CN212866498U CN202021097970.5U CN202021097970U CN212866498U CN 212866498 U CN212866498 U CN 212866498U CN 202021097970 U CN202021097970 U CN 202021097970U CN 212866498 U CN212866498 U CN 212866498U
Authority
CN
China
Prior art keywords
groove
planting
keel frame
building
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021097970.5U
Other languages
Chinese (zh)
Inventor
恽超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhusen Architectural Design Co Ltd
Original Assignee
Jiangsu Zhusen Architectural Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhusen Architectural Design Co Ltd filed Critical Jiangsu Zhusen Architectural Design Co Ltd
Priority to CN202021097970.5U priority Critical patent/CN212866498U/en
Application granted granted Critical
Publication of CN212866498U publication Critical patent/CN212866498U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a structure is planted to afforestation of building curtain, pour the shaping outside planting groove of main part roof beam front side on the building including an organic whole, it has glass curtain wall to plant the upper end and the lower extreme of groove near main part roof beam lateral wall fixed mounting respectively, still install the decoration subassembly on the outer wall of planting the groove. The utility model discloses planting greening plants the structure and can hide planting groove and inside lining groove, simultaneously, makes the glass curtain wall or the decoration subassembly of planting the groove and building outside have better integration nature to ensured that green building has better whole pleasing to the eye effect, and this planting greening plants structure simple in design rationally, and the feasibility height is implemented in the application, and the practicality is strong.

Description

Greening planting structure of building curtain wall
Technical Field
The utility model relates to a green building technical field, concretely relates to structure is planted to afforestation of building curtain.
Background
The green building refers to a building which can save resources to the maximum extent within the whole life cycle of the building, comprises the functions of saving energy, land, water, materials and the like, protects the environment, reduces pollution, provides healthy, comfortable and efficient use space for people, and is harmonious with the nature.
Along with the increasing popularization of green buildings, the greening form of the buildings gradually develops from the ground to the three-dimensional form, in addition to the traditional roof greening, more and more walls are subjected to vertical greening, for example, some drooping plants such as scindapsus aureus, ivy and the like are planted on the curtain wall of the green buildings, and meanwhile, planting grooves required by the vertical greening are produced. However, the combination difficulty of the planting groove and the vertical surface of the glass curtain wall in the prior art is high, and meanwhile, the common planting groove is installed on the curtain wall and has a poor attractive effect.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome the defect that exists among the prior art, provide a structure is planted to afforestation of building curtain, this afforestation is planted the structure and can be blanked planting groove and inside lining groove, simultaneously, make the glass curtain wall or the decoration subassembly of planting the groove and the building outside have better integration nature to ensured that green building has better whole pleasing to the eye effect, and this afforestation is planted and is planted the structure structural design simple reasonable, the application implementation feasibility is high, the practicality is strong.
In order to achieve the purpose, the technical scheme of the utility model a design a structure is planted to afforestation of building curtain, including integrative the shaping of pouring main part roof beam front side outside planting groove on the building, the upper end and the lower extreme that the planting groove is close to a main part roof beam lateral wall fixed mounting respectively have glass curtain wall, still install the decoration subassembly on the outer wall of planting groove.
The utility model discloses planting greening plants the structure and can hide planting groove and inside lining groove, simultaneously, makes the glass curtain wall or the decoration subassembly of planting the groove and building outside have better integration nature to ensured that green building has better whole pleasing to the eye effect, and this planting greening plants structure simple in design rationally, and the feasibility height is implemented in the application, and the practicality is strong.
The preferable technical scheme is that the inside lining groove that still is equipped with of planting groove, the welding of lining groove bottom has the drain pipe, drain pipe one end and the sealed link up of lining groove, the drain pipe other end runs through plant the groove and be close to a lateral wall of main part roof beam and extend to in the main drainage pipeline of building. The inside lining groove effectively avoids planting the destructive action of thing root system to the concrete planting groove, and the unnecessary ponding of inside lining inslot can in time be flowed through the drain pipe and get into the main drainage pipeline of building simultaneously, prevents effectively that the ponding of inside lining inslot from leaking outward.
Further preferred technical scheme is in addition, it has first keel frame to plant the up end fixed mounting that the groove is close to a main part roof beam lateral wall, it has second keel frame to plant the lower terminal surface fixed mounting that the groove is close to a main part roof beam lateral wall, and first keel frame and second keel frame all set up along the length direction of main part roof beam, are located the lower extreme fixed mounting of the glass curtain wall of main part roof beam upside is on first keel frame, is located the upper end fixed mounting of the glass curtain wall of main part roof beam downside is on the second keel frame. Glass curtain wall through first keel frame or the indirect planting groove lateral wall fixed connection with main part roof beam of second keel frame, reduced glass curtain wall and building fixed mounting process's the construction degree of difficulty, the fixed connection steadiness between glass curtain wall and first fossil fragments or second fossil fragments is high simultaneously, has guaranteed the safety in utilization of this building curtain wall's afforestation planting structure.
Further preferred technical scheme still includes concrete keel frame, concrete keel frame integrative pouring shaping in plant on the groove is close to the up end of a main part roof beam lateral wall, first keel frame pass through screw fixed mounting in on the up end of concrete keel frame. Because the upper end face that plants the groove and be close to a main part roof beam lateral wall flushes with the up end of main part roof beam for the fixed mounting degree of difficulty of first fossil fragments frame on planting this lateral wall of groove is great, and causes the destruction to this lateral wall of planting the groove easily in the construction drilling installation, and concrete keel frame protrusion sets up in this lateral wall upper end of planting the groove, thereby reduced the drilling construction degree of difficulty in the first keel frame fixed mounting process, improved first keel frame and planting the groove simultaneously and be close to fixed connection efficiency and the steadiness between a main part roof beam lateral wall up end.
Further preferred technical scheme still, decorate the subassembly and include body frame and decorative board, body frame fixed mounting in plant on the outer wall surface in groove, decorative board fixed mounting in the outside of body frame. The decorative board passes through body frame fixed mounting on planting the outer wall in groove, has reduced the installation degree of difficulty of decorative board on planting the groove outer wall, has improved the installation and construction efficiency and the installation flexibility of decorative board to the pleasing to the eye effect after the decorative board installation has been guaranteed.
Further preferred technical scheme still, first keel frame, second keel frame and body frame are hot-galvanize steel material, inside lining groove and drain pipe are stainless steel material, the decorative board is aluminum plate or corrugated sheet. The hot-dip galvanized steel has excellent corrosion resistance, and the service life of the keel frame and the pipe body frame is ensured; the lining groove and the drain pipe are made of stainless steel materials, have series characteristics of excellent corrosion resistance, formability, compatibility, toughness in a wide temperature range and the like, and ensure the service life and the service performance of the lining groove and the drain pipe; the decorative plate is an aluminum plate or a corrugated plate, the decorative effect is good, the economy is good, and the greening planting structure of the building curtain wall is ensured to have good overall attractiveness and low cost.
The preferable technical scheme is that a lifting hook is fixedly arranged at the upper end of the planting groove close to one side wall of the main body beam. The lifting hook is convenient for the staff to fix the safety rope and maintain the interior of the planting groove.
The utility model has the advantages and the beneficial effects that:
1. the utility model discloses planting greening plants the structure and can hide planting groove and inside lining groove, simultaneously, makes the glass curtain wall or the decoration subassembly of planting the groove and building outside have better integration nature to ensured that green building has better whole pleasing to the eye effect, and this planting greening plants structure simple in design rationally, and the feasibility height is implemented in the application, and the practicality is strong.
2. The inside lining groove effectively avoids planting the destructive action of thing root system to the concrete planting groove, and the unnecessary ponding of inside lining inslot can in time be flowed through the drain pipe and get into the main drainage pipeline of building simultaneously, prevents effectively that the ponding of inside lining inslot from leaking outward.
3. Glass curtain wall through first keel frame or the indirect planting groove lateral wall fixed connection with main part roof beam of second keel frame, reduced glass curtain wall and building fixed mounting process's the construction degree of difficulty, the fixed connection steadiness between glass curtain wall and first fossil fragments or second fossil fragments is high simultaneously, has guaranteed the safety in utilization of this building curtain wall's afforestation planting structure.
4. Because the upper end face that plants the groove and be close to a main part roof beam lateral wall flushes with the up end of main part roof beam for the fixed mounting degree of difficulty of first fossil fragments frame on planting this lateral wall of groove is great, and causes the destruction to this lateral wall of planting the groove easily in the construction drilling installation, and concrete keel frame protrusion sets up in this lateral wall upper end of planting the groove, thereby reduced the drilling construction degree of difficulty in the first keel frame fixed mounting process, improved first keel frame and planting the groove simultaneously and be close to fixed connection efficiency and the steadiness between a main part roof beam lateral wall up end.
5. The decorative board passes through body frame fixed mounting on planting the outer wall in groove, has reduced the installation degree of difficulty of decorative board on planting the groove outer wall, has improved the installation and construction efficiency and the installation flexibility of decorative board to the pleasing to the eye effect after the decorative board installation has been guaranteed.
6. The hot-dip galvanized steel has excellent corrosion resistance, and the service life of the keel frame and the pipe body frame is ensured; the lining groove and the drain pipe are made of stainless steel materials, have series characteristics of excellent corrosion resistance, formability, compatibility, toughness in a wide temperature range and the like, and ensure the service life and the service performance of the lining groove and the drain pipe; the decorative plate is an aluminum plate or a corrugated plate, the decorative effect is good, the economy is good, and the greening planting structure of the building curtain wall is ensured to have good overall attractiveness and low cost.
7. The upper end of the planting groove close to one side wall of the main beam is fixedly provided with a lifting hook. The lifting hook is convenient for the staff to fix the safety rope and maintain the interior of the planting groove.
Drawings
FIG. 1 is a cross-sectional view of the greening planting structure of the building curtain wall of the present invention;
fig. 2 is a partially enlarged view at H in fig. 1.
In the figure: 1. a body beam; 2. planting grooves; 3. a glass curtain wall; 4. a lining groove; 5. a drain pipe; 6. a first keel frame; 7. a second keel frame; 8. a concrete keel frame; 9. a hook; 10. a first tube body frame; 11. a second tube body frame; 12. a third tube body frame; 13. a fourth tube body frame; 14. a first decorative plate; 15. a second decorative panel; 16. a third decorative panel; 17. a fourth decorative panel; 18. a fifth decorative plate; 19. decorating strips; 20. a corner connector; 21. a fifth pipe body frame; 22. and (3) soil.
Detailed Description
The following description will further describe embodiments of the present invention with reference to the accompanying drawings and examples. The following examples are only for illustrating the technical solutions of the present invention more clearly, and the protection scope of the present invention is not limited thereby.
Examples
As shown in figures 1-2, the utility model relates to a structure is planted in afforestation of building curtain, including integrative pouring shaping main part roof beam 1 front side outside planting groove 2 on the building, planting groove 2 is close to the upper end and the lower extreme of 1 lateral wall of main part roof beam and is fixed mounting respectively has glass curtain wall 3, still install the decoration subassembly on planting groove 2's the outer wall.
Preferably, the inside lining groove 4 that still is equipped with of planting groove 2, the welding of 4 bottoms in lining groove has drain pipe 5, 5 one end of drain pipe and the sealed link up of lining groove 4, the drain pipe 5 other end run through planting groove 2 is close to a lateral wall of main body roof beam 1 and extends to in the main drainage pipeline of building.
Further preferably, it has first keel frame 6 to plant the up end fixed mounting that groove 2 is close to 1 lateral wall of main part roof beam, it has second keel frame 7 to plant the lower terminal surface fixed mounting that groove 2 is close to 1 lateral wall of main part roof beam, and first keel frame 6 and second keel frame 7 all set up along the length direction of main part roof beam 1, are located the lower extreme fixed mounting of the glass curtain wall 3 of 1 upside of main part roof beam 3 is on first keel frame 6, is located the upper end fixed mounting of the glass curtain wall 3 of 1 downside of main part roof beam is on second keel frame 7.
Further preferably still, still include concrete keel frame 8, concrete keel frame 8 integrated into one piece pour the shaping in plant groove 2 and be close to on the up end of 1 lateral wall of main part roof beam, first keel frame 6 pass through screw fixed mounting in on the up end of concrete keel frame 8.
Further preferably, the decoration assembly comprises a pipe body frame and a decoration plate, the pipe body frame is fixedly installed on the outer wall surface of the planting groove 2, and the decoration plate is fixedly installed on the outer side of the pipe body frame.
Specifically, the tube body frame comprises a first tube body frame 10, a second tube body frame 11, a third tube body frame 12 and a fourth tube body frame 13, the upper end of the first pipe body frame 10 is fixedly arranged on the concrete keel frame 8, the lower end is fixedly arranged on the upper end of the planting groove 2 close to one side wall of the main body beam 1, the second pipe body frame 11 is fixedly arranged on the outer wall surface of one side wall of the planting groove 2 far away from the main body beam 1, the third pipe body frame 12 is horizontally and fixedly arranged on the outer wall surface of the bottom of the planting groove 2, the fourth pipe body frame 13 is obliquely positioned at the front side below the planting groove 2, and the higher end of the fourth pipe body frame 13 is fixedly connected with the lower end of the second pipe body frame 11, the other end is fixedly connected with the eaves body of the third pipe body frame 12 extending to the outside of the planting groove 2, the front side surface of the third pipe body frame 12 is also fixedly provided with a fifth pipe body frame 21 along the length direction of the main beam body 1; the decorative board includes first decorative board 14, second decorative board 15, third decorative board 16, fourth decorative board 17, fifth decorative board 18 and ornamental strip 19, first decorative board 14 fixed mounting is in the outside one side of groove 2 towards planting of first body frame 10, 15 fixed mounting of second decorative board is in the outside one side of groove 2 towards planting of second body frame 11, 16 fixed mounting of third decorative board is on the downside of third body frame 12, fourth decorative board 17 fixed mounting is in the last side of fourth body frame 13, 18 fixed mounting of fifth decorative board in plant on the up end of groove 2 keeping away from 1 lateral wall of main part roof beam, ornamental strip 19 fixed mounting is in the one side that fifth body frame 21 deviates from planting groove 2.
Further preferably still, first keel frame 6, second keel frame 7, first body frame 10, second body frame 11, third body frame 12, fourth body frame 13 and fifth body frame 21 are hot-dip galvanized steel material, inside lining groove 4 and drain pipe 5 are stainless steel material, first decorative board 14, third decorative board 16, fourth decorative board 17 and fifth decorative board 18 decorative board are the aluminium veneer, second decorative board 15 is the corrugated sheet, ornamental strip 19 is the aluminum alloy lines, wherein second decorative board 15 through angle sign indicating number connecting piece 20 and screw fixed mounting in second body frame 11 towards the outside one side of planting groove 2.
Further preferably, a hook 9 is fixedly installed at the upper end of the planting groove 2 close to one side wall of the main body beam 1, and the hook 9 is located above the planting groove 2.
The utility model relates to a construction and the theory of use of structure are planted in afforestation of building curtain:
principle of construction
Step 1: pouring a main body beam 1, a concrete keel frame 8 and a planting groove 2 on the building, and reserving a pore channel for a drain pipe 5 to pass through at the bottom of one side wall of the planting groove 2 close to the main body beam 1;
step 2: fixedly installing a lining groove 4 in the planting groove 2, and enabling the end part of a drain pipe 5 at the bottom of the planting groove 2 to penetrate through a reserved hole channel on the side wall of the planting groove 2 close to the main body beam 1 and extend into a main drain pipe of a building;
and step 3: installing a first keel frame 6, a second keel frame 7, each pipe body frame on the decoration assembly and a corresponding decoration plate;
and 4, step 4: and the glass curtain wall 3 is fixedly arranged on the upper end surface of the first keel frame 6 and the lower end surface of the second keel frame 7 respectively.
(II) principle of use
When the device is used, a certain amount of soil 22 is filled in the lining groove 4, green plants are planted, watering is carried out, and redundant accumulated water enters a main drainage pipeline of a building from the drainage pipe 5.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of improvements and decorations can be made without departing from the technical principle of the present invention, and these improvements and decorations should also be regarded as the protection scope of the present invention.

Claims (7)

1. The utility model provides a structure is planted in afforestation of building curtain wall, its characterized in that, including integrative pouring shaping in the outside planting groove (2) of main part roof beam (1) front side on the building, planting groove (2) are close to the upper end and the lower extreme of main part roof beam (1) a lateral wall and are fixed mounting respectively has glass curtain wall (3), still install the decoration subassembly on the outer wall of planting groove (2).
2. A greening planting structure of building curtain walls as claimed in claim 1, wherein a lining groove (4) is further arranged inside the planting groove (2), a drain pipe (5) is welded at the bottom of the lining groove (4), one end of the drain pipe (5) is hermetically communicated with the lining groove (4), and the other end of the drain pipe (5) penetrates through one side wall of the planting groove (2) close to the main body beam (1) and extends into a main drainage pipeline of the building.
3. A greening planting structure for building curtain walls as claimed in claim 2, wherein the planting groove (2) is fixedly provided with a first keel frame (6) near the upper end face of one side wall of the main body beam (1), the planting groove (2) is fixedly provided with a second keel frame (7) near the lower end face of one side wall of the main body beam (1), the first keel frame (6) and the second keel frame (7) are both arranged along the length direction of the main body beam (1), the lower end of the glass curtain wall (3) on the upper side of the main body beam (1) is fixedly provided on the first keel frame (6), and the upper end of the glass curtain wall (3) on the lower side of the main body beam (1) is fixedly provided on the second keel frame (7).
4. The greening planting structure of the building curtain wall as claimed in claim 3, further comprising a concrete keel frame (8), wherein the concrete keel frame (8) is integrally cast on the upper end surface of the planting groove (2) close to one side wall of the main body beam (1), and the first keel frame (6) is fixedly mounted on the upper end surface of the concrete keel frame (8) through screws.
5. A greening planting structure of building curtain walls according to claim 4, characterized in that the decoration assembly comprises a pipe body frame fixedly mounted on the outer wall surface of the planting groove (2) and a decoration plate fixedly mounted on the outer side of the pipe body frame.
6. A greening planting structure of building curtain walls as claimed in claim 5, wherein the first keel frame (6), the second keel frame (7) and the pipe body frame are made of hot galvanized steel, the lining groove (4) and the drain pipe (5) are made of stainless steel, and the decorative plate is an aluminum plate or a corrugated plate.
7. A greening planting structure for building curtain walls as claimed in claim 6, wherein a hook (9) is fixedly mounted on the upper end of the planting groove (2) near one side wall of the main body beam (1).
CN202021097970.5U 2020-06-15 2020-06-15 Greening planting structure of building curtain wall Active CN212866498U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021097970.5U CN212866498U (en) 2020-06-15 2020-06-15 Greening planting structure of building curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021097970.5U CN212866498U (en) 2020-06-15 2020-06-15 Greening planting structure of building curtain wall

Publications (1)

Publication Number Publication Date
CN212866498U true CN212866498U (en) 2021-04-02

Family

ID=75210046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021097970.5U Active CN212866498U (en) 2020-06-15 2020-06-15 Greening planting structure of building curtain wall

Country Status (1)

Country Link
CN (1) CN212866498U (en)

Similar Documents

Publication Publication Date Title
CN205276709U (en) Industry factory building building integrated photovoltaic roof power generation system
CN210238957U (en) Energy-conserving roofing of green building
CN212866498U (en) Greening planting structure of building curtain wall
CN212478305U (en) Green building roof structure
CN203701453U (en) Double-layered rolling iron roof gutter
CN209742427U (en) Multifunctional energy-saving landscape corridor frame suitable for forest park or wetland park environment
CN204983300U (en) Metal curtain wallboard articulates structure
CN207151310U (en) A kind of wall spatial greening structure
CN213448830U (en) Environment-friendly building roof
CN212248939U (en) Bucket arch structure between five pavements are makeed to benefit
CN212026734U (en) Heat-insulation sound-insulation building curtain wall
CN112523389A (en) Environment-friendly wall with movable flower stand
CN201663834U (en) Light planting container device used for tridimensional virescence
CN201991151U (en) Aluminum-alloy profile for assembled-type mobile sunlight-house eaves girder
CN217379414U (en) Component type green pull-net-shaped aluminum plate ecological curtain wall system
CN214034416U (en) Flower house roof connecting structure convenient to disassemble and assemble
CN215735969U (en) Green plant planting and sun shading device for residential building balcony
CN211499158U (en) Sunshine room
CN217975110U (en) Solar roof structure of ecological energy-saving building
CN219100527U (en) Metal roof drainage structure combined with curtain wall component
CN217217541U (en) Hide green decorative wall of planting of water storage tank
CN216641103U (en) Light steel building type slope roof structure
CN219352475U (en) Modular vertical greening sunshade decorative curtain wall
CN216380302U (en) Open type decorative aluminum cornice hanging structure
CN111042401B (en) Waterproof device for glass curtain wall

Legal Events

Date Code Title Description
GR01 Patent grant