CN212896310U - Anti-leakage pre-embedding device for ultra-deep underground diaphragm wall - Google Patents

Anti-leakage pre-embedding device for ultra-deep underground diaphragm wall Download PDF

Info

Publication number
CN212896310U
CN212896310U CN202020942688.6U CN202020942688U CN212896310U CN 212896310 U CN212896310 U CN 212896310U CN 202020942688 U CN202020942688 U CN 202020942688U CN 212896310 U CN212896310 U CN 212896310U
Authority
CN
China
Prior art keywords
ultra
continuous wall
shaped steel
underground continuous
diaphragm wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020942688.6U
Other languages
Chinese (zh)
Inventor
乔兆宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Geotechnical Technology Co Ltd
Original Assignee
Zhejiang Geotechnical Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Geotechnical Technology Co Ltd filed Critical Zhejiang Geotechnical Technology Co Ltd
Priority to CN202020942688.6U priority Critical patent/CN212896310U/en
Application granted granted Critical
Publication of CN212896310U publication Critical patent/CN212896310U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

Super dark underground continuous wall leak protection pre-buried device includes both sides underground continuous wall and is located the shaped steel structure between the adjacent underground continuous wall, shaped steel structure top-down is provided with a plurality of pre-buried honeycomb ducts, the honeycomb duct runs through the setting structural at shaped steel, the check valve is installed to the one end that the honeycomb duct is located underground continuous wall and meets the soil face. The beneficial effects of the utility model reside in that: aiming at a key water seepage area of 15-25m below the ground, a plurality of guide pipes with check valves are pre-embedded, when water seepage in a certain joint area is serious, a grouting pipeline can be connected in real time, the treatment speed is high, and the effect is good.

Description

Anti-leakage pre-embedding device for ultra-deep underground diaphragm wall
Technical Field
The utility model relates to an underground continuous wall construction technical field especially relates to an ultra-deep underground continuous wall leak protection pre-buried device.
Background
Along with the development of economy, the capital construction is accelerated, underground continuous wall foundation pit retaining structures are more and more common in subway construction and deep foundation pit construction, and in the process of completing excavation by underground continuous wall maintenance structure construction, the prevention and emergency treatment of seepage and piping are very critical, and the problems of seepage of foundation pits, piping and pit outer side cavities, foundation pit instability and the like are caused due to untimely treatment. In the prior art, drainage and grouting work is usually carried out after water seepage occurs, and the problems of low treatment efficiency, long working hours, high construction cost and the like exist.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects of the prior art, the utility model aims to provide a quick, high-efficient and low-cost ultra-deep underground continuous wall leakage-proof pre-embedding device.
The purpose of the utility model is realized by adopting the following technical scheme:
super dark underground continuous wall leak protection pre-buried device includes both sides underground continuous wall and is located the shaped steel structure between the adjacent underground continuous wall, its characterized in that: the top-down of shaped steel structure is provided with a plurality of pre-buried honeycomb ducts, the honeycomb duct runs through the setting at shaped steel structure, the check valve is installed to honeycomb duct one end.
Preferably, the draft tube is mounted at a height of 15-25m below ground level.
Preferably, the draft tubes are arranged at a height of 3-4m apart.
Preferably, the draft tube is a galvanized tube.
Preferably, the draft tube is horizontally mounted.
Preferably, the profiled bar structure is mounted vertically.
Preferably, the section steel is an I-shaped steel structure.
Compared with the prior art, the beneficial effects of the utility model reside in that:
1. aiming at a key water seepage area of 15-25m below the ground, a plurality of guide pipes with check valves are pre-embedded, when water seepage in a certain joint area is serious, a grouting pipeline can be connected in real time, the treatment speed is high, and the effect is good.
2. The method has the advantages of rapid and effective prevention of leakage and piping, high efficiency compared with the traditional grouting mode, concrete material saving and low cost.
Drawings
Fig. 1 is a top view of the present invention;
FIG. 2 is a front view of the present invention;
the labels and counterparts in the figures are: 1-continuous wall, 2-I-shaped steel, 3-check valve, 4-galvanized pipe, 5-pipe, 6-grouting pump and 7-water seepage area.
Detailed Description
The present invention will now be described in more detail with reference to the accompanying drawings, and it is to be understood that the following description of the present invention is made only by way of illustration and not by way of limitation with reference to the accompanying drawings. The various embodiments may be combined with each other to form other embodiments not shown in the following description.
As shown in fig. 1 and 2, the anti-leakage pre-buried device for the ultra-deep underground diaphragm wall comprises two side underground diaphragm walls 1 and an I-shaped steel 2 structure vertically installed between the adjacent underground diaphragm walls 1, wherein the I-shaped steel 2 structure is provided with a plurality of flow guide pipes from top to bottom, the flow guide pipes are horizontally installed galvanized pipes 4, two ends of each galvanized pipe 4 penetrate through the I-shaped steel 2 structure and are fixed at connecting parts through welding, and one end, located on the soil facing surface of each underground diaphragm wall 1, of each galvanized pipe 4 is provided with a check valve 3.
Further, the galvanized pipes 4 are installed at a height of 15-25m below the ground level, the galvanized pipes 4 are uniformly arranged at intervals of 3-4m in height, and in the embodiment, 3 honeycomb ducts are embedded.
Because the continuous wall seam crossing 15-25m below the horizon is the concentrated region of infiltration, play key influence to the engineering quality of underground continuous wall 1, when the concrete implementation, if leak at this position that is close to I-steel 2, will flow from the galvanized pipe 4 that buries underground in advance, when the infiltration phenomenon is serious, carry out the pipeline 5 with galvanized pipe 4 one end that is located underground continuous wall excavation face through grouting pump 6 and be connected, pour into the concrete into to inside infiltration district 7 through the high pressure, because the setting of check valve 3, can effectively avoid the concrete that injects and infiltration district inside water and earth to take place the refluence, reach the effect in quick, high-efficient shutoff infiltration area.
The above embodiments are only preferred embodiments of the present invention, and the protection scope of the present invention cannot be limited thereby, and any insubstantial changes and substitutions made by those skilled in the art based on the present invention are all within the protection scope of the present invention.

Claims (7)

1. Super dark underground continuous wall leak protection pre-buried device includes both sides underground continuous wall and is located the shaped steel structure between the adjacent underground continuous wall, its characterized in that: the top-down of shaped steel structure is provided with a plurality of pre-buried honeycomb ducts, the honeycomb duct runs through the setting at shaped steel structure, the check valve is installed to the honeycomb duct position in the one end that underground continuous wall faced the soil face.
2. The anti-leakage pre-buried device of the ultra-deep underground diaphragm wall as claimed in claim 1, wherein: the draft tube is installed at a height of 15-25m below the ground level.
3. The anti-leakage pre-buried device of the ultra-deep underground diaphragm wall as claimed in claim 2, wherein: the draft tubes are arranged at intervals of 3-4m in height.
4. The anti-leakage pre-buried device of the ultra-deep underground diaphragm wall as claimed in claim 3, wherein: the honeycomb duct adopts galvanized pipe.
5. The anti-leakage pre-buried device of the ultra-deep underground diaphragm wall as claimed in claim 4, wherein: the honeycomb duct is horizontally arranged.
6. The anti-leakage pre-buried device of the ultra-deep underground diaphragm wall as claimed in claim 5, wherein: the section steel is vertically installed.
7. The ultra-deep underground diaphragm wall leak-proof embedding device as claimed in any one of claims 1 to 6, wherein: the section steel is of an I-shaped steel structure.
CN202020942688.6U 2020-05-28 2020-05-28 Anti-leakage pre-embedding device for ultra-deep underground diaphragm wall Active CN212896310U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020942688.6U CN212896310U (en) 2020-05-28 2020-05-28 Anti-leakage pre-embedding device for ultra-deep underground diaphragm wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020942688.6U CN212896310U (en) 2020-05-28 2020-05-28 Anti-leakage pre-embedding device for ultra-deep underground diaphragm wall

Publications (1)

Publication Number Publication Date
CN212896310U true CN212896310U (en) 2021-04-06

Family

ID=75266268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020942688.6U Active CN212896310U (en) 2020-05-28 2020-05-28 Anti-leakage pre-embedding device for ultra-deep underground diaphragm wall

Country Status (1)

Country Link
CN (1) CN212896310U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114837208A (en) * 2022-05-16 2022-08-02 中铁七局集团郑州工程有限公司 Method for disposing leakage water of underground diaphragm wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114837208A (en) * 2022-05-16 2022-08-02 中铁七局集团郑州工程有限公司 Method for disposing leakage water of underground diaphragm wall

Similar Documents

Publication Publication Date Title
CN203924137U (en) A kind of diaphragm wall serious leakage plugging structure
CN103132488B (en) Reverse osmosis water processing method and reverse osmosis drainage system in construction period of concrete faced rockfill dam
CN212896310U (en) Anti-leakage pre-embedding device for ultra-deep underground diaphragm wall
CN111305141B (en) Drainage method for underground comprehensive pipe gallery in dry season canal penetrating
CN216518138U (en) Vertical drainage system of shaft
CN104963693B (en) Rectangular parallel push pipe connection channel construction method
CN204491645U (en) A kind of deep foundation pit precipitation well-sealing device
CN104404960B (en) A kind of underground diaphragm wall seam grouting device and constructional method
CN212052921U (en) Foundation pit enclosure leakage repairing structure
CN204456228U (en) A kind of diaphragm wall fast plugging device
CN104074195A (en) Method for controlling sedimentation of ground outside foundation pit through horizontal grouting
CN102877539B (en) Suspended section-steel sewage pipe diversion structure and construction method thereof
CN204691255U (en) Diaphragm wall
CN104790430B (en) Construction method of underground continuous wall
CN212612487U (en) Pile-first interpolation type jacket grouting plugging system
CN211144525U (en) Water stopping structure of shield tunnel segment in middle air shaft
CN112096414A (en) Lining segment for shield receiving engineering horizontal micro-freezing stratum and construction method thereof
CN113152387A (en) Face mask earth-rock dam lower buried pipe structure and construction method thereof
CN211080289U (en) Flexible interface pipeline buttress
CN104912057A (en) Novel underground diaphragm wall construction method
CN111236986A (en) Waterproof and drainage structure of fabricated lining and construction method thereof
CN204690729U (en) For the skeleton of diaphragm wall
CN111364477A (en) Waterproof construction method for penetrating basement exterior wall through support changing structure
CN204690732U (en) Novel underground diaphragm wall
CN204690733U (en) Novel underground diaphragm wall skeleton

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant