CN212053407U - Adjustable conversion layer component of assembled - Google Patents

Adjustable conversion layer component of assembled Download PDF

Info

Publication number
CN212053407U
CN212053407U CN201922457688.7U CN201922457688U CN212053407U CN 212053407 U CN212053407 U CN 212053407U CN 201922457688 U CN201922457688 U CN 201922457688U CN 212053407 U CN212053407 U CN 212053407U
Authority
CN
China
Prior art keywords
external member
otic placode
construction
connecting piece
suspender
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922457688.7U
Other languages
Chinese (zh)
Inventor
梁超
郝边遥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Decoration Project Design Institute Co ltd
Original Assignee
Jilin Decoration Project Design Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Decoration Project Design Institute Co ltd filed Critical Jilin Decoration Project Design Institute Co ltd
Priority to CN201922457688.7U priority Critical patent/CN212053407U/en
Application granted granted Critical
Publication of CN212053407U publication Critical patent/CN212053407U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The utility model discloses an adjustable conversion layer component of assembled that is used for suspended ceiling in architectural decoration surface course and building, including jib, jib collet, lower otic placode external member, go up otic placode external member, fossil fragments connecting piece. Go up otic placode external member, lower otic placode external member with the jib cup joints and to realize the level to adjusting, go up otic placode external member, lower otic placode external member with fossil fragments connecting piece bolt joint can realize perpendicularly to adjusting. The utility model discloses component structural style is simple, before the construction, in the construction, all can multi-direction regulation after the construction, but all connecting pieces batch factory processing, and quality control is convenient, connects portably, and the time limit for a project is controllable, and the reliability is high. Has good social benefit and economic benefit, and is suitable for popularization and use.

Description

Adjustable conversion layer component of assembled
Technical Field
The utility model relates to an adjustable conversion layer component of assembled belongs to building decoration technical field.
Background
The conventional steel structure conversion member is mainly composed of: fixing piece, jib, angle steel keel bracing, square tube conversion fossil fragments etc. constitute, and steel frame conversion layer process steps mainly divide into: measuring and paying off, punching and embedding expansion bolts, installing a suspender, welding a conversion layer steel frame, and painting anti-rust paint. However, when the structure is in a multi-surface or curved-surface structure with different characteristics, a large amount of time is needed for paying off and positioning, the whole structure is in rigid connection, stress generated by welding deformation is difficult to overcome, rework rate is high due to errors and deformation, and construction efficiency is affected. Welding and trompil more influence conversion layer intensity to a certain extent, and a large amount of high altitude welding have huge construction hidden danger, bring inconvenience for the construction.
Disclosure of Invention
The utility model aims at providing a bolted connection's multi-angle adjustable just for solving above-mentioned problem, have certain flexible rigidity conversion layer component, component structural style is simple, and all can multi-direction regulation before the construction, in the construction, after the construction, but all connecting pieces batch factory process, quality control is convenient, connects portably, and the time limit for a project is controllable, and the reliability is high.
The utility model discloses a following technical scheme realizes above-mentioned purpose. An assembled adjustable conversion layer component comprises a hanging rod, a hanging rod bottom support, an upper lug plate external member, a lower lug plate external member and a keel connecting piece. The ear plate sleeve is sleeved with the hanging rod, so that the horizontal adjustment is realized. The otic placode external member is connected with fossil fragments connecting piece, realizes perpendicularly to adjusting. By controlling the length of the hanger rod, the decoration surface and the building can be always or specially shaped. The ear plate external member is a combination of an upper ear plate external member and a lower ear plate external member.
Preferably, the boom and the boom shoe may be bolted. The requirement that the heights of the hanging rods are uneven is met, and the large-scale ground assembling hanging piece cannot be constructed in the early stage.
Preferably, the conversion kit may be welded to a plurality of connection lugs. Satisfy multidirectional fossil fragments construction.
Drawings
The present invention will be further explained with reference to the drawings and examples.
FIG. 1 is a diagram: the component of the utility model is disassembled;
FIG. 2 is a diagram of: the utility model is a component axonometric drawing;
FIG. 3 is a diagram of: the utility model discloses a component front view;
FIG. 4 is a diagram of: the utility model discloses a component top view;
the figures in the drawings represent:
1. a boom; 2. a suspender bottom support; 3. a lower ear plate kit; 4. an upper ear plate kit; 5. a keel connecting piece; 6. a bolt;
7. a nut; 8. the main joist.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. It is to be understood that the embodiments described are only some embodiments of the invention, and not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the suspension rod 1 is welded to the suspension rod base 2, and the lower ear plate set 3 and the upper ear plate set 4 are sequentially connected to the suspension rod 1. After assembly, the steel plate is vertically welded to the building main body bearing member or the embedded member. The keel connecting piece 5 and the main keel 8 are fixed through the bolts 6 and the nuts 7, the main keel 8 with the installed keel connecting piece 5 is bolted with the lower lug plate external member 3 and the upper lug plate external member 4, after all installation is finished, after settlement data are observed to be stable, the bolts are loosened to release stress, and finally the bolts are fastened after adjustment, so that construction is completed.
The lower lug plate external member 3, the upper lug plate external member 4 and the suspender 1 are linked for sleeving, and the horizontal adjustment can be realized. Lower otic placode external member 3, go up otic placode external member 4 and fossil fragments connecting piece 5 are the bolt joint, and the prefabricated bolt hole is waist shape hole and circular port combination, can realize vertical regulation. Keel connecting piece 5 is connected for the bolt with main joist 8, and the prefabricated bolt hole is oval hole and circular port combination, can release fossil fragments stress and compensate the error.
As a technical optimization scheme of the utility model, the connection of the suspender 1 and the suspender base 2 and the connection of the suspender 1 and the building main body adopt the fixing modes such as a bolting mode, a groove mode, a buckle and the like, and are suitable for special projects such as high-level fire protection requirements and the like which are not suitable for field fire;
as a technical optimization scheme of the utility model, go up otic placode external member, lower otic placode external member and can a plurality ofly cup joint and also can weld a plurality of otic placodes on the jib, satisfy more angle main joist demands. The suspender can adopt different strength materials according to the load demand.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive. The scope of the invention is defined by the appended claims, rather than the description above, and all changes that come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein, and any reference signs in the claims should not be construed as limiting the claim concerned.
Moreover, it should be understood that while the specification describes embodiments, not every embodiment includes only a single embodiment. This description is given for clarity only, and those skilled in the art should be able to integrate the description as a whole, and the technical solutions in the embodiments may be appropriately combined to form other embodiments that can be understood by those skilled in the art.

Claims (1)

1. An assembled adjustable conversion layer component comprises a suspender (1), a suspender bottom support (2), a lower lug plate external member (3), an upper lug plate external member (4) and a keel connecting member (5); the method is characterized in that: suspender (1) and suspender collet (2) welding, lower otic placode external member (3), go up otic placode external member (4) and cup joint to suspender (1) one by one, the one end and the main joist (8) of fossil fragments connecting piece (5) are fixed with bolt (6) and nut (7), the other end of fossil fragments connecting piece (5) respectively with lower otic placode external member (3), go up otic placode external member (4) bolt joint fixed.
CN201922457688.7U 2019-12-31 2019-12-31 Adjustable conversion layer component of assembled Active CN212053407U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922457688.7U CN212053407U (en) 2019-12-31 2019-12-31 Adjustable conversion layer component of assembled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922457688.7U CN212053407U (en) 2019-12-31 2019-12-31 Adjustable conversion layer component of assembled

Publications (1)

Publication Number Publication Date
CN212053407U true CN212053407U (en) 2020-12-01

Family

ID=73535476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922457688.7U Active CN212053407U (en) 2019-12-31 2019-12-31 Adjustable conversion layer component of assembled

Country Status (1)

Country Link
CN (1) CN212053407U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112796456A (en) * 2020-12-29 2021-05-14 广东景龙建设集团有限公司 Mounting structure of dysmorphism ceiling furred ceiling
CN117536376A (en) * 2023-11-16 2024-02-09 中建八局西北建设有限公司 Connecting device and connecting method for keels of suspended ceiling conversion layers

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112796456A (en) * 2020-12-29 2021-05-14 广东景龙建设集团有限公司 Mounting structure of dysmorphism ceiling furred ceiling
CN112796456B (en) * 2020-12-29 2022-07-12 广东景龙建设集团有限公司 Mounting structure of dysmorphism ceiling furred ceiling
CN117536376A (en) * 2023-11-16 2024-02-09 中建八局西北建设有限公司 Connecting device and connecting method for keels of suspended ceiling conversion layers

Similar Documents

Publication Publication Date Title
CN212053407U (en) Adjustable conversion layer component of assembled
CN209443580U (en) A kind of building construction antidetonation movable plank house
CN109184061B (en) Space structure overhanging eave suspended ceiling system structure and construction method
CN205822665U (en) Welding steel structure system exempted from by a kind of indoor wall stone material
CN116163461B (en) Space structure assembled ultra-large color grain metal plate suspended ceiling and construction method
CN204609092U (en) A kind of combined type conversion layer connector
CN211118011U (en) Assembled comprehensive support and hanger
CN105421630B (en) A kind of metal curtain wall hitch assembly
CN204531130U (en) A kind of telescopic conversion layer connector
CN111549961B (en) Energy-saving ceiling for airport terminal building and construction method thereof
CN113323256A (en) Fabricated suspended ceiling anti-support structure and mounting method thereof
CN205314319U (en) Metal curtain wall articulates subassembly
CN215888894U (en) Anti-bearing structure of assembled furred ceiling
CN203308047U (en) Installing and suspending assembly of finish material
CN215907325U (en) Building scaffold that can multi-angle was used
CN216195911U (en) Corridor suspended ceiling
CN111691596B (en) Adjustable suspender and installation method thereof
CN102777703A (en) Assembly type light pipeline hanger
CN114809420A (en) Construction method of hanging bracket structure system of building suspended ceiling
CN110258798B (en) Mounting method of assembled column base connection node
CN208870333U (en) A kind of assembled metope metal plate hanging structure
CN217811871U (en) A assembled keel structure that is used for double-deck GRG molding to fall level furred ceiling
CN112482648A (en) Hanging system of assembled indoor high-altitude ecological wood square tube
CN219690848U (en) Suspended ceiling conversion assembly under net rack ball
CN222814424U (en) Photovoltaic bracket for fixing photovoltaic panels

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant