CN209786688U - Combined cable bridge convenient to install - Google Patents

Combined cable bridge convenient to install Download PDF

Info

Publication number
CN209786688U
CN209786688U CN201920777627.6U CN201920777627U CN209786688U CN 209786688 U CN209786688 U CN 209786688U CN 201920777627 U CN201920777627 U CN 201920777627U CN 209786688 U CN209786688 U CN 209786688U
Authority
CN
China
Prior art keywords
kink
installation
clamping
bridge frame
frame body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920777627.6U
Other languages
Chinese (zh)
Inventor
张玉明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou Suer Electric Co Ltd
Original Assignee
Yangzhou Suer Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou Suer Electric Co Ltd filed Critical Yangzhou Suer Electric Co Ltd
Priority to CN201920777627.6U priority Critical patent/CN209786688U/en
Application granted granted Critical
Publication of CN209786688U publication Critical patent/CN209786688U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a combination formula cable testing bridge convenient to installation belongs to combination formula cable testing bridge technical field, including the crane span structure body, the both sides of crane span structure body all are provided with first kink, the one end that the crane span structure body was kept away from to first kink is provided with the joint head, the one end that the apron was kept away from to the second kink is provided with the joint groove, the upper end of mounting panel is provided with the rubber fastener, the one end that the draw-in groove was kept away from to the crane span structure body is provided with the cardboard. The utility model discloses a first kink and the second kink that sets up mutually support to insert the joint head joint inslot, use instruments such as pliers to extrude first kink and second kink, make its chucking, thereby accomplish the installation of apron and crane span structure body, reduced the quantity of connecting piece and bolt, the installation is comparatively simple and convenient, through the mounting panel that sets up, fixes the cable inside the rubber fastener, and convenient to overhaul avoids the heat to pile up and is difficult for scattering and disappearing.

Description

Combined cable bridge convenient to install
Technical Field
The utility model relates to a combination formula cable testing bridge technical field specifically is a combination formula cable testing bridge convenient to installation.
Background
The cable bridge is divided into structures of groove type, tray type, ladder type, grid type, etc., and is composed of a support, a supporting arm, an installation accessory, etc., the bridge in the building can be independently erected and also can be attached to various buildings and pipe gallery supports, the characteristics of simple structure, attractive appearance, flexible configuration, convenient maintenance, etc. are reflected, all parts need to be galvanized, the bridge is installed outside the building in the open air, the combined bridge is a novel bridge, is a second generation product in the cable bridge series, and is suitable for laying various projects, units and various cables.
The existing combined bridge is mostly combined and fixed through bolts and connecting pieces, the operation process is complex, the installation efficiency is low, cables inside the bridge are messy, the bridge is inconvenient to overhaul, and heat is accumulated together and is not easy to dissipate.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: in order to solve the problem that the existing combined bridge is mostly combined and fixed through bolts and connecting pieces, the operation process is complex, the installation efficiency is low, cables inside the bridge are messy, the bridge is inconvenient to overhaul, and heat is accumulated together and is difficult to dissipate and dissipate, a combined bridge is provided.
in order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a combination formula cable testing bridge convenient to installation, includes the crane span structure body, the both sides of crane span structure body all are provided with first kink, the one end that the crane span structure body was kept away from to first kink is provided with the joint head, the top of crane span structure body is provided with the apron, the both sides of apron all are provided with the second kink, the one end that the apron was kept away from to the second kink is provided with the joint groove, the bottom of crane span structure body is provided with the louvre, the inside of crane span structure body is provided with the mounting panel, the upper end of mounting panel is provided with the rubber fastener, the inside of rubber fastener is provided with the mounting hole, the one end of crane span structure body is provided with.
Preferably, first kink and second kink phase-match, joint head and joint groove phase-match.
Preferably, the number of the mounting plates is two, and the two mounting plates are distributed up and down.
Preferably, the number of the rubber clamping pieces is multiple, and the rubber clamping pieces are evenly distributed at the upper end of the mounting plate at intervals.
Preferably, the both sides of mounting panel all are provided with reset spring, spacing post is installed to one side of reset spring, the both sides of crane span structure body all be provided with spacing post assorted passageway.
Preferably, the clamping plate is matched with the clamping groove, and the clamping plate is fixedly connected with the clamping groove through a bolt.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a first kink and the second kink that sets up mutually support, and insert the joint inslot with the joint head, use tools such as pliers to extrude first kink and second kink, make its chucking, thereby accomplish the installation of apron and crane span structure body, through inserting the draw-in groove with the cardboard, the accessible apron makes two crane span structure body coupling under the cooperation of first kink and second kink, fasten through the bolt simultaneously, increase the stability of connecting, the quantity of connecting piece and bolt has been reduced, the installation is comparatively simple and convenient, the work efficiency is improved, mounting panel through setting up, fix the cable inside the rubber fastener, the easy maintenance, avoid the heat to pile up difficult scattering and disappearing.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of the present invention A;
Fig. 3 is a schematic view of the connection structure of the bridge frame body of the present invention.
In the figure: 1. a bridge frame body; 2. a first bent portion; 3. a clamping head; 4. a cover plate; 5. a second bent portion; 6. a clamping groove; 7. mounting a plate; 8. a rubber fastener; 9. mounting holes; 10. heat dissipation holes; 11. a return spring; 12. a limiting column; 13. clamping a plate; 14. a clamping groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
referring to fig. 1-3, a combined cable bridge convenient to install includes a bridge body 1, first bending portions 2 are disposed on two sides of the bridge body 1, a clamping joint 3 is disposed at one end of each first bending portion 2, which is far away from the bridge body 1, a cover plate 4 is disposed on the top end of the bridge body 1, second bending portions 5 are disposed on two sides of each cover plate 4, a clamping groove 6 is disposed at one end of each second bending portion 5, which is far away from the cover plate 4, a heat dissipation hole 10 is disposed at the bottom end of the bridge body 1, a mounting plate 7 is disposed inside the bridge body 1, a rubber clamping member 8 is disposed at the upper end of the mounting plate 7, a mounting hole 9 is disposed inside the rubber clamping member 8, a clamping groove 14 is disposed at one end of the bridge body.
In the implementation: mutually support through the first kink 2 and the second kink 5 that set up, and insert joint 3 in joint groove 6, use instruments such as pliers to extrude first kink 2 and second kink 5, make its chucking, thereby accomplish the installation of apron 4 and crane span structure body 1, through inserting cardboard 13 in draw-in groove 14, accessible apron 4 makes two crane span structure bodies 1 connect under the cooperation of first kink 2 and second kink 5, fasten through the bolt simultaneously, increase the stability of connecting, the quantity of connecting piece and bolt has been reduced, the installation is comparatively simple and convenient, work efficiency is improved, mounting panel 7 through setting up, fix the cable inside rubber fastener 8, convenient maintenance, avoid the heat to pile up difficult scattering and disappearing, dispel the heat through the louvre 10 that sets up.
Please refer to fig. 1, the first bending portion 2 is matched with the second bending portion 5, the clamping connector 3 is matched with the clamping groove 6, the second bending portion 5 is inserted into the first bending portion 2, so that the clamping connector 3 is inserted into the clamping groove 6, and the first bending portion 2 and the second bending portion 5 are extruded by using tools such as pliers, so as to be clamped.
Please refer to fig. 1 heavily, the quantity of mounting panel 7 is two sets ofly, and two sets of mounting panels 7 are upper and lower distribution, and the quantity of rubber fastener 8 is a plurality of, and a plurality of rubber fasteners 8 interval evenly distributed are in the upper end of mounting panel 7, separately installs the cable through the rubber fastener 8 that sets up, and easy access avoids the cable to pile up and lead to the difficult giving off of heat through two mounting panels 7 that set up.
Please refer to fig. 2, the two sides of the mounting plate 7 are both provided with a return spring 11, one side of the return spring 11 is provided with a limit post 12, the two sides of the bridge body 1 are both provided with a channel matched with the limit post 12, the limit post 12 is ejected out under the action of the return spring 11 and inserted into the channel during mounting, and during dismounting, a tool is used to press the limit post 12 to separate from the bridge body 1, thereby facilitating the dismounting and mounting of the mounting plate 7.
Please refer to fig. 3, the clamping plate 13 is matched with the clamping groove 14, and the clamping plate 13 is fixedly connected with the clamping groove 14 through a bolt, and the clamping plate 13 is inserted into the clamping groove 14 and fastened through the bolt, so as to increase the connection stability.
The working principle is as follows: the clamping head 3 is inserted into the clamping groove 6 by inserting the second bent part 5 into the first bent part 2, the first bent part 2 and the second bent part 5 are extruded by using tools such as pliers and the like to be clamped, so that the installation of the cover plate 4 and the bridge frame body 1 is completed, compared with the traditional bolt installation, the installation process is simpler and more convenient, the clamping plate 13 is inserted into the clamping groove 14, the two bridge frame bodies 1 can be connected by the cover plate 4 under the matching of the first bent part 2 and the second bent part 5, meanwhile, the fastening is carried out by using bolts, the connection stability is increased, the number of connecting pieces and bolts is reduced, the installation process is simpler and more convenient, the working efficiency is improved, the limiting column 12 is popped out under the action of the reset spring 11 during installation and is inserted into a channel, when the mounting is dismounted, the limiting column 12 is extruded by using tools to be separated from the bridge frame bodies 1, the mounting, separately install the cable through rubber fastener 8, convenient to overhaul avoids the cable to pile up through 7 intervals of two mounting panels and leads to the heat difficult giving off.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a combination formula cable testing bridge convenient to installation, includes crane span structure body (1), its characterized in that: two sides of the bridge frame body (1) are respectively provided with a first bending part (2), one end of the first bending part (2) far away from the bridge frame body (1) is provided with a clamping joint (3), the top end of the bridge frame body (1) is provided with a cover plate (4), two sides of the cover plate (4) are provided with second bending parts (5), one end of the second bending part (5) far away from the cover plate (4) is provided with a clamping groove (6), the bottom end of the bridge frame body (1) is provided with heat dissipation holes (10), the interior of the bridge frame body (1) is provided with a mounting plate (7), the upper end of the mounting plate (7) is provided with a rubber clamping piece (8), the inside of the rubber clamping piece (8) is provided with a mounting hole (9), a clamping groove (14) is formed in one end of the bridge frame body (1), and a clamping plate (13) is arranged at one end, far away from the clamping groove (14), of the bridge frame body (1).
2. A modular cable tray for ease of installation as defined in claim 1, wherein: first kink (2) and second kink (5) phase-match, joint (3) and joint groove (6) phase-match.
3. A modular cable tray for ease of installation as defined in claim 1, wherein: the number of the mounting plates (7) is two, and the two mounting plates (7) are distributed up and down.
4. A modular cable tray for ease of installation as defined in claim 1, wherein: the number of the rubber clamping pieces (8) is multiple, and the rubber clamping pieces (8) are evenly distributed at the upper end of the mounting plate (7) at intervals.
5. A modular cable tray for ease of installation as defined in claim 1, wherein: the utility model discloses a bridge frame, including mounting panel (7), the both sides of mounting panel (7) all are provided with reset spring (11), spacing post (12) are installed to one side of reset spring (11), the both sides of bridge frame body (1) all be provided with spacing post (12) assorted passageway.
6. A modular cable tray for ease of installation as defined in claim 1, wherein: the clamping plate (13) is matched with the clamping groove (14), and the clamping plate (13) is fixedly connected with the clamping groove (14) through a bolt.
CN201920777627.6U 2019-05-28 2019-05-28 Combined cable bridge convenient to install Active CN209786688U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920777627.6U CN209786688U (en) 2019-05-28 2019-05-28 Combined cable bridge convenient to install

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920777627.6U CN209786688U (en) 2019-05-28 2019-05-28 Combined cable bridge convenient to install

Publications (1)

Publication Number Publication Date
CN209786688U true CN209786688U (en) 2019-12-13

Family

ID=68788529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920777627.6U Active CN209786688U (en) 2019-05-28 2019-05-28 Combined cable bridge convenient to install

Country Status (1)

Country Link
CN (1) CN209786688U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112864990A (en) * 2021-02-26 2021-05-28 丁小燚 Insulating ageing resistance PVC crane span structure wire casing
CN113328394A (en) * 2021-06-28 2021-08-31 江苏国美钢网桥架有限公司 Convenient wire bundling mechanism of push-type self-locking grid bridge and use method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112864990A (en) * 2021-02-26 2021-05-28 丁小燚 Insulating ageing resistance PVC crane span structure wire casing
CN113328394A (en) * 2021-06-28 2021-08-31 江苏国美钢网桥架有限公司 Convenient wire bundling mechanism of push-type self-locking grid bridge and use method thereof

Similar Documents

Publication Publication Date Title
CN209786688U (en) Combined cable bridge convenient to install
CN109629736A (en) A kind of portable connection structure of light gage steel joist
CN215185659U (en) High-strength light energy-saving bridge convenient to assemble and disassemble
CN214144252U (en) Assembled partition wall fossil fragments frame and partition wall
CN213653943U (en) Mounting structure of assembled furred ceiling
CN212465682U (en) Hanging plate mounting structure
CN211720192U (en) Power communication transmission bridge
CN210744638U (en) Cable bridge and fixing device thereof
CN114150803A (en) Light curtain wall keel assembly and mounting method
CN211597286U (en) Glass rib mounting structure capable of being mounted indoors
CN219247750U (en) M-shaped BIPV drainage bracket with fixing structure
CN215368167U (en) Indoor suspended ceiling convenient to install
CN216720819U (en) Adjustable bridge device of data center machine room
CN217811884U (en) Hanging aluminum alloy grid
CN111956043B (en) Hanging plate mounting structure
CN219973603U (en) Grille assembly for curtain wall decoration
CN212836440U (en) Fast-assembling wall decorative panel mounting structure
CN219175731U (en) Wood veneer card formula structure of easily installing
CN221193739U (en) Building assembled connecting piece
CN216405861U (en) Hang stone material curtain connected system futilely
CN214117642U (en) Board house type public toilet convenient to disassemble and assemble
CN214381755U (en) Comprehensive wiring management system
CN214249489U (en) Lamp mounting structure with longitudinal and transverse pressing plates
CN218911897U (en) Detachable aluminum square through structure on aluminum veneer curtain wall
CN220954416U (en) Split type assembled skirting line

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant