CN212924672U - Integrated water purifier monitoring system - Google Patents

Integrated water purifier monitoring system Download PDF

Info

Publication number
CN212924672U
CN212924672U CN202021726614.5U CN202021726614U CN212924672U CN 212924672 U CN212924672 U CN 212924672U CN 202021726614 U CN202021726614 U CN 202021726614U CN 212924672 U CN212924672 U CN 212924672U
Authority
CN
China
Prior art keywords
water
valve
fixedly connected
left end
clean water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021726614.5U
Other languages
Chinese (zh)
Inventor
贾学伟
史兴旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Daxi Environmental Protection Technology Development Co ltd
Original Assignee
Shandong Daxi Environmental Protection Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Daxi Environmental Protection Technology Development Co ltd filed Critical Shandong Daxi Environmental Protection Technology Development Co ltd
Priority to CN202021726614.5U priority Critical patent/CN212924672U/en
Application granted granted Critical
Publication of CN212924672U publication Critical patent/CN212924672U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model relates to the technical field of water purifier equipment, in particular to an integrated water purifier monitoring system, which comprises a bottom plate and a clean water reservoir, wherein the clean water reservoir is fixedly connected with the top end of the bottom plate, the left end of the clean water reservoir is sequentially communicated with a blowdown valve, a water flushing valve and a gas flushing valve from top to bottom, the right side of the top end of the bottom plate is fixedly connected with a fan, the left end of an installation plate is fixedly connected with a water inlet valve, the top end of the water inlet valve is communicated with a water inlet pipe, the inner side of the installation plate is fixedly connected with a charging basket, the bottom end of the charging basket is communicated with a material conveying pipe, the right end of the material conveying pipe is fixedly connected with a cover plate, the inner side of the cover plate is rotatably connected with a material conveying spiral rod, the left end of the material conveying spiral rod, automatically performing air-water back flushing, and automatically adding a water purifying agent when delivering water to the water purifying tank.

Description

Integrated water purifier monitoring system
Technical Field
The utility model relates to a water purifier equipment technical field specifically is integration water purifier monitored control system.
Background
When the standard of industrial water is higher than that of water source, an integrated water purifier is needed, a series of intensified water purification process technologies are adopted to purify the water of the water source so as to meet the index requirement of industrial water, and the process of treating external water source by using the water purifier in the industrial water is more common, so that the demand of the monitoring system of the integrated water purifier is increasing.
The existing integrated water purifier monitoring system adopts manual sewage discharge when a water purifier discharges sludge, the interval days of the sewage discharge are also longer, the sewage discharge can not be automatically performed according to needs, and the backwashing can not be automatically judged according to the water height on a filter layer when the water is purified.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an integration water purifier monitored control system to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
an integrated water purifier monitoring system comprises a base plate and a clean water reservoir, wherein the top end of the base plate is fixedly connected with the clean water reservoir, the left end of the clean water reservoir is sequentially communicated with a blowdown valve, a water flushing valve and a gas flushing valve from top to bottom, the right side of the top end of the base plate is fixedly connected with a fan, a fan air outlet is communicated with the gas flushing valve, the inner side of the clean water reservoir is sequentially provided with a filter layer and a supporting layer from top to bottom, the lower side of the left end of the clean water reservoir is communicated with a water outlet valve, the top end of the right side of the clean water reservoir is fixedly connected with a mounting plate, the right side of the top end of the mounting plate is fixedly connected with a PLC (programmable logic controller), the right side of the bottom end of the mounting plate is fixedly connected with a liquid level meter, the left end of, the inner side of the cover plate is rotatably connected with a material conveying screw rod, and the left end of the material conveying screw rod is fixedly connected with an impeller.
Preferably, the air flushing valve, the water flushing valve, the blowdown valve, the water outlet valve and the water inlet valve are all electric butterfly valves, and the number of the blowdown valves is two.
Preferably, an overflow port is formed in the inner side of the upper side of the left end of the water purification tank.
Preferably, the liquid level meter is an ultrasonic liquid level meter.
Preferably, the bottom end of the left side of the mounting plate is fixedly connected with a connecting plate, and the connecting plate is rotatably connected with a material conveying screw rod.
Compared with the prior art, the beneficial effects of the utility model are that:
1. in the utility model, through the PLC controller, the level gauge, the air blast valve, the water-washed valve, the blowoff valve, outlet valve and water intaking valve that set up, can be through the timer function of PLC controller, the opening of timing control blowoff valve, the mud of deposit on the filter layer surface is discharged along with the rivers, use manpower sparingly, slow down the jam speed of filter layer, can detect the degree of depth of water in the clean water basin through the level gauge, after the filter layer blocks up seriously gradually, because the reduction of filter speed, the liquid level height above the filter layer can increase, when the height of the water that the level gauge detected is higher than the upper limit of setting value, the PLC controller control water intaking valve is closed, after the level gauge detects that there is no water above the filter layer, close the outlet valve, open the air blast valve, start the fan, make high-pressure gas get into the clean water basin through the air blast valve, high-pressure gas is from the following upward movement, utilize the air to the disturbance of filtering layer and the shearing force that the filter material collided each other and the friction formed, peel off the adnexed mud in filter material surface, close air blast valve and fan, open water blast valve and blowoff valve, the clear water flows into the clean water reservoir from the water blast valve, when flowing through the filter layer, take away the mud that the air blast stage peeled off, finally carry mud to flow out from the blowoff valve, the overall process uses the PLC controller to control automatically, can monitor the degree of blocking up of filter layer automatically, the manpower is saved, degree of automation is high.
2. The utility model discloses in, storage bucket through the setting, the conveying pipeline, defeated material hob and impeller, carry the water in-process to the clean water reservoir, add the solid water purifying agent of sufficient volume in advance to the storage bucket, the rivers flow out from the water intaking valve top, rivers can drive the impeller on falling the impeller and rotate, the rotatory defeated material hob that drives of impeller is rotatory, defeated material hob drives the water purifying agent and falls into the clean water reservoir from the right side left side transportation, continuously throw in the water purifying agent in toward the clean water reservoir automatically during the delivery water, when stopping the delivery water, stop throwing in, automatic throwing in water purifying agent has been realized, the manpower has been saved.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the structure at A of FIG. 1 according to the present invention;
fig. 3 is a schematic cross-sectional view of the impeller of the present invention.
In the figure: 1-bottom plate, 2-clean water tank, 3-air flushing valve, 4-blower, 5-water flushing valve, 6-liquid level meter, 7-mounting plate, 8-PLC controller, 9-charging bucket, 10-connecting plate, 11-water inlet pipe, 12-water inlet valve, 13-impeller, 14-overflow port, 15-blow-down valve, 16-water outlet valve, 17-material conveying pipe, 18-material conveying screw rod, 19-cover plate, 20-supporting layer and 21-filtering layer.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution:
an integrated water purifier monitoring system comprises a bottom plate 1 and a purified water tank 2, wherein the top end of the bottom plate 1 is fixedly connected with the purified water tank 2, the left end of the purified water tank 2 is sequentially communicated with a blowdown valve 15, a water flushing valve 5 and an air flushing valve 3 from top to bottom, the blowdown valve 15 is used for discharging sludge accumulated on the upper surface of a filter layer 21, the air flushing valve 3 and the water flushing valve 5 are used for air-water back flushing, the right side of the top end of the bottom plate 1 is fixedly connected with a fan 4, an air outlet of the fan 4 is communicated with the air flushing valve 3 and provides high-pressure air through the fan 4, the inner side of the purified water tank 2 is sequentially provided with the filter layer 21 and a support layer 20 from top to bottom, the filter layer 21 is used for filtering impurities in water, the support layer 20 is used for supporting the filter layer 21, the filter layer 21 is arranged at a certain height away from the bottom of the purified water tank 2, the lower, the automatic water purifying device is used for automatically controlling the opening and closing of a valve, a liquid level meter 6 is fixedly connected to the right side of the bottom end of a mounting plate 7, the liquid level above a filter layer 21 can be measured through the liquid level meter 6, a water inlet valve 12 is fixedly connected to the left end of the mounting plate 7, a water inlet pipe 11 is communicated with the top end of the water inlet valve 12, a material barrel 9 is fixedly connected to the inner side of the mounting plate 7, a material conveying pipe 17 is communicated with the bottom end of the material barrel 9, a cover plate 19 is fixedly connected to the right end of the material conveying pipe 17, a material conveying spiral rod 18 is rotatably connected to the inner side of the cover plate 19, water purifying agents in the material conveying barrel 9 from right to left are conveyed, an impeller 13.
Air blast valve 3, water-washed valve 5, blowoff valve 15, outlet valve 16 and water intaking valve 12 are electric butterfly valve, and blowoff valve 15's quantity is total two, use electric butterfly valve to be convenient for control through PLC controller 8, overflow mouth 14 has been seted up to 2 left ends upper sides inboards in clean water reservoir, can play the guard action to level gauge 6, level gauge 6 is the ultrasonic wave level gauge, adopt non-contact measurement, can make electronic component and surface of water keep apart from, mounting panel 7 left side bottom fixedly connected with connecting plate 10, and connecting plate 10 rotates with defeated material hob 18 to be connected, the connecting plate plays the supporting role, can make defeated material hob 18 pivoted more stable.
The working process is as follows: the utility model discloses need supply power through external power supply when using, put into the solid-state water purification agent of capacity in storage bucket 9 in advance, external water source loops through inlet tube 11 and water intaking valve 12 and flows, rivers fall on impeller 13, later fall into clean water reservoir 2 in, through the filtration of filter layer 21, discharge from outlet valve 16, simultaneously under the impact of rivers, impeller 13 takes place the rotation, impeller 13 drives spiral conveying pole 18 and rotates, spiral conveying pole 18 carries solid-state water purification agent from the right side to the left, make the water purification agent fall into clean water reservoir 2, realize continuously throwing in the water purification agent automatically, through the timer function of PLC controller 8, opening of timing control blowoff valve 15, discharge the mud that deposits on the filter layer 21 surface along with the rivers, the manpower is saved, slow down the jam rate of filter layer 21, can detect the height of the liquid level in clean water reservoir 2 through level gauge 6, when the filtering layer 21 is gradually seriously blocked, the liquid level above the filtering layer 21 is increased due to the reduction of the filtering speed, when the liquid level meter 6 detects that the liquid level is higher than the upper limit of a set value, the PLC 8 controls the water inlet valve 12 to be closed, water in the clean water tank 2 is discharged through the water outlet valve 16, when the liquid level meter 6 detects that no water exists above the filtering layer 21, the water outlet valve 16 is closed, the air flushing valve 3 is opened, the fan 4 is started, high-pressure gas enters the clean water tank 2 through the air flushing valve 3, the high-pressure gas moves from bottom to top, when the high-pressure gas passes through the filtering layer 21, the sludge attached to the surface of the filtering material is peeled off by utilizing the disturbance of air on the filtering layer and the shearing force formed by mutual collision and friction of the filtering material, the air flushing valve 3 and the fan 4 are closed, the water flushing valve 5 and the blowdown valve 15 are opened, clean water flows into the clean water tank 2 from, finally, the sludge carried by the sewage flows out of the sewage valve 15, so that the blockage degree of the filter layer 21 is automatically monitored, and the filter layer 21 is automatically subjected to air-water back flushing.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. Integration water purifier monitored control system includes bottom plate (1) and clean water reservoir (2), its characterized in that: bottom plate (1) top fixedly connected with clean water reservoir (2), clean water reservoir (2) left end from the top down communicates in proper order has blowoff valve (15), water-washed valve (5) and air flushing valve (3), bottom plate (1) top right side fixedly connected with fan (4) to fan (4) air outlet and air flushing valve (3) intercommunication, clean water reservoir (2) inboard from the top down has set gradually filter layer (21) and supporting layer (20), clean water reservoir (2) left end downside intercommunication has outlet valve (16), clean water reservoir (2) right side top fixedly connected with mounting panel (7), mounting panel (7) top right side fixedly connected with PLC controller (8), mounting panel (7) bottom right side fixedly connected with level gauge (6), mounting panel (7) left end fixedly connected with water intaking valve (12), water intaking valve (12) top intercommunication has inlet tube (11), the utility model discloses a material conveying device, including mounting panel (7), inboard fixedly connected with storage bucket (9) of mounting panel (7), storage bucket (9) bottom intercommunication has conveying pipeline (17), conveying pipeline (17) right-hand member fixedly connected with apron (19), apron (19) inboard rotation is connected with defeated material hob (18), defeated material hob (18) left end fixedly connected with impeller (13).
2. The integrated water purifier monitoring system of claim 1, wherein: the air flushing valve (3), the water flushing valve (5), the blow-down valve (15), the water outlet valve (16) and the water inlet valve (12) are all electric butterfly valves, and the number of the blow-down valves (15) is two.
3. The integrated water purifier monitoring system of claim 1, wherein: an overflow port (14) is arranged on the inner side of the upper side of the left end of the purified water tank (2).
4. The integrated water purifier monitoring system of claim 1, wherein: the liquid level meter (6) is an ultrasonic liquid level meter.
5. The integrated water purifier monitoring system of claim 1, wherein: the bottom end of the left side of the mounting plate (7) is fixedly connected with a connecting plate (10), and the connecting plate (10) is rotatably connected with a material conveying screw rod (18).
CN202021726614.5U 2020-08-18 2020-08-18 Integrated water purifier monitoring system Active CN212924672U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021726614.5U CN212924672U (en) 2020-08-18 2020-08-18 Integrated water purifier monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021726614.5U CN212924672U (en) 2020-08-18 2020-08-18 Integrated water purifier monitoring system

Publications (1)

Publication Number Publication Date
CN212924672U true CN212924672U (en) 2021-04-09

Family

ID=75299079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021726614.5U Active CN212924672U (en) 2020-08-18 2020-08-18 Integrated water purifier monitoring system

Country Status (1)

Country Link
CN (1) CN212924672U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113457269A (en) * 2021-07-08 2021-10-01 徐丽庆 Bubble-eliminating oil-gas separator for deep sea oil drilling

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113457269A (en) * 2021-07-08 2021-10-01 徐丽庆 Bubble-eliminating oil-gas separator for deep sea oil drilling

Similar Documents

Publication Publication Date Title
CN206801849U (en) A kind of pump tube with sedimentation pollution discharge structure
CN212924672U (en) Integrated water purifier monitoring system
CN103938706A (en) Lift pump station for sewage treatment
CN201752601U (en) Fiber-filter-cloth rotary disc filter device
CN105617733A (en) Continuous sand filter water purifying device and filter and back flushing method
CN203100131U (en) Waste heat utilization and dust removal device of coal firing equipment
CN110963645A (en) Black smelly water integral type clarification plant in river course
CN206215374U (en) Decontamination exhaust level vortex dirt-remover
CN201890787U (en) Double-layered pressure type integrated deoiler
CN104436778B (en) Large Scale and Continuous automatic sand filter
CN211898852U (en) Sewage draining pipeline device
CN202322457U (en) Combined-type water purifier
CN103981938A (en) Sewage filtering and taking device for sewage source heat pump system
CN212504044U (en) River pollution purification device for ecological restoration
CN211987254U (en) Rotary multi-medium processor
CN211946535U (en) Municipal construction sewage treatment plant
CN203440911U (en) Sewage treatment pumping station
CN209423140U (en) A kind of filter device being retrofitted on settling apparatus
CN203155020U (en) Coal equipment smoke extraction and dust removal device
CN112403041A (en) Sedimentation tank for wastewater treatment
CN201632170U (en) Flange conical screen pipe bundle immersion high-efficiency wet-type dust collector
CN206604232U (en) A kind of sewage-treatment plant and its tube settler
CN2787283Y (en) Water filtration disposal pool for purification
CN219252233U (en) Online self-cleaning type multistage reverse osmosis water treatment equipment
CN212770130U (en) Sewage treatment is filterable fibre filtration system for first time

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant