CN212887573U - Hydraulic engineering is with construction pipeline rack - Google Patents
Hydraulic engineering is with construction pipeline rack Download PDFInfo
- Publication number
- CN212887573U CN212887573U CN202021515442.7U CN202021515442U CN212887573U CN 212887573 U CN212887573 U CN 212887573U CN 202021515442 U CN202021515442 U CN 202021515442U CN 212887573 U CN212887573 U CN 212887573U
- Authority
- CN
- China
- Prior art keywords
- groove
- wall
- pipeline
- cardboard
- construction pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 16
- 239000012634 fragment Substances 0.000 claims abstract description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 13
- 239000000463 material Substances 0.000 claims description 8
- 238000005192 partition Methods 0.000 claims description 5
- 239000007769 metal material Substances 0.000 claims description 4
- 239000002023 wood Substances 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 15
- 238000000034 method Methods 0.000 abstract description 5
- 238000009434 installation Methods 0.000 abstract description 2
- 238000003825 pressing Methods 0.000 abstract description 2
- 241000282414 Homo sapiens Species 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 230000003139 buffering effect Effects 0.000 description 2
- 230000006378 damage Effects 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000009194 climbing Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000013016 damping Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 230000002262 irrigation Effects 0.000 description 1
- 238000003973 irrigation Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000006748 scratching Methods 0.000 description 1
- 230000002393 scratching effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 239000002352 surface water Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a hydraulic engineering is with construction pipeline rack, concretely relates to hydraulic engineering technical field, including vaulting pole, pipe chase, draw-in groove and base, the inner chamber of vaulting pole is inlayed and is installed the slide, the spout has all been seted up to the both sides of slide, the inner wall activity joint of spout has the slider, one side fixed mounting of slider has the connecting block, the pivot is installed to the inner chamber of connecting block is inlayed, the inner wall of pipe chase is inlayed and is installed the shell fragment, the inner wall activity joint of spout has the cardboard, the arc wall has been seted up to one side of cardboard, the inner wall demountable installation of arc wall has the rubber pad. The utility model discloses a set up cardboard and rubber pad, one side of cardboard can slide from top to bottom in the spout, presss from both sides tightly it according to the concrete height of pipeline, and the cardboard is pressing from both sides tight in-process to the pipeline, and the rubber pad of cardboard inner wall setting can play the effect of protection to the pipeline, prevents that the cardboard from causing unnecessary to destroy to the pipeline.
Description
Technical Field
The utility model relates to a hydraulic engineering technical field, more specifically say, the utility model relates to a hydraulic engineering is with construction pipeline rack.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in the nature to achieve the purpose of removing harmful substances and benefiting, is also called water engineering, and water is a valuable resource essential for human production and life, but the naturally existing state of water does not completely meet the needs of human beings.
The pipeline is a device which is formed by connecting pipes, pipe connectors, valves and the like and is used for conveying gas, liquid or fluid with solid particles, the pipeline has wide application range, and is mainly used in water supply, water drainage, heat supply, gas supply, long-distance oil and gas conveying, agricultural irrigation, hydraulic engineering and various industrial devices, and the pipeline placing frame is a bearing device for storing and clamping the pipeline.
However, in practical use, there still exist some disadvantages, such as:
one, the pipeline rack that takes who is used for hydraulic engineering of current does not consider how convenient pipeline of taking, when needs use the pipeline, not only takes time and is hard, needs artifical climbing to take moreover, and the danger coefficient is very high.
Secondly, the pipeline rack that is used for hydraulic engineering that has now on the market can not press from both sides tightly and adjust the pipeline according to the concrete height of pipeline, leads to the pipeline to place unfixed very easily to cause the pipeline to roll off the scheduling problem, there is certain potential safety hazard.
Therefore, it is urgent to provide a factor of safety high construction pipeline rack for hydraulic engineering.
SUMMERY OF THE UTILITY MODEL
In order to overcome the above-mentioned defect of prior art, the embodiment of the utility model provides a hydraulic engineering is with construction pipeline rack, through pivot and cardboard, the pivot can drive the rotation of whole pipe chase and slope, be convenient for do benefit to the effect of earth heart attraction and take out the pipeline, and the cardboard can play the effect of a tight protection of clamp to the pipeline of pipeline inslot, prevent that the pipeline from causing the accident to drop placing the in-process of accomodating, form the potential safety hazard, with the problem of proposing in solving above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a hydraulic engineering is with construction pipeline rack, includes vaulting pole, pipeline groove, draw-in groove and base, the slide is installed to the inner chamber of vaulting pole is inlayed, the spout has all been seted up to the both sides of slide, the inner wall activity joint of spout has the slider, one side fixed mounting of slider has the connecting block, the pivot is inlayed and installed to the inner chamber of connecting block, the shell fragment is inlayed and installed to the inner wall of pipeline groove, the inner wall activity joint of spout has the cardboard, the arc wall has been seted up to one side of cardboard, the inner wall demountable installation of arc wall has the rubber pad, the baffle has been cup jointed in the surface activity of spout, the top activity joint of spout is in the inner wall of draw-in groove, the bottom surface fixed welding of base has last cushion, go up one side fixedly.
In a preferred embodiment, the slider is rectangular in shape, the slider is made of a metal material, and the inner wall of the sliding groove is smooth.
In a preferred embodiment, the inner cavity of the rotating shaft is movably clamped with a shaft center, and one side of the rotating shaft is fixedly connected with a pipeline groove.
In a preferred embodiment, the elastic sheet is in a semicircular shape, the pipe groove is made of a metal component, and the inner wall of the pipe groove is provided with anti-skid threads.
In a preferred embodiment, the thickness of the partition board ranges from ten to twelve centimeters, and the partition board is made of a moisture-proof wood member.
In a preferred embodiment, the two ends of the clamping groove are fixedly provided with clamping blocks, and one side of the clamping groove is fixedly connected with a base.
In a preferred embodiment, a spring is movably sleeved on the surface of the telescopic rod, and the upper end and the lower end of the spring are fixedly adhered to the surfaces of the upper cushion block and the lower cushion block respectively.
In a preferred embodiment, a roller is fixedly installed on the surface of the lower cushion block, and anti-skid grains are formed on the surface of the roller.
The utility model discloses a technological effect and advantage:
1. the utility model discloses a set up pivot and draw-in groove, the pivot can drive whole pipe chase device and rotate and slope, when operating personnel need take out the pipeline and carry out the use, the pipe chase of slope can assist the effect whereabouts of pipe utilization geocentric attraction, and whole upstand can slide in the draw-in groove, is favorable to wiping the convenient pipeline of taking of staff more.
2. The utility model discloses a set up cardboard and rubber pad, one side of cardboard can slide from top to bottom in the spout, can press from both sides tight adjustment to it according to the concrete height of pipeline, prevents unexpected the drop, and the cardboard is pressing from both sides tight in-process to the pipeline, and the rubber pad of cardboard inner wall setting can play the effect of protection to the pipeline, prevents that the cardboard from causing unnecessary to destroy to the pipeline.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic view of the structure of the clamping plate of the present invention.
Fig. 3 is a schematic view of the pipeline channel structure of the present invention.
Fig. 4 is an enlarged schematic view of a portion a of fig. 1 according to the present invention.
Fig. 5 is an enlarged schematic structural diagram of fig. 1 at B.
The reference signs are: 1. a stay bar; 2. a partition plate; 3. clamping a plate; 4. connecting blocks; 5. a spring plate; 6. an arc-shaped slot; 7. a pipe chase; 8. a slider; 9. a slide base; 10. a chute; 11. a card slot; 12. a clamping block; 13. a base; 14. a lower cushion block; 15. a roller; 16. a rotating shaft; 17. a rubber pad; 18. an upper cushion block; 19. a spring; 20. a telescopic rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in the attached figures 1-5, the construction pipeline placing frame for the hydraulic engineering comprises a stay bar 1, a pipeline groove 7, a clamping groove 11 and a base 13, wherein a sliding seat 9 is embedded in an inner cavity of the stay bar 1, sliding grooves 10 are respectively formed in two sides of the sliding seat 9, a sliding block 8 is movably clamped and connected on the inner wall of the sliding groove 10, a connecting block 4 is fixedly installed on one side of the sliding block 8, a rotating shaft 16 is embedded and installed in an inner cavity of the connecting block 4, an elastic sheet 5 is embedded and installed on the inner wall of the pipeline groove 7, a clamping plate 3 is movably clamped and connected on the inner wall of the sliding groove 10, an arc-shaped groove 6 is formed in one side of the clamping plate 3, a rubber pad 17 is detachably installed on the inner wall of the arc-shaped groove 6, a partition plate 2 is movably sleeved on the surface of the sliding groove 10, the top end of the sliding, slider 8's shape is the rectangle, slider 8's material is the metal material component, the inner wall of spout 10 is smooth, the inner chamber activity joint of pivot 16 has the axle center, one side fixedly connected with pipe chute 7 of pivot 16, the thickness value scope of baffle 2 is ten to twelve centimetres, the material of baffle 2 is dampproofing wooden material component, the equal fixed mounting in both ends of draw-in groove 11 has fixture block 12, one side fixedly connected with base 13 of draw-in groove 11, spring 19 has been cup jointed in the surface activity of telescopic link 20, spring 19's upper and lower both ends are fixed respectively and bond in the surface of last cushion 18 and lower cushion 14, the fixed surface of lower cushion 14 installs gyro wheel 15, anti-skidding line has been seted up on gyro wheel 15's surface.
Referring to the attached drawing 3 of the specification specifically, the shape of the elastic sheet 5 is semicircular, the material of the pipeline groove 7 is a metal component, and the inner wall of the pipeline groove 7 is provided with anti-skid grains.
The implementation mode is specifically as follows: the design of shell fragment 5 is in order to form the buffering to the protection pipeline surface is not worn and torn or even is destroyed by pipe groove 7, and the anti-skidding line of seting up in the pipe groove 7, can increase the frictional force on 7 inner walls of pipe groove and pipeline surface to a certain extent, prevents that the pipeline is unexpected to drop, makes the injury to operating personnel.
The utility model discloses the theory of operation:
the first step is as follows: the operator first assembles the various components of the device normally and then starts the device normally.
The second step is that: firstly, an operator pushes the whole placing device to a place where a pipeline needs to be placed by means of a roller 15 at the bottom, in the moving process of the device, a spring 19 movably sleeved on the surface of a telescopic rod 20 can play a role in buffering and damping vibration and jolting, then the operator places and clamps the pipeline needing to be stored on the inner wall of a pipeline groove 7, then the operator starts to adjust a clamping plate 3 according to the specific height of the pipeline, one side of the clamping plate 3 can slide up and down on the inner wall of a sliding groove 10, the clamping of the pipeline on the inner wall of the pipeline groove 7 is facilitated, a rubber pad 17 arranged on the inner wall of the pipeline groove 7 can play a role in protecting the surface of the pipeline, scratching and even damage are prevented, when the pipeline needs to be taken for use, the operator can firstly push a support rod 1 in a clamping groove 11, then by means of a specific driving device outside, so that a rotating shaft 16 can rotate and, the pipeline can utilize the effect of earth's heart gravity, drops, and operating personnel carries out corresponding transportation to the pipeline can.
The third step: the operator first closes the device normally, then checks whether the fixity between the various components of the device is normal, and then replaces and repairs the more aged and worn parts inside the device.
The points to be finally explained are: first, in the description of the present application, it should be noted that, unless otherwise specified and limited, the terms "mounted," "connected," and "connected" should be understood broadly, and may be a mechanical connection or an electrical connection, or a communication between two elements, and may be a direct connection, and "upper," "lower," "left," and "right" are only used to indicate a relative positional relationship, and when the absolute position of the object to be described is changed, the relative positional relationship may be changed;
secondly, the method comprises the following steps: in the drawings of the disclosed embodiments of the present invention, only the structures related to the disclosed embodiments are referred to, and other structures can refer to the common design, and under the condition of no conflict, the same embodiment and different embodiments of the present invention can be combined with each other;
and finally: the above description is only for the preferred embodiment of the present invention and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (8)
1. The utility model provides a hydraulic engineering is with construction pipeline rack, includes vaulting pole (1), pipe chase (7), draw-in groove (11) and base (13), its characterized in that: the inner cavity of the support rod (1) is inlaid with a sliding seat (9), sliding grooves (10) are formed in two sides of the sliding seat (9), a sliding block (8) is connected to the inner wall of each sliding groove (10) in a movable manner, a connecting block (4) is fixedly mounted on one side of the sliding block (8), a rotating shaft (16) is inlaid in the inner cavity of the connecting block (4), an elastic sheet (5) is inlaid in the inner wall of the pipeline groove (7), a clamping plate (3) is connected to the inner wall of each sliding groove (10) in a movable manner, an arc-shaped groove (6) is formed in one side of the clamping plate (3), a rubber pad (17) is detachably mounted on the inner wall of each arc-shaped groove (6), a partition plate (2) is sleeved on the surface of each sliding groove (10) in a movable manner, a rubber pad (18) is fixedly welded on the top, one side of the upper cushion block (18) is fixedly connected with an expansion link (20), and the bottom surface of the expansion link (20) is fixedly connected with a lower cushion block (14).
2. The construction pipeline placing frame for the water conservancy project according to claim 1, characterized in that: the shape of slider (8) is the rectangle, the material of slider (8) is the metal material component, the inner wall of spout (10) is smooth.
3. The construction pipeline placing frame for the water conservancy project according to claim 1, characterized in that: the inner cavity of the rotating shaft (16) is movably clamped with an axis, and one side of the rotating shaft (16) is fixedly connected with a pipeline groove (7).
4. The construction pipeline placing frame for the water conservancy project according to claim 1, characterized in that: the shape of shell fragment (5) is semicircle form, the material of pipe groove (7) is the metal material component, anti-skidding line has been seted up to the inner wall of pipe groove (7).
5. The construction pipeline placing frame for the water conservancy project according to claim 1, characterized in that: the thickness value range of baffle (2) is ten to twelve centimetres, the material of baffle (2) is dampproofing wood material component.
6. The construction pipeline placing frame for the water conservancy project according to claim 1, characterized in that: the clamping groove is characterized in that clamping blocks (12) are fixedly mounted at two ends of the clamping groove (11), and a base (13) is fixedly connected to one side of the clamping groove (11).
7. The construction pipeline placing frame for the water conservancy project according to claim 1, characterized in that: the surface of the telescopic rod (20) is movably sleeved with a spring (19), and the upper end and the lower end of the spring (19) are fixedly bonded to the surfaces of the upper cushion block (18) and the lower cushion block (14) respectively.
8. The construction pipeline placing frame for the water conservancy project according to claim 1, characterized in that: the surface of the lower cushion block (14) is fixedly provided with a roller (15), and the surface of the roller (15) is provided with anti-skid grains.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021515442.7U CN212887573U (en) | 2020-07-28 | 2020-07-28 | Hydraulic engineering is with construction pipeline rack |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021515442.7U CN212887573U (en) | 2020-07-28 | 2020-07-28 | Hydraulic engineering is with construction pipeline rack |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212887573U true CN212887573U (en) | 2021-04-06 |
Family
ID=75230228
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021515442.7U Expired - Fee Related CN212887573U (en) | 2020-07-28 | 2020-07-28 | Hydraulic engineering is with construction pipeline rack |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212887573U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114083049A (en) * | 2021-12-24 | 2022-02-25 | 芜湖通和汽车管路系统有限公司 | Positioning tool for cutting automobile pipeline |
-
2020
- 2020-07-28 CN CN202021515442.7U patent/CN212887573U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114083049A (en) * | 2021-12-24 | 2022-02-25 | 芜湖通和汽车管路系统有限公司 | Positioning tool for cutting automobile pipeline |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212887573U (en) | Hydraulic engineering is with construction pipeline rack | |
CN206377412U (en) | A kind of mobile damping type Architectural Equipment installation equipment | |
CN105269202A (en) | Automobile back panel assembly clamp | |
CN209414940U (en) | A kind of bottom bracket of the moisture-proof isolation steam of numerically-controlled machine tool | |
CN105557367B (en) | Flowerpot retaining device | |
CN214327023U (en) | Dedicated jacking equipment of electromechanical installation | |
CN211232185U (en) | Pneumatic pump fixing device | |
CN210025197U (en) | Assembled component safety repairing frame | |
CN212963391U (en) | Electric bicycle instrument convenient to connect | |
CN213777151U (en) | Magnet steel PET rigging machine convenient to remove | |
CN214662521U (en) | Fixing and supporting device for temporary pressurizing pipeline of water supply engineering | |
CN105383919A (en) | Feeding and assembling die set for rubber O-shaped ring | |
CN108867338A (en) | A kind of bridge cushioning device | |
CN211077001U (en) | Drainage pipeline transportation frame based on highway construction | |
CN107310602A (en) | A kind of glass carrier vehicle | |
CN210971950U (en) | Plywood tray for honeycomb tray box | |
FR2853892B1 (en) | LIFTING TABLE FOR VEHICLES | |
CN218568582U (en) | Mounting structure of on-vehicle transformer | |
CN107097200B (en) | Water conservancy construction pipe laying pay-off | |
CN217479118U (en) | Membrane filtration urban drinking water ultrafiltration purification equipment | |
CN109094448A (en) | A kind of clipping vehicle carried pick device for municipal pipeline transport | |
CN218258292U (en) | Mounting device for pump station electromechanical equipment | |
CN211294541U (en) | Advertising platform device of portable adjustment | |
CN215436508U (en) | Novel building prefab that takes precautions against earthquakes | |
CN212616733U (en) | Water conservancy pipeline lays and uses stabilizing support with protect function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210406 |