CN212902231U - Cooling device is used in production of zinc-impregnated steel pipe - Google Patents

Cooling device is used in production of zinc-impregnated steel pipe Download PDF

Info

Publication number
CN212902231U
CN212902231U CN202021839674.8U CN202021839674U CN212902231U CN 212902231 U CN212902231 U CN 212902231U CN 202021839674 U CN202021839674 U CN 202021839674U CN 212902231 U CN212902231 U CN 212902231U
Authority
CN
China
Prior art keywords
steel pipe
cooling
fixedly provided
production
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021839674.8U
Other languages
Chinese (zh)
Inventor
向文
杨斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Zhenhong Steel Products Co ltd
Original Assignee
Sichuan Zhenhong Steel Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Zhenhong Steel Products Co ltd filed Critical Sichuan Zhenhong Steel Products Co ltd
Priority to CN202021839674.8U priority Critical patent/CN212902231U/en
Application granted granted Critical
Publication of CN212902231U publication Critical patent/CN212902231U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a steel pipe cooling technology field just discloses a cooling device is used in production of zinc-impregnated steel pipe, including the cooler bin, the equal fixed mounting in the left and right sides at cooler bin top has electric putter, the bottom fixed mounting of electric putter output shaft has the link. This cooling device is used in production of zinc-impregnated steel pipe, through opening the sealing door when cooling, place required refrigerated steel pipe in the draw-in groove on the rack, the size of draw-in groove and the big or small looks adaptation of steel pipe, and the left side of steel pipe supports on the slider, make its difficult production skew, then the operation through electric putter, it moves down to take the rack through the link, make the steel pipe arrange the condensate in completely and cool off, when the condensate temperature risees, through the water pump with the condensate in the connecting pipe suction liquid reserve tank, when the condensate at the in-process of connecting pipe inside removal, because connecting pipe length is longer, can carry out effectual cooling treatment, the mesh of facilitating the use has been reached.

Description

Cooling device is used in production of zinc-impregnated steel pipe
Technical Field
The utility model relates to a steel pipe cooling technical field specifically is a cooling device is used in production of zinc-impregnated steel pipe.
Background
Galvanized steel pipes and the like are widely used in equipment, so that production of the galvanized steel pipes is often indispensable for many processing enterprises, but in the production process, the temperature is often high after production and preparation, so that further cooling is needed.
The cooling device for the production of the galvanized steel pipe in the current market is diversified, but the defect of inconvenient use generally exists, the existing cooling mode is basically that the steel pipe which is directly ironed is placed in a cooling tank, so that the steel pipe is very troublesome to take out, and meanwhile, the water in the cooling tank rises due to the high-temperature steel pipe, so that the subsequent cooling effect is not ideal, and the cooling device for the production of the galvanized steel pipe is provided to solve the problem.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a cooling device is used in production of zinc dipping steel pipe possesses advantages such as facilitate the use, has solved the shortcoming that generally exists inconvenient use, and current cooling method all is direct steel pipe that will roll the boiling hot basically and places in the cooling bath for very trouble when the steel pipe takes out, water in the cooling bath leads to the temperature to rise because of the steel pipe of high temperature simultaneously, leads to subsequent cooling effect not very ideal problem.
(II) technical scheme
In order to realize the purpose of convenient use, the utility model provides a following technical scheme: a cooling device for producing a zinc-impregnated steel pipe comprises a cooling box, wherein electric push rods are fixedly mounted on the left side and the right side of the top of the cooling box, a connecting frame is fixedly mounted at the bottom of an output shaft of each electric push rod, a placing frame is fixedly mounted in the connecting frame, a positioning block is fixedly mounted on the left side wall of an inner cavity of the cooling box, a sliding block is fixedly mounted on the left side of the connecting frame, a processing box is fixedly mounted at the top of the cooling box, an activated carbon layer is fixedly mounted in the processing box, an air pipe is fixedly mounted at the bottom of the processing box, a fan is fixedly mounted in the air pipe, a liquid storage box is fixedly mounted on the front of the cooling box, a supporting plate is fixedly mounted on the front of the cooling box and positioned at the bottom of the liquid storage box, a water pump is fixedly, the inside of water pump just is located the fixed surface of mount and installs the connecting pipe, the inside packing of liquid reserve tank has the condensate, the draw-in groove that two are no less than in quantity is seted up at the top of rack, the right side movable mounting of cooler bin has the sealing door.
Preferably, the shape of cooler bin is the cuboid of inside hollow, two electric putter is the left and right sides of symmetric distribution in the cooler bin axis.
Preferably, the size of the connecting frame is matched with that of the placing frame, and the sliding block is movably arranged inside the positioning block.
Preferably, one end of the air pipe close to the cooling box penetrates through and extends into the cooling box, and the size of the treatment box is matched with that of the activated carbon layer.
Preferably, the shape of mount is the cylinder, the upper and lower both ends of connecting pipe run through respectively and extend to the inside of liquid reserve tank and cooling tank.
Preferably, the number of the clamping grooves is not less than two, the clamping grooves are evenly distributed at the top of the placing frame, and a water inlet is formed in the bottom of the placing frame.
(III) advantageous effects
Compared with the prior art, the utility model provides a cooling device is used in production of zinc dipping steel pipe possesses following beneficial effect:
1. this cooling device is used in production of zinc-impregnated steel pipe, through opening the sealing door when cooling, place required refrigerated steel pipe in the draw-in groove on the rack, the size of draw-in groove and the big or small looks adaptation of steel pipe, and the left side of steel pipe supports on the slider, make it be difficult for producing the skew, then the operation through electric putter, its output shaft extension is taking the rack to move down through the link, make the steel pipe arrange the condensate in completely, cool off, when the condensate temperature risees, through the operation of water pump, pass through the inside of connecting pipe suction liquid reserve tank with the condensate in the cooler bin, in-process at the inside removal of connecting pipe when the condensate, because connecting pipe length is longer, when the inside of reacing the liquid reserve tank, can carry out effectual cooling treatment, the mesh that facilitates the use has been reached.
2. This cooling device is used in production of zinc-impregnated steel pipe, reach the inside back of liquid reserve tank through the condensate, according to the drain pipe on its right side, directly cool off its inside that discharges to the cooler bin once more to the steel pipe, avoid leading to the temperature to rise because the steel pipe of high temperature, it is not very ideal to lead to subsequent cooling effect, consequently, carry out circulative cooling to the steel pipe, when the steel pipe contacts with the condensate, can produce dense smoke, through the operation of fan, contact the inside and the activated carbon layer of dense smoke suction processing case, carry out effectual absorption to dense smoke, open sealed door at last and take out the steel pipe, directly pull out it from the draw-in groove is inside when taking out, and is very convenient, thereby the purpose that facilitates the use has been reached.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the liquid storage tank of the present invention.
In the figure: 1 cooling box, 2 electric putter, 3 link, 4 racks, 5 locating pieces, 6 sliders, 7 processing boxes, 8 activated carbon layers, 9 tuber pipes, 10 fans, 11 liquid storage tanks, 12 backup pads, 13 water pumps, 14 mounts, 15 connecting pipes, 16 condensate, 17 draw-in grooves, 18 sealing doors.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, a cooling device for producing a galvanized steel pipe comprises a cooling box 1, wherein electric push rods 2 are fixedly installed on the left side and the right side of the top of the cooling box 1, the electric push rods 2 can be Y802-4 in model, the cooling box 1 is shaped as a cuboid with a hollow interior, the two electric push rods 2 are symmetrically distributed on the left side and the right side of the central axis of the cooling box 1, a connecting frame 3 is matched with a placing frame 4 in size, a sliding block 6 is movably installed inside a positioning block 5, one end of an air pipe 9 close to the cooling box 1 penetrates through and extends into the cooling box 1, a processing box 7 is matched with an activated carbon layer 8 in size, a fixing frame 14 is cylindrical in shape, the upper end and the lower end of a connecting pipe 15 respectively penetrate through and extend into a liquid storage box 11 and the cooling box 1, and at least two clamping grooves 17 are uniformly distributed on the top of the placing, the bottom of the placing frame 4 is provided with a water inlet, the sealing door 18 is opened when the steel pipe to be cooled is placed in the clamping groove 17 on the placing frame 4, the size of the clamping groove 17 is matched with that of the steel pipe, the left side of the steel pipe is abutted against the sliding block 6, so that the steel pipe is not easy to deviate, then the electric push rod 2 runs, the output shaft extends to drive the placing frame 4 to move downwards through the connecting frame 3, so that the steel pipe is completely placed in the condensate 16 for cooling, when the temperature of the condensate 16 is increased, the condensate 16 in the cooling box 1 is pumped into the liquid storage box 11 through the connecting pipe 15 by running of the water pump 13, when the condensate 16 moves in the connecting pipe 15, because the connecting pipe 15 is longer, when the condensate reaches the inside of the liquid storage box 11, effective cooling treatment can be carried out, and the purpose of convenient use is achieved, the bottom of an output shaft of the electric push rod 2 is fixedly provided with a connecting frame 3, the inside of the connecting frame 3 is fixedly provided with a placing frame 4, the left side wall of an inner cavity of the cooling box 1 is fixedly provided with a positioning block 5, the left side of the connecting frame 3 is fixedly provided with a sliding block 6, the top of the cooling box 1 is fixedly provided with a processing box 7, the inside of the processing box 7 is fixedly provided with an activated carbon layer 8, the bottom of the processing box 7 is fixedly provided with an air pipe 9, the inside of the air pipe 9 is fixedly provided with a fan 10, the model of the fan 10 can be RT-H21, the front of the cooling box 1 is fixedly provided with a liquid storage box 11, after reaching the inside of the liquid storage box 11 through a condensate 16, the condensate is directly discharged into the inside of the cooling box 1 according to a drain pipe on the right side of the condensate to cool the steel pipe, when the steel pipe is contacted with the condensate 16, dense smoke is generated, the dense smoke is pumped into the inside of the treatment box 7 to be contacted with the activated carbon layer 8 through the operation of the fan 10, the dense smoke is effectively adsorbed, the sealing door 18 is finally opened to take out the steel pipe, the steel pipe is directly pulled out from the inside of the clamping groove 17 when the steel pipe is taken out, the use is convenient, and the purpose of convenience is achieved, the front surface of the cooling box 1 is fixedly provided with the supporting plate 12 at the bottom of the liquid storage box 11, the top of the supporting plate 12 is fixedly provided with the water pump 13, the model of the water pump 13 can be 150QJ10-50/7, the front surface of the cooling box 1 is fixedly provided with the fixing frame 14, the inside of the water pump 13 is fixedly provided with the connecting pipe 15 at the outer surface of the fixing frame 14, the inside of the liquid storage box 11 is filled with, a sealing door 18 is movably arranged at the right side of the cooling box 1.
In conclusion, the cooling device for the production of the galvanized steel pipe opens the sealing door 18 during cooling, the steel pipe to be cooled is placed in the clamping groove 17 on the placing rack 4, the size of the clamping groove 17 is matched with that of the steel pipe, and the left side of the steel pipe is abutted against the sliding block 6, so that the steel pipe is not easy to deviate, and then through the operation of the electric push rod 2, the output shaft of the cooling tower extends to pass through the connecting frame 3 and drive the placing frame 4 to move downwards, so that the steel pipe is completely placed in the condensate 16 to be cooled, when the temperature of the condensate 16 rises, the condensate 16 in the cooling tank 1 is drawn into the interior of the reservoir 11 through the connection pipe 15 by the operation of the water pump 13, during the movement of the condensate 16 inside the connection pipe 15, since the connection pipe 15 is long in length, when the liquid reaches the inside of the liquid storage tank 11, effective cooling treatment can be carried out, and the purpose of convenient use is achieved.
And, after the condensate 16 reaches the inside of the liquid storage tank 11, the condensate is directly discharged into the cooling tank 1 according to the drain pipe on the right side of the liquid storage tank to cool the steel pipe again, so that the problem that the subsequent cooling effect is not ideal due to the rise of water temperature caused by the high-temperature steel pipe is solved, the steel pipe is circularly cooled, dense smoke is generated when the steel pipe is in contact with the condensate 16, the dense smoke is pumped into the treatment tank 7 to be in contact with the activated carbon layer 8 through the operation of the fan 10 to effectively adsorb the dense smoke, finally, the steel pipe is taken out by opening the sealing door 18, and the steel pipe is directly pulled out from the clamping groove 17 when being taken out, so that the aim of convenient use is fulfilled, the defect of inconvenient use generally existing cooling methods is solved, and basically, the rolled steel pipe is directly placed in a cooling tank, the steel pipe is very troublesome to take out, and the subsequent cooling effect is not ideal due to the fact that the water temperature of the water in the cooling pool rises due to the high-temperature steel pipe.
It is to be noted that the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a cooling device is used in production of zinc-impregnated steel pipe, includes cooler bin (1), its characterized in that: the left side and the right side of the top of the cooling box (1) are fixedly provided with electric push rods (2), the bottom of an output shaft of each electric push rod (2) is fixedly provided with a connecting frame (3), the inside of each connecting frame (3) is fixedly provided with a placing frame (4), the left side wall of an inner cavity of the cooling box (1) is fixedly provided with a positioning block (5), the left side of each connecting frame (3) is fixedly provided with a sliding block (6), the top of the cooling box (1) is fixedly provided with a processing box (7), the inside of the processing box (7) is fixedly provided with an activated carbon layer (8), the bottom of the processing box (7) is fixedly provided with an air pipe (9), the inside of the air pipe (9) is fixedly provided with a fan (10), the front of the cooling box (1) is fixedly provided with a liquid storage box (11), the front of the cooling box (1) is fixedly provided with a, the top fixed mounting of backup pad (12) has water pump (13), the positive fixed mounting of cooler bin (1) has mount (14), the inside of water pump (13) and the fixed surface who is located mount (14) install connecting pipe (15), the inside packing of liquid reserve tank (11) has condensate (16), draw-in groove (17) that two are no less than in quantity are seted up at the top of rack (4), the right side movable mounting of cooler bin (1) has sealing door (18).
2. The cooling device for the production of the galvanized steel pipe as recited in claim 1, wherein: the shape of cooler bin (1) is the cuboid of inside hollow, two electric putter (2) are the left and right sides of symmetric distribution in cooler bin (1) axis.
3. The cooling device for the production of the galvanized steel pipe as recited in claim 1, wherein: the size of the connecting frame (3) is matched with that of the placing frame (4), and the sliding block (6) is movably arranged in the positioning block (5).
4. The cooling device for the production of the galvanized steel pipe as recited in claim 1, wherein: one end of the air pipe (9) close to the cooling box (1) penetrates through and extends into the cooling box (1), and the size of the treatment box (7) is matched with that of the activated carbon layer (8).
5. The cooling device for the production of the galvanized steel pipe as recited in claim 1, wherein: the shape of mount (14) is the cylinder, the upper and lower both ends of connecting pipe (15) run through respectively and extend to the inside of liquid reserve tank (11) and cooling box (1).
6. The cooling device for the production of the galvanized steel pipe as recited in claim 1, wherein: the number of the clamping grooves (17) is not less than two, the clamping grooves are evenly distributed at the top of the placing frame (4), and a water inlet is formed in the bottom of the placing frame (4).
CN202021839674.8U 2020-08-28 2020-08-28 Cooling device is used in production of zinc-impregnated steel pipe Active CN212902231U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021839674.8U CN212902231U (en) 2020-08-28 2020-08-28 Cooling device is used in production of zinc-impregnated steel pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021839674.8U CN212902231U (en) 2020-08-28 2020-08-28 Cooling device is used in production of zinc-impregnated steel pipe

Publications (1)

Publication Number Publication Date
CN212902231U true CN212902231U (en) 2021-04-06

Family

ID=75251187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021839674.8U Active CN212902231U (en) 2020-08-28 2020-08-28 Cooling device is used in production of zinc-impregnated steel pipe

Country Status (1)

Country Link
CN (1) CN212902231U (en)

Similar Documents

Publication Publication Date Title
CN112821860B (en) Self-cleaning solar power generation panel
CN113731909A (en) Multi-stage pickling equipment for monocrystalline silicon rod for new energy battery production and operation method
CN212902231U (en) Cooling device is used in production of zinc-impregnated steel pipe
CN210378613U (en) Cooling and drying device for cable processing
CN210036155U (en) Weaving cloth drying device
CN208543044U (en) Novel tin immersion furnace
CN214325960U (en) Big data hardware equipment strorage device with dehumidification function
CN212944478U (en) Low-volatility heat treatment medium preparation equipment
CN211842813U (en) Cooling device is used in production of polyethylene plastic film
CN112981087A (en) Copper strips electrical tempering equipment
CN116811084B (en) Cooling equipment for producing insulating material for reducing deformation of plate body
CN216192649U (en) Novel circulation zinc impregnation furnace
CN214095279U (en) Waste residue moisture evaporation treatment facility
CN220103687U (en) Rolling tube processing heat treatment machine
CN216055953U (en) Cooling integrated control electric control cabinet for mechanical device
CN220012761U (en) Copper line annealing tinning stack
CN220784582U (en) Plastic gear Cooling device for processing
CN217526891U (en) Dust-absorbing and cooling device for silicon carbide production
CN209964493U (en) Cabinet with fireproof and explosion-proof functions
CN213256313U (en) Production protection device for preventing copper wire from being oxidized
CN212934358U (en) Photovoltaic transformer
CN218223238U (en) Plate-tube condenser dip coating device
CN218565733U (en) Heat conduction oil furnace for lubricating grease production
CN212031077U (en) Multi-wire-rod rapid tin pick-up testing device
CN217237850U (en) Portable measuring device for residual heat storage capacity of phase change energy storage material

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant