CN212863807U - Building pipe hoisting clamp - Google Patents

Building pipe hoisting clamp Download PDF

Info

Publication number
CN212863807U
CN212863807U CN202021966284.7U CN202021966284U CN212863807U CN 212863807 U CN212863807 U CN 212863807U CN 202021966284 U CN202021966284 U CN 202021966284U CN 212863807 U CN212863807 U CN 212863807U
Authority
CN
China
Prior art keywords
sleeve
rod
telescopic
fixed
vertical rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021966284.7U
Other languages
Chinese (zh)
Inventor
周振云
张大金
杨长轩
姚进朝
刘东亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021966284.7U priority Critical patent/CN212863807U/en
Application granted granted Critical
Publication of CN212863807U publication Critical patent/CN212863807U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a hoisting clamp for construction pipes, which effectively solves the problems of unbalanced stress and inconvenient disassembly when hoisting a cement pipeline, and adopts the technical proposal that the hoisting clamp comprises a sleeve which is transversely arranged, a left extension rod and a right extension rod are arranged in the sleeve, and the extension rods can move left and right in the sleeve; the outer edge surface of the sleeve is provided with a left group of support modules and a right group of support modules, each group of support modules consists of a plurality of telescopic rods, the telescopic rods are positioned in the same vertical plane, the inner ends of the telescopic rods are fixed on the sleeve, the outer ends face different directions, and the length of each telescopic rod can be adjusted; a vertical rod is fixed at the end part of each extension rod, and a hanging ring is arranged on each vertical rod; the utility model discloses can be adapted to the hoist and mount of different diameters and not unidimensional large-scale cement pipeline, it is convenient simultaneously to install and dismantle, and is fast, can play the multiple spot to the cement pipeline during hoist and mount and support, makes the atress balanced.

Description

Building pipe hoisting clamp
Technical Field
The utility model relates to a pipeline hoist and mount field, especially a building tubular product stone tongs.
Background
The laying of sewer is generally done to large-scale cement pipeline commonly, when laying, because the water pipeling is bulky, and weight is heavy, when adopting traditional wire rope winding mode to hoist, easy slippage on the one hand, on the other hand, after the cement pipeline was placed to the completion of hoist and mount, the cement pipeline pressed on wire rope, and wire rope is not convenient for take out. Meanwhile, scratches and even fractures can be caused on the outer surface of the cement pipeline in the hoisting process; moreover, because the shape of the cement pipeline is special, the cement pipeline is easy to crack if the stress is not uniform during hoisting; therefore, a novel lifting appliance is needed to handle the lifting of cement pipelines with different sizes and lengths.
Disclosure of Invention
To the situation, for solving the problem that exists among the prior art, the utility model aims at providing a building pipe stone tongs, the atress is uneven when can effectively solving the cement pipeline hoist and mount, dismantles inconvenient problem.
The technical scheme for solving the problem is that the telescopic type telescopic; the outer edge surface of the sleeve is provided with a left group of support modules and a right group of support modules, each group of support modules consists of a plurality of telescopic rods, the telescopic rods are positioned in the same vertical plane, the inner ends of the telescopic rods are fixed on the sleeve, the outer ends face different directions, and the length of each telescopic rod can be adjusted; a vertical rod is fixed at the end part of each extension rod, and a hanging ring is installed on each vertical rod.
The utility model discloses can be adapted to the hoist and mount of different diameters and not unidimensional large-scale cement pipeline, it is convenient simultaneously to install and dismantle, and is fast, can play the multiple spot to the cement pipeline during hoist and mount and support, makes the atress balanced.
Drawings
Fig. 1 is a front sectional view of the present invention.
Fig. 2 is a left side sectional view of the present invention (with the vertical bar removed).
Fig. 3 is a front view (schematic of a long and thin pipeline) of the present invention.
Detailed Description
The following detailed description of the embodiments of the present invention will be made with reference to the accompanying drawings.
As shown in fig. 1 to 3, the utility model comprises a sleeve 1 which is transversely placed, a left extension rod and a right extension rod 2 are arranged inside the sleeve 1, and the extension rods 2 can move left and right inside the sleeve 1; the outer edge surface of the sleeve 1 is provided with a left group of support modules and a right group of support modules, each group of support modules consists of a plurality of telescopic rods 3, the telescopic rods 3 are positioned in the same vertical plane, the inner ends of the telescopic rods 3 are fixed on the sleeve 1, the outer ends face different directions, and the length of the telescopic rods 3 can be adjusted; a vertical rod 4 is fixed at the end part of each extension rod 2, and a hanging ring 6 is arranged on each vertical rod 4.
In order to realize the movement of the extension rod 2 in the sleeve 1, a cylindrical protruding block is fixed at one end of each extension rod 2 in the sleeve 1, and the inner diameters of the left end and the right end of the sleeve 1 are smaller than the diameter of the protruding block.
In order to realize the length adjustment of the telescopic rod 3, the telescopic rod 3 consists of a shell 301 and a top rod 302 in the shell 301, a plurality of through holes 303 are uniformly distributed on the shell 301 from top to bottom, and a positioning hole is formed on the top rod 302; a pin 304 penetrating through the through hole 303 and the positioning hole is inserted into the housing 301.
In order to avoid sliding, the outer end of each telescopic rod 3 is fixed with a rubber layer 8.
In order to enable the vertical rods 4 to play a certain role in blocking the inclination of the pipeline, a cylinder 5 capable of moving up and down along the vertical rods 4 is sleeved outside each vertical rod 4, a limiting block arranged inside the cylinder 5 is arranged at the upper end of each vertical rod 4, and a tension spring 7 is connected between the upper end of each vertical rod 4 and the cylinder 5; the hanging ring 6 is fixed on the upper end surface of the cylinder 5.
In order to save the installation time and balance the stress, the number of the telescopic rods 3 of each group of the support modules is three, and the included angle between the adjacent three telescopic rods 3 is 60 degrees.
The utility model discloses during the use, at first on two rings 6 of controlling respectively fixed a wire rope, later according to the size of the diameter of the cement pipeline of required hoist and mount, adjust the length of telescopic link 3, when adjusting the length of a plurality of telescopic links 3, need adjust the length of a plurality of telescopic links 3 to the same length, when adjusting the length of telescopic link 3, can differentiate according to the position of through-hole 303 on the shell 301 of telescopic link 3.
The length adjustment of telescopic link 3 does not have special requirement, but need consider on the one hand can not the overlength after adjusting, can be smooth insert the whole device into the cement pipeline in, on the other hand can not the overlength, should make three telescopic link 3 support the position of pipeline inner wall a little as far as possible, avoids stress concentration to the central point on upper portion.
After the length of the telescopic rod 3 is adjusted, the whole device can be inserted into a cement pipeline, and at the moment, the length of the extension rod 2 is properly stretched or contracted according to the length of the cement pipeline, so that the left vertical rod 4 and the right vertical rod 4 are just arranged on the left side and the right side of the cement pipeline; then fixing the upper ends of the two ropes on a hook of the crane; the edge can be lifted.
When in hoisting, the vertical rod 4 is vertically upward, and the support module is also upward; the rubber layer 8 at the end part of each telescopic rod 3 is in contact with the inner side wall of the cement pipeline, the cylinder 5 sleeved outside the vertical rod 4 is stretched and the tension spring 7 inside is stretched in the hoisting process; by stretching the cylinder body 5, on one hand, the lengthened vertical rod 4 and the cylinder body 5 can play a role in blocking the left side and the right side of the cement pipeline, and the cement pipeline is prevented from being separated from the whole lifting appliance after being inclined; on the other hand, the tension spring 7 in the cement pipeline can play a role in buffering stress, and the overlarge impact force caused by the stress of the cement pipeline during lifting and putting down is avoided.
After the hoisting is finished, the cement pipeline is put down, and then the steel wire rope is untied, so that the whole clamp can be taken out for next hoisting.
When the device is not used, the telescopic rod 3 can be contracted, and the extension rod 2 is inserted into the large sleeve 1, so that the whole device is small in size, small in occupied area and convenient to store.
This device is through setting up a plurality of telescopic links 3 towards different position, through adjusting a plurality of telescopic links 3 to the same length to can make the outer end of a plurality of telescopic links 3 can the inside wall of multiple spot support cement pipeline simultaneously, guaranteed the balance of cement pipeline inside wall atress.
Through the length of adjusting telescopic link 3 and the length of extension rod 2 in this device, can be adapted to the cement pipeline of different diameters with incessant length to realized only needing one set of hoist alright with carry out the purpose of hoist to the pipeline of difference.
Two montants 4 and the outer barrel 5 of montant 4 not only play the effect of hoist and mount about this device, can play the buffering atress in addition, block the effect of pipeline slope.

Claims (5)

1. A hoisting clamp for building pipes comprises a sleeve (1) which is transversely placed, and is characterized in that a left extension rod and a right extension rod (2) are installed inside the sleeve (1), and the extension rods (2) can move left and right inside the sleeve (1); the outer edge surface of the sleeve (1) is provided with a left group of support modules and a right group of support modules, each group of support modules consists of a plurality of telescopic rods (3), the telescopic rods (3) are positioned in the same vertical plane, the inner ends of the telescopic rods (3) are fixed on the sleeve (1), the outer ends face different directions, and the length of the telescopic rods (3) can be adjusted; the end part of each extension rod (2) is fixed with a vertical rod (4), and the vertical rod (4) is provided with a hanging ring (6).
2. The hoisting clamp for the construction pipe as claimed in claim 1, wherein a cylindrical bump is fixed at one end of each extension rod (2) inside the sleeve (1), and the inner diameter of the left and right ends of the sleeve (1) is smaller than the diameter of the bump.
3. The building pipe hoisting clamp according to claim 1, wherein the telescopic rod (3) comprises a shell (301) and a top rod (302) inside the shell (301), a plurality of through holes (303) are uniformly distributed on the shell (301) from top to bottom, and a positioning hole is formed in the top rod (302); and a pin (304) penetrating through the through hole (303) and the positioning hole is inserted in the shell (301).
4. The hoisting clamp for the construction pipe as claimed in claim 1, wherein the rubber layer (8) is fixed at the outer end of each telescopic rod (3).
5. The building pipe hoisting clamp as claimed in claim 1, wherein a cylinder (5) capable of moving up and down along the vertical rod (4) is sleeved outside each vertical rod (4), a limiting block arranged inside the cylinder (5) is arranged at the upper end of each vertical rod (4), and a tension spring (7) is connected between the upper end of each vertical rod (4) and the cylinder (5); the hanging ring (6) is fixed on the upper end surface of the cylinder body (5).
CN202021966284.7U 2020-09-10 2020-09-10 Building pipe hoisting clamp Expired - Fee Related CN212863807U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021966284.7U CN212863807U (en) 2020-09-10 2020-09-10 Building pipe hoisting clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021966284.7U CN212863807U (en) 2020-09-10 2020-09-10 Building pipe hoisting clamp

Publications (1)

Publication Number Publication Date
CN212863807U true CN212863807U (en) 2021-04-02

Family

ID=75197132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021966284.7U Expired - Fee Related CN212863807U (en) 2020-09-10 2020-09-10 Building pipe hoisting clamp

Country Status (1)

Country Link
CN (1) CN212863807U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114735628A (en) * 2022-03-21 2022-07-12 煤炭科学研究总院有限公司 Lifting frame for measuring ground stress by hydraulic fracturing method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114735628A (en) * 2022-03-21 2022-07-12 煤炭科学研究总院有限公司 Lifting frame for measuring ground stress by hydraulic fracturing method
CN114735628B (en) * 2022-03-21 2023-11-07 煤炭科学研究总院有限公司 Use method of lifting frame for hydraulic fracturing method ground stress measurement

Similar Documents

Publication Publication Date Title
CN212863807U (en) Building pipe hoisting clamp
CN108016984A (en) A kind of mechanical splice building pipeline lifting fixator
CN210735989U (en) Hoisting device for installing vertical shaft pipeline with large vertical depth
CN109878561A (en) Large-caliber pipe fittings translating device
NO331908B1 (en) Floating ceiling device
CN102060232B (en) Transportation method for refractory brick for stove construction
CN102431891A (en) Pipeline spreader
CN111962821B (en) Automatic centering and inverting method for vertical shaft pipeline
CN207632338U (en) A kind of mechanical splice building pipeline lifting fixator
CN204096710U (en) A kind of wound roll material feed mechanism with two air cylinder device
CN213863893U (en) Telescopic chute
CN206654663U (en) A kind of balance sling for installing finishing mill taper box
CN112722734B (en) Method for transporting heavy steel pipes with large calibers in pipe gallery
CN201061446Y (en) Hanging material racks
CN209958797U (en) Brickwork wall horizontal mortar joint thickness control device
CN206901583U (en) Core suspender
CN213537082U (en) Hoop support location hoisting structure
CN205241747U (en) " arm " formula stove roller hoist
CN213141166U (en) Steel pipe hoisting device convenient to disassemble and assemble
CN219860175U (en) Municipal administration water supply and drainage send pipe erection equipment
CN217398223U (en) Safe portable scaffold pipe lifting device
CN210558887U (en) Refractory brick hoisting clamp
CN219860094U (en) Long soft rock core overhead hoist
CN111115429A (en) Underwater pipeline pulling-out clamp, pulling-out device and pulling-out method
CN208815912U (en) A kind of steel structure net rack, which is integrally promoted, uses device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210402

Termination date: 20210910