CN206604232U - A kind of sewage-treatment plant and its tube settler - Google Patents

A kind of sewage-treatment plant and its tube settler Download PDF

Info

Publication number
CN206604232U
CN206604232U CN201720296328.1U CN201720296328U CN206604232U CN 206604232 U CN206604232 U CN 206604232U CN 201720296328 U CN201720296328 U CN 201720296328U CN 206604232 U CN206604232 U CN 206604232U
Authority
CN
China
Prior art keywords
pond body
tube settler
pressure water
support frame
water pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720296328.1U
Other languages
Chinese (zh)
Inventor
郭力千
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Yuxi Environmental Protection Technology Co Ltd
Original Assignee
Tianjin Yuxi Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Yuxi Environmental Protection Technology Co Ltd filed Critical Tianjin Yuxi Environmental Protection Technology Co Ltd
Priority to CN201720296328.1U priority Critical patent/CN206604232U/en
Application granted granted Critical
Publication of CN206604232U publication Critical patent/CN206604232U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Physical Water Treatments (AREA)

Abstract

The utility model provides a kind of sewage-treatment plant and its tube settler, wherein tube settler includes pond body, swash plate is connected with the middle part of pond body, multiple through holes being obliquely installed are formed with swash plate, pond body is communicated with above blow-off pipe, pond body below swash plate and has high-pressure water pipe, and high-pressure water pipe is communicated with multiple shower nozzles towards through hole, pond body both sides slide the support frame for being connected with and opposite side being slid onto from pond body side, and high-pressure water pipe two ends are respectively erected on support frame.Tube settler described in the utility model, pass through set cleaning and waste removal equipment, it is ensured that swash plate it is unobstructed with it is clean.

Description

A kind of sewage-treatment plant and its tube settler
Technical field
The utility model belongs to water treatment field, more particularly, to a kind of sewage-treatment plant and its tube settler.
Background technology
The water quality species of flocculence processing is a lot, up to the present, can almost include whole Shang Shui and lower water, various by dirty The raw water of dye and the processing of industrial wastewater.It can not only remove the suspended solid in water, turbidity removal, color, bromine, oil, and can remove Pathogen and virus, moreover it is possible to remove the eutrophy compounds such as BOD, COD, oil and other greases, the nitrogen phosphorus of various organic matters compositions Matter and radioactive pollution material.
Typically by using flocculant is uniformly blended into raw water, flocculant forms flco with water Quick uniform mixture; Again by pipe chute deposition technique, water flows from bottom to top, and impurity particle freely glides along swash plate, is sunken to bottom of pond formation sludge; Finally by the fast filter method and disinfection by ultraviolet light of double-layer filter material, water process is completed.
But after a long time use, flco can be attached on the inwall of swash plate, the negotiability of swash plate is not only hindered, and Cause effectively to precipitate from the water that swash plate is discharged, and then influence the efficiency and quality of sewage-treatment plant.
Utility model content
In view of this, the utility model is directed to a kind of tube settler, with ensure swash plate it is unobstructed with it is clean.
To reach above-mentioned purpose, what the technical solution of the utility model was realized in:
A kind of tube settler, including pond body, are connected with the middle part of pond body and multiple be obliquely installed are formed with swash plate, swash plate Through hole, pond body is communicated with above blow-off pipe, pond body below swash plate and has high-pressure water pipe, and high-pressure water pipe is communicated with multiple directions The shower nozzle of through hole, pond body both sides slide the support frame for being connected with and opposite side being slid onto from pond body side, high-pressure water pipe two ends point It is not erected on support frame.
Further, the diameter parallel of the axis of shower nozzle and through hole.
Further, high-pressure water pipe is rotated with support frame and is connected, and the fixture of fixed high-pressure water pipe is connected with support frame.
Further, fixture is clip, and clip includes lower semi-ring and upper semi-ring, and lower semi-ring and support frame are affixed, upper half Ring both sides are connected with lower half collar bolt, and high-pressure water pipe is held between upper and lower semi-ring.
Further, the guide rail set along its length is connected with the ground of pond body both sides, support frame is slided with guide rail Move connection.
Further, suction pump is connected with support frame, the delivery port of suction pump is connected with high-pressure water pipe, suction pump enters The mouth of a river is connected by flexible pipe with water source.
Further, pond body bottom surface is formed with poly- dirty bucket, and poly- dirty bucket bottom is connected with blow-off pipe.
Further, it is rotatably connected in blow-off pipe by motor-driven auger.
Relative to prior art, tube settler described in the utility model has the advantage that:
(1) tube settler described in the utility model, after a long time use, blocks upstream and downstream and the opening of pond body Blow-off pipe, liquid level drops under swash plate in pond body, and high-pressure water pipe sprays water jets under high pressure by shower nozzle, with support frame in pond body two Slid repeatedly between side, water jets under high pressure progressively opens through hole spray, and carrying is adhered the water column of flco in swash plate originally and glided along through hole And discharged from blow-off pipe;So while flco in swash plate is cleared up, also the impurity particle for being deposited on bottom of pond is together discharged, it is whole Body cleans tube settler.
(2) because the inclination angle of swash plate is generally 60 °, but also it is slightly different, therefore should be slightly adjusted when installing high-pressure water pipe It is whole;High-pressure water pipe is first rotated, makes the axis of shower nozzle and the diameter parallel of through hole, then is fixed high-pressure water pipe with clip, is so protected The water column for demonstrate,proving shower nozzle ejection smoothly enters in the cavity in swash plate, reduces the loss of water column impulse force.
(3) according to the design specification of inclined-plate clarifying basin, the length of inclined-plate clarifying basin should be greater than width, therefore along the length side of pond body High-pressure water pipe is set to setting guide rail, and along the width of pond body, the length needed for high-pressure water pipe is shortened, reduces its intensity It is required that.
(4) drive auger to rotate by motor, accelerate the blowdown speed of blow-off pipe, while preventing blowdown blockage.
Accordingly, the utility model also proposes a kind of sewage-treatment plant, to ensure the efficiency and product of sewage-treatment plant Matter.
To reach above-mentioned purpose, what the technical solution of the utility model was realized in:
A kind of sewage-treatment plant, including perforation rotational flow flocculation tank, the above-mentioned tube settling being sequentially connected by pipeline Valve is equipped with pond, filtering ponds and sterilization pool, pipeline.
Further, the ultraviolet lamp of transmitting C-band ultraviolet is had on sterilization pool.
Relative to prior art, sewage-treatment plant described in the utility model has the advantage that:
(1) sewage-treatment plant described in the utility model, inclined-plate clarifying basin upstream and downstream are blocked by valve body, it is ensured that tiltedly Plate sedimentation basin cleaning is smoothed out.
(2) DNA structure that C-band ultraviolet can be destroyed in various viruses and bacterium and other pathogens, makes it can not be certainly Body is bred, and reaches the purpose for removing pathogen, it is ensured that the cleaning of water quality.
Brief description of the drawings
Constitute a part of accompanying drawing of the present utility model to be used for providing further understanding to of the present utility model, this practicality is new The schematic description and description of type is used to explain the utility model, does not constitute to improper restriction of the present utility model. In accompanying drawing:
Fig. 1 is the tube settler sectional view described in the utility model embodiment 1;
A portions enlarged drawing A in Fig. 1 that Fig. 2 is done for display support frame and high-pressure water pipe connected mode;
Fig. 3 be the utility model embodiment 2 described in sewage-treatment plant overlook connection diagram (in figure, solid arrow Water inlet or water outlet above are represented, dotted arrow represents water inlet or water outlet below).
Description of reference numerals:
1st, pond body;11st, support;12nd, swash plate;121st, through hole;13rd, dirty bucket is gathered;131st, blow-off pipe;14th, water inlet;15th, go out The mouth of a river;2nd, high-pressure water pipe;21st, shower nozzle;3rd, ground;31st, guide rail;4th, support frame;41st, clip;411st, upper semi-ring;412nd, lower half Ring;413rd, semicircular ring;414th, connecting portion;5th, suction pump;6th, perforation rotational flow flocculation tank;7th, tube settler;8th, filtering ponds;9th, disappear Malicious pond;91st, ultraviolet lamp.
Embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the utility model can To be mutually combined.
In description of the present utility model, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " on ", " under ", The orientation or position relationship of the instruction such as "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " are Based on orientation shown in the drawings or position relationship, it is for only for ease of description the utility model and simplifies description, rather than indicate Or imply that the device or element of meaning must have specific orientation, with specific azimuth configuration and operation, therefore be not understood that For to limitation of the present utility model.In addition, term " first ", " second " etc. are only used for describing purpose, and it is not intended that indicating Or imply relative importance or the implicit quantity for indicating indicated technical characteristic.Thus, " first ", " second " etc. are defined Feature can express or implicitly include one or more this feature.In description of the present utility model, unless separately It is described, " multiple " are meant that two or more.
, it is necessary to which explanation, unless otherwise clearly defined and limited, term " are pacified in description of the present utility model Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integratedly Connection;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected to by intermediary, It can be the connection of two element internals.For the ordinary skill in the art, on being understood by concrete condition State concrete meaning of the term in the utility model.
Describe the utility model in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
A kind of tube settler, as depicted in figs. 1 and 2, including rectangularity pond body 1 and for cleaning pond body 1 High-pressure water pipe 2.
Being set up in pond body 1 by support 11 has the swash plate 12 being adapted with the inner chamber of pond body 1, so that swash plate 12 is fixed on into pond Interior medium position.Be densely covered with swash plate 12 it is evenly distributed, set along 60 ° of inclination angles, cellular through holes 121.
And the digging of the bottom of pond body 1 has five poly- dirty buckets 13 into quadrangular frustum pyramid shaped.Five are gathered dirty bucket 13 along the length direction of pond body 1 It is arranged in a row, its upper port respectively accounts for 1/5th of the bottom of pond body 1, and lower port is respectively communicated with a blow-off pipe 131.Blow-off pipe Equal level extends to outside pond, and rotation connection is by motor-driven auger in it.
By the setting of swash plate 12 and poly- dirty bucket 13, the inner chamber of pond body 1 is divided into four parts from the bottom to top:Poly- dirty bucket Mud accumulation area where 13, the water distributing area between poly- dirty bucket 13 and swash plate 12, the inclined tube area where swash plate 12 and positioned at oblique The clear water zone of the top of plate 12.Wherein, water distributing area is provided with the water inlet 14 connected with upstream in the side of pond body 1, and clear water zone exists The opposite side of pond body 1 is provided with the delivery port 15 with communicating downstream.So as to which water flows from bottom to top, the precipitator in water process is completed Sequence.
High-pressure water pipe 2 is crossed on the top of pond body 1 by support frame 4, and support frame 4 is arranged on guide rail 31.Guide rail 31 is total to There are two, mode connects for screw is on the ground 3 of the both sides of pond body 1 respectively, and is set along the length direction of pond body 1.Corresponding support Frame 4 also is provided with two, and its lower end is separately mounted on guide rail 31, so as to be connected with the sliding of guide rail 31.
With reference to shown in Fig. 2, the upper end of support frame 4 is mounted on clip 41.Clip 41 includes lower semi-ring 412 and upper semi-ring 411. Upper semi-ring 411 is set with the lower mirror image of semi-ring 412, the connecting portion 414 including semicircular ring 413 and positioned at the both sides of semicircular ring 413, The equal rectangularity of connecting portion 414 simultaneously extends radially outwardly along semicircular ring 413.Wherein, the semicircular ring 413 of lower semi-ring 412 is welded on The top of support frame 4;The two ends of high-pressure water pipe 2 are respectively erected on lower semi-ring 412, and the connecting portion 413 of upper semi-ring 411 is respectively with The bolt connection of connecting portion 413 of semi-ring 412, so that high-pressure water pipe 2 to be clamped in the semicircular ring of upper semi-ring 411 and lower semi-ring 412 It is interior.
Multiple shower nozzles 21 are uniformly installed vertically on the tube wall of high-pressure water pipe 2.Shower nozzle 21 is connected and referred to high-pressure water pipe 2 Also it is 60 ° to through hole 121, the i.e. inclination angle of the axis of shower nozzle 21.The bolt connection of support frame 4 of side has suction pump 5, suction pump 5 Delivery port 15 is connected with the one end of high-pressure water pipe 2, and the water inlet 14 of suction pump 5 is connected by flexible pipe with water source.Water source can be certainly Water, or complete the water of precipitation process.And high-pressure water pipe 2 is blocked with the other end that suction pump 5 is connected by blind plate.
Scale removal process is as follows:Blocked by valve behind the upstream and downstream of pond body 1, open blow-off pipe 131;Liquid level declines in pond body 1 To after water distributing area, start suction pump 5, shower nozzle 21 is sprayed water jets under high pressure, because the jet velocity of water jets under high pressure is fast, reach swash plate Stroke it is shorter, therefore influenceed small by gravity, can be smoothly entered in through hole 121, the flco in through hole 121 is discharged; Support frame 4 is promoted to be slid repeatedly along guide rail 31, water jets under high pressure progressively clears up swash plate;Carry and be adhered the flco in swash plate 12 originally Water column along through hole glide and discharged from blow-off pipe 131;At the same time, motor drives auger to rotate, auxiliary water connection swash plate 12 Interior flco and the impurity particle being deposited in poly- dirty bucket 13 are together discharged, so that overall cleaning tube settler.
A kind of sewage-treatment plant, as shown in figure 3, including the perforation rotational flow flocculation tank 6, the inclined tube that are sequentially communicated by pipeline Sedimentation basin 7, filtering ponds 8 and sterilization pool 9.
Wherein, perforation rotational flow flocculation tank 6 is made up of six grids, and six grids are uniformly arranged to the row of two row three, each lattice Between dividing plate on be provided with above and below checkerwork cell, aperture and be staggered along pool wall so that six grids are sequentially connected.Wherein it is located at The checkerwork cell size at top is smaller, flow velocity is larger, and follow-up checkerwork cell size gradually increases, and flow velocity reduces, with adapt to floccule body by Gradually grow up.And sedimentation basin is as described in Example 1.
Filtering ponds 8 are equipped with filtering ponds 8 positioned at the anthracite on upper strata and under being located at using the fast filter method of double-layer filter material The quartz sand of layer, current from top to bottom flow.
Finally, the ultraviolet lamp 91 of many transmitting C-band ultraviolets is uniformly had on sterilization pool 9.And on pipeline Provided with valve.
Above-mentioned perforation rotational flow flocculation tank 6, filtering ponds 8 and sterilization pool 9 respectively uses prior art, and the present embodiment is not Repeat again.
The course of work:Raw water is uniformly added into after flocculant in a mixer, into perforation rotational flow flocculation tank 6, current by In the perforation rotational flow flocculation tank 6 of multiple grid compositions, eddy flow is formed after entering along pool wall tangential direction, flocculant is quickly equal with water It is even to be mixed to form flco;After flco is formed, water enters tube settler 7 by bottom, is flowed downward from down, impurity particle is sunken to crowd In many poly- dirty buckets 13, clear water flows into filtering ponds 8 from clear water zone;Current from top to bottom flow successively through anthracite and quartz sand, its In smokeless coal particle it is larger, for retaining major pollutants, and quartz sand retention contaminant remaining;Terminal disinfection pond 9 utilizes C ripples DNA structures in the various viruses of section ultraviolet damage and bacteriums and other pathogens, make its can not self-reproduction, reach that removal is caused The purpose of sick body;Complete the processing of sewage.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Within the spirit and principle of utility model, any modification, equivalent substitution and improvements made etc. should be included in the utility model Protection domain within.

Claims (10)

1. a kind of tube settler, including pond body (1), be connected with the middle part of pond body (1) on swash plate (12), swash plate (12) be formed with it is many The individual through hole (121) being obliquely installed, pond body (1) is communicated with blow-off pipe (131) below swash plate (12), it is characterised in that:Pond body (1) top has high-pressure water pipe (2), and high-pressure water pipe (2) is communicated with multiple shower nozzles (21) towards through hole (121), pond body (1) Both sides slide the support frame (4) for being connected with and opposite side being slid onto from pond body (1) side, and high-pressure water pipe (2) two ends are set up respectively On support frame (4).
2. tube settler according to claim 1, it is characterised in that:The axis of shower nozzle (21) and the axle of through hole (121) Line is parallel.
3. tube settler according to claim 2, it is characterised in that:High-pressure water pipe (2) is rotated with support frame (4) to be connected Connect, the fixture of fixed high-pressure water pipe (2) is connected with support frame (4).
4. tube settler according to claim 3, it is characterised in that:Fixture is clip (41), and clip (41) includes Lower semi-ring (412) and upper semi-ring (411), lower semi-ring (412) and support frame (4) are affixed, upper semi-ring (411) both sides and lower semi-ring (412) bolt connection, high-pressure water pipe (2) is held between upper and lower semi-ring (411,412).
5. tube settler according to claim 1, it is characterised in that:It is connected with the ground (3) of pond body (1) both sides The guide rail (31) set along its length, support frame (4) is connected with guide rail (31) sliding.
6. tube settler according to claim 5, it is characterised in that:Suction pump (5) is connected with support frame (4), is taken out The delivery port (15) of water pump (5) is connected with high-pressure water pipe (2), and the water inlet (14) of suction pump (5) is connected by flexible pipe with water source.
7. tube settler according to claim 1, it is characterised in that:Pond body (1) bottom surface is formed with poly- dirty bucket (13), gathers Dirt bucket (13) bottom is connected with blow-off pipe (131).
8. tube settler according to claim 1, it is characterised in that:It is rotatably connected in blow-off pipe (131) by motor The auger of driving.
9. a kind of sewage-treatment plant, it is characterised in that:Including be sequentially communicated by pipeline perforation rotational flow flocculation tank (6), power Profit requires to be equipped with valve on tube settler (7), filtering ponds (8) and the sterilization pool (9) described in 1 to 8 any one, pipeline.
10. sewage-treatment plant according to claim 9, it is characterised in that:Sterilization pool has transmitting C-band on (9) The ultraviolet lamp (91) of ultraviolet.
CN201720296328.1U 2017-03-24 2017-03-24 A kind of sewage-treatment plant and its tube settler Expired - Fee Related CN206604232U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720296328.1U CN206604232U (en) 2017-03-24 2017-03-24 A kind of sewage-treatment plant and its tube settler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720296328.1U CN206604232U (en) 2017-03-24 2017-03-24 A kind of sewage-treatment plant and its tube settler

Publications (1)

Publication Number Publication Date
CN206604232U true CN206604232U (en) 2017-11-03

Family

ID=60171801

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720296328.1U Expired - Fee Related CN206604232U (en) 2017-03-24 2017-03-24 A kind of sewage-treatment plant and its tube settler

Country Status (1)

Country Link
CN (1) CN206604232U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109133292A (en) * 2018-09-29 2019-01-04 铜陵新创流体科技有限公司 It is a kind of for handling the device of sand grain in sewage

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109133292A (en) * 2018-09-29 2019-01-04 铜陵新创流体科技有限公司 It is a kind of for handling the device of sand grain in sewage

Similar Documents

Publication Publication Date Title
CN208327752U (en) A kind of sewage purification processing system
CN209361920U (en) A kind of town and country sewage treatment sedimentation basin
CN210313802U (en) Groundwater remediation equipment
CN101723478A (en) Mobile device for treating, recovering and reusing sewage
CN204079703U (en) Urban river sewage treatment equipment
CN219136431U (en) Air supporting equipment convenient to clearance
CN211097945U (en) Industrial wastewater treatment mud removal device
CN206604232U (en) A kind of sewage-treatment plant and its tube settler
CN112960792A (en) Low-carbon environment-friendly sewage treatment device
CN220665079U (en) Purifying treatment device for industrial wastewater containing heavy metals
CN107500434A (en) A kind of sewage-treatment plant and tunnel Waste Water Treatment and method
CN208843825U (en) Integrated precipitating pond
CN208869422U (en) Filtering water treatment equipment
CN203060904U (en) Improved advection setting device
CN216404017U (en) Large-traffic river course water purifies filters integrated device
CN212800000U (en) High-speed medium sedimentation water treatment equipment for quartz sand
CN107583315A (en) A kind of cyclic water tank with self-cleaning function
CN104310630A (en) Oilfield produced water purification system and control method thereof
CN204097237U (en) Flat flow dissolved gas floatator
CN210595666U (en) Sewage treatment system for building site
CN211310900U (en) Biological pond scrubbing device
CN209853875U (en) Integrated water purifying device
CN106946381A (en) A kind of Combined-type water purifier
CN111362442A (en) Multistage purification sewage treatment device
CN113101741B (en) Method and device for treating solid waste in mine water under mine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171103

Termination date: 20200324