CN212818869U - Spraying dust-settling and cooling device for construction working face of building - Google Patents

Spraying dust-settling and cooling device for construction working face of building Download PDF

Info

Publication number
CN212818869U
CN212818869U CN202021697113.9U CN202021697113U CN212818869U CN 212818869 U CN212818869 U CN 212818869U CN 202021697113 U CN202021697113 U CN 202021697113U CN 212818869 U CN212818869 U CN 212818869U
Authority
CN
China
Prior art keywords
mounting bracket
fixedly connected
extrusion
frame
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021697113.9U
Other languages
Chinese (zh)
Inventor
张鹏
李小松
姜涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202021697113.9U priority Critical patent/CN212818869U/en
Application granted granted Critical
Publication of CN212818869U publication Critical patent/CN212818869U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a construction operation face sprays dust fall heat sink is built in room, including first mounting bracket and second mounting bracket, the both sides fixedly connected with installation pole of first mounting bracket, the installation pole cup joints with the second mounting bracket, the utility model relates to a construction technical field. This construction operation face sprays dust fall heat sink is built in room, first mounting bracket has been reached, the second mounting bracket, the installation pole, stop device, the fixed block, the fixed plate, a whole is constituteed with the strengthening rib to the shower head, set up the shower head on the fixed plate, be convenient for spray water to the construction face, set up first mounting bracket and second mounting bracket, and first mounting bracket and second mounting bracket pass through the installation piece, stop device can carry out quick installation, the installation effectiveness is improved, overall structure is light and handy, the staff of being convenient for installs on the scaffold frame, the installation effectiveness is improved, convenient to use, set up the extrusion device, improve whole installation stability, satisfy the purpose of user demand.

Description

Spraying dust-settling and cooling device for construction working face of building
Technical Field
The utility model relates to a construction field, more specifically say, relate to a construction working face sprays dust fall heat sink is built in room.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. In the process of building construction, the construction operation surface needs to be sprinkled, dust is reduced, particularly in summer construction operation, the temperature of a construction site can be reduced through sprinkling, and meanwhile, environmental pollution is reduced. At present, the construction operation face sprays dust fall heat sink is built in current room, and the structure is relatively fixed, and the volume is great, the installation of being not convenient for, especially when the staff is under construction on the scaffold frame, the construction operation face sprays dust fall heat sink is built in traditional room, and the staff of being not convenient for installs, wastes time and energy, and it is great to occupy the space, can't satisfy the user demand.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
Aiming at the problems that the prior spraying dust-settling and cooling device for the construction working face of building construction in the prior art has relatively fixed structure, larger volume, inconvenient installation on a scaffold, time and labor waste, larger occupied space and incapability of meeting the use requirement, the utility model aims to provide a spraying dust-settling and cooling device for the construction working face of building construction, which can realize that a first mounting frame, a second mounting frame, a mounting rod, a limiting device, a fixed block, a fixed plate, a spray head and a reinforcing rib form a whole, the spray head is arranged on the fixed plate to facilitate the water spraying on the construction working face of building, the first mounting frame and the second mounting frame are arranged, and the first mounting frame and the second mounting frame can be quickly installed through a mounting block and the limiting device, thereby improving the installation efficiency, the whole structure is light and handy, and the installation on the scaffold by workers can be conveniently carried out, the convenient use sets up extrusion device, improves whole installation stability, satisfies the user demand.
2. Technical scheme
In order to solve the above problems, the utility model adopts the following technical proposal.
The utility model provides a construction working face sprays dust fall heat sink is built in room, includes first mounting bracket and second mounting bracket, the both sides fixedly connected with installation pole of first mounting bracket, the installation pole cup joints with the second mounting bracket, the lateral wall of second mounting bracket is provided with stop device, the second mounting bracket passes through stop device and installation pole joint, the lateral wall fixedly connected with fixed block of second mounting bracket, one side fixedly connected with fixed plate of second mounting bracket is kept away from to the fixed block, the surface of fixed plate is provided with the shower head, the lateral wall fixedly connected with strengthening rib of fixed block, strengthening rib and fixed plate fixed connection.
Preferably, the lateral wall of fixed plate is provided with the inlet tube, the surface of inlet tube is provided with the valve.
Preferably, stop device includes the link, link and second mounting bracket fixed connection, link sliding connection has the extrusion pole, the quantity of extrusion pole is two, the top fixedly connected with dog of extrusion pole, the top fixedly connected with pull ring of dog, the one end fixedly connected with extrusion piece of dog is kept away from to the extrusion pole, the top fixedly connected with supporting spring of extrusion piece, supporting spring cup joints with the extrusion pole, the extrusion piece is connected with the link through supporting spring, the surface of installation pole is provided with the draw-in groove, extrusion piece and draw-in groove joint.
Preferably, a squeezing device is arranged inside the second mounting frame and corresponds to the first mounting frame.
Preferably, extrusion device includes spacing frame, spacing frame is located the inside of second mounting bracket, the inner wall fixedly connected with compression spring of spacing frame, spacing frame passes through compression spring fixedly connected with motion piece, the lateral wall fixedly connected with motion pole of motion piece, motion pole and spacing frame sliding connection, the motion pole is located the outside one end fixedly connected with contact frame of spacing frame, the surface of contact frame is provided with the lug.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of: through the first mounting frame, the second mounting frame, the mounting rod, the limiting device, the fixed block, the fixed plate, the spray head and the reinforcing rib form a whole, the spray head is arranged on the fixed plate, water spraying to a building construction surface is facilitated, the first mounting frame and the second mounting frame are arranged, the first mounting frame and the second mounting frame can be rapidly mounted through the mounting block and the limiting device, the mounting efficiency is improved, the whole structure is light and handy, workers can conveniently mount on a scaffold, the mounting efficiency is improved, the water inlet pipe and the valve are arranged, the water inlet pipe is connected with the water supply pipeline, the construction surface can be sprayed by opening the valve, the use is facilitated, when the first mounting frame and the second mounting frame are required to be mounted, the pull ring is pulled to drive the stop block to move, the extrusion rod is driven to move, the extrusion block is driven to move, the elastic potential energy of the supporting spring is increased, the first mounting frame and the second mounting frame are matched and mounted on a scaffold, the pull ring is loosened, the elastic potential energy of the supporting spring is converted into kinetic energy to drive the extrusion block to reset, the extrusion block is clamped with the clamping groove, the mounting efficiency is improved, the rapid mounting and dismounting are convenient, the use is convenient, the extrusion device is arranged to improve the overall mounting stability, when the first mounting frame and the second mounting frame are mounted, the scaffold is in contact with the contact frame and drives the contact frame to move to drive the moving rod to move to drive the moving block to move, the elastic potential energy of the compression spring is increased, the supporting force of the scaffold is further improved, the overall mounting stability is improved, the lug is arranged to further reinforce the scaffold to meet the use requirement, and the first mounting frame, the second mounting frame, the mounting rod, the limiting device, the fixed block, the fixed plate, the spray head and the reinforcing rib form a whole body, set up the shower head on the fixed plate, be convenient for spray water to the construction face, set up first mounting bracket and second mounting bracket, and first mounting bracket and second mounting bracket can install fast through installation piece, stop device, improve the installation effectiveness, overall structure is light and handy, and the staff of being convenient for installs on the scaffold frame, improves the installation effectiveness, facilitates the use, sets up the extrusion device, improves whole installation stability, satisfies the purpose of user demand.
Drawings
Fig. 1 is a schematic view of the overall external structure of the present invention;
FIG. 2 is a schematic view of the overall internal structure of the present invention;
fig. 3 is a schematic view of a partial enlarged structure at a in fig. 2 according to the present invention;
fig. 4 is a schematic diagram of a partial enlarged structure at B of fig. 2 according to the present invention.
The reference numbers in the figures illustrate:
1. a first mounting bracket; 2. a second mounting bracket; 3. mounting a rod; 4. a limiting device; 41. a connecting frame; 42. an extrusion stem; 43. a stopper; 44. a pull ring; 45. extruding the block; 46. a support spring; 47. a card slot; 5. an extrusion device; 51. a limiting frame; 52. a compression spring; 53. a motion block; 54. a motion bar; 55. a contact frame; 56. a bump; 6. a fixed block; 7. a fixing plate; 8. a shower head; 9. reinforcing ribs; 10. a water inlet pipe; 11. and (4) a valve.
Detailed Description
The drawings in the embodiments of the present invention will be combined; the technical scheme in the embodiment of the utility model is clearly and completely described; obviously; the described embodiments are only some of the embodiments of the present invention; rather than all embodiments. Based on the embodiment of the utility model; all other embodiments obtained by a person skilled in the art without making any inventive step; all belong to the protection scope of the utility model.
Example 1:
referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a construction working face sprays dust fall heat sink is built in room, including first mounting bracket 1 and second mounting bracket 2, the both sides fixedly connected with installation pole 3 of first mounting bracket 1, installation pole 3 cup joints with second mounting bracket 2, the lateral wall of second mounting bracket 2 is provided with stop device 4, second mounting bracket 2 passes through stop device 4 and installation pole 3 joint, the lateral wall fixedly connected with fixed block 6 of second mounting bracket 2, one side fixedly connected with fixed plate 7 of second mounting bracket 2 is kept away from to fixed block 6, the surface of fixed plate 7 is provided with shower head 8, the lateral wall fixedly connected with strengthening rib 9 of fixed block 6, strengthening rib 9 and 7 fixed connection of fixed plate. First mounting bracket 1, second mounting bracket 2, installation pole 3, stop device 4, fixed block 6, fixed plate 7, a whole is constituteed with strengthening rib 9 to shower head 8, set up shower head 8 on fixed plate 7, be convenient for spray water to the construction face, set up first mounting bracket 1 and second mounting bracket 2, and first mounting bracket 1 and second mounting bracket 2 are through installing piece 3, stop device 4 can install fast, and the installation effectiveness is improved, and the overall structure is light and handy, the staff of being convenient for installs on the scaffold frame, and the installation effectiveness is improved.
Example 2:
referring to fig. 2, a spraying dust-settling and cooling device for a construction working surface of a building is substantially the same as that of embodiment 1, and further, a water inlet pipe 10 is disposed on a side wall of a fixing plate 7, and a valve 11 is disposed on a surface of the water inlet pipe 10. The water inlet pipe 10 and the valve 11 are arranged, the water inlet pipe 10 is connected with a water supply pipeline, and the valve 11 is opened, so that the construction surface can be sprayed, and the use is convenient.
Example 3:
please refer to fig. 3, a spraying dust-settling and cooling device for a construction working surface of a building, which is substantially the same as that in embodiment 1, further, the limiting device 4 includes a connecting frame 41, the connecting frame 41 is fixedly connected to the second mounting frame 2, the connecting frame 41 is slidably connected to two extrusion rods 42, the number of the extrusion rods 42 is two, the top of the extrusion rods 42 is fixedly connected to a stop 43, the top of the stop 43 is fixedly connected to a pull ring 44, one end of the extrusion rod 42 away from the stop 43 is fixedly connected to an extrusion block 45, the top of the extrusion block 45 is fixedly connected to a supporting spring 46, the supporting spring 46 is sleeved with the extrusion rod 42, the extrusion block 45 is connected to the connecting frame 41 through the supporting spring 46, a slot 47 is formed on the surface of the mounting rod 3, and the extrusion block. When first mounting bracket 1 and second mounting bracket 2 need be installed, pulling pull ring 44, drive dog 43 motion, drive the motion of extrusion stem 42, drive extrusion block 45 motion, increase supporting spring 46's elastic potential energy, remove the restriction of extrusion block 45 and draw-in groove 47, cooperate first mounting bracket 1 and second mounting bracket 2, install on the scaffold frame, and loosen pull ring 44, supporting spring 46 elastic potential energy turns into kinetic energy, it resets to drive extrusion block 45, extrusion block 45 carries out the joint with draw-in groove 47, the installation effectiveness is improved, be convenient for install fast and dismantle, and convenient to use.
Example 4:
referring to fig. 1, a spraying dust-settling and cooling device for a construction working surface of a building is substantially the same as that of embodiment 1, and further, an extrusion device 5 is disposed inside the second mounting frame 2, and the extrusion device 5 corresponds to the first mounting frame 1. The extrusion device 5 is arranged, and the overall installation stability is improved.
Example 5:
referring to fig. 4, a spraying dust-settling and cooling device for a construction working surface of a building is substantially the same as that of embodiment 4, and further, the extruding device 5 includes a limiting frame 51, the limiting frame 51 is located inside the second mounting frame 2, a compression spring 52 is fixedly connected to an inner wall of the limiting frame 51, the limiting frame 51 is fixedly connected to a moving block 53 through the compression spring 52, a moving rod 54 is fixedly connected to a side wall of the moving block 53, the moving rod 54 is slidably connected to the limiting frame 51, a contact frame 55 is fixedly connected to one end of the moving rod 54 located outside the limiting frame 51, and a protrusion 56 is disposed on a surface of the contact frame 55. When installing first mounting bracket 1 and second mounting bracket 2, the scaffold frame contacts with contact frame 55 to drive contact frame 55 motion, drive motion pole 54 motion, drive motion piece 53 motion, increase compression spring 52's elastic potential energy, and then improve the holding power to the scaffold frame, improve overall installation stability, set up lug 56, further consolidate the scaffold frame, satisfy the user demand.
The above; is only a preferred embodiment of the present invention; however, the scope of protection of the present invention is not limited thereto; any person skilled in the art is within the technical scope of the present disclosure; according to the technical scheme of the utility model and the improvement conception, equivalent substitution or change is carried out; are all covered by the protection scope of the utility model.

Claims (5)

1. The utility model provides a construction working face sprays dust fall heat sink is built in room, includes first mounting bracket (1) and second mounting bracket (2), its characterized in that: the utility model discloses a spray gun, including first mounting bracket (1), both sides fixedly connected with installation pole (3), installation pole (3) cup joint with second mounting bracket (2), the lateral wall of second mounting bracket (2) is provided with stop device (4), second mounting bracket (2) are through stop device (4) and installation pole (3) joint, the lateral wall fixedly connected with fixed block (6) of second mounting bracket (2), one side fixedly connected with fixed plate (7) of second mounting bracket (2) are kept away from in fixed block (6), the surface of fixed plate (7) is provided with shower head (8), the lateral wall fixedly connected with strengthening rib (9) of fixed block (6), strengthening rib (9) and fixed plate (7) fixed connection.
2. The spraying dust-reducing and temperature-reducing device for the construction working surface of the house building according to claim 1, which is characterized in that: the lateral wall of fixed plate (7) is provided with inlet tube (10), the surface of inlet tube (10) is provided with valve (11).
3. The spraying dust-reducing and temperature-reducing device for the construction working surface of the house building according to claim 1, which is characterized in that: the limiting device (4) comprises a connecting frame (41), the connecting frame (41) is fixedly connected with the second mounting frame (2), the connecting frame (41) is connected with two extrusion rods (42) in a sliding way, the number of the extrusion rods (42) is two, the top of the extrusion rod (42) is fixedly connected with a stop block (43), the top of the stop block (43) is fixedly connected with a pull ring (44), one end of the extrusion rod (42) far away from the stop block (43) is fixedly connected with an extrusion block (45), the top of the extrusion block (45) is fixedly connected with a supporting spring (46), the supporting spring (46) is sleeved with the extrusion rod (42), the extrusion block (45) is connected with the connecting frame (41) through a supporting spring (46), the surface of installation pole (3) is provided with draw-in groove (47), extrusion piece (45) and draw-in groove (47) joint.
4. The spraying dust-reducing and temperature-reducing device for the construction working surface of the house building according to claim 1, which is characterized in that: the inside of second mounting bracket (2) is provided with extrusion device (5), extrusion device (5) are corresponding with first mounting bracket (1).
5. The spraying dust-reducing and temperature-reducing device for the construction working surface of the house building according to claim 4, which is characterized in that: extrusion device (5) are including spacing frame (51), spacing frame (51) are located the inside of second mounting bracket (2), the inner wall fixedly connected with compression spring (52) of spacing frame (51), spacing frame (51) are through compression spring (52) fixedly connected with motion piece (53), the lateral wall fixedly connected with motion pole (54) of motion piece (53), motion pole (54) and spacing frame (51) sliding connection, motion pole (54) are located the outside one end fixedly connected with contact frame (55) of spacing frame (51), the surface of contact frame (55) is provided with lug (56).
CN202021697113.9U 2020-08-14 2020-08-14 Spraying dust-settling and cooling device for construction working face of building Expired - Fee Related CN212818869U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021697113.9U CN212818869U (en) 2020-08-14 2020-08-14 Spraying dust-settling and cooling device for construction working face of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021697113.9U CN212818869U (en) 2020-08-14 2020-08-14 Spraying dust-settling and cooling device for construction working face of building

Publications (1)

Publication Number Publication Date
CN212818869U true CN212818869U (en) 2021-03-30

Family

ID=75133480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021697113.9U Expired - Fee Related CN212818869U (en) 2020-08-14 2020-08-14 Spraying dust-settling and cooling device for construction working face of building

Country Status (1)

Country Link
CN (1) CN212818869U (en)

Similar Documents

Publication Publication Date Title
CN205518863U (en) Building flue cleaning device
CN215808985U (en) Building construction working face sprays dust fall heat sink
CN112087198A (en) But water economy resource's solar panel self-cleaning device
CN212818869U (en) Spraying dust-settling and cooling device for construction working face of building
CN209393609U (en) A kind of central air-conditioning cleaning device
CN206784295U (en) A kind of distance type tower crane spray system
CN206201166U (en) Mobile spray device
CN215696624U (en) Environment-friendly dust removal device with purification function and used for building construction
CN214363229U (en) Dust fall equipment for portable construction
CN213837769U (en) Spraying dust-settling and cooling device for construction working face of building
CN211257078U (en) Utility tunnel template reinforcing apparatus
CN210010259U (en) Knapsack hair-dryer installs atomizer additional
CN219784258U (en) Hand-push type dust removing equipment for construction site
CN213683292U (en) Civil engineering construction working face sprays dust fall heat sink in room
CN219894126U (en) Spray irrigation device
CN220125806U (en) Dust fall device for civil engineering
CN220928351U (en) Curtain wall structure for building
CN219825988U (en) Movable wall plastering maintenance tool
CN216492566U (en) Multifunctional water saver
CN218590072U (en) Green construction is with on-spot dust device
CN213713517U (en) Air conditioner water high efficiency treatment equipment
CN214479325U (en) Pipeline fixing device on construction frame
CN210057773U (en) Building construction dust collector
CN213014804U (en) Energy-saving building outer wall with launching fixing structure
CN220571232U (en) Afforestation street tree maintenance device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210330

Termination date: 20210814