CN212804594U - Steel construction piping lane - Google Patents

Steel construction piping lane Download PDF

Info

Publication number
CN212804594U
CN212804594U CN202021412548.4U CN202021412548U CN212804594U CN 212804594 U CN212804594 U CN 212804594U CN 202021412548 U CN202021412548 U CN 202021412548U CN 212804594 U CN212804594 U CN 212804594U
Authority
CN
China
Prior art keywords
truss
pipe gallery
cross beam
steel
piping lane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021412548.4U
Other languages
Chinese (zh)
Inventor
阙保华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan New Century Heavy Steel Co ltd
Original Assignee
Dongguan New Century Heavy Steel Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan New Century Heavy Steel Co ltd filed Critical Dongguan New Century Heavy Steel Co ltd
Priority to CN202021412548.4U priority Critical patent/CN212804594U/en
Application granted granted Critical
Publication of CN212804594U publication Critical patent/CN212804594U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the field of steel structures, in particular to a steel structure pipe gallery, which comprises a truss and a plurality of support frames, wherein two adjacent support frames are connected through the truss, the top surface of the truss and the top surfaces of the support frames form a walkway for bearing a pipeline, one side of the walkway is provided with an access way, the support frames are provided with a crawling ladder, and the crawling ladder is communicated with the access way; the assembly mode of the truss and the support frame greatly reduces the difficulty of construction, is convenient to install and reduces labor cost; this steel construction piping lane is equipped with access road and cat ladder, and the pipeline on the convenient piping lane is installed and is maintained.

Description

Steel construction piping lane
Technical Field
The utility model relates to a steel construction field indicates a steel construction piping lane especially.
Background
Pipe gallery, i.e. the corridor of the pipeline. Many of the pipes in chemical and related plants are grouped together and arranged along the outside of the plant or building, typically in the air, supported by supports, in a manner similar to a corridor. There are also a few pipe galleries located underground. The pipe gallery is a main place for intensively laying large-scale device pipelines, is composed of upright columns, cross beams and trusses of a steel structure or a reinforced concrete structure, and can be divided into single-layer or multi-layer pipes, accessible or inaccessible according to types.
However, most of the existing pipe galleries are complex in structure, many of the existing pipe galleries are welded by iron rods one by one on the site of installing the pipe gallery, the number of the rod pieces which are converged on the nodes is large, the manufacturing and the installation are very complex and difficult, the material cost and the labor cost are very high, and the pipe gallery is not suitable for the requirements of the times.
In addition, the general aerial pipe gallery is not provided with a maintenance device, and much inconvenience is brought to the maintenance of the pipe gallery and the installation and maintenance of the pipeline on the pipe gallery.
Disclosure of Invention
In order to solve the problems, the utility model provides a steel structure pipe gallery, which mainly aims to solve the problems of high manufacturing cost and large installation difficulty of the traditional pipe gallery in the background technology;
the utility model discloses a still another purpose provides a steel construction piping lane, this steel construction piping lane is equipped with access road and cat ladder, and the pipeline on the convenient piping lane is installed and is maintained.
In order to achieve the above object, the utility model adopts the following technical scheme: the utility model provides a steel construction piping lane which characterized in that contains: the support frame is provided with a ladder stand, and the ladder stand is communicated with the access way.
Furthermore, the both sides of access road all are equipped with the guardrail, the cat ladder is equipped with the cat ladder and protects the cage.
Furthermore, the ladder stand protection cage is of an arch structure.
Furthermore, the truss is a quadrilateral truss, the quadrilateral truss comprises a truss beam, a first cross beam and a second cross beam, the truss beam is vertically connected with the first cross beam and the second cross beam, and the first cross beam is perpendicular to the second cross beam.
Furthermore, a first inclined rod is arranged between the two first cross beams.
Furthermore, two second inclined rods are arranged between the two second cross beams, and the two second inclined rods are arranged in a crossed mode.
Further, the vertical distance between the lowest position of the ladder stand and the ground is more than 2.2m and less than 2.5 m.
Further, the support frame is provided with a support platform.
The beneficial effects of the utility model reside in that:
the utility model comprises a truss and a plurality of supporting frames, wherein two adjacent supporting frames are connected through the truss, the top surface of the truss and the top surface of the supporting frames form a walkway for bearing a pipeline, one side of the walkway is provided with an access way, the supporting frames are provided with crawling ladders, and the crawling ladders are communicated with the access way; the assembly mode of the truss and the support frame greatly reduces the difficulty of construction, is convenient to install and reduces labor cost; this steel construction piping lane is equipped with access road and cat ladder, and the pipeline on the convenient piping lane is installed and is maintained.
Drawings
Fig. 1 is a plan view of the present invention.
Fig. 2 is a schematic structural diagram of the truss of the present invention.
Fig. 3 is a schematic structural diagram of the present invention.
The reference numbers illustrate: 1. a support frame; 2. a truss; 3. a first diagonal member; 4. a truss beam; 5. a first cross member; 6. a second cross member; 7. a second diagonal member; 8. a guardrail; 9. a support platform; 10. the ladder stand protects the cage.
Detailed Description
Referring to fig. 1-3, the present invention relates to a steel structure pipe rack, comprising: the pipeline maintenance device comprises a truss 2 and a plurality of supporting frames 1, wherein two adjacent supporting frames 1 are connected through the truss 2, the top surface of the truss 2 and the top surface of the supporting frame 1 form a walkway for bearing a pipeline, an access way is arranged on one side of the walkway, and the supporting frame 1 is provided with a crawling ladder which is communicated with the access way;
in the scheme, the assembly mode of the truss 2 and the support frame 1 is adopted for the pipe gallery, so that the construction difficulty is greatly reduced, the installation is convenient, and the labor cost is reduced; this steel construction piping lane is equipped with access road and cat ladder, and the pipeline on the convenient piping lane is installed and is maintained.
Guardrails 8 are arranged on two sides of the access road, and the crawling ladder is provided with a crawling ladder protection cage 10;
in the scheme, the guardrails 8 are arranged on two sides of the access road, and the ladder stand protective cage 10 is arranged on the ladder stand, so that the construction danger of a constructor on a pipe gallery can be greatly reduced.
The ladder stand protection cage 10 is of an arch structure, the arch structure can fully wrap the ladder stand, a compact space is formed by the arch structure and the ladder stand, and safety is high.
The truss 2 is a quadrilateral truss 2, the quadrilateral truss 2 comprises a truss girder 4, a first cross beam 5 and a second cross beam 6, the truss girder 4 is vertically connected with the first cross beam 5 and the second cross beam 6, the first cross beam 5 is perpendicular to the second cross beam 6, and the truss girder 4, the first cross beam 5 and the second cross beam 6 are perpendicular to each other to enable the structure of the quadrilateral truss 2 to be more stable.
A first diagonal rod 3 is arranged between the two first cross beams 5, so that the stability of the truss 2 is further enhanced.
Two second diagonal rods 7 are arranged between the two second cross beams 6, and the two second diagonal rods 7 are arranged in a crossed mode, so that a plurality of triangular structures are formed between the two second cross beams 6, and the two second cross beams 6 are more stable and safer.
The vertical distance between the lowest part of the ladder stand and the ground is more than 2.2m and less than 2.5 m; the purpose of this definition is that it is possible to prevent children from climbing up, reducing the chances that they will climb the pipe gallery, reducing the potential safety hazards.
The support frame 1 is provided with a support platform 9; during installation, the truss 2 is only required to be placed on the supporting platform 9 for welding, so that installation steps are reduced, and labor cost is reduced.
The above embodiments are only for describing the preferred embodiments of the present invention, and are not intended to limit the scope of the present invention, and various modifications and improvements made by the technical solution of the present invention by those skilled in the art are all within the scope of the present invention as defined by the claims.

Claims (8)

1. The utility model provides a steel construction piping lane which characterized in that contains: the support frame is provided with a ladder stand, and the ladder stand is communicated with the access way.
2. The steel structure pipe gallery of claim 1, wherein guardrails are arranged on both sides of the access road, and the ladder stand is provided with a ladder stand protection cage.
3. A steel structural pipe gallery according to claim 2 wherein the ladder cage is of an arch configuration.
4. The steel structure pipe gallery of claim 3, wherein the truss is a quadrilateral truss including truss beams, a first cross beam and a second cross beam, the truss beams being perpendicularly connected to the first cross beam and the second cross beam, the first cross beam and the second cross beam being perpendicular to each other.
5. A steel structural pipe gallery according to claim 4 wherein a first diagonal member is provided between the first cross members.
6. A steel structure pipe gallery according to claim 5, wherein two second diagonal members are provided between the two second cross members, and the two second diagonal members are arranged in a crossing manner.
7. A steel structural pipe gallery according to claim 6 wherein the lowermost part of the ladder stand is at a vertical distance of more than 2.2m and less than 2.5m from the ground.
8. A steel structural pipe gallery according to claim 7 wherein the support frame is provided with a support platform.
CN202021412548.4U 2020-07-17 2020-07-17 Steel construction piping lane Active CN212804594U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021412548.4U CN212804594U (en) 2020-07-17 2020-07-17 Steel construction piping lane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021412548.4U CN212804594U (en) 2020-07-17 2020-07-17 Steel construction piping lane

Publications (1)

Publication Number Publication Date
CN212804594U true CN212804594U (en) 2021-03-26

Family

ID=75103060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021412548.4U Active CN212804594U (en) 2020-07-17 2020-07-17 Steel construction piping lane

Country Status (1)

Country Link
CN (1) CN212804594U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114849942A (en) * 2022-06-27 2022-08-05 上海外高桥造船有限公司 Track supporting device and ship spraying equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114849942A (en) * 2022-06-27 2022-08-05 上海外高桥造船有限公司 Track supporting device and ship spraying equipment
CN114849942B (en) * 2022-06-27 2024-01-19 上海外高桥造船有限公司 Rail support device and ship spraying equipment

Similar Documents

Publication Publication Date Title
CN106760529B (en) Roof steel truss sliding assembly construction platform and installation method
CN209412683U (en) A kind of supporting system for aqueduct
CN212804594U (en) Steel construction piping lane
CN211551986U (en) Air pipe sliding installation device in steel structure net rack and air pipe system
CN109424072B (en) Connecting joint for supporting reinforced concrete columns on steel beams and construction method
CN109653517B (en) Multidirectional unloading system and construction method for assembling steel corridor by using same
CN215580291U (en) Large-span ultrahigh-voltage power pipe trench suspension device in foundation pit
CN112962664A (en) Overhead cable corridor with steel pipe truss structure
CN102828616B (en) High-formwork support system for roof
CN113137102B (en) Assembled garage roof house structure and installation method thereof
CN211571987U (en) Suspension structure for additionally arranging prestressed steel stay cable in steel truss
CN210600469U (en) Assembled series pipeline support
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN113309008A (en) Steel case roof beam temporary support construction safety work platform
CN110030005B (en) Light circular protection supporting system for shield tunnel and construction method thereof
CN209163448U (en) A kind of superelevation long-span beams formwork support structure
CN218436587U (en) Cross-road coal conveying trestle
CN111395850A (en) Assembled tower frame for cable hoisting system and erection method
CN213061736U (en) Cast-in-place construction fabricated combined support frame for concrete box girder
CN220150379U (en) Operation and maintenance overhauling cable steel trestle
CN219643490U (en) Saddle plate roofing cable bridge and overhaul channel support
CN219840350U (en) Assembled operating platform for butt joint of steel giant columns
CN220266283U (en) Combined structure of trestle and power transmission framework of power plant
CN219731676U (en) Safety channel for opening steel girder
CN110777938B (en) Suspension structure for additionally arranging prestressed steel stay cable in steel truss

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant