en) Slope protection template with arch framework
CN215150187U (en) Prefabricated plate pouring mold of antiseep
CN213062931U (en) Anti-bank reinforcing apparatus of aluminium mould
CN210530084U (en) Open type steel reinforced concrete composite truss floor
CN211498922U (en) Box girder contact net foundation construction template
CN204983681U (en) Novel reinforcing bar hopper
CN209924187U (en) High-rise building is roof beam mounting structure even convenient to construction
CN218668487U (en) Electromagnetic connection's template for concrete structure construction
CN212201284U (en) Combined large pier column steel formwork
CN214879479U (en) Boiler top beam
CN220133510U (en) Civil engineering construction pouring template convenient to splice
CN111485704A (en) Ceramic tile paving frame
CN110919825A (en) Large die table die for plate type prefabricated part assembly line construction
CN217711588U (en) A portable auxiliary device for tall and big space wall stone material vertical hoisting
CN205171991U (en) Compound template of steel aluminium
CN212356331U (en) Embedded part for ribbed disc type tower crane
CN216831496U (en) Core mold structure for prefabricated part mold of exhaust and smoke exhaust duct of assembled subway station
CN211898347U (en) Prefabricated part and cast-in-place integral concrete frame structure of building assembly
CN210195240U (en) Cylindrical form
CN215054297U (en) Quick assembly structure that wall body was pour in advance
CN215165790U (en) Make things convenient for rag bolt fixing device of dismouting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant