CN212801555U - Civil engineering weak soil foundation ditch support erects board with build fast - Google Patents

Civil engineering weak soil foundation ditch support erects board with build fast Download PDF

Info

Publication number
CN212801555U
CN212801555U CN202021095732.0U CN202021095732U CN212801555U CN 212801555 U CN212801555 U CN 212801555U CN 202021095732 U CN202021095732 U CN 202021095732U CN 212801555 U CN212801555 U CN 212801555U
Authority
CN
China
Prior art keywords
plate
wing plate
hook
clamping
civil engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021095732.0U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Zhiyun Construction Engineering Co ltd
Original Assignee
Wen Miaoyun
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wen Miaoyun filed Critical Wen Miaoyun
Priority to CN202021095732.0U priority Critical patent/CN212801555U/en
Application granted granted Critical
Publication of CN212801555U publication Critical patent/CN212801555U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a civil engineering weak soil excavation supporting erects board with build fast, include: a plate body, a left clamping hook and a clamping groove; the left side of the plate body is provided with a left wing plate, and the plate body and the left wing plate are of an integrated structure; the left hook is positioned on the left side of the left wing plate, and the left hook and the left wing plate are of an integrated structure; the right wing plate is positioned on the right side of the plate body, and the right wing plate and the plate body are of an integrated structure; the right clamping hook is positioned on the right side of the right wing plate, and the right clamping hook and the right wing plate are of an integrated structure; the clamping grooves are respectively positioned at the front sides of the left wing plate and the right wing plate and are respectively integrated with the left wing plate and the right wing plate; the connecting block sets up in the centre of fixed plate front side, and the connecting block is connected through the welding mode with the fixed plate. Through structural improvement, have simple to operate, protect comprehensive and durable advantage to the effectual problem and the not enough of having solved among the prior art.

Description

Civil engineering weak soil foundation ditch support erects board with build fast
Technical Field
The utility model relates to a excavation supporting technical field, more specifically the theory that says so especially relates to a civil engineering weak soil excavation supporting erects board with build fast.
Background
The steel sheet pile is often used in the excavation operation of a foundation pit, is a plate-shaped structure with a locking notch at the edge, and can cause great harm if the steel sheet pile is inclined during pile insertion in the supporting process of a soft soil foundation pit, so that the requirement on the convenience in installation of the steel sheet pile is very important.
But present common steel sheet pile still has the convenient function of installation imperfect, utilizes ordinary interface to connect the plate body, and its stop gear is comparatively weak, leads to the plate body to take place the incline easily at the sunken in-process, influences the construction progress, causes the problem that the efficiency of construction is low.
In view of this, research and improvement are carried out to the existing problems, and a civil engineering soft soil foundation pit supporting and erecting plate with quick construction is provided, aiming at achieving the purposes of solving the problems and improving the practical value through the technology.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a civil engineering weak soil excavation supporting erects board with build fast to the convenient function of present common steel sheet pile who proposes in solving above-mentioned background still exists the installation imperfect, utilizes ordinary interface to connect the plate body, and its stop gear is comparatively weak, leads to the plate body to take place the incline easily at the submerged in-process, influences the construction progress, causes the problem and the not enough of efficiency of construction low.
In order to achieve the above object, the utility model provides a civil engineering weak soil excavation supporting erects board with build fast is reached by following concrete technical means:
the utility model provides a civil engineering soft soil foundation ditch support erects board with build fast, includes: the plate body, the left wing plate, the left hook, the right wing plate, the right hook, the clamping groove, the fixing plate, the clamping block and the connecting block; the left side of the plate body is provided with a left wing plate, and the plate body and the left wing plate are of an integrated structure; the left hook is positioned on the left side of the left wing plate, and the left hook and the left wing plate are of an integrated structure; the right wing plate is positioned on the right side of the plate body, and the right wing plate and the plate body are of an integrated structure; the right clamping hook is positioned on the right side of the right wing plate, and the right clamping hook and the right wing plate are of an integrated structure; the clamping grooves are respectively positioned at the front sides of the left wing plate and the right wing plate and are respectively integrated with the left wing plate and the right wing plate; the fixing plate is arranged on the front sides of the left wing plate and the right wing plate and is connected with the left wing plate and the right wing plate in a bolt fixing mode; the fixture block is arranged on the rear side of the fixing plate and connected with the fixing plate in a welding mode; the connecting block sets up in the centre of fixed plate front side, and the connecting block is connected through the welding mode with the fixed plate.
As this technical scheme's further optimization, the utility model relates to a civil engineering weak soil excavation supporting erects board with build fast left wing board and right wing board are the platelike structure of L shape, and left wing board and right wing board are bilateral symmetry's mode setting.
As a further optimization of this technical scheme, the utility model relates to a civil engineering weak soil excavation supporting erects board with build fast left pothook and right pothook are the platelike structure of shape of \\ 21274, and left pothook passes through clearance fit's mode sliding connection with right pothook.
As this technical scheme's further optimization, the utility model relates to a civil engineering weak soil excavation supporting erects board with build fast the draw-in groove side is regarded as parallelogram, and the draw-in groove is the mode of vertical arrangement from top to bottom and is equipped with many places.
As this technical scheme's further optimization, the utility model relates to a civil engineering weak soil excavation supporting erects board with build fast the fixed plate is rectangular platelike structure, and the mode that the fixed plate is the matrix arrangement is provided with many places.
As this technical scheme's further optimization, the utility model relates to a civil engineering weak soil excavation supporting erects board with build fast the fixture block is parallelogram's massive structure for looking sideways at, and the mode that the fixture block is bilateral symmetry is provided with two to the fixture block passes through clearance fit's sliding connection with the draw-in groove.
Because of above-mentioned technical scheme's application, compared with the prior art, the utility model have the following advantage:
1. the utility model relates to a civil engineering weak soil excavation supporting erects board with build fast sets up left and right pothook of mutual joint through the both sides at the plate body, compares ordinary hasp mode among the prior art, and its limit function is abundanter, can make the plate body can not take place the incline at the in-process that sinks to improve it and build efficiency, thereby make the device play simple to operate's effect.
2. The utility model relates to a civil engineering weak soil excavation supporting erects board with build fast sets up the draw-in groove through the front side at left and right pterygoid lamina, utilizes fixed plate and fixture block to its spacing, can make the fastening more that left and right pterygoid lamina connects to make the device play the comprehensive effect of protection.
3. The utility model relates to a civil engineering weak soil excavation supporting erects board with build fast sets up the connecting block through the front side at the fixed plate, can utilize the connecting rod to connect many connecting blocks to increase the whole intensity of strutting the main part, thereby make the device play durable effect.
4. The utility model discloses a structurally to above-mentioned device, have simple to operate, protect comprehensive and durable advantage to the effectual problem of having solved among the prior art with not enough.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification. In the drawings:
fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the upper side structure of the plate body of the present invention;
FIG. 3 is a schematic view of the structure of the joint of the fixture block of the present invention;
FIG. 4 is a schematic view of the structure of the fixing plate of the present invention;
fig. 5 is a schematic view of the structure of the connection position of the plate body of the present invention.
In the figure: the plate comprises a plate body 1, a left wing plate 2, a left hook 3, a right wing plate 4, a right hook 5, a clamping groove 6, a fixing plate 7, a clamping block 8 and a connecting block 9.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
It is to be noted that, in the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
Meanwhile, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "connected" and "connected" should be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; the connection can be mechanical connection or electrical connection; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Please refer to fig. 1 to 5, the utility model provides a civil engineering soft soil foundation pit supporting erection plate's specific technical implementation with build fast is provided:
the utility model provides a civil engineering soft soil foundation ditch support erects board with build fast, includes: the plate comprises a plate body 1, a left wing plate 2, a left hook 3, a right wing plate 4, a right hook 5, a clamping groove 6, a fixing plate 7, a clamping block 8 and a connecting block 9; the left side of the plate body 1 is provided with a left wing plate 2, and the plate body 1 and the left wing plate 2 are of an integrated structure; the left hook 3 is positioned on the left side of the left wing plate 2, and the left hook 3 and the left wing plate 2 are of an integrated structure; the right wing plate 4 is positioned on the right side of the plate body 1, and the right wing plate 4 and the plate body 1 are of an integrated structure; the right hook 5 is positioned on the right side of the right wing plate 4, and the right hook 5 and the right wing plate 4 are of an integrated structure; the clamping groove 6 is respectively positioned at the front sides of the left wing plate 2 and the right wing plate 4, and the clamping groove 6 and the left wing plate 2 and the right wing plate 4 are respectively of an integrated structure; the fixing plate 7 is arranged at the front sides of the left wing plate 2 and the right wing plate 4, and the fixing plate 7 is connected with the left wing plate 2 and the right wing plate 4 in a bolt fixing mode; the fixture block 8 is arranged on the rear side of the fixing plate 7, and the fixture block 8 is connected with the fixing plate 7 in a welding mode; the connecting block 9 is arranged in the middle of the front side of the fixing plate 7, and the connecting block 9 is connected with the fixing plate 7 by welding.
Specifically, the left wing plate 2 and the right wing plate 4 are both L-shaped plate-shaped structures, and the left wing plate 2 and the right wing plate 4 are arranged in a left-right symmetrical manner.
Specifically, the left hook 3 and the right hook 5 are both of a v-21274-shaped plate-shaped structure, and the left hook 3 and the right hook 5 are in sliding connection in a clearance fit mode.
Specifically, the clamping groove 6 is in a parallelogram shape in side view, and the clamping groove 6 is vertically arranged at a plurality of positions.
Specifically, the fixing plate 7 has a rectangular plate-shaped structure, and the fixing plate 7 is provided at a plurality of positions in a matrix arrangement, as shown in fig. 1, the position of the fixing plate 7 corresponds to the position of the slot 6, and the surfaces of the fixing plate 7, the left wing plate 2, and the right wing plate 4 are provided with threaded holes for fixing.
Specifically, the fixture block 8 is a block structure in a parallelogram shape in a side view, and the fixture block 8 is provided with two positions in a bilateral symmetry manner, and the fixture block 8 is connected with the clamping groove 6 in a sliding manner through clearance fit.
The method comprises the following specific implementation steps:
the device is characterized in that a crane is used for hanging a plurality of pile inserting points, the pile inserting points are connected through the matching of a left hook 3 and a right hook 5, then the pile inserting points are vertically driven into the ground through a screen type driving method to form a cofferdam, so that earthwork excavation can be carried out, a fixing plate 7 is fixed on the front sides of a left wing plate 2 and a right wing plate 4 through fixing bolts while earthwork excavation is carried out, a clamping block 8 on the rear side of the fixing plate is connected with a clamping groove 6 in a corresponding position, fastening is carried out between plate bodies 1 of the fixing plate, and a connecting rod can be used for connecting a connecting block 9 to strengthen the strength of the device, so that the device has the effects of overall protection and firmness and durability, and the practical value is greatly improved.
In summary, the following steps: according to the civil engineering soft soil foundation pit supporting and erecting plate with the rapid erection function, the left and right clamping hooks which are mutually clamped are arranged on the two sides of the plate body, compared with a common locking and buckling mode in the prior art, the limiting function is richer, the plate body cannot deflect in the sinking process, the erection efficiency is improved, and therefore the device has the effect of convenience in installation; the clamping grooves are formed in the front sides of the left wing plate and the right wing plate, and the left wing plate and the right wing plate can be connected more tightly by limiting the clamping grooves through the fixing plate and the clamping blocks, so that the device has a comprehensive protection effect; through set up the connecting block in the front side of fixed plate, can utilize the connecting rod to connect many connecting blocks to increase the whole intensity of strutting the main part, thereby make the device play durable effect of durable.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a civil engineering soft soil foundation ditch support erects board with build fast, includes: the plate comprises a plate body (1), a left wing plate (2), a left clamping hook (3), a right wing plate (4), a right clamping hook (5), a clamping groove (6), a fixing plate (7), a clamping block (8) and a connecting block (9); the method is characterized in that: the left side of the plate body (1) is provided with a left wing plate (2), and the plate body (1) and the left wing plate (2) are of an integrated structure; the left hook (3) is positioned on the left side of the left wing plate (2), and the left hook (3) and the left wing plate (2) are of an integrated structure; the right wing plate (4) is positioned on the right side of the plate body (1), and the right wing plate (4) and the plate body (1) are of an integrated structure; the right clamping hook (5) is positioned on the right side of the right wing plate (4), and the right clamping hook (5) and the right wing plate (4) are of an integrated structure; the clamping groove (6) is respectively positioned at the front sides of the left wing plate (2) and the right wing plate (4), and the clamping groove (6) is respectively integrated with the left wing plate (2) and the right wing plate (4); the fixing plate (7) is arranged at the front sides of the left wing plate (2) and the right wing plate (4), and the fixing plate (7) is connected with the left wing plate (2) and the right wing plate (4) in a bolt fixing mode; the fixture block (8) is arranged on the rear side of the fixing plate (7), and the fixture block (8) is connected with the fixing plate (7) in a welding mode; the connecting block (9) is arranged in the middle of the front side of the fixing plate (7), and the connecting block (9) is connected with the fixing plate (7) in a welding mode.
2. The civil engineering soft soil foundation pit supporting and erecting board with the rapid building function as claimed in claim 1, wherein: the left wing plate (2) and the right wing plate (4) are both L-shaped plate-shaped structures, and the left wing plate (2) and the right wing plate (4) are arranged in a bilateral symmetry mode.
3. The civil engineering soft soil foundation pit supporting and erecting board with the rapid building function as claimed in claim 1, wherein: the left hook (3) and the right hook (5) are both of a \ 21274 @ -shaped plate-shaped structure, and the left hook (3) and the right hook (5) are in sliding connection in a clearance fit mode.
4. The civil engineering soft soil foundation pit supporting and erecting board with the rapid building function as claimed in claim 1, wherein: the clamping grooves (6) are in parallelogram in side view, and the clamping grooves (6) are vertically arranged at a plurality of positions.
5. The civil engineering soft soil foundation pit supporting and erecting board with the rapid building function as claimed in claim 1, wherein: the fixing plate (7) is of a rectangular plate-shaped structure, and a plurality of positions are arranged on the fixing plate (7) in a matrix arrangement mode.
6. The civil engineering soft soil foundation pit supporting and erecting board with the rapid building function as claimed in claim 1, wherein: the clamping block (8) is of a parallelogram-shaped block structure in side view, the clamping block (8) is arranged at two positions in a bilateral symmetry mode, and the clamping block (8) is in sliding connection with the clamping groove (6) through clearance fit.
CN202021095732.0U 2020-06-15 2020-06-15 Civil engineering weak soil foundation ditch support erects board with build fast Active CN212801555U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021095732.0U CN212801555U (en) 2020-06-15 2020-06-15 Civil engineering weak soil foundation ditch support erects board with build fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021095732.0U CN212801555U (en) 2020-06-15 2020-06-15 Civil engineering weak soil foundation ditch support erects board with build fast

Publications (1)

Publication Number Publication Date
CN212801555U true CN212801555U (en) 2021-03-26

Family

ID=75096524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021095732.0U Active CN212801555U (en) 2020-06-15 2020-06-15 Civil engineering weak soil foundation ditch support erects board with build fast

Country Status (1)

Country Link
CN (1) CN212801555U (en)

Similar Documents

Publication Publication Date Title
CN212801555U (en) Civil engineering weak soil foundation ditch support erects board with build fast
WO2023173676A1 (en) Space truss support platform, system and method for super-deep slurry wall
CN205062667U (en) A can dismantle concrete foundation for bridge construction support
CN214460479U (en) Lattice column assembled formwork support bracket
CN215290154U (en) Double row pile supporting construction
CN212897448U (en) Plug-in card type multifunctional scaffold
CN210238492U (en) Crown beam type miniature pile construction formwork capable of being circulated
CN209277185U (en) A kind of foundation pit enclosure wall assembled all steel crown beam
CN218437085U (en) Trench excavation prestressing force assembled supporting device
CN112779926A (en) Assembled buttress retaining wall structure
CN219992414U (en) Assembled static pressure stake connection structure
CN215887898U (en) Abutment structure suitable for bedrock area abrupt slope district
CN215406130U (en) Steel sheet pile cofferdam for hydraulic engineering construction
CN212947627U (en) Intelligent working platform for overhauling and maintaining valve piece
CN215715356U (en) Steel sheet pile supporting construction who holds platform template simultaneously and support
CN220352842U (en) Box-type supporting structure for inspection well construction
CN218757465U (en) Steel sheet pile installation auxiliary machinery
CN220099928U (en) Assembled steel-pipe pile supporting device
CN220620173U (en) Underwater cofferdam convenient to assemble and disassemble
CN212866002U (en) Assembled foundation structure
CN220888740U (en) Horizontal separation structure for land block risk management
CN220847580U (en) Auxiliary device is pour to foundation ditch crown beam
CN218148406U (en) Foundation pit supporting structure for construction engineering construction
CN213897195U (en) Concrete foundation
CN220768095U (en) Foundation pit supporting structure capable of accelerating earthwork transportation efficiency

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240123

Address after: Room 302, No. 73 Qingnian Road, Rongcheng Town, Qingyang County, Chizhou City, Anhui Province, 247100

Patentee after: Cao Zhiyun

Country or region after: China

Patentee after: Xu Daoqing

Address before: 516000 Wanju Technology Co., Ltd., Wuyi village, Chenjiang street, Zhongkai high tech Zone, Huizhou City, Guangdong Province

Patentee before: Wen Miaoyun

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240314

Address after: No. 1, Building F418, Wanghua Market, Wanghua Road, Huayang Town, Wangjiang County, Anqing City, Anhui Province, 246000

Patentee after: Anhui Zhiyun Construction Engineering Co.,Ltd.

Country or region after: China

Address before: Room 302, No. 73 Qingnian Road, Rongcheng Town, Qingyang County, Chizhou City, Anhui Province, 247100

Patentee before: Cao Zhiyun

Country or region before: China

Patentee before: Xu Daoqing