CN212801326U - Assembled guardrail - Google Patents
Assembled guardrail Download PDFInfo
- Publication number
- CN212801326U CN212801326U CN202021114647.4U CN202021114647U CN212801326U CN 212801326 U CN212801326 U CN 212801326U CN 202021114647 U CN202021114647 U CN 202021114647U CN 212801326 U CN212801326 U CN 212801326U
- Authority
- CN
- China
- Prior art keywords
- guardrail
- skeleton
- framework
- supporting column
- holes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model relates to an assembled guardrail, include: at least two guardrail components, every the guardrail component includes crossbeam, curb plate and a plurality of group's skeleton, the skeleton with crossbeam fixed connection, the curb plate with skeleton fixed connection. The utility model provides a pin-connected panel guardrail is assembling the completion back, does not have independent component, and the connection of guardrail subassembly is by taking the couple certainly, can not produce the problem that the component was lost, and single guardrail subassembly is small, and the transportation is convenient, and the conveying efficiency is high, perfects the drainage function of guardrail, avoids surface gathered water to influence the vehicle and passes through.
Description
Technical Field
The utility model relates to a guardrail technical field, in particular to pin-connected panel guardrail.
Background
At present, the guardrail adopts the integral type structure more, and it is big to occupy the vehicle area when the transportation, and the bicycle freight volume is few, and the cost of transportation is high, needs movable pin rod to connect after assembling the completion, but takes place the pin rod easily in handling and loses, uses inconveniently.
SUMMERY OF THE UTILITY MODEL
The utility model provides a pin-connected panel guardrail solves current movable guardrail transportation inconvenient, appears the problem that the part was lost easily in the equipment process.
In order to achieve the above object, the present invention provides the following technical solutions:
a sectional guardrail comprising: at least two guardrail components, every the guardrail component includes crossbeam 1, curb plate 2 and a plurality of group's skeleton, the skeleton with crossbeam 1 fixed connection, curb plate 2 with skeleton fixed connection.
Preferably, the skeleton includes couple skeleton 3, couple hole skeleton 4 and a plurality of standard skeleton 5, couple skeleton 3 sets up 1 one end of crossbeam, couple hole skeleton 4 sets up 1 other end of crossbeam, it is a plurality of standard skeleton 5 evenly sets up couple skeleton 3 with between the couple hole skeleton 4.
Preferably, a plurality of hooks 6 are arranged on the hook framework 3, a plurality of hanging holes 7 are arranged on the hook hole framework 4, and adjacent guardrail components are fixedly connected through the hooks 6 and the hanging holes 7.
Preferably, a plurality of locking holes 8 are further formed in the hook hole framework 4 and connected through first bolts 9.
Preferably, every group the skeleton includes first support column 10, second support column 11 and triangular support column 12, first support column 10 with the equal one end of second support column 11 with crossbeam 1 is connected, the other end with triangular support column 12 fixed connection, first support column 10 with second support column 11 passes through connecting plate 13 fixed connection.
Preferably, be equipped with a plurality of first connecting holes 14 on the first support column 10, be equipped with a plurality of second connecting holes 15 on the second support column 11, be equipped with a plurality of corresponding third connecting holes on the curb plate 2, the third connecting hole respectively with first connecting hole 14 with second connecting hole 15 fixed connection.
Preferably, the triangular support column 12 is made of channel steel.
Through implementing above technical scheme, have following technological effect: the utility model provides a pin-connected panel guardrail is assembling the completion back, does not have independent component, and the connection of guardrail subassembly is by taking the couple certainly, can not produce the problem that the component was lost, and single guardrail subassembly is small, and the transportation is convenient, and the conveying efficiency is high, perfects the drainage function of guardrail, avoids surface gathered water to influence the vehicle and passes through.
Drawings
Fig. 1 is a schematic structural view (a perspective view) of the assembled guardrail assembly provided by the present invention;
fig. 2 is a schematic view of an assembly structure of the assembled guard rail provided by the present invention;
fig. 3 is the utility model provides a pin-connected panel guardrail skeleton texture sketch map.
Detailed Description
For better understanding of the technical solutions of the present invention, the following describes the embodiments of the present invention in detail with reference to fig. 1-3.
A sectional guardrail comprising: at least two guardrail components, every the guardrail component includes crossbeam 1, curb plate 2 and a plurality of group's skeleton, the skeleton with crossbeam 1 fixed connection, curb plate 2 with skeleton fixed connection.
In this embodiment, the pin-connected panel guardrail by the guardrail subassembly equipment forms, the pin-connected panel guardrail has 2 at least, can be 3, 5, 10, 20, every the guardrail subassembly all includes crossbeam 1, curb plate 2 and a plurality of group's skeleton, the quantity of skeleton can be 3 groups, 4 groups, 5 groups, 10 groups, every group the skeleton all with 1 fixed connection of crossbeam can adopt modes such as bolt, round pin post, buckle to realize the skeleton with the fixed connection of crossbeam 1, curb plate 2 with skeleton fixed connection can adopt modes such as bolt, round pin post, buckle to realize curb plate 2 with the fixed connection of skeleton realizes the connection of 2 adjacent guardrail subassemblies through the skeleton.
On the basis of the above embodiment, in other embodiments, more specifically, the skeleton includes couple skeleton 3, couple hole skeleton 4 and a plurality of standard skeleton 5, couple skeleton 3 sets up 1 one end of crossbeam, couple hole skeleton 4 sets up 1 other end of crossbeam, and is a plurality of standard skeleton 5 evenly sets up couple skeleton 3 with between the couple hole skeleton 4.
In this embodiment, couple skeleton 3 sets up 1 one end of crossbeam, couple hole skeleton 4 sets up 1 other end of crossbeam, couple skeleton 3 is connected with adjacent couple hole skeleton 4 to realize the connection of adjacent guardrail subassembly, standard skeleton 5 sets up couple skeleton 3 with between the couple hole skeleton 4, the quantity of standard skeleton 5 can be 1, 2, 3, preferably, the quantity of standard skeleton 5 is 2.
On the basis of the above embodiments, in other embodiments, more specifically, the hook frame 3 is provided with a plurality of hooks 6, the hook hole frame 4 is provided with a plurality of hanging holes 7, the adjacent guardrail assemblies are fixedly connected with the hanging holes 7 through the hooks 6, the hook hole frame 4 is further provided with a plurality of locking holes 8, and the locking holes are connected through the first bolts 9.
In this embodiment, be equipped with a plurality of couples 6 on the couple skeleton 3, the quantity of couple 6 can be 2, 3, 4 etc., be equipped with a plurality of hanging holes 7 on the couple hole skeleton 4, the quantity of hanging holes 7 with the quantity of couple 6 is the same, and adjacent guardrail subassembly passes through couple 6 and hanging holes 7 fixed connection still be equipped with a plurality of locking holes 8 on the couple hole skeleton 4, the quantity of locking holes 8 can be 1, 2, 3, through first bolt 9 with the combination in locking holes 8 can be strengthened couple 6 with the connection of hanging holes 7 avoids interconnect's guardrail subassembly to appear coming off.
On the basis of the foregoing embodiments, in other embodiments, more specifically, each group of the framework includes a first supporting column 10, a second supporting column 11 and a triangular supporting column 12, one end of each of the first supporting column 10 and the second supporting column 11 is connected to the beam 1, the other end of each of the first supporting column 10 and the second supporting column 11 is fixedly connected to the triangular supporting column 12, and the first supporting column 10 and the second supporting column 11 are fixedly connected to each other through a connecting plate 13.
In this embodiment, first support column 10 with second support column 11 all be one end with crossbeam 1 is connected, the other end with triangular support column 12 adopts triangular support column 12 to make the guardrail subassembly more stable in the use, triangular support column 12 do not with curb plate 2 is connected, triangular support column 12 is made by the channel-section steel, and both sides are penetrating space, and the cavity of channel-section steel is favorable to the drainage for make rivers in time flow through when large-scale rainfall, guarantee the normal use of pin-connected panel guardrail.
On the basis of the foregoing embodiments, in other embodiments, more specifically, a plurality of first connection holes 14 are formed in the first support column 10, a plurality of second connection holes 15 are formed in the second support column 11, and a plurality of corresponding third connection holes are formed in the side plate 2, and the third connection holes are respectively and fixedly connected to the first connection holes 14 and the second connection holes 15.
In this embodiment, a plurality of first connection holes 14 are formed in the first support column 10, a plurality of second connection holes 15 are formed in the second support column 11, third connection holes are formed in corresponding positions of the side plates 2, and the first support column 10, the second support column 11 and the side plates 2 are fixedly connected through the first connection holes 14, the second connection holes 15 and the third connection holes by means of bolts, pins and the like.
It is right above the utility model provides a pin-connected panel guardrail introduces in detail, to the general technical personnel in this field, according to the utility model discloses the thought of embodiment all has the change part on concrete implementation and application scope, to sum up, this description content should not be understood as right the utility model discloses a restriction.
Claims (7)
1. The utility model provides a pin-connected panel guardrail which characterized in that includes: the guardrail comprises at least two guardrail components, wherein each guardrail component comprises a cross beam (1), a side plate (2) and a plurality of groups of frameworks, the frameworks are fixedly connected with the cross beams (1), and the side plates (2) are fixedly connected with the frameworks.
2. The assembled guardrail according to claim 1, wherein the framework comprises a hook framework (3), a hook hole framework (4) and a plurality of standard frameworks (5), the hook framework (3) is arranged at one end of the cross beam (1), the hook hole framework (4) is arranged at the other end of the cross beam (1), and the standard frameworks (5) are uniformly arranged between the hook framework (3) and the hook hole framework (4).
3. The assembled guardrail according to claim 2, wherein a plurality of hooks (6) are arranged on the hook framework (3), a plurality of hanging holes (7) are arranged on the hook hole framework (4), and adjacent guardrail components are fixedly connected through the hooks (6) and the hanging holes (7).
4. The assembled guardrail according to claim 3, wherein the hook hole frame (4) is further provided with a plurality of locking holes (8), and the locking holes are connected through first bolts (9).
5. The assembled guardrail according to claim 1, wherein each group of frameworks comprises a first supporting column (10), a second supporting column (11) and a triangular supporting column (12), each of the first supporting column (10) and the second supporting column (11) has one end connected with the cross beam (1) and the other end fixedly connected with the triangular supporting column (12), and the first supporting column (10) and the second supporting column (11) are fixedly connected through a connecting plate (13).
6. The assembled guardrail according to claim 5, wherein the first support column (10) is provided with a plurality of first connecting holes (14), the second support column (11) is provided with a plurality of second connecting holes (15), the side plate (2) is provided with a plurality of corresponding third connecting holes, and the third connecting holes are respectively fixedly connected with the first connecting holes (14) and the second connecting holes (15).
7. Sectional guardrail according to claim 6, characterized in that the triangular supporting posts (12) are made of channel steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021114647.4U CN212801326U (en) | 2020-06-16 | 2020-06-16 | Assembled guardrail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021114647.4U CN212801326U (en) | 2020-06-16 | 2020-06-16 | Assembled guardrail |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212801326U true CN212801326U (en) | 2021-03-26 |
Family
ID=75096786
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021114647.4U Active CN212801326U (en) | 2020-06-16 | 2020-06-16 | Assembled guardrail |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212801326U (en) |
-
2020
- 2020-06-16 CN CN202021114647.4U patent/CN212801326U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212801326U (en) | Assembled guardrail | |
CN214753901U (en) | Water cooling assembly and battery module | |
CN215626370U (en) | Tower crane for assembly type concrete engineering | |
CN111101522A (en) | Transverse oblique connection truss support structure assembly | |
CN212689540U (en) | Guide rail for climbing frame | |
CN216766251U (en) | Steel structure supporting truss with anti-torsion function | |
CN215443481U (en) | Movable assembly enclosure capable of being repeatedly used | |
CN213927404U (en) | Detachable hanging basket for steel structure net rack construction | |
CN217172920U (en) | Beam slab and steel bar integrated hoisting truss | |
CN212922360U (en) | Assembled building transportation frame splicing apparatus | |
CN211547296U (en) | Novel pier structure for bridge support | |
CN210366636U (en) | Hoisting device based on multistation that electrical engineering construction used | |
CN212559101U (en) | Integral hoisting frame of workover rig | |
CN208950053U (en) | A kind of column beam reinforcement by connection part of steel structure frame | |
CN215054030U (en) | High-strength steel connection structure for building | |
CN217926644U (en) | Detachable wooden bolt frame structure | |
CN217079759U (en) | Transporting tool for transporting roof panels | |
CN213391937U (en) | Crawling ladder for power station support | |
CN218467046U (en) | Vertical main frame of lifting scaffold | |
CN218406886U (en) | Earth repairing isolation board | |
CN217741610U (en) | Exempt from to weld nut solar panel I-shaped frame | |
CN211919030U (en) | Frame section bar for mooring integrated box and connecting piece thereof | |
CN211312823U (en) | Fluid adding support assembly and lattice beam column based on same | |
CN210395846U (en) | Connecting piece for enhancing plane rigidity of multiple Bailey frames | |
CN218072190U (en) | Integrated pallet with modular structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |