CN212839791U - Mounting bracket for fire-fighting pipeline in house construction - Google Patents

Mounting bracket for fire-fighting pipeline in house construction Download PDF

Info

Publication number
CN212839791U
CN212839791U CN202021571608.7U CN202021571608U CN212839791U CN 212839791 U CN212839791 U CN 212839791U CN 202021571608 U CN202021571608 U CN 202021571608U CN 212839791 U CN212839791 U CN 212839791U
Authority
CN
China
Prior art keywords
connecting rod
hole
sleeve
jib
fire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021571608.7U
Other languages
Chinese (zh)
Inventor
许翔
林琳洁
林源远
林志航
刘用政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Yancheng Construction Engineering Co Ltd
Original Assignee
Fujian Yancheng Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Yancheng Construction Engineering Co Ltd filed Critical Fujian Yancheng Construction Engineering Co Ltd
Priority to CN202021571608.7U priority Critical patent/CN212839791U/en
Application granted granted Critical
Publication of CN212839791U publication Critical patent/CN212839791U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The application discloses installing support of fire-fighting pipeline in building relates to the technical field of fire-fighting pipeline installation, including the jib subassembly, the jib subassembly includes jib and threaded connection in the outside sleeve of jib, and the one end of jib is connected with and is used for fixing the top of jib on the wall and explodes the screw, and the sleeve is kept away from the one end that the top explodes the screw and is connected with the joint subassembly that is used for the joint pipeline. This application has the effect of being convenient for carry out installing support length adjustment.

Description

Mounting bracket for fire-fighting pipeline in house construction
Technical Field
The application relates to the technical field of fire-fighting pipeline installation, in particular to a mounting bracket for a fire-fighting pipeline in a building.
Background
The fire-fighting pipeline is a kind of pipeline equipment used for transporting the water for fire-fighting, the house is built the in-process of construction and is related to laying installation of fire-fighting pipeline, the mode that adopts hoist and mount usually with the piping erection on the ceiling in house, the installing support plays the effect of fixed pipeline, the installing support can play the effect to the fire-fighting pipeline protection, keeps the holistic steadiness of fire-fighting pipeline.
Fig. 4 shows a mounting bracket for installing a fire fighting pipeline in the related art, which includes a suspension rod 11, a pop screw 3 installed at the end of the suspension pipe, and a clip 9 connected to the lower end of the suspension rod 11 for fixing the fire fighting pipeline.
To the correlation technique among the above-mentioned, the inventor thinks that in actual installation, need level the fire-fighting pipeline installation, but because the difference of the concrete mounted position of fire-fighting pipeline, often need cut into different length with the jib in order to adapt to different wall, its length adjustment's process is comparatively inconvenient.
SUMMERY OF THE UTILITY MODEL
In order to facilitate the length adjustment who carries out the installing support, this application provides a fire pipeline's installing support in building.
The application provides a fire pipeline's installing support in room is built adopts following technical scheme:
the utility model provides a fire-fighting pipeline's installing support in building, includes the jib subassembly, the jib subassembly includes jib and threaded connection in the outside sleeve of jib, the one end of jib is connected with and is used for fixing the top of jib on the wall and explodes the screw, the sleeve is kept away from the one end that the top explodes the screw and is connected with the joint subassembly that is used for the joint pipeline.
By adopting the technical scheme, when the fire fighting pipeline is installed, according to the requirement of the installation height of the pipeline, when the length of the suspender component is longer than the height to be installed, the suspender is rotated towards the moving direction of the sleeve, and the suspender component is adjusted to the proper height; when the length of jib subassembly is short in the height that the pipeline will be installed, remove the jib to keeping away from telescopic direction, then realize the fixed of fire control pipeline through the joint subassembly, because jib subassembly holistic length realizes adjusting through jib and sleeve threaded connection's position, saved the process of measuring the cutting, its jib subassembly's length adjustment is comparatively convenient.
Preferably, the joint subassembly includes connecting rod, lower connecting rod, left connecting rod and right connecting rod, go up connecting rod and lower connecting rod parallel arrangement, left side connecting rod and right connecting rod parallel arrangement, go up connecting rod, lower connecting rod, left connecting rod and right connecting rod and can dismantle the connection, enclose between connecting rod, lower connecting rod, left connecting rod and the right connecting rod and close the installation department that forms the confession piping erection.
Through adopting above-mentioned technical scheme, through last connecting rod, lower connecting rod, left connecting rod and the right connecting rod that can dismantle the connection, enclose the installation department that supplies the piping erection to the realization is fixed to the joint of pipeline.
Preferably, the upper connecting rod is provided with a first through hole for the left connecting rod to penetrate through, the lower connecting rod is provided with a second through hole for the left connecting rod to penetrate through, and two ends of the left connecting rod are in threaded connection with a first nut for fixing the upper connecting rod, the lower connecting rod and the left connecting rod; the upper connecting rod is provided with a third through hole for the right connecting rod to penetrate through, the lower connecting rod is provided with a fourth through hole for the right connecting rod to penetrate through, and two ends of the right connecting rod are in threaded connection with a second nut for fixing the upper connecting rod, the lower connecting rod and the right connecting rod.
Through adopting above-mentioned technical scheme, it is fixed with left connecting rod and last connecting rod and lower connecting rod through first nut, realize fixing right connecting rod and last connecting rod and lower connecting rod through the second nut to realize the holistic connection of dismantling of joint subassembly.
Preferably, the first through hole, the second through hole, the third through hole and the fourth through hole are all kidney-shaped holes.
Through adopting above-mentioned technical scheme, slide in waist shape hole through with left connecting rod and right connecting rod to the realization removes left connecting rod and right connecting rod to the position with the laminating of fire-fighting pipeline lateral wall, is convenient for fix the fire-fighting pipeline.
Preferably, the left connecting rod is sleeved with a rubber cushion block inserted in the waist-shaped hole.
Through adopting above-mentioned technical scheme, when carrying out the installation of fire control pipeline, remove left connecting rod to the direction that is close to the upper connecting rod, peg graft rubber cushion and first through-hole simultaneously to realize the fixed of left connecting rod and upper connecting rod.
Preferably, the middle part of the lower connecting rod is provided with a groove for positioning the pipeline.
Through adopting above-mentioned technical scheme, the recess is convenient for realize the location of pipeline.
Preferably, the upper link is rotatably connected to the sleeve.
Through adopting above-mentioned technical scheme, because last connecting rod and sleeve swivelling joint, when the orientation of fire control pipeline changed, make the change of making of installing support suitability.
Preferably, the middle part of the upper connecting rod is provided with a mounting hole for the sleeve to penetrate through, and the position of the sleeve, which is arranged on the lower end face of the upper connecting rod, is provided with a baffle abutting against the lower end face of the upper connecting rod.
Through adopting above-mentioned technical scheme, the baffle butt can improve the sleeve and the steadiness of linking the board with last at the lower terminal surface of last connecting rod.
Preferably, a bearing is arranged between the upper connecting rod and the sleeve.
Through adopting above-mentioned technical scheme, when the relative sleeve emergence of joint subassembly is rotatory, the bearing can reduce the friction between upper connecting rod and the sleeve.
In summary, the present application includes at least one of the following benefits:
1. when the fire fighting pipeline is installed, according to the requirement of the installation height of the pipeline, when the length of the suspender component is longer than the height to be installed, the suspender is rotated towards the moving direction of the sleeve, and the suspender component is adjusted to the proper height; when the length of the suspender component is shorter than the height of the pipeline to be installed, the suspender is moved to the direction far away from the sleeve, and then the fire-fighting pipeline is fixed through the clamping component;
2. through sliding left connecting rod and right connecting rod in waist shape hole to the realization removes left connecting rod and right connecting rod to the position with the laminating of fire-fighting pipeline lateral wall, is convenient for fix the fire-fighting pipeline.
Drawings
Fig. 1 is a schematic structural view of the mounting structure of the present embodiment;
FIG. 2 is a schematic view of a state that a rubber cushion block fixes a left connecting rod;
FIG. 3 is an exploded view of the sleeve and upper link connection;
fig. 4 is a schematic view of a related art mounting structure.
Description of reference numerals: 1. a boom assembly; 11. a boom; 12. a sleeve; 13. a baffle plate; 2. a clamping assembly; 21. an upper connecting rod; 211. a first through hole; 212. a third through hole; 213. mounting holes; 22. a lower connecting rod; 221. a second through hole; 222. a fourth via hole; 223. a groove; 23. a left connecting rod; 24. a right connecting rod; 3. ejecting a screw; 4. an installation part; 5. a first nut; 6. a second nut; 7. a rubber cushion block; 8. a bearing; 9. and (5) clamping a hoop.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses fire pipeline's installing support in room is built. Referring to fig. 1, the mounting bracket of the fire fighting pipeline in the building comprises a suspender component 1 and a clamping component 2.
Referring to fig. 1, the boom assembly 1 includes a boom 11 and a sleeve 12 screwed to the outside of the boom 11, one end of the boom 11 is connected to a pop-up screw 3, and when the boom assembly 1 is mounted on a wall surface, the boom assembly is connected to the wall surface through the pop-up screw 3, thereby fixing the boom assembly 1 to the wall surface.
Referring to fig. 1, the clamping assembly 2 includes an upper connecting rod 21, a lower connecting rod 22, a left connecting rod 23 and a right connecting rod 24, the upper connecting rod 21 and the lower connecting rod 22 are arranged in parallel, the left connecting rod 23 and the right connecting rod 24 are arranged in parallel, and an installation part 4 for installing the fire fighting pipeline is formed by enclosing the upper connecting rod 21, the lower connecting rod 22, the left connecting rod 23 and the right connecting rod 24.
Referring to fig. 1, a first through hole 211 for the left connecting rod 23 to pass through is formed in the upper connecting rod 21, a second through hole 221 for the left connecting rod 23 to connect is formed in the lower connecting rod 22, a third through hole 212 for the right connecting rod 24 to be inserted into is formed in a position where the upper connecting rod 21 is symmetrical to the first through hole 211, a fourth through hole 222 for the right connecting rod 24 to be inserted into is formed in a position where the lower connecting rod 22 is symmetrical to the second through hole 221, first nuts 5 are connected to the upper end and the lower end of the left connecting rod 23 in a threaded manner, and the left connecting rod 23 is fixed to the upper connecting rod 21 and the lower connecting rod 22 through. The upper end and the lower end of the right connecting rod 24 are in threaded connection with a second nut 6, and the right connecting rod 24 is fixed with the upper connecting rod 21 and the lower connecting rod 22 through the second nut 6. First through-hole 211, second through-hole 221, third through-hole 212 and fourth through-hole 222 are waist shape hole, through remove left connecting rod 23 and right connecting rod 24 in waist shape hole to realize the butt of left connecting rod 23 and right connecting rod 24 and fire-fighting pipeline lateral wall, realize left connecting rod 23, right connecting rod 24 fixed to fire-fighting pipeline.
Referring to fig. 2, the left connecting rod 23 is sleeved with a rubber cushion block 7 inserted into the kidney-shaped hole, the rubber cushion block 7 moves up and down on the left connecting rod 23, and when the left connecting rod 23 is pulled in a direction close to the upper connecting rod 21, the rubber cushion block 7 is clamped in the first through hole 211, so that the left connecting rod 23 and the upper connecting rod 21 are fixed conveniently.
Referring to fig. 2, the middle of the lower connecting rod 22 is provided with a groove 223 for positioning the fire fighting pipeline, and when the fire fighting pipeline is installed, the positioning of the fire fighting pipeline is facilitated through the groove 223.
Referring to fig. 3, the upper link 21 is rotatably connected to the sleeve 12, a mounting hole 213 for the sleeve 12 to pass through is formed in the middle of the upper link 21, the sleeve 12 is fixedly welded to the lower end face of the upper link 21, and the baffle 13 abutted to the lower end face of the upper link 21 is welded to the lower end face of the sleeve 12, so that the stability of connection between the sleeve 12 and the upper link 21 is improved, a bearing 8 is arranged between the upper link 21 and the sleeve 12, an inner ring of the bearing 8 is fixedly welded to the sleeve 12, an outer ring of the bearing 8 is fixedly welded to the upper link 21, and when the clamping assembly 2 rotates relative to the sleeve 12, the bearing 8 can reduce friction between the.
The implementation principle of the installing support of the fire-fighting pipeline in the house building is as follows:
when the fire fighting pipeline is installed, according to the installation requirement of the fire fighting pipeline, when the length between the suspension rod 11 and the sleeve 12 is longer than the height of the fire fighting pipeline to be installed, the sleeve 12 is screwed in the direction close to the top explosion screw 3, so that the length from the upper end of the suspension rod 11 to the lower end of the sleeve 12 meets the installation requirement, and when the length between the suspension rod 11 and the sleeve 12 is shorter than the height of the fire fighting pipeline to be installed, the sleeve 12 is screwed in the direction far away from the top explosion screw 3, so that the length from the upper end of the suspension rod 11 to the lower end of the sleeve 12 is adjusted. Then dismantle the first nut 5 of left connecting rod 23 lower extreme, move left connecting rod 23 to the direction that is close to upper link 21, through the fixed of rubber cushion 7 with first through-hole 211, realize left connecting rod 23 and upper link 21 fixed, later put into installation department 4 with the pipeline from one side of left connecting rod 23, through recess 223 with the pipeline location, make left connecting rod 23 reset again, realize the holistic installation of fire control pipeline.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (9)

1. The utility model provides a fire-fighting pipeline's installing support in building which characterized in that: including jib subassembly (1), jib subassembly (1) includes jib (11) and threaded connection in jib (11) outside sleeve (12), the one end of jib (11) is connected with and is used for fixing top explosion screw (3) on the wall with jib (11), the one end that top explosion screw (3) were kept away from in sleeve (12) is connected with joint subassembly (2) that are used for the joint pipeline.
2. A mounting bracket for fire fighting pipes in buildings according to claim 1, characterized in that: joint subassembly (2) include connecting rod (21), lower connecting rod (22), left connecting rod (23) and right connecting rod (24), go up connecting rod (21) and lower connecting rod (22) parallel arrangement, left connecting rod (23) and right connecting rod (24) parallel arrangement, go up connecting rod (21), lower connecting rod (22), left connecting rod (23) and right connecting rod (24) and can dismantle the connection, enclose between connecting rod (21), lower connecting rod (22), left connecting rod (23) and the right connecting rod (24) and close installation department (4) that form the confession piping erection.
3. A mounting bracket for fire fighting pipes in buildings according to claim 2, characterized in that: a first through hole (211) for the left connecting rod (23) to penetrate through is formed in the upper connecting rod (21), a second through hole (221) for the left connecting rod (23) to penetrate through is formed in the lower connecting rod (22), and first nuts (5) for fixing the upper connecting rod (21), the lower connecting rod (22) and the left connecting rod (23) are connected to two ends of the left connecting rod (23) in a threaded mode; the upper connecting rod (21) is provided with a third through hole (212) for the right connecting rod (24) to penetrate through, the lower connecting rod (22) is provided with a fourth through hole (222) for the right connecting rod (24) to penetrate through, and two ends of the right connecting rod (24) are in threaded connection with a second nut (6) for fixing the upper connecting rod (21), the lower connecting rod (22) and the right connecting rod (24).
4. A mounting bracket for fire fighting pipes in buildings according to claim 3, characterized in that: the first through hole (211), the second through hole (221), the third through hole (212) and the fourth through hole (222) are all kidney-shaped holes.
5. The mounting bracket for the fire fighting pipes in the buildings according to claim 4, wherein: and the left connecting rod (23) is sleeved with a rubber cushion block (7) inserted in the waist-shaped hole.
6. A mounting bracket for fire fighting pipes in buildings according to claim 2, characterized in that: the middle part of the lower connecting rod (22) is provided with a groove (223) for positioning the pipeline.
7. A mounting bracket for fire fighting pipes in buildings according to claim 2, characterized in that: the upper connecting rod (21) is rotatably connected with the sleeve (12).
8. A mounting bracket for fire fighting pipes in buildings according to claim 2, characterized in that: the middle part of the upper connecting rod (21) is provided with a mounting hole (213) for the sleeve (12) to penetrate through, and the position of the sleeve (12) on the lower end face of the upper connecting rod (21) is provided with a baffle (13) abutted against the lower end face of the upper connecting rod (21).
9. A mounting bracket for fire fighting pipes in buildings according to claim 2, characterized in that: and a bearing (8) is arranged between the upper connecting rod (21) and the sleeve (12).
CN202021571608.7U 2020-07-31 2020-07-31 Mounting bracket for fire-fighting pipeline in house construction Active CN212839791U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021571608.7U CN212839791U (en) 2020-07-31 2020-07-31 Mounting bracket for fire-fighting pipeline in house construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021571608.7U CN212839791U (en) 2020-07-31 2020-07-31 Mounting bracket for fire-fighting pipeline in house construction

Publications (1)

Publication Number Publication Date
CN212839791U true CN212839791U (en) 2021-03-30

Family

ID=75125993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021571608.7U Active CN212839791U (en) 2020-07-31 2020-07-31 Mounting bracket for fire-fighting pipeline in house construction

Country Status (1)

Country Link
CN (1) CN212839791U (en)

Similar Documents

Publication Publication Date Title
CN209960009U (en) Anti-seismic support hanger
CN212839791U (en) Mounting bracket for fire-fighting pipeline in house construction
CN112360052A (en) Suspended ceiling mounting structure of pre-buried bolt of assembled calcium silicate furred ceiling board
CN109114308A (en) A kind of pipe-hanger support
CN213682775U (en) Suspended ceiling mounting structure of pre-buried bolt of assembled calcium silicate furred ceiling board
CN212478243U (en) Mineral wool board ceiling structure
KR200445812Y1 (en) Improved supporting structure of pipe
CN211118012U (en) Anti-seismic connecting piece and lateral longitudinal anti-seismic support
CN112081294A (en) Combined type suspender structure of assembled ceiling
CN214331867U (en) Anti-seismic support capable of being hoisted and fixed in multi-direction for electromechanical installation of building construction project
CN212053407U (en) Adjustable conversion layer component of assembled
CN210739578U (en) Antidetonation support convenient to installation
CN212897134U (en) Combined type suspender structure of assembled ceiling
CN220891305U (en) Building water supply and drainage structure
CN214940387U (en) Connecting structure of prefabricated pipe gallery
CN201391016Y (en) Suspended ceiling converting support
CN210577614U (en) Improved suspension bracket for cable bridge
CN219627283U (en) High-strength horizontal cable bridge convenient to construct
CN220214378U (en) Dust fall device for environmental treatment
CN220668609U (en) Fire control pipeline supporting component for fire engineering
CN211421554U (en) Suspended ceiling structure
CN218373891U (en) Novel support in steel sheet pile device
CN213541654U (en) Anti-seismic support connecting piece
CN204609001U (en) A kind of assembled steel pipe connected node
CN218543400U (en) Assembled antidetonation support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant