CN212832509U - Well grate erector - Google Patents

Well grate erector Download PDF

Info

Publication number
CN212832509U
CN212832509U CN202021855052.4U CN202021855052U CN212832509U CN 212832509 U CN212832509 U CN 212832509U CN 202021855052 U CN202021855052 U CN 202021855052U CN 212832509 U CN212832509 U CN 212832509U
Authority
CN
China
Prior art keywords
grate
well
frame
rainwater
erector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021855052.4U
Other languages
Chinese (zh)
Inventor
鲁世超
刘晓峰
董林惠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinhuangdao Xinglong Construction Engineering Co ltd
Original Assignee
Qinhuangdao Xinglong Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinhuangdao Xinglong Construction Engineering Co ltd filed Critical Qinhuangdao Xinglong Construction Engineering Co ltd
Priority to CN202021855052.4U priority Critical patent/CN212832509U/en
Application granted granted Critical
Publication of CN212832509U publication Critical patent/CN212832509U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to the technical field of well grates, in particular to a well grate erector which is convenient to use, reduces repeated measurement, improves construction efficiency, and effectively solves the quality problems that the axis deviation of a rainwater grate is large, the elevation is inaccurate, the rainwater grate is damaged and deformed by external force extrusion, the flatness of surrounding asphalt concrete and the rainwater grate is poor, and the like; the vertical type lifting device comprises a square frame, vertical columns vertically arranged at the lower ends of the four corners of the frame, two horizontal beams horizontally arranged in parallel on the frame, and a T-shaped connecting rod longitudinally penetrating through the horizontal beams and used for temporarily lifting the well grate, wherein the two vertical columns on one side are respectively as high as the two vertical columns on the other side, and the two vertical columns on one side and the two vertical columns on the other side have height difference.

Description

Well grate erector
Technical Field
The utility model relates to a technical field of well grate especially relates to a well grate erector.
Background
At present, with the continuous development of urban roads in China, the increase of urban traffic flow and the increase of heavy load vehicles, the requirement on road construction quality is more and more strict. Compared with highways and expressways, the urban road is mainly characterized in that various underground pipelines are matched in the urban road, most of the driving lanes are provided with rainwater collecting wells, and most rainwater well covers are in a steel grating rainwater grate form.
The rainwater grate is formed by welding flat steel and twisted square steel or flat steel and flat steel. The rainwater grate has the advantages of beautiful appearance, optimal drainage, high strength, various specifications, low cost and the like. The steel grating is a water-collecting well cover material gradually popularized in municipal facilities. Due to the characteristics of high strength, easy processing and the like of the steel, corresponding load products can be produced according to the requirements of different roads, the maximization of the cross section can also be realized, and the appearance and the long-term use requirement can also be ensured by hot-dip galvanizing treatment.
Most of traditional rainwater grates are installed by a pre-embedded steel bar method, vertical steel bars are pre-embedded in a rainwater well cover plate, a wedge is used for temporary fixation after the rainwater grate is positioned and measured, and the rainwater grate and the vertical steel bars pre-embedded in the rainwater well cover plate are connected and fixed through the steel bars. Because road engineering has longitudinal slope and cross slope, the height of four angles of well grate needs the road slope to keep unanimous, so need repeatedly measure, adjust wedge height and position, and the accuracy is low moreover, and welding process and very easily warp, causes the rainwater grate to fix a position inaccurate, and the axis deviation is big, and the elevation error is big. The rainwater grate is rolled for a long time by vehicles, so that the rainwater grate is damaged or subsided, asphalt concrete around the rainwater grate is damaged, the rainwater collection well is directly accelerated to be damaged, the use function of a road is influenced, and great potential safety hazards exist.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a convenient to use, reduction are measured repeatedly, are improved efficiency of construction's well grate erector has solved rainwater grate axis off normal big effectively, and the elevation is inaccurate, and the rainwater grate receives external force extrusion and destroys the deformation, quality problems such as the bituminous concrete is relatively poor with rainwater grate roughness on every side.
In order to achieve the above purpose, the utility model is realized by adopting the following technical scheme:
the utility model discloses a well grate erector, including square frame, install perpendicularly in two crossbeams of frame and the T type connecting rod that vertically runs through the crossbeam and be used for interim hoist and mount well grate, two of one side of stand and opposite side two of stand difference height-identical, two of one side stand and opposite side there is the difference in height in the stand.
Preferably, the lower end of the upright post is provided with a universal wheel.
Preferably, the position of the cross beam in the frame is adjustable.
Preferably, the transverse position and the longitudinal position of the T-shaped connecting rod mounted on the cross beam can be adjusted.
Compared with the prior art, the beneficial effects of the utility model are that: according to the size of the well grate, the positions of the cross beam and the T-shaped connecting rod are determined, the rainwater grate is temporarily hoisted by the T-shaped connecting rod, the position of the rainwater grate is fixed after the rainwater grate is checked to be accurate, the position and the gradient of the well grate are determined after the positions of the cross beam and the T-shaped bolt are adjusted, the well grate is directly used when being installed next well grate, repeated measurement is reduced, a wood plugging wedge is not needed at the bottom of the well grate, the construction efficiency can be improved, and the construction cost is reduced; the rainwater grate effectively solves the quality problems that the rainwater grate has large axis deviation and inaccurate elevation, the rainwater grate is extruded and damaged by external force and deformed, the flatness of the surrounding asphalt concrete and the rainwater grate is poor, and the like.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
fig. 2 is a schematic plan view of the usage state of the present invention;
reference numerals: 1-a frame; 2-upright post; 3-universal wheels; 4-a cross beam; 5-fixing the bolt; 6-T shaped connecting rods; 7-height adjusting bolt.
Detailed Description
The following detailed description of the embodiments of the present invention is provided with reference to the accompanying drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
As shown in fig. 1 to 2, the well grate installer of the embodiment of the present invention comprises a square frame 1, wherein the frame 1 is made of angle steel, the upright 2 is vertically installed at the lower end of the four corners of the frame 1, the upright 2 is in the shape of a square tube, and is horizontally and parallelly installed on two cross beams 4 of the frame 1 and a T-shaped connecting rod 6 which longitudinally penetrates through the cross beam 4 and is used for temporarily hoisting the well grate, the two upright 2 on one side are respectively the same in height as the two upright 2 on the other side, and the two upright 2 on one side and the two upright 2 on the other side have a height difference; making an upright post with a height difference by using the height of the road engineering curb stone, so that the frame 1 is kept horizontal; determining the positions of the cross beam and the T-shaped connecting rod according to the size of the well grate, wherein the T-shaped connecting rod can rotate 360 degrees, so that the well grate can be fixed temporarily; according to the longitudinal and transverse gradient conditions of a road, the gradient condition is monitored by using a gradient ruler or a level gauge, the height of the T-shaped connecting rod is adjusted according to the gradient condition, then the rainwater grate and the embedded steel bar are welded and connected, the well grate is easy to deform under stress in the welding process, and the installation deviation of the well grate can be found in time and adjusted in time by observing the fitting degree of the upper surface and the lower surface of the T-shaped connecting rod; in this embodiment, the distance between the bottom ends of the two upright posts 2 on one side and the bottom end of the frame 1 is 10cm, and the distance between the bottom ends of the two upright posts 2 on the other side and the bottom end of the frame 1 is 29 cm.
In the embodiment, the universal wheels 3 are installed at the lower ends of the upright columns 2, and after one well grate is welded and fixed, the universal wheels are opened, so that the universal wheels can be dragged and moved on the kerbs, and the transportation and the movement are convenient; the position of the cross beam 4 on the frame 1 can be adjusted, in the embodiment, strip-shaped holes are formed in two sides, perpendicular to the cross beam 4, of the frame 1, and after the cross beam 4 determines a proper position according to actual use requirements, fixing bolts 5 penetrate through the strip-shaped holes to fix the cross beam 4; the position adjustment mode of the beam 4 can also adopt any other feasible scheme, and the details are not repeated herein; the transverse position and the longitudinal position of the T-shaped connecting rod 6 mounted on the cross beam 4 can be adjusted, in the embodiment, a plurality of positioning holes are formed in the cross beam 4, the T-shaped connecting rod 6 can be positioned by selecting a proper positioning hole according to the size of the well grate, and the height of the T-shaped connecting rod 6 in the positioning holes is adjusted and fixed by adopting an elevation adjusting bolt 7.
The utility model discloses well double-edged fine-toothed comb erector's installation flow does: making a well grate erector before construction, determining the heights of an upright post 2 and a universal wheel 3 of the erector according to the height of a road engineering curb, and fixing the universal wheel 3 to prevent movement; according to the size of the well grate, the positions of the cross beam 4 and the T-shaped connecting rod 6 are determined, the elevation adjusting bolts 7 are adjusted according to the longitudinal gradient condition and the transverse gradient condition of a road, the T-shaped connecting rod 6 is used for temporarily hoisting the rainwater grate, after the position of the rainwater grate is checked to be accurate, the rainwater grate is welded with the embedded steel bars, after welding is completed, the T-shaped connecting rod 6 is rotated by 90 degrees, taken out upwards and separated from the well grate, the universal wheel 3 is opened, and the rainwater grate is dragged to the next rainwater well.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and variations can be made without departing from the technical principle of the present invention, and these modifications and variations should also be regarded as the protection scope of the present invention.

Claims (4)

1. The well grate installer is characterized by comprising a square frame (1), upright columns (2) vertically installed at the lower ends of the four corners of the frame (1), two horizontal beams (4) which are horizontally and parallelly installed on the frame (1) and a T-shaped connecting rod (6) which longitudinally penetrates through the horizontal beams (4) and is used for temporarily hoisting a well grate, wherein the heights of the upright columns (2) on one side and the heights of the upright columns (2) on the other side are respectively the same, and the height difference exists between the upright columns (2) on one side and the height difference exists between the upright columns (2) on the other side.
2. The well grate erector of claim 1 wherein the lower end of the column (2) is fitted with a universal wheel (3).
3. Well grate erector in accordance with claim 1, characterized in that the cross beam (4) is adjustable in the position of the frame (1).
4. The well grate erector of claim 3 wherein the T-bars (6) are mounted on the cross-beams (4) in adjustable lateral and longitudinal positions.
CN202021855052.4U 2020-08-31 2020-08-31 Well grate erector Active CN212832509U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021855052.4U CN212832509U (en) 2020-08-31 2020-08-31 Well grate erector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021855052.4U CN212832509U (en) 2020-08-31 2020-08-31 Well grate erector

Publications (1)

Publication Number Publication Date
CN212832509U true CN212832509U (en) 2021-03-30

Family

ID=75142243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021855052.4U Active CN212832509U (en) 2020-08-31 2020-08-31 Well grate erector

Country Status (1)

Country Link
CN (1) CN212832509U (en)

Similar Documents

Publication Publication Date Title
CN104005338A (en) Three-directional temporary tower and girder consolidation structure of large-span cable-stayed bridge
CN114059554A (en) Novel deep foundation pit inner support system with steel truss and inclined cast support and construction method
CN210066504U (en) Large-span cantilever truss type bent cap support system
CN212832509U (en) Well grate erector
CN203866711U (en) Large span cable-stayed bridge tower beam three-way temporary consolidation structure
CN214301300U (en) Adjustable bracket system for mounting steel box girder
CN214170072U (en) Steel construction factory building structure based on exposed foundation
CN111501531A (en) Construction method of V-shaped thin-wall pier and 0# block main beam supporting system
CN214940246U (en) Rock high and steep slope structure on high-voltage cable
CN220099696U (en) Protection device for bridge construction on reconstruction and expansion engineering
CN217399430U (en) Device is assembled to preloading arch bridge support normal position of exempting from to pile
CN221142491U (en) Combined type large-span river-crossing cast-in-situ continuous box girder support frame
CN212426789U (en) Light-duty basket counter-force pre-compaction device that hangs
CN217949823U (en) Protective shed frame device for crossing existing railway on expressway
CN112144655B (en) Steel structure traveling protection channel system in building and construction method thereof
CN219342870U (en) Beam supporting structure is assembled to two line bridge festival sections
CN221094825U (en) Large cantilever pedestrian overpass and frame pier
CN112942629B (en) Collision test wall and prefabricated installation method thereof
CN217556736U (en) Cutting side slope widening protection device under traffic-guaranteeing condition
CN217298631U (en) Pier side assembly type construction platform
CN217811227U (en) Subway foundation pit cable trench suspends normal position protection architecture in midair based on H shaped steel supports
CN220724855U (en) Assembled soilless roadbed panel quick installation auxiliary device
CN216615539U (en) V-shaped supporting leg safety protection shed buttress capable of being recycled
CN216427989U (en) Connecting structure of bridge anti-collision guardrail socket type anti-throwing net and bridge
CN221501741U (en) Leveling device for installing bridge expansion assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant