CN212836440U - Fast-assembling wall decorative panel mounting structure - Google Patents

Fast-assembling wall decorative panel mounting structure Download PDF

Info

Publication number
CN212836440U
CN212836440U CN202020918492.3U CN202020918492U CN212836440U CN 212836440 U CN212836440 U CN 212836440U CN 202020918492 U CN202020918492 U CN 202020918492U CN 212836440 U CN212836440 U CN 212836440U
Authority
CN
China
Prior art keywords
wall
sign indicating
hole
indicating number
angle sign
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020918492.3U
Other languages
Chinese (zh)
Inventor
马凯
张长庆
余国潮
孙振标
赵银帅
翁延华
朱福熙
刘文萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN202020918492.3U priority Critical patent/CN212836440U/en
Application granted granted Critical
Publication of CN212836440U publication Critical patent/CN212836440U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model provides a ready-package wall decorative board mounting structure belongs to wall decorative board installation technical field. The quick-mounting type wall veneer mounting structure comprises a keel framework and a wall veneer. The utility model discloses in at first install the fossil fragments skeleton on the wall through first fastener, then will connect the angle sign indicating number and install at the wall decorative board back, place the wall decorative board in the storage tank after that, to connect the angle sign indicating number and peg graft in the skeleton through-hole, thereby realize hanging the wall decorative board on the fossil fragments skeleton, wall decorative board stable connection is in connecting the angle sign indicating number, the fossil fragments skeleton evenly exerts force for connecting angle sign indicating number periphery, thereby can block the connection angle sign indicating number steadily in the storage tank, avoid connecting the angle sign indicating number and drop from the storage tank, simple installation, stability is higher.

Description

Fast-assembling wall decorative panel mounting structure
Technical Field
The utility model belongs to the technical field of the installation of wall veneer, a ready-package wall veneer mounting structure is related to.
Background
The wall decorative panel mainly plays the effect such as protection wall body, improvement indoor service condition and beautify indoor environment, and the mounting form of traditional wall decorative panel adopts gluing, wet work usually etc. nevertheless it has a lot of drawbacks in construction and use: in order to prevent the decorative panel from hollowing and falling off after being installed, a large amount of dust is generated on the site when the wall surface base layer is roughened, the body health of workers is harmed, and the decorative panel does not conform to the civilized construction concept; the coatings, paints, glues and construction auxiliaries used in construction can generate a lot of waste materials. The utilization rate of raw materials is low, the environment can be polluted even, and the method does not accord with the concept of green construction; the construction period is long, the construction environment influence is large, the site can not enter the building immediately after construction, and the requirements of owners can not be met; the skill level of workers is excessively depended, and the overall quality and the use cost of wall decoration are directly influenced by the skill level; the construction quality cannot be guaranteed; most of the materials in decoration can not be disassembled and replaced, which is not beneficial to maintenance, and a large amount of construction waste can be generated even during secondary decoration.
Along with the built-in development of assembled, integrated wallboard has appeared in the market at present, and the low price of its simple and convenient and cost of mounting form is very favored by the owner, and the veneer effect of its decorative board is abundant, has improved the installation effectiveness and the installation effect of wall veneer. However, such integrated wall panels also suffer from the following problems: most of the plates are installed in a plugging mode, and if a single plate is maintained, the plates in front of the plate need to be completely disassembled, so that maintenance is not facilitated. Because the integrated wallboard is integrally extruded and molded by the mounting structure, the material of the integrated wallboard is limited to a certain extent, and the applicability is poor. Therefore, a wall veneer installation structure with simple installation, convenient maintenance and higher stability is needed.
Chinese patent CN209538587U discloses a wall panel hanging structure, which comprises: the metal framework is arranged on the wall surface and consists of metal strips which are distributed transversely and vertically; the right-angle corner connector is arranged on a vertical metal strip of the metal framework, and the vertical metal strip refers to a metal strip which is vertically distributed; the angle steels are fixed on the right-angle corner connectors and are distributed transversely; and the back plate is arranged on the back surface of the wall panel, and a groove used for being hung on the angle steel is formed in the back plate. The utility model provides a shingle nail hanging structure dismantles conveniently to can be by reuse after dismantling, reach environmental protection and energy-conserving purpose. Hang the groove through the backplate in above-mentioned patent and adorn in the angle steel realization and hang the backplate on the wall, if the backplate atress rocks and leads to the groove to drop from the angle steel then the backplate easily drops from the wall, and stability is relatively poor.
SUMMERY OF THE UTILITY MODEL
The utility model discloses to the above-mentioned problem that prior art exists, provide a ready-package wall decorative panel mounting structure, the utility model aims to solve the technical problem that: how to provide a fast-assembling wall decorative panel mounting structure who installs portably, easy maintenance, stability are higher.
The purpose of the utility model can be realized by the following technical proposal:
the utility model provides a ready-package wall decorative board mounting structure, is including installing fossil fragments skeleton on the wall, installing the wall decorative board on fossil fragments skeleton, still including setting up skeleton through-hole on fossil fragments skeleton, setting up a plurality of storage tanks on fossil fragments skeleton, installing the connection angle sign indicating number at the wall decorative board back, connect the angle sign indicating number and peg graft in the skeleton through-hole when wall decorative board is placed in the storage tank.
Preferably, the keel frame is mounted on the wall through a first fastener.
Preferably, the skeleton through-hole hangs the through-hole for a plurality of vertical first hanging through-holes that set up on keel frame and a plurality of levels set up the second on keel frame, connect the angle sign indicating number and set up the connection angle sign indicating number on wall panel for a plurality of vertical connection angle sign indicating numbers that set up in wall decorative board or a plurality of levels.
Preferably, the back of the wall veneer comprises a plurality of vertically arranged first mounting holes or a plurality of horizontally arranged second mounting holes, and the connecting angle code is connected to the first mounting holes or the second mounting holes through self-tapping screws.
Preferably, the connecting corner brace is a circular connecting corner brace.
Preferably, the keel frame is including setting up in the sky fossil fragments on top, setting up in the ground fossil fragments of bottom, setting up in the limit fossil fragments of both sides, setting up in a plurality of vertical fossil fragments of inside, setting up in a plurality of stull fossil fragments of inside, arbitrary one the storage tank be by storage tank that sky fossil fragments, vertical fossil fragments, stull fossil fragments, limit fossil fragments enclose or by storage tank that stull fossil fragments, vertical fossil fragments, limit fossil fragments, ground fossil fragments enclose or by two adjacent parallel arrangement stull fossil fragments, two adjacent parallel arrangement one in the storage tank in the vertical fossil fragments enclose.
Preferably, the first hanging through hole in one accommodating groove is formed in the left side of the vertical center line of the accommodating groove, and the second hanging through hole in one accommodating groove is formed in the upper end of the horizontal center line of the accommodating groove.
Preferably, the first hanging through holes in the accommodating groove are arranged at equal intervals, and the second hanging through holes in the accommodating groove are arranged at equal intervals.
Preferably, the area of connecting the angle sign indicating number is less than the area of first through-hole that hangs, still including the elasticity leather sheath of connecting the angle sign indicating number periphery is located to the cover, the area sum of elasticity leather sheath and connection angle sign indicating number is greater than the area of first through-hole that hangs.
Preferably, the part of the cross-brace keel or the ground keel, which is located at the lower part of one accommodating groove, is provided with a first magnet, and the bottom of the back surface of the wall veneer is provided with a second magnet which is used for being adsorbed to the first magnet.
The utility model provides a beneficial effect: 1. the wall veneer is characterized in that a keel framework is installed on a wall through a first fastener, connecting corner codes are installed on the back of a wall veneer, the wall veneer is placed in a containing groove, the connecting corner codes are inserted into framework through holes, the wall veneer is hung on the keel framework, the wall veneer is stably connected to the connecting corner codes, force is uniformly applied to the periphery of the connecting corner codes by the keel framework, the connecting corner codes can be stably clamped in the containing groove, the connecting corner codes are prevented from falling off from the containing groove, the wall veneer is simple and convenient to install and high in stability, each wall veneer is independently installed and can be independently disassembled, high requirements for technical levels of operators are not required, installation can be completed through simple operation, the problems that when a single veneer is maintained, adjacent veneers need to be disassembled, the operation is complex and the efficiency is low are solved, and the wall veneer is free of dust on a construction site, The method has the advantages of no waste, no noise, short construction period, low technical requirement on constructors and cost saving in secondary decoration;
2. the wall veneer board is installed on the keel framework through 3 different installation modes of vertical installation, horizontal installation and vertical and horizontal combined installation, and the installation modes are diversified;
3. the connecting angle code is connected to the first mounting hole or the second mounting hole through a self-tapping screw, so that the connecting angle code can be conveniently and quickly mounted on the back of the wall veneer;
4. the first hanging through holes in one accommodating groove are arranged at equal intervals, and the second hanging through holes in one accommodating groove are arranged at equal intervals, so that the connection stability between the connecting corner connectors and the keel framework is improved;
5. the area of the connecting corner brace is smaller than that of the first hanging through hole, the elastic leather sleeve is arranged on the periphery of the connecting corner brace, and the sum of the areas of the elastic leather sleeve and the connecting corner brace is larger than that of the first hanging through hole, so that the connecting corner brace sleeved with the elastic leather sleeve is inserted into the framework through hole, interference fit between the connecting corner brace and the framework through hole is realized, the connection stability of the connecting corner brace and the framework of the keel is improved, the stability of the wall veneer installed on the framework of the keel is improved, and the installation is simple and convenient;
6. the part that lies in the lower part of a storage tank on stull fossil fragments or the ground fossil fragments is equipped with first magnet, and wall decorative board back bottom is equipped with the second magnet that is used for adsorbing in first magnet, can connect the bottom of wall decorative board in keel frame steadily like this, improves the stability that wall decorative board installed in keel frame, and is simple to handle.
Drawings
Fig. 1 is a front view of a wall facing panel of the present invention as installed in a keel frame;
fig. 2 is a front view of the first hanging through hole and the second hanging through hole of the present invention disposed in a containing groove;
fig. 3 is a front view of a wall veneer of the present invention;
fig. 4 is a rear view of the wall veneer of the present invention provided with the second magnet;
fig. 5 is a schematic view of a partial structure of the cross-brace keel or the ground keel of the present invention when a first magnet is disposed at a lower portion of an accommodating groove;
fig. 6 is a rear view of the wall facing of the present invention.
In the figure: 1-wall veneer, 11-connecting corner connectors, 12-second magnets, 2-keel frameworks, 21-ceiling keels, 22-floor keels, 23-vertical keels, 24-cross-bracing keels, 25-side keels, 26-second hanging through holes, 27-first hanging through holes and 28-first magnets.
Detailed Description
The following are specific embodiments of the present invention and the accompanying drawings are used to further describe the technical solution of the present invention, but the present invention is not limited to these embodiments.
Referring to fig. 1, 2, 3, 4, 5, and 6, the fast-assembly wall decorative panel installation structure in the embodiment includes a keel frame 2 installed on a wall, a wall decorative panel 1 installed on the keel frame 2, a frame through hole disposed on the keel frame 2, a plurality of receiving grooves disposed on the keel frame 2, and a connection corner connector 11 installed on the back of the wall decorative panel 1, wherein the connection corner connector 11 is inserted into the frame through hole when the wall decorative panel 1 is placed in the receiving grooves.
Here, at first, install keel frame 2 on the wall through first fastener, then install connection angle sign indicating number 11 at the wall decorative board 1 back, place wall decorative board 1 in the storage tank, peg graft connection angle sign indicating number 11 in the skeleton through-hole, thereby realize hanging wall decorative board 1 on keel frame 2, wall decorative board 1 is stably connected in connection angle sign indicating number 11, keel frame 2 evenly exerts force for connection angle sign indicating number 11 periphery, thereby can block connection angle sign indicating number 11 in the storage tank steadily, avoid connecting angle sign indicating number 11 and drop from the storage tank, simple installation, stability is higher, because every piece of wall decorative board 1 is independently installed, can dismantle alone, and need not have higher requirement to operating personnel technical level, can accomplish the installation only with simple operation, when having solved the maintenance of monolithic decorative board and needing to tear down adjacent decorative board, the operation is complicated, The problem of low efficiency, no dust, no waste material, no noise, short construction period, low technical requirement on constructors and cost saving in secondary decoration on a construction site.
Keel frame 2 is installed on the wall through first fastener, and first fastener can be the inflation screw, conveniently installs keel frame 2 on the wall. The first fastener may also be a bolt or a screw. The expansion screw may be a plastic expansion screw.
The skeleton through-hole can hang through-hole 26 for a plurality of vertical first through-holes 27 and the second that sets up on keel frame 2 of hanging that set up on keel frame 2 of a plurality of levels that set up on keel frame 2, first area that hangs through-hole 27 equals the area that the second hung through-hole 26, connect angle sign indicating number 11 and set up the connection angle sign indicating number 11 on wall panel for a plurality of vertical connection angle sign indicating numbers 11 that set up in wall panel 1 or a plurality of levels, make connection angle sign indicating numbers 11 have vertical mode of arranging, transversely arrange the mode, 3 different modes of arranging of vertical and horizontal combination mode of arranging, then can be through vertical installation, transversely install, install wall panel 1 on keel frame 2 with 3 different mounting means of vertical and horizontal combination installation, the mounting form is diversified.
The back of wall decorative board 1 can include the first mounting hole of a plurality of vertical settings or the second mounting hole of a plurality of level settings, connects angle sign indicating number 11 and passes through self tapping screw connection in first mounting hole or second mounting hole, and the back at wall decorative board 1 is installed to convenient quick with connecting angle sign indicating number 11.
The connection corner brace 11 can be a circular connection corner brace 11, the areas of the first hanging through hole 27 and the second hanging through hole 28 are equal, and the first hanging through hole 27 and the second hanging through hole 28 can be located in the circular through holes, so that the connection corner brace 11 can be conveniently inserted into the first hanging through hole 27 or the second hanging through hole 28.
Keel frame 2 can be including setting up in the sky fossil fragments 21 on top, setting up in the ground fossil fragments 22 of bottom, setting up in the limit fossil fragments 25 of both sides, setting up in a plurality of vertical fossil fragments 23 of inside, setting up in a plurality of stull fossil fragments 24 of inside, arbitrary one the storage tank be by the storage tank that sky fossil fragments 21, vertical fossil fragments 23, stull fossil fragments 24, limit fossil fragments 25 enclosed or by the storage tank that stull fossil fragments 24, vertical fossil fragments 23, limit fossil fragments 25, ground fossil fragments 22 enclosed or by two adjacent parallel arrangement stull fossil fragments 24, two adjacent parallel arrangement one in the storage tank in the vertical fossil fragments 23 enclosed. The side keel 25 and the vertical keel 23 can be vertically arranged, the ceiling keel 21, the ground keel 22 and the cross-brace keel 24 can be horizontally arranged, the accommodating groove can be a rectangular accommodating groove, and the wall veneer 1 can be a rectangular panel.
The first hanging through hole 27 in one accommodating groove is arranged on the left side of the vertical center line of the accommodating groove, and the second hanging through hole 26 in one accommodating groove is arranged on the upper end of the horizontal center line of the accommodating groove.
The first hanging through holes 27 in one accommodating groove are arranged at equal intervals, and the second hanging through holes 26 in one accommodating groove are arranged at equal intervals, so that the connection stability between the connecting corner connectors 11 and the keel framework 2 is improved.
Connect the area of angle sign indicating number 11 and can be less than the first area that hangs through-hole 27, still locate the elasticity leather sheath of connecting the 11 peripheries of angle sign indicating number including the cover, the area sum of elasticity leather sheath and connection angle sign indicating number 11 is greater than the first area that hangs through-hole 27, thereby peg graft in the skeleton through-hole at the connection angle sign indicating number 11 that will cup joint elasticity leather sheath, realize connecting angle sign indicating number 11 and skeleton through-hole interference fit, the stability of connecting angle sign indicating number 11 and keel frame 2 and connecting is improved, improve the stability of wall decorative board 1 installation in keel frame 2, simple installation.
The part that lies in the lower part of a storage tank on stull fossil fragments 24 or the ground fossil fragments 22 can be equipped with first magnet 28, and 1 back bottom of wall decorative board is equipped with and is used for adsorbing in the second magnet 12 of first magnet 28, and first magnet 28, second magnet 12 all can be the permanent magnet, can connect the bottom of wall decorative board 1 in keel frame 2 steadily like this, improve the stability of wall decorative board 1 installation in keel frame 2, simple installation. The central line of first magnet 28 can coincide with the central line of a storage tank, and the central line of second magnet 12 can coincide with the central line of wall decorative board 1 for second magnet 12 can be better when adsorbing in first magnet 28 with wall decorative board 1 bottom connect on fossil fragments skeleton 2.
The specific embodiments described herein are merely illustrative of the spirit of the invention. Various modifications, additions and substitutions for the specific embodiments described herein may be made by those skilled in the art without departing from the spirit of the invention or exceeding the scope of the invention as defined in the accompanying claims.

Claims (10)

1. The utility model provides a ready-package wall decorative board mounting structure which characterized in that: the wall decoration board comprises a keel framework (2) arranged on a wall, a wall decoration board (1) arranged on the keel framework (2), a framework through hole arranged on the keel framework (2), a plurality of accommodating grooves arranged on the keel framework (2), and a connecting angle code (11) arranged on the back surface of the wall decoration board (1), wherein the connecting angle code (11) is inserted into the framework through hole when the wall decoration board (1) is placed in the accommodating grooves.
2. The quick install wall veneer installation structure of claim 1, wherein: the keel framework (2) is installed on the wall through a first fastener.
3. A quick-fit wall veneer installation structure according to claim 1 or 2, wherein: the skeleton through-hole sets up second on fossil fragments skeleton (2) for a plurality of vertical first through-hole (27) and a plurality of levels that hang that set up on fossil fragments skeleton (2) and hangs through-hole (26), connect angle sign indicating number (11) and set up connection angle sign indicating number (11) on the wall panel for a plurality of vertical connection angle sign indicating numbers (11) or a plurality of levels that set up in wall panel (1).
4. A quick-fit wall veneer installation structure according to claim 3, wherein: the back of the wall veneer (1) comprises a plurality of vertically arranged first mounting holes or a plurality of horizontally arranged second mounting holes, and the connecting corner connectors (11) are connected to the first mounting holes or the second mounting holes through self-tapping screws.
5. The quick install wall veneer installation structure of claim 4, wherein: the connecting corner brace (11) is a round connecting corner brace (11).
6. A quick-fit wall veneer installation structure according to claim 3, wherein: the keel frame (2) comprises a top keel (21) arranged on the top end, a ground keel (22) arranged on the bottom end, side keels (25) arranged on two sides, a plurality of vertical keels (23) arranged inside, and a plurality of cross-brace keels (24) arranged inside, wherein any one of the accommodating grooves is an accommodating groove formed by the top keel (21), the vertical keels (23), the cross-brace keels (24) and the side keels (25) or an accommodating groove formed by the cross-brace keels (24), the vertical keels (23), the side keels (25) and the ground keel (22) or an accommodating groove formed by two adjacent parallel arrangements of the cross-brace keels (24) and the two adjacent parallel arrangements of one of the accommodating grooves formed by the vertical keels (23).
7. The quick install wall veneer installation structure of claim 6, wherein: the first hanging through hole (27) in one accommodating groove is formed in the left side of the vertical center line of the accommodating groove, and the second hanging through hole (26) in one accommodating groove is formed in the upper end of the horizontal center line of the accommodating groove.
8. A quick-fit wall veneer installation structure according to claim 7, wherein: the first hanging through holes (27) in the accommodating grooves are arranged at equal intervals, and the second hanging through holes (26) in the accommodating grooves are arranged at equal intervals.
9. A quick-fit wall veneer installation structure according to claim 8, wherein: the area of connecting angle sign indicating number (11) is less than the area of first through-hole (27) that hangs, still including the cover locate the elasticity leather sheath of connecting angle sign indicating number (11) periphery, the area sum of elasticity leather sheath and connection angle sign indicating number (11) is greater than the area of first through-hole (27) that hangs.
10. A quick-fit wall veneer installation structure according to claim 8, wherein: the part of stull fossil fragments (24) or ground fossil fragments (22) that lie in the lower part of an accommodating groove is equipped with first magnet (28), wall decorative board (1) back bottom is equipped with second magnet (12) that are used for adsorbing in first magnet (28).
CN202020918492.3U 2020-05-27 2020-05-27 Fast-assembling wall decorative panel mounting structure Active CN212836440U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020918492.3U CN212836440U (en) 2020-05-27 2020-05-27 Fast-assembling wall decorative panel mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020918492.3U CN212836440U (en) 2020-05-27 2020-05-27 Fast-assembling wall decorative panel mounting structure

Publications (1)

Publication Number Publication Date
CN212836440U true CN212836440U (en) 2021-03-30

Family

ID=75168039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020918492.3U Active CN212836440U (en) 2020-05-27 2020-05-27 Fast-assembling wall decorative panel mounting structure

Country Status (1)

Country Link
CN (1) CN212836440U (en)

Similar Documents

Publication Publication Date Title
CN101832009B (en) Building block type detachable decoration assembly system
CN212836440U (en) Fast-assembling wall decorative panel mounting structure
CN202899393U (en) Unit assembly type suspended ceiling connection structure
CN201747006U (en) Building block type detachable decoration combined system
CN209786688U (en) Combined cable bridge convenient to install
CN210369520U (en) Pendant convenient to ceiling installation on world wall
CN206607774U (en) A kind of detachable decoration wallboard
CN213837440U (en) Detachable wall decorative panel
CN212148474U (en) Fill electric pile convenient to fixed mounting
CN211018136U (en) Support is used in installation of cable testing bridge
CN204915602U (en) Washing tank with quick mounting structure
CN219196582U (en) Mounting structure of wall decorative board
CN209990004U (en) Light and shade joint formula smallpox system
CN202550317U (en) Electric appliance cabinet stand column section bar and electric appliance installing board as well as electric appliance cabinet and electric appliance screen frame using electric appliance installing board
CN203349402U (en) Outdoor unit of air conditioner
CN202706439U (en) Metal wall unit plate
CN220565592U (en) Assembled mounting system of background wall
CN205116415U (en) Board house with corridor structure
CN217680075U (en) Water-saving mechanism for green building
CN207610282U (en) Air-conditioning equipment
CN2315480Y (en) Rear fixing structure for motor rack of window air conditioner
CN219973603U (en) Grille assembly for curtain wall decoration
CN221030843U (en) Environment-friendly energy-saving building peripheral structure
CN203669150U (en) Partition wall profile
CN216713870U (en) Detachable unit glass curtain wall hanging and mounting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant