CN212926962U - Scaffold for building construction - Google Patents
Scaffold for building construction Download PDFInfo
- Publication number
- CN212926962U CN212926962U CN202020475281.7U CN202020475281U CN212926962U CN 212926962 U CN212926962 U CN 212926962U CN 202020475281 U CN202020475281 U CN 202020475281U CN 212926962 U CN212926962 U CN 212926962U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- construction
- fixedly connected
- support body
- spring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009435 building construction Methods 0.000 title claims abstract description 7
- 238000010276 construction Methods 0.000 claims abstract description 50
- 230000000087 stabilizing effect Effects 0.000 claims description 5
- 238000003466 welding Methods 0.000 claims description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims 2
- 229910052742 iron Inorganic materials 0.000 claims 1
- 238000000034 method Methods 0.000 description 6
- 238000005457 optimization Methods 0.000 description 6
- 239000000463 material Substances 0.000 description 3
- 230000000630 rising effect Effects 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000009194 climbing Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000012634 fragment Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model belongs to the technical field of building construction, in particular to a scaffold for building construction, which comprises a scaffold body, the upper end surface of the frame body is fixedly provided with a construction table, the top ends of the inner parts of the left side and the right side of the construction table can be detachably connected with supporting legs, the top ends of the two supporting legs are fixedly connected with a frame top, the bottom of the frame body is connected with a stable plate in a sliding way, the frame body penetrates through the stable plate and extends to the lower part of the stable plate, the left side and the right side of the frame body are both fixedly connected with supporting plates, the bottoms of the two supporting plates are both fixedly connected with supporting devices and springs, the supporting device is positioned at the outer side of the spring, the left side and the right side of the bottom of the frame body are fixedly connected with wheels, thereby make the scaffold keep steadily on complicated road surface, be provided with the instrument bag, prevent that the instrument from losing to and the construction tool who protects constructor and prevent to drop injures by a crashing object.
Description
Technical Field
The utility model relates to a construction technical field, concretely relates to scaffold frame for construction.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out. The scaffold is divided into an outer scaffold and an inner scaffold according to the erected positions; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; the scaffold is divided into a vertical rod type scaffold, a bridge type scaffold, a door type scaffold, a suspension type scaffold, a hanging type scaffold, a lifting type scaffold and a climbing type scaffold according to the structural form.
There are more kinds of scaffold on the market at present, the scaffold is detachable mostly, but current scaffold is comparatively wasted time and energy in the installation, and is difficult to keep steady on complicated road surface, and the construction tool of eminence drops and injures constructor by a crashing object, uses safety inadequately, and secondly is that the instrument of construction does not have the position of putting specially, not only loses easily, reduces work efficiency moreover.
SUMMERY OF THE UTILITY MODEL
The utility model provides a scaffold frame for construction, have can keep steadily on the road surface of complicacy, can prevent again that the eminence from falling the thing that falls and injure people's characteristics by a crashing object.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a scaffold frame for construction, includes the support body, the up end fixed mounting of support body has the construction table, the inside top of the construction table left and right sides all can be dismantled and is connected with the landing leg, two the top fixedly connected with frame top of landing leg, the bottom sliding connection of support body has the steadying plate, the support body runs through the steadying plate and extends to the below of steadying plate, the equal fixedly connected with backup pad in the left and right sides of support body, two the equal fixedly connected with strutting arrangement in bottom of backup pad and spring, strutting arrangement is located the outside of spring, the equal fixedly connected with wheel in the bottom left and right sides of support body.
For strutting arrangement steady board contactless spring that flattens down, conduct the utility model relates to a scaffold frame is preferred for construction, the spring all with the up end fixed connection of steady board with strutting arrangement's bottom.
Can be connected and rotate for between first bracing piece and the second bracing piece, conduct the utility model relates to a scaffold frame is preferred for construction, strutting arrangement includes first bracing piece, second bracing piece and axis of rotation, first bracing piece passes through the axis of rotation with the second bracing piece and is connected.
In order to accomodate the instrument of construction, prevent that the instrument from losing, conduct the utility model relates to a scaffold frame is preferred for construction, the equal fixed welding in the left and right sides of construction table inside has the instrument bag, two cut into a plurality of little pockets equally in the inside of instrument bag.
In order to protect workman's self safety, the angle instruction table makes things convenient for the workman to survey the balanced condition of scaffold, as the utility model relates to a scaffold is preferred for construction, the up end fixedly connected with angle instruction table of backup pad.
In order to prevent that the construction tool of eminence from dropping and injure constructor by a crashing object, conduct the utility model relates to a scaffold frame is preferred for construction, both sides are the wire netting around the scaffold frame, the top on frame top is equipped with the safety net.
In order to keep balance at complicated road surface support body and can the antiskid again, as the utility model relates to a scaffold frame is preferred for construction, the bottom outside of steadying plate is the slipmat of rubber material.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses in the operation process, at first find the position of putting the scaffold frame in the road surface of complicacy, the steady board pushes down, the spring extension, first bracing piece rotates along with the axis of rotation with the second bracing piece, until steady board contacts ground, first bracing piece supports and pushes down the steady board with the second bracing piece, it rises to prevent the steady board, constructor viewing angle instruction table, thereby it reaches balanced constructor and just can be under construction to observe the support body, when the workman master is under construction at the construction desk, can put into appointed little pocket with the construction tool for use, thereby prevent that the instrument from losing, when the eminence falls construction tool carelessly, the constructor can be protected to the safety net on frame top, prevent to pound the wound.
Drawings
FIG. 1 is a structural diagram of a scaffold for building construction according to the present invention;
FIG. 2 is a cross-sectional view of the scaffold for building construction according to the present invention;
fig. 3 is a cross-sectional view at a of the present invention;
fig. 4 is an enlarged view of the position B of the present invention.
In the figure: 1. a frame body; 2. a construction table; 201. a tool bag; 2011. a small pocket; 3. a stabilizing plate; 301. A support device; 3011. a rotating shaft; 3012. a first support bar; 3013. a second support bar; 4. a support leg; 401. a frame top; 5. a support plate; 6. an angle indicating gauge; 7. and (7) wheels.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-4, the utility model provides a technical solution: the utility model provides a scaffold frame for construction, comprising a frame body 1, the up end fixed mounting of support body 1 has construction table 2, the inside top of the 2 left and right sides of construction table all can be dismantled and is connected with landing leg 4, the top fixedly connected with roof 401 of two landing legs 4, the bottom sliding connection of support body 1 has steadying plate 3, support body 1 runs through steadying plate 3 and extends to steadying plate 3's below, the equal fixedly connected with backup pad 5 in the left and right sides of support body 1, the equal fixedly connected with strutting arrangement 301 in bottom of two backup pads 5 and spring 302, strutting arrangement 301 is located the outside of spring 302, the equal fixedly connected with wheel 7 in the bottom left and right sides of support body 1.
In this embodiment: firstly, finding the position for placing a scaffold on a complex road surface, pressing down a stable plate 3, extending a spring 302, enabling a first supporting rod 3012 and a second supporting rod 3013 to rotate along with a rotating shaft 3011 until the first supporting rod 3012 and the second supporting rod 3013 rotate to be vertical, enabling the stable plate 3 to be in contact with the ground, enabling the first supporting rod 3012 and the second supporting rod 3013 to support and press down the stable plate 3 to prevent the stable plate 3 from rising, enabling angle indication of an angle indication meter 6 to observe whether a frame body reaches balance or not, and enabling a worker to construct on a construction table 2, the construction tools to be used can be placed into the designated small-mouth bag 2011, when the construction tools or stone fragments are carelessly dropped from a high place, the safety net of the frame top 401 can block falling objects, protect constructors, after the scaffold is used, the first support rod 3012 and the second support rod 3013 are pulled outwards, the spring 302 rebounds, and the stabilizing plate 3 is pulled upwards to leave the ground.
As a technical optimization scheme of the utility model, spring 302 and strutting arrangement 301's bottom all with the up end fixed connection of steady board 3.
In this embodiment: through setting up spring 302 and strutting arrangement 301, make steady board 3 and 1 sliding connection of support body, when using the scaffold frame, strutting arrangement 301 pushes down steady board 3, and steady board 3 glides to ground along support body 1, and at this moment, strutting arrangement 301 pushes down steady board, prevents that steady board 3 from leaving ground because of the extension of spring 302.
As a technical optimization scheme of the utility model, strutting arrangement 301 includes first bracing piece 3012, second bracing piece 3013 and axis of rotation 3011, and first bracing piece 3012 rotates with second bracing piece 3013 through axis of rotation 3011 to be connected.
In this embodiment: the first support rod 3012 and the second support rod 3013 rotate along with the rotation shaft 3011 until the first support rod 3012 and the second support rod 3013 stand upright, and support the balance of the frame body 1.
As a technical optimization scheme of the utility model, the equal fixed welding in both sides has the instrument bag 201 about 2 inside of construction stage, cuts into a plurality of osculum bags 2011 equally in the inside of two instrument bags 201.
In this embodiment: a plurality of small-mouth bags 2011 are arranged in the construction table 2, and each small-mouth bag 2011 is provided with a tool which is placed in a designated mode, so that the tools are prevented from being placed in disorder and appearing in disorder.
As a technical optimization scheme of the utility model, the up end fixedly connected with angle indicator 6 of backup pad 5.
In this embodiment: when the scaffold is used, the angle indicator 6 can observe whether the scaffold is balanced.
As a technical optimization scheme of the utility model, both sides are the wire netting around the construction platform 2, and the top of frame top 401 is equipped with the safety net.
In this embodiment: when a construction tool at a high place is carelessly dropped, the safety net of the frame top 401 can prevent the dropped construction tool from injuring constructors.
As a technical optimization scheme of the utility model, the bottom outside of steady board 3 is the slipmat of rubber material.
In this embodiment: the outer side of the bottom of the stabilizing plate 3 is provided with a rubber non-slip mat, so that the frame body can be balanced and is non-slip.
When the device is used, when the device is needed to be used, firstly, the position for placing the scaffold on a complex road surface is found, the stable plate 3 is pressed downwards, the spring 302 extends, the first supporting rod 3012 and the second supporting rod 3013 rotate along with the rotating shaft 3011 until the stable plate 3 contacts the ground, the first supporting rod 3012 and the second supporting rod 3013 support and press the stable plate 3 downwards, the stable plate 3 is prevented from rising due to the pulling force of the spring 302, the observation angle indication table 6 is used for checking whether the scaffold body 1 is stable or not, a master worker can place a standby construction tool into a specified small pocket 2011 when the master worker is constructing the construction platform 2, the tool is prevented from being lost, when an object is carelessly dropped at a high place, a safety net of the scaffold top 401 protects a constructor, the scaffold is prevented from being smashed, after the scaffold is used, the first supporting rod 3012 and the second supporting rod 3013 are pulled outwards, the spring 302 rebounds, and the stable plate 3 is stretched upwards and leaves the ground.
It should be noted that, in this document, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. A scaffold for building construction comprises a scaffold body (1) and is characterized in that the scaffold body is provided with a scaffold base; the up end fixed mounting of support body (1) has construction table (2), the inside top of the construction table (2) left and right sides all can be dismantled and be connected with landing leg (4), two the top fixedly connected with frame top (401) of landing leg (4), the bottom sliding connection of support body (1) has steadying plate (3), support body (1) runs through steadying plate (3) and extends to the below of steadying plate (3), the equal fixedly connected with backup pad (5) of the left and right sides of support body (1), two the equal fixedly connected with strutting arrangement (301) in bottom of backup pad (5) and spring (302), strutting arrangement (301) are located the outside of spring (302), the equal fixedly connected with wheel (7) of the bottom left and right sides of support body (1).
2. A scaffold for construction according to claim 1, wherein: the bottom ends of the spring (302) and the supporting device (301) are fixedly connected with the upper end face of the stabilizing plate (3).
3. A scaffold for construction according to claim 1, wherein: the supporting device (301) comprises a first supporting rod (3012), a second supporting rod (3013) and a rotating shaft (3011), wherein the first supporting rod (3012) is rotatably connected with the second supporting rod (3013) through the rotating shaft (3011).
4. A scaffold for construction according to claim 1, wherein: the inside left and right sides of construction platform (2) all fixed welding have instrument bag (201), two the inside of instrument bag (201) is equally cut into a plurality of little pockets (2011).
5. A scaffold for construction according to claim 1, wherein: the upper end face of the supporting plate (5) is fixedly connected with an angle indicating meter (6).
6. A scaffold for construction according to claim 1, wherein: the front side and the rear side of the construction table (2) are both iron wire nets, and a safety net is arranged at the top of the frame top (401).
7. A scaffold for construction according to claim 1, wherein: the outer side of the bottom of the stabilizing plate (3) is provided with a rubber non-slip mat.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020475281.7U CN212926962U (en) | 2020-04-02 | 2020-04-02 | Scaffold for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020475281.7U CN212926962U (en) | 2020-04-02 | 2020-04-02 | Scaffold for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212926962U true CN212926962U (en) | 2021-04-09 |
Family
ID=75297106
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020475281.7U Expired - Fee Related CN212926962U (en) | 2020-04-02 | 2020-04-02 | Scaffold for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212926962U (en) |
-
2020
- 2020-04-02 CN CN202020475281.7U patent/CN212926962U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111610192A (en) | Bridge overhauls with bridge gap check out test set that has degree of depth structure | |
CN205840761U (en) | A kind of packaged type construction raises ladder | |
CN108755081B (en) | Tailoring equipment convenient to move for clothing | |
CN212926962U (en) | Scaffold for building construction | |
CN206858013U (en) | Movable detachable manual-automatic integrated support lift device | |
CN209799310U (en) | Building scaffold convenient to dismantle transportation | |
CN209891681U (en) | Anti-tilting scaffold | |
CN205421932U (en) | Portable support frame | |
CN203296367U (en) | Cantilever type lifting platform | |
CN216642145U (en) | Collapse-preventing supporting device for tunnel construction | |
CN212388958U (en) | Pulling-up hanging basket for construction of constructional engineering | |
CN210592041U (en) | Auxiliary frame for assisting office furniture cabinet to move | |
CN210313390U (en) | Transformer overhauls with overhauing frame | |
CN211199530U (en) | Weaving frame convenient to remove | |
CN207348424U (en) | A kind of construction site foldable scaffold | |
CN210883036U (en) | Prefabricated floor storage rack convenient to take | |
CN212024711U (en) | Safety protection equipment for logistics loading high-altitude operation | |
CN212837546U (en) | Collapsible ladder of ascending a height that portable thing car was used of putting | |
CN209799302U (en) | Movable height-adjustable scaffold | |
CN208563126U (en) | A kind of road and bridge construction safety protective tool | |
CN110805250A (en) | Outdoor scaffold with rest platform | |
CN209211856U (en) | A kind of mobile working platform | |
CN212687496U (en) | Construction electrical equipment construction equipment | |
CN205846536U (en) | A kind of converting equipment repairing frame | |
CN217128893U (en) | Scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210409 |
|
CF01 | Termination of patent right due to non-payment of annual fee |