CN212936921U - Domatic greening structure of afforestation engineering - Google Patents

Domatic greening structure of afforestation engineering Download PDF

Info

Publication number
CN212936921U
CN212936921U CN202021632040.5U CN202021632040U CN212936921U CN 212936921 U CN212936921 U CN 212936921U CN 202021632040 U CN202021632040 U CN 202021632040U CN 212936921 U CN212936921 U CN 212936921U
Authority
CN
China
Prior art keywords
water
greening
pipe
platform
diversion platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021632040.5U
Other languages
Chinese (zh)
Inventor
林耽
龙永丰
张其来
肖鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Hengtai Construction Co Ltd
Original Assignee
Guangdong Hengtai Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Hengtai Construction Co Ltd filed Critical Guangdong Hengtai Construction Co Ltd
Priority to CN202021632040.5U priority Critical patent/CN212936921U/en
Application granted granted Critical
Publication of CN212936921U publication Critical patent/CN212936921U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The utility model discloses a landscaping engineering slope greening structure, which comprises a fixed ladder platform, wherein the upper side of the fixed ladder platform is provided with a flow guide platform and a greening installation groove, the greening installation groove is positioned between the upper and lower adjacent flow guide platforms, one side of the bottom of the fixed ladder platform is provided with a reservoir, the bottom of the reservoir is connected with a water supply pipe which runs through the fixed ladder platform, the flow guide platforms are three, water is sprayed out from a water spray pipe and a spray head through the structures to spray the greening installation groove, redundant water can flow to the flow guide platform and finally flow into the reservoir due to the inclined structure of the greening installation groove, circulation is realized, the connecting part of the greening installation groove and the flow guide platform is provided with water guide holes, and only comprehensive spraying can be realized, and the water can also flow into soil through the water guide holes to be moist without wasting excessive water, the design is more reasonable and convenient.

Description

Domatic greening structure of afforestation engineering
Technical Field
The utility model belongs to the technical field of the afforestation slope and specifically relates to a domatic greening structure of afforestation engineering is related to.
Background
At present, greening vegetation can be planted on some engineering slopes, but the vegetation spraying system of the engineering slope can not comprehensively spray vegetation on the engineering slope, so that some vegetation can not obtain moisture and is subjected to drought necrosis, excessive water resources are wasted, and the greening engineering slope greening structure is not in accordance with the green environmental protection concept, so that the greening engineering slope greening structure which can comprehensively spray vegetation and can save water sources is necessary to be provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a domatic greening structure of afforestation engineering to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a domatic afforestation structure of afforestation engineering, includes fixed halfpace, fixed halfpace upside install water conservancy diversion platform and afforestation mounting groove, the afforestation mounting groove be located between the upper and lower adjacent water conservancy diversion platform, fixed halfpace bottommost one side install the cistern, cistern bottom be connected with and run through the water pipe of fixed halfpace, the water conservancy diversion platform be provided with threely, threely the water conservancy diversion platform inside install respectively with the water pipe first water pipe, second water pipe and the third water pipe that are connected, threely water conservancy diversion platform top be provided with respectively with first water pipe, second water pipe and the third water pipe spray pipe that is connected, the spray pipe both ends install the shower head.
As a further technical scheme of the utility model, afforestation mounting groove tilting install in the water conservancy diversion platform direct, the afforestation mounting groove in be provided with the baffle, the baffle be provided with 4, and form first afforestation vegetation between the adjacent baffle and place the chamber and the chamber is placed to second afforestation vegetation, first afforestation vegetation place the chamber area and be less than second afforestation vegetation place the chamber.
As a further technical scheme of the utility model, water conservancy diversion platform inboard side symmetry seted up the guiding gutter.
As a further technical scheme of the utility model, afforestation mounting groove with water conservancy diversion platform be connected the department and be provided with the water guide hole.
As the utility model discloses further technical scheme, cistern liquid level highly be less than the minimum afforestation mounting groove height, just the cistern outside vertical install the breakwater, the water injection pipe is installed to the top, the water injection pipe install the valve.
Compared with the prior art, the beneficial effects of the utility model are that: after vegetation and soil are installed in a first greening vegetation placing cavity and a second greening vegetation placing cavity, covering the surface with grids, fixing the grids by screws through screw holes, pumping water from a water storage tank through a water feeding pipe, wherein the tail end of the water feeding pipe is provided with a booster pump, a first lifting pump, a second lifting pump and a third lifting pump are respectively installed in the first water feeding pipe, the second water feeding pipe and the third water feeding pipe, water is sprayed out from a water spraying pipe and a spraying head through the structures, a greening mounting groove is sprayed, redundant water flows to a flow guide platform due to the inclined structure of the greening mounting groove and finally flows into the water storage tank, circulation is realized, a water guide hole is formed at the joint of the greening mounting groove and the flow guide platform, and the greening mounting groove and the flow guide platform can only realize comprehensive spraying and can also flow into soil through the water guide hole to be moist without wasting excessive water, the design is more reasonable and convenient.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a top view of the greening mounting groove of the present invention.
Fig. 3 is a top view of the diversion platform of the present invention.
Wherein: the greening vegetation placing device comprises a fixed terrace 1, a greening mounting groove 2, a first greening vegetation placing cavity 2-1, a second greening vegetation placing cavity 2-2, a partition plate 2-3, screw holes 2-4, a flow guide platform 3, a flow guide groove 3-1, a water storage tank 4, a water baffle 5, a water injection pipe 6, a valve 7, a first water feeding pipe 8, a second water feeding pipe 9, a third water feeding pipe 10, a water feeding pipe 11, a booster pump 12, a first lifting pump 13, a second lifting pump 14, a third lifting pump 15, a water spraying pipe 16, a spray header 17 and a water guide hole 18.
Detailed Description
The following describes embodiments of the present invention with reference to the drawings and preferred embodiments.
Please refer to fig. 1-3, which are combined together, a landscaping engineering slope greening structure comprises a fixed terrace 1, a diversion platform 3 and a greening installation groove 2 are installed on the upper side of the fixed terrace 1, the greening installation groove 2 is located between the upper and lower adjacent diversion platforms 3, a reservoir 4 is installed on one side of the bottom of the fixed terrace 1, the bottom of the reservoir 4 is connected with a water supply pipe 11 penetrating through the fixed terrace 1, the diversion platforms 3 are provided with three diversion platforms 3, a first water supply pipe 8, a second water supply pipe 9 and a third water supply pipe 10 which are connected with the water supply pipe 11 are respectively installed in the three diversion platforms 3, water spray pipes 16 which are respectively connected with the first water supply pipe 8, the second water supply pipe 9 and the third water supply pipe 10 are arranged above the three diversion platforms 3, spray heads 17 are installed at two ends of the water spray pipes 16, the greening mounting groove 2 is obliquely mounted on the diversion platform 3 directly, a partition plate 2-3 is arranged in the greening mounting groove 2, 4 partition plates 2-3 are arranged, a first greening vegetation placing cavity 2-1 and a second greening vegetation placing cavity 2-2 are formed between the adjacent partition plates 2-3, the area of the first greening vegetation placing cavity 2-1 is smaller than that of the second greening vegetation placing cavity 2-2, a screw hole 2-4 for fixing vegetation is formed in each partition plate 2-3, the first greening vegetation placing cavity 2-1 and the second greening vegetation placing cavity 2-2, and greening and soil are covered on the surface by a grid after being mounted in the first greening vegetation placing cavity 2-1 and the second greening vegetation placing cavity 2-2, and wear to establish the fixed net of screw through screw 2-4 and realize fixing, draw water through delivery pipe 11 in the follow cistern 4, wherein, delivery pipe 11 end install booster pump 12, first upper hose 8, second upper hose 9 and third upper hose 10 in install first elevator pump 13, second elevator pump 14 and third elevator pump 15 respectively, spout water from spray pipe 16 and shower head 17 through above structure, spray afforest mounting groove 2, unnecessary water can flow to water conservancy diversion platform 3 and flow into cistern 4 at last because the structure that afforest mounting groove 2 slope set up, realizes the circulation, afforest mounting groove 2 with water conservancy diversion platform 3 junction be provided with guiding hole 18, only can realize spraying comprehensively also can flow into moist in the soil through guiding hole 18, not extravagant too much water, the design is more reasonable, and is convenient.
Furthermore, the inner side of the diversion platform 3 is symmetrically provided with diversion trenches 3-1, so that water can be conveniently collected into the reservoir 4.
Further, 4 liquid level height of cistern be less than 2 height of minimum afforestation mounting groove, just 4 outside vertical breakwaters 5 of installing of cistern, water injection pipe 6 is installed to the top, water injection pipe 6 install valve 7, highly so design avoids the bad soil of water logging, sets up valve 7 convenient control simultaneously.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. The utility model provides a domatic greening structure of afforestation engineering, includes fixed halfpace (1), a serial communication port, fixed halfpace (1) upside install water conservancy diversion platform (3) and afforestation mounting groove (2), afforestation mounting groove (2) be located between upper and lower adjacent water conservancy diversion platform (3), fixed halfpace (1) bottommost one side install cistern (4), cistern (4) bottom be connected with and run through water supply pipe (11) of fixed halfpace (1), water conservancy diversion platform (3) be provided with threely, threely water conservancy diversion platform (3) inside install respectively with water supply pipe (11) be connected first water pipe (8), second water supply pipe (9) and third water supply pipe (10), three water conservancy diversion platform (3) top be provided with respectively with first water supply pipe (8), And the second water feeding pipe (9) and the third water feeding pipe (10) are connected with each other through a water spraying pipe (16), and two ends of the water spraying pipe (16) are provided with spray headers (17).
2. The slope greening structure of the landscaping project according to claim 1, wherein the greening mounting groove (2) is obliquely installed on the diversion platform (3) directly, a partition plate (2-3) is arranged in the greening mounting groove (2), 4 partition plates (2-3) are arranged, a first greening vegetation placing cavity (2-1) and a second greening vegetation placing cavity (2-2) are formed between the adjacent partition plates (2-3), and the area of the first greening vegetation placing cavity (2-1) is smaller than that of the second greening vegetation placing cavity (2-2).
3. The slope greening structure of the landscaping project as defined in claim 1, wherein the diversion platform (3) is symmetrically provided with diversion trenches (3-1) on the inner surface.
4. A landscaping structure on a landscaping engineering slope according to claim 1, wherein a water guide hole (18) is formed at the connection of the greening installation groove (2) and the diversion platform (3).
5. The slope greening structure of the landscaping project according to claim 1, wherein the liquid level of the reservoir (4) is lower than the height of the lowest greening installation groove (2), a water baffle (5) is vertically installed at the outer side of the reservoir (4), a water injection pipe (6) is installed above the water baffle, and a valve (7) is installed on the water injection pipe (6).
CN202021632040.5U 2020-08-07 2020-08-07 Domatic greening structure of afforestation engineering Active CN212936921U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021632040.5U CN212936921U (en) 2020-08-07 2020-08-07 Domatic greening structure of afforestation engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021632040.5U CN212936921U (en) 2020-08-07 2020-08-07 Domatic greening structure of afforestation engineering

Publications (1)

Publication Number Publication Date
CN212936921U true CN212936921U (en) 2021-04-13

Family

ID=75348838

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021632040.5U Active CN212936921U (en) 2020-08-07 2020-08-07 Domatic greening structure of afforestation engineering

Country Status (1)

Country Link
CN (1) CN212936921U (en)

Similar Documents

Publication Publication Date Title
CN205946785U (en) Water conservation gardens irrigation equipment
CN212936921U (en) Domatic greening structure of afforestation engineering
CN214015179U (en) Greening energy-saving building outer wall decoration
CN212344666U (en) A water conservation nursery for landscape garden design
CN111387021B (en) Cloud control intelligent agricultural ecological irrigation system
CN210597906U (en) Roof greening layer drainage structure
CN216292292U (en) Roof greening structure with waterproof and heat-insulating effects
CN217884538U (en) Artificial planting geogrid for inclined roof
CN106718781B (en) Mist culture production system with step distribution of sunlight greenhouse
CN212993554U (en) Water-saving accurate drip irrigation device for crop cultivation
CN210406527U (en) Retaining wall control by temperature change formula afforestation equipment
CN210580378U (en) Retaining wall timing control formula afforestation equipment
CN217160707U (en) Aerial floriculture water-retaining matrix wall
CN112359914A (en) High-drop injection energy-saving water supply system
CN219080359U (en) Improved ecological side slope structure
CN218784126U (en) A watering plants frame for vegetable planting
CN216017998U (en) Three-dimensional greening wall water circulating system
CN221784746U (en) Ecological building greening curtain wall
CN220044281U (en) Municipal construction afforestation barricade
CN213548892U (en) Device for improving survival rate of landscaping nursery stocks
CN217011927U (en) Plant wall assembly and plant wall
CN215774455U (en) Buried water-saving irrigation device for expressway green isolation belt
CN216567303U (en) Domatic afforestation structure of garden engineering
CN218292025U (en) Ecological side slope protection retaining wall
CN218970275U (en) Modularized flower pond type water scattering structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant