CN212802576U - Construction pull rod device - Google Patents

Construction pull rod device Download PDF

Info

Publication number
CN212802576U
CN212802576U CN202021029373.9U CN202021029373U CN212802576U CN 212802576 U CN212802576 U CN 212802576U CN 202021029373 U CN202021029373 U CN 202021029373U CN 212802576 U CN212802576 U CN 212802576U
Authority
CN
China
Prior art keywords
fixedly connected
pull rod
outer tube
construction
buckle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021029373.9U
Other languages
Chinese (zh)
Inventor
刘玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Creation Vocational College
Original Assignee
Chongqing Creation Vocational College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Creation Vocational College filed Critical Chongqing Creation Vocational College
Priority to CN202021029373.9U priority Critical patent/CN212802576U/en
Application granted granted Critical
Publication of CN212802576U publication Critical patent/CN212802576U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a construction pull rod device, including pull rod, outer tube and connecting pipe, the top of pull rod is passed through connecting pipe fixedly connected with and is drawn the handle, the surperficial threaded connection of outer tube has the bolt, the bottom of outer tube one side has the curb plate through connecting axle swing joint, the bottom fixedly connected with tubule of one side of outer tube, the inside wall swing joint of tubule has the buckle, the one end fixedly connected with spring of buckle, one side fixedly connected with square plate of curb plate, the surperficial threaded connection of square plate has connecting bolt. This construction draw bar device through the setting of connecting axle, buckle and spring, can make buckle and curb plate carry out the joint to can adjust the angle of construction pull rod, the staff of being convenient for uses, then through the setting of bolt, the length that the constructor can adjust the pull rod, through the setting of square slab at last, the construction staff of being convenient for installs the draw bar device.

Description

Construction pull rod device
Technical Field
The utility model relates to a pull rod technical field for the construction specifically is a construction pull rod device.
Background
The construction refers to the production activities in the construction implementation stage of the construction, and is the construction process of various buildings, or the process of changing various lines on the design drawing into real objects at the designated places, and includes foundation construction, main structure construction, roofing construction, decoration construction, etc., the place of construction operation is called "construction site" or "construction site", also called as construction site, the construction is the production activities for building various building products in a certain space and time by using various building materials and mechanical equipment according to the specific design blueprint, and includes all the production processes from construction preparation, earth breaking activity to project completion acceptance, the process is to be carried out, construction preparation, construction organization design and management, earthwork, blasting project, foundation project, and construction, The method comprises the following working procedures of steel bar engineering, template engineering, scaffold engineering, concrete engineering, prestressed concrete engineering, masonry engineering, steel structure engineering, wood structure engineering, structure installation engineering and the like.
At the job site, the instrument of pull car class can be used to the constructor mostly, the pull rod on the current pull car, and most of them are that the angle can rotate at will, and length is unchangeable, and the angle rotates at will, and when placing the pull car, the pull rod will be placed subaerial, and under the condition that constructor used the pull car many times, stoop for a long time and take the pull rod, has increased constructor's tired sense, provides a construction draw bar device for this reason.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a construction pull rod device has solved the problem of proposing among the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a construction pull rod device, includes pull rod and outer tube, the surface of pull rod with the outer tube is pegged graft, the top of pull rod is drawn the handle through connecting pipe fixedly connected with, the surperficial threaded connection of outer tube has the bolt, the bottom of outer tube one side has the curb plate through connecting axle swing joint, the bottom fixedly connected with tubule of one side of outer tube, the inside wall swing joint of tubule has the buckle, the one end fixedly connected with spring of buckle, one side fixedly connected with square slab of curb plate, the surperficial threaded connection of square slab has connecting bolt.
Optionally, the inner side wall of the connecting pipe is fixedly connected with the pull rod, and the top of the connecting pipe is fixedly connected with the pull handle.
Optionally, both ends of the connecting shaft penetrate through the outer tube and are fixedly connected with the side plates, and the surfaces of the side plates are fixedly connected with the connecting plates.
Optionally, one end of the spring is fixedly connected with the buckle, and the other end of the spring is fixedly connected with the outer tube.
Optionally, a protecting sleeve is arranged on the surface of the pull handle, and a thread groove is formed on the surface of the outer tube.
Optionally, the number of the side plates is two, and the surfaces of the two side plates are provided with clamping grooves.
(III) advantageous effects
The utility model provides a construction draw bar device possesses following beneficial effect:
1. this construction draw bar device through the setting of connecting axle, buckle and spring, can make buckle and curb plate carry out the joint to can adjust the angle of construction pull rod, the staff of being convenient for uses, then through the setting of bolt, can adjust the length of pull rod, and the staff of being convenient for installs the draw bar device through the setting of square slab at last.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged schematic view of the structure at A of FIG. 1 according to the present invention;
fig. 3 is a schematic view of the spring structure of the present invention.
In the figure: 1. a pull rod; 2. an outer tube; 3. a connecting pipe; 4. pulling a handle; 5. a bolt; 6. a connecting shaft; 7. a side plate; 8. a thin tube; 9. buckling; 10. a spring; 11. a square plate; 12. a connecting bolt; 13. a connecting plate; 14. a card slot; 15. a thread groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: a building construction pull rod device comprises a pull rod 1 and an outer tube 2, wherein the surface of the pull rod 1 is spliced with the outer tube 2, the top of the pull rod 1 is fixedly connected with a pull handle 4 through a connecting tube 3, the surface of the outer tube 2 is in threaded connection with a bolt 5, the length of the pull rod 1 can be adjusted through the arrangement of the bolt 5, the bottom of one side of the outer tube 2 is movably connected with a side plate 7 through a connecting shaft 6, the bottom of one side of the outer tube 2 is fixedly connected with a tubule 8, the inner side wall of the tubule 8 is movably connected with a buckle 9, one end of the buckle 9 is fixedly connected with a spring 10, one side of the side plate 7 is fixedly connected with a square plate 11, the surface of the square plate 11 is in threaded connection with a connecting bolt 12, through the arrangement of the square plate 11 and the connecting bolt 12, the pull rod device is convenient for workers to install, the inner side wall of the connecting, the fixed surface of curb plate 7 is connected with connecting plate 13, the one end and the buckle 9 fixed connection of spring 10, the other end and the outer tube 2 fixed connection of spring 10, and the surface of pulling 4 is provided with the lag, and thread groove 15 has been seted up on the surface of outer tube 2, and the quantity of curb plate 7 is two, and draw-in groove 14 has all been seted up on the surface of two curb plates 7.
The utility model discloses in, the device's working procedure as follows:
1. through the arrangement of the connecting shaft 6, the buckle 9 and the spring 10, the outer tube 2 can rotate on the surface of the connecting shaft 6, the spring 10 drives the buckle 9 to pop out when reaching the clamping groove on the side plate 7, and the buckle 9 can be clamped with the side plate 7, so that the angle of the construction pull rod can be adjusted;
2. the length of the pull rod 1 can be adjusted through the arrangement of the bolt 5;
3. and finally, through the arrangement of the square plate 11, the pull rod device is convenient for workers to install.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a construction pull rod device, includes pull rod (1) and outer tube (2), its characterized in that: the surface of pull rod (1) with outer tube (2) are pegged graft, the top of pull rod (1) is passed through connecting pipe (3) fixedly connected with and is drawn (4), the surperficial threaded connection of outer tube (2) has bolt (5), the bottom of outer tube (2) one side has curb plate (7) through connecting axle (6) swing joint, the bottom fixedly connected with tubule (8) of one side of outer tube (2), the inside wall swing joint of tubule (8) has buckle (9), the one end fixedly connected with spring (10) of buckle (9), one side fixedly connected with square plate (11) of curb plate (7), the surperficial threaded connection of square plate (11) has connecting bolt (12).
2. The construction tie bar apparatus of claim 1, wherein: the inner side wall of the connecting pipe (3) is fixedly connected with the pull rod (1), and the top of the connecting pipe (3) is fixedly connected with the pull handle (4).
3. The construction tie bar apparatus of claim 1, wherein: the two ends of the connecting shaft (6) penetrate through the outer pipe (2) and are fixedly connected with the side plates (7), and the surfaces of the side plates (7) are fixedly connected with connecting plates (13).
4. The construction tie bar apparatus of claim 1, wherein: one end of the spring (10) is fixedly connected with the buckle (9), and the other end of the spring (10) is fixedly connected with the outer tube (2).
5. The construction tie bar apparatus of claim 1, wherein: the surface of the pull handle (4) is provided with a protective sleeve, and the surface of the outer tube (2) is provided with a thread groove (15).
6. The construction tie bar apparatus of claim 1, wherein: the number of the side plates (7) is two, and the surfaces of the two side plates (7) are provided with clamping grooves (14).
CN202021029373.9U 2020-06-05 2020-06-05 Construction pull rod device Active CN212802576U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021029373.9U CN212802576U (en) 2020-06-05 2020-06-05 Construction pull rod device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021029373.9U CN212802576U (en) 2020-06-05 2020-06-05 Construction pull rod device

Publications (1)

Publication Number Publication Date
CN212802576U true CN212802576U (en) 2021-03-26

Family

ID=75094711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021029373.9U Active CN212802576U (en) 2020-06-05 2020-06-05 Construction pull rod device

Country Status (1)

Country Link
CN (1) CN212802576U (en)

Similar Documents

Publication Publication Date Title
CN110805257B (en) Flower basket overhanging type section steel bearing beam structure and construction method
CN104153587B (en) A kind of built with ribbed bricks body of wall assembly construction method
CN107165281A (en) A kind of high-altitude long-span overhung steel platform mould bases construction
CN212802576U (en) Construction pull rod device
CN202627540U (en) Constructing rack device for assisting prestress tension
CN111827648A (en) Construction device and method for down-supporting type overhanging scaffold
CN110847289A (en) Ultra-deep large-span circular water intake pump house roof support and construction method thereof
CN109779238A (en) A kind of multi-storey residential buildings outer scaffold wall connector
CN201704695U (en) Slope reinforcement structure supported by glass fiber pre-stressed soil nails
CN213626685U (en) Portable form removal tool for composite material template
CN213268820U (en) Pull rod type I-steel cantilever beam
CN214219300U (en) Pavement construction elevation control tool
CN210013362U (en) Assembled oblique roofing construction structures
CN204139634U (en) The safe enclosed construction in a kind of fast-type hole
CN201738567U (en) Connecting piece in adjustable type support component of cast-in-situ concrete suspend mold plate
CN211850989U (en) Be used for construction installation protection early warning device
CN212482476U (en) Economical and practical monitoring point protection device
CN205444484U (en) Wall lacing wire subassembly
CN215331594U (en) Brickwork drawknot muscle plant bar point arranges appurtenance
CN210497750U (en) Steel pipe straightening tool
CN211540113U (en) Pipeline erection welding steel frame for building construction
CN218406592U (en) Movable I-steel dismantlement platform that encorbelments
CN213015591U (en) Deep basal pit construction safety protection canopy
CN217734854U (en) Novel formwork support device for building construction
CN213979012U (en) Telescopic slurry bag for underground continuous wall construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant