CN212863807U - Building pipe hoisting clamp - Google Patents
Building pipe hoisting clamp Download PDFInfo
- Publication number
- CN212863807U CN212863807U CN202021966284.7U CN202021966284U CN212863807U CN 212863807 U CN212863807 U CN 212863807U CN 202021966284 U CN202021966284 U CN 202021966284U CN 212863807 U CN212863807 U CN 212863807U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- rod
- telescopic
- fixed
- vertical rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a hoisting clamp for construction pipes, which effectively solves the problems of unbalanced stress and inconvenient disassembly when hoisting a cement pipeline, and adopts the technical proposal that the hoisting clamp comprises a sleeve which is transversely arranged, a left extension rod and a right extension rod are arranged in the sleeve, and the extension rods can move left and right in the sleeve; the outer edge surface of the sleeve is provided with a left group of support modules and a right group of support modules, each group of support modules consists of a plurality of telescopic rods, the telescopic rods are positioned in the same vertical plane, the inner ends of the telescopic rods are fixed on the sleeve, the outer ends face different directions, and the length of each telescopic rod can be adjusted; a vertical rod is fixed at the end part of each extension rod, and a hanging ring is arranged on each vertical rod; the utility model discloses can be adapted to the hoist and mount of different diameters and not unidimensional large-scale cement pipeline, it is convenient simultaneously to install and dismantle, and is fast, can play the multiple spot to the cement pipeline during hoist and mount and support, makes the atress balanced.
Description
Technical Field
The utility model relates to a pipeline hoist and mount field, especially a building tubular product stone tongs.
Background
The laying of sewer is generally done to large-scale cement pipeline commonly, when laying, because the water pipeling is bulky, and weight is heavy, when adopting traditional wire rope winding mode to hoist, easy slippage on the one hand, on the other hand, after the cement pipeline was placed to the completion of hoist and mount, the cement pipeline pressed on wire rope, and wire rope is not convenient for take out. Meanwhile, scratches and even fractures can be caused on the outer surface of the cement pipeline in the hoisting process; moreover, because the shape of the cement pipeline is special, the cement pipeline is easy to crack if the stress is not uniform during hoisting; therefore, a novel lifting appliance is needed to handle the lifting of cement pipelines with different sizes and lengths.
Disclosure of Invention
To the situation, for solving the problem that exists among the prior art, the utility model aims at providing a building pipe stone tongs, the atress is uneven when can effectively solving the cement pipeline hoist and mount, dismantles inconvenient problem.
The technical scheme for solving the problem is that the telescopic type telescopic; the outer edge surface of the sleeve is provided with a left group of support modules and a right group of support modules, each group of support modules consists of a plurality of telescopic rods, the telescopic rods are positioned in the same vertical plane, the inner ends of the telescopic rods are fixed on the sleeve, the outer ends face different directions, and the length of each telescopic rod can be adjusted; a vertical rod is fixed at the end part of each extension rod, and a hanging ring is installed on each vertical rod.
The utility model discloses can be adapted to the hoist and mount of different diameters and not unidimensional large-scale cement pipeline, it is convenient simultaneously to install and dismantle, and is fast, can play the multiple spot to the cement pipeline during hoist and mount and support, makes the atress balanced.
Drawings
Fig. 1 is a front sectional view of the present invention.
Fig. 2 is a left side sectional view of the present invention (with the vertical bar removed).
Fig. 3 is a front view (schematic of a long and thin pipeline) of the present invention.
Detailed Description
The following detailed description of the embodiments of the present invention will be made with reference to the accompanying drawings.
As shown in fig. 1 to 3, the utility model comprises a sleeve 1 which is transversely placed, a left extension rod and a right extension rod 2 are arranged inside the sleeve 1, and the extension rods 2 can move left and right inside the sleeve 1; the outer edge surface of the sleeve 1 is provided with a left group of support modules and a right group of support modules, each group of support modules consists of a plurality of telescopic rods 3, the telescopic rods 3 are positioned in the same vertical plane, the inner ends of the telescopic rods 3 are fixed on the sleeve 1, the outer ends face different directions, and the length of the telescopic rods 3 can be adjusted; a vertical rod 4 is fixed at the end part of each extension rod 2, and a hanging ring 6 is arranged on each vertical rod 4.
In order to realize the movement of the extension rod 2 in the sleeve 1, a cylindrical protruding block is fixed at one end of each extension rod 2 in the sleeve 1, and the inner diameters of the left end and the right end of the sleeve 1 are smaller than the diameter of the protruding block.
In order to realize the length adjustment of the telescopic rod 3, the telescopic rod 3 consists of a shell 301 and a top rod 302 in the shell 301, a plurality of through holes 303 are uniformly distributed on the shell 301 from top to bottom, and a positioning hole is formed on the top rod 302; a pin 304 penetrating through the through hole 303 and the positioning hole is inserted into the housing 301.
In order to avoid sliding, the outer end of each telescopic rod 3 is fixed with a rubber layer 8.
In order to enable the vertical rods 4 to play a certain role in blocking the inclination of the pipeline, a cylinder 5 capable of moving up and down along the vertical rods 4 is sleeved outside each vertical rod 4, a limiting block arranged inside the cylinder 5 is arranged at the upper end of each vertical rod 4, and a tension spring 7 is connected between the upper end of each vertical rod 4 and the cylinder 5; the hanging ring 6 is fixed on the upper end surface of the cylinder 5.
In order to save the installation time and balance the stress, the number of the telescopic rods 3 of each group of the support modules is three, and the included angle between the adjacent three telescopic rods 3 is 60 degrees.
The utility model discloses during the use, at first on two rings 6 of controlling respectively fixed a wire rope, later according to the size of the diameter of the cement pipeline of required hoist and mount, adjust the length of telescopic link 3, when adjusting the length of a plurality of telescopic links 3, need adjust the length of a plurality of telescopic links 3 to the same length, when adjusting the length of telescopic link 3, can differentiate according to the position of through-hole 303 on the shell 301 of telescopic link 3.
The length adjustment of telescopic link 3 does not have special requirement, but need consider on the one hand can not the overlength after adjusting, can be smooth insert the whole device into the cement pipeline in, on the other hand can not the overlength, should make three telescopic link 3 support the position of pipeline inner wall a little as far as possible, avoids stress concentration to the central point on upper portion.
After the length of the telescopic rod 3 is adjusted, the whole device can be inserted into a cement pipeline, and at the moment, the length of the extension rod 2 is properly stretched or contracted according to the length of the cement pipeline, so that the left vertical rod 4 and the right vertical rod 4 are just arranged on the left side and the right side of the cement pipeline; then fixing the upper ends of the two ropes on a hook of the crane; the edge can be lifted.
When in hoisting, the vertical rod 4 is vertically upward, and the support module is also upward; the rubber layer 8 at the end part of each telescopic rod 3 is in contact with the inner side wall of the cement pipeline, the cylinder 5 sleeved outside the vertical rod 4 is stretched and the tension spring 7 inside is stretched in the hoisting process; by stretching the cylinder body 5, on one hand, the lengthened vertical rod 4 and the cylinder body 5 can play a role in blocking the left side and the right side of the cement pipeline, and the cement pipeline is prevented from being separated from the whole lifting appliance after being inclined; on the other hand, the tension spring 7 in the cement pipeline can play a role in buffering stress, and the overlarge impact force caused by the stress of the cement pipeline during lifting and putting down is avoided.
After the hoisting is finished, the cement pipeline is put down, and then the steel wire rope is untied, so that the whole clamp can be taken out for next hoisting.
When the device is not used, the telescopic rod 3 can be contracted, and the extension rod 2 is inserted into the large sleeve 1, so that the whole device is small in size, small in occupied area and convenient to store.
This device is through setting up a plurality of telescopic links 3 towards different position, through adjusting a plurality of telescopic links 3 to the same length to can make the outer end of a plurality of telescopic links 3 can the inside wall of multiple spot support cement pipeline simultaneously, guaranteed the balance of cement pipeline inside wall atress.
Through the length of adjusting telescopic link 3 and the length of extension rod 2 in this device, can be adapted to the cement pipeline of different diameters with incessant length to realized only needing one set of hoist alright with carry out the purpose of hoist to the pipeline of difference.
Two montants 4 and the outer barrel 5 of montant 4 not only play the effect of hoist and mount about this device, can play the buffering atress in addition, block the effect of pipeline slope.
Claims (5)
1. A hoisting clamp for building pipes comprises a sleeve (1) which is transversely placed, and is characterized in that a left extension rod and a right extension rod (2) are installed inside the sleeve (1), and the extension rods (2) can move left and right inside the sleeve (1); the outer edge surface of the sleeve (1) is provided with a left group of support modules and a right group of support modules, each group of support modules consists of a plurality of telescopic rods (3), the telescopic rods (3) are positioned in the same vertical plane, the inner ends of the telescopic rods (3) are fixed on the sleeve (1), the outer ends face different directions, and the length of the telescopic rods (3) can be adjusted; the end part of each extension rod (2) is fixed with a vertical rod (4), and the vertical rod (4) is provided with a hanging ring (6).
2. The hoisting clamp for the construction pipe as claimed in claim 1, wherein a cylindrical bump is fixed at one end of each extension rod (2) inside the sleeve (1), and the inner diameter of the left and right ends of the sleeve (1) is smaller than the diameter of the bump.
3. The building pipe hoisting clamp according to claim 1, wherein the telescopic rod (3) comprises a shell (301) and a top rod (302) inside the shell (301), a plurality of through holes (303) are uniformly distributed on the shell (301) from top to bottom, and a positioning hole is formed in the top rod (302); and a pin (304) penetrating through the through hole (303) and the positioning hole is inserted in the shell (301).
4. The hoisting clamp for the construction pipe as claimed in claim 1, wherein the rubber layer (8) is fixed at the outer end of each telescopic rod (3).
5. The building pipe hoisting clamp as claimed in claim 1, wherein a cylinder (5) capable of moving up and down along the vertical rod (4) is sleeved outside each vertical rod (4), a limiting block arranged inside the cylinder (5) is arranged at the upper end of each vertical rod (4), and a tension spring (7) is connected between the upper end of each vertical rod (4) and the cylinder (5); the hanging ring (6) is fixed on the upper end surface of the cylinder body (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021966284.7U CN212863807U (en) | 2020-09-10 | 2020-09-10 | Building pipe hoisting clamp |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021966284.7U CN212863807U (en) | 2020-09-10 | 2020-09-10 | Building pipe hoisting clamp |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212863807U true CN212863807U (en) | 2021-04-02 |
Family
ID=75197132
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021966284.7U Expired - Fee Related CN212863807U (en) | 2020-09-10 | 2020-09-10 | Building pipe hoisting clamp |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212863807U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114735628A (en) * | 2022-03-21 | 2022-07-12 | 煤炭科学研究总院有限公司 | Lifting frame for measuring ground stress by hydraulic fracturing method |
-
2020
- 2020-09-10 CN CN202021966284.7U patent/CN212863807U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114735628A (en) * | 2022-03-21 | 2022-07-12 | 煤炭科学研究总院有限公司 | Lifting frame for measuring ground stress by hydraulic fracturing method |
CN114735628B (en) * | 2022-03-21 | 2023-11-07 | 煤炭科学研究总院有限公司 | Use method of lifting frame for hydraulic fracturing method ground stress measurement |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212863807U (en) | Building pipe hoisting clamp | |
CN108016984A (en) | A kind of mechanical splice building pipeline lifting fixator | |
CN210735989U (en) | Hoisting device for installing vertical shaft pipeline with large vertical depth | |
CN109878561A (en) | Large-caliber pipe fittings translating device | |
NO331908B1 (en) | Floating ceiling device | |
CN102060232B (en) | Transportation method for refractory brick for stove construction | |
CN102431891A (en) | Pipeline spreader | |
CN111962821B (en) | Automatic centering and inverting method for vertical shaft pipeline | |
CN207632338U (en) | A kind of mechanical splice building pipeline lifting fixator | |
CN204096710U (en) | A kind of wound roll material feed mechanism with two air cylinder device | |
CN213863893U (en) | Telescopic chute | |
CN206654663U (en) | A kind of balance sling for installing finishing mill taper box | |
CN112722734B (en) | Method for transporting heavy steel pipes with large calibers in pipe gallery | |
CN201061446Y (en) | Hanging material racks | |
CN209958797U (en) | Brickwork wall horizontal mortar joint thickness control device | |
CN206901583U (en) | Core suspender | |
CN213537082U (en) | Hoop support location hoisting structure | |
CN205241747U (en) | " arm " formula stove roller hoist | |
CN213141166U (en) | Steel pipe hoisting device convenient to disassemble and assemble | |
CN219860175U (en) | Municipal administration water supply and drainage send pipe erection equipment | |
CN217398223U (en) | Safe portable scaffold pipe lifting device | |
CN210558887U (en) | Refractory brick hoisting clamp | |
CN219860094U (en) | Long soft rock core overhead hoist | |
CN111115429A (en) | Underwater pipeline pulling-out clamp, pulling-out device and pulling-out method | |
CN208815912U (en) | A kind of steel structure net rack, which is integrally promoted, uses device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210402 Termination date: 20210910 |