CN212784493U CN202021828557.1U CN202021828557U CN212784493U CN 212784493 U CN212784493 U CN 212784493U CN 202021828557 U CN202021828557 U CN 202021828557U CN 212784493 U CN212784493 U CN 212784493U
Authority
CN
China
Prior art keywords
fixedly connected
buried
transformer
bottom plate
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021828557.1U
Other languages
Chinese (zh)
Inventor
张广召
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Huarui Electric Manufacturing Co ltd
Original Assignee
Henan Huarui Electric Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Huarui Electric Manufacturing Co ltd filed Critical Henan Huarui Electric Manufacturing Co ltd
Priority to CN202021828557.1U priority Critical patent/CN212784493U/en
Application granted granted Critical
Publication of CN212784493U publication Critical patent/CN212784493U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

The utility model relates to a transformer substation technical field specifically is a half bury formula pre-installation transformer substation, including the ground, the inside of ground is provided with the basement, the top fixedly connected with of basement holds the storehouse, the top fixedly connected with backup pad that holds the storehouse, the inside that holds the storehouse is provided with pre-buried case, pre-buried case's inside is provided with the transformer body, pre-buried case's inside fixed link has electric putter, electric putter's bottom fixedly connected with base, electric putter passes through base and pre-buried case fixed connection, electric putter's top fixedly connected with bottom plate. This partly bury formula pre-installation transformer substation through setting up electric putter for when the staff operates the transformer again, can extend through control electric putter earlier, in order to raise certain height with bottom plate and transformer substation box, then get into to operate the transformer in the pre-buried case, the effectual protection effect to the staff that has strengthened, and the effectual security that has strengthened the device.

Description

Semi-buried prefabricated substation
Technical Field
The utility model relates to a transformer substation technical field specifically is a semi-buried formula pre-installation transformer substation.
Background
The transformer substation refers to a place for converting voltage and current, receiving electric energy and distributing electric energy in an electric power system, the transformer substation in a power plant is a step-up transformer substation, the function of the step-up transformer substation is to boost the electric energy generated by a generator and feed the boosted electric energy into a high-voltage power grid, the transformer substation is usually presented in the form of a box body, namely a transformer box, the transformer box is the box body of the place for converting, concentrating and distributing the voltage and the current of the electric energy in the electric power system, in order to ensure the quality of the electric energy and the safety of equipment, the existing preassembled transformer substation is installed in a city, along with the rapid development of city construction, the city image puts higher and higher requirements on city landscapes, the city construction is subjected to old city removal, road widening, building facade renovation and city network transformation, city greenbelts, overhead power supply and chemical engineering are implemented, and the street view is being stepped on nowadays for improving, The beauty stage of building harmonious living cities and the improvement and beautification of urban environments become the central importance of the current urban construction. The box-type transformer substation is used as a common electrical device everywhere, plays a vital role in the image of a city, and is produced by the semi-buried landscape type transformer substation.
In the semi-buried box-type substation disclosed in CN210326589U, the semi-buried box-type substation has the advantages of preventing rain leakage and preventing mice from entering and damaging, in specific use, compared with the traditional box-type substation, the utility model can prevent the ground rainwater from entering the substation from the door panel by opening the door panel at the top of the step and then entering the second box at the bottom of the ground from the first box at the top of the ground through the ladder stand, so as to facilitate the operation of the worker inside the substation, the first rain baffle plate and the second rain baffle plate are arranged at the top of the first box, so as to prevent the rainwater from entering the substation from the heat dissipation opening and the vent slot, and the first grid plate and the second grid plate prevent the mice from entering the box and ensure the ventilation and heat dissipation inside the box, however, the semi-buried box-type substation, while solving the problem, has the following disadvantages:
when the staff maintains the box body, the staff needs to enter the box body, great hidden danger is brought to the personal safety of the staff, electric shock accidents are easy to happen, and therefore improvement is needed.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a partly bury formula pre-installation transformer substation for solve the device in the past when the staff maintains it, need get into the inside of box, bring great hidden danger for staff's personal safety, take place the technical problem of electric shock accident easily.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
a semi-buried pre-installed substation comprises a foundation, wherein a base is arranged in the foundation, a containing bin is fixedly connected to the top of the base, a supporting plate is fixedly connected to the top of the containing bin, a pre-buried box is arranged in the containing bin, a transformer body is arranged in the pre-buried box, and an electric push rod is fixedly connected to the interior of the pre-buried box;
the bottom of the electric push rod is fixedly connected with a base, the electric push rod is fixedly connected with the pre-buried box through the base, the top of the electric push rod is fixedly connected with a bottom plate, one end of the electric push rod, which is close to the bottom plate, is fixedly connected with a fixed plate, and the electric push rod is fixedly connected with the bottom plate through the fixed plate;
and a transformer substation box body is arranged at the top of the bottom plate.
The utility model discloses further set up to: the base is made of reinforced concrete, and the length and the width of the base are respectively greater than those of the accommodating bin.
Through adopting above-mentioned technical scheme, through the setting of basement, the effectual steadiness that strengthens the device.
The utility model discloses further set up to: the accommodating bin and the supporting plate are built by a plurality of bricks, and the length and the width of the supporting plate are respectively the same as those of the bottom plate.
Through adopting above-mentioned technical scheme for the backup pad can support the bottom plate.
The utility model discloses further set up to: the material of pre-buried case is stainless steel.
The utility model discloses further set up to: the number of the electric push rods is two, the two electric push rods are respectively arranged on two sides of the transformer body, and the electric push rods are not in contact with the transformer body completely.
Through adopting above-mentioned technical scheme, through setting up electric putter, when making the staff operate the transformer again, can be earlier through control electric putter extension, in order to raise certain height with bottom plate and transformer substation box, then can get into the pre-buried incasement and operate the transformer, thereby the effectual device in the past that has improved, when the staff maintains it, need get into the inside of box, bring great hidden danger for staff's personal safety, the drawback of electric shock accident takes place easily, and then effectual reinforcing is to staff's protection effect, the effectual security that has strengthened the device.
The utility model discloses further set up to: first screw holes are formed in the base and the embedded box, first fixing screws are connected to the inner threads of the screw holes, and the base is fixedly connected with the embedded box through the first fixing screws.
The utility model discloses further set up to: the fixed plate and the bottom plate are both provided with second screw holes, bolts are fixedly connected to the inner portions of the second screw holes, and the fixed plate is fixedly connected with the bottom plate through the bolts.
Through adopting above-mentioned technical scheme for electric putter is convenient for install and is dismantled.
To sum up, the utility model discloses a beneficial technological effect does:
1. according to the semi-buried preassembled transformer substation, the electric push rod is arranged, so that when a worker operates the transformer again, the electric push rod is controlled to extend to lift the bottom plate and the transformer substation box body to a certain height, and then the transformer can enter the pre-buried box to operate the transformer, so that the previous device is effectively improved, when the worker maintains the transformer, the transformer needs to enter the box body, the greater hidden danger is brought to the personal safety of the worker, the defect of electric shock accidents is easily caused, the protection effect on the worker is effectively enhanced, and the safety of the device is effectively enhanced;
2. this formula of partly burying prepackage transformer substation through the setting of basement, the effectual steadiness that has strengthened the device through setting up the backup pad for the backup pad can support the bottom plate, thereby the effectual steadiness that has strengthened the device, and then the effectual security that has strengthened the device.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is an enlarged schematic view of the structure of FIG. 1;
fig. 3 is an enlarged schematic view of the structure at B in the present invention 1.
In the figure: 1-foundation, 2-substrate, 3-containing bin, 4-supporting plate, 5-embedded box, 6-transformer body, 7-electric push rod, 8-base, 9-bottom plate, 10-fixing plate and 11-transformer substation box body.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses a half bury formula pre-installation transformer substation, including ground 1, the inside of ground 1 is provided with basement 2, and the top fixedly connected with of basement 2 holds storehouse 3, holds the top fixedly connected with backup pad 4 of storehouse 3, and the inside that holds storehouse 3 is provided with pre-buried case 5, and pre-buried case 5's inside is provided with transformer body 6, and pre-buried case 5's inside fixed link has electric putter 7, and in this embodiment, pre-buried case 5's inner wall scribbles a layer of insulating paint.
Electric putter 7's bottom fixedly connected with base 8, electric putter 7 passes through base 8 and pre-buried case 5 fixed connection, electric putter 7's top fixedly connected with bottom plate 9, and electric putter 7 is close to the one end fixedly connected with fixed plate 10 of bottom plate 9, and electric putter 7 passes through fixed plate 10 and bottom plate 9 fixed connection, and in this embodiment, electric putter 7's theory of operation is the same with the theory of operation of electric putter in the horse-mouth iron printing purifier that discloses in chinese patent CN 211195379U.
A substation box 11 is arranged on top of the bottom plate 9.
The base 2 is made of reinforced concrete, and the length and the width of the base 2 are respectively greater than those of the accommodating bin 3.
The accommodating bin 3 and the supporting plate 4 are built by a plurality of bricks, and the length and the width of the supporting plate 4 are respectively the same as those of the bottom plate 9.
The material of the embedded box 5 is stainless steel.
The number of the electric push rods 7 is two, the two electric push rods 7 are respectively arranged on two sides of the transformer body 6, and the electric push rods 7 are not in contact with the transformer body 6 completely.
First screw holes are formed in the base 8 and the embedded box 5, first fixing screws are connected to the inner threads of the screw holes, and the base 8 is fixedly connected with the embedded box 5 through the first fixing screws.
The second screw hole has all been seted up with the inside of bottom plate 9 to fixed plate 10, and the inside fixedly connected with bolt in second screw hole, and fixed plate 10 passes through bolt and bottom plate 9 fixed connection.
The implementation principle of the embodiment is as follows: by arranging the electric push rod 7, when the working personnel operates the transformer again, the electric push rod 7 is controlled to extend to lift the bottom plate 9 and the transformer substation box body 1 to a certain height, then the transformer can enter the pre-buried box 5 to operate the transformer, thereby effectively improving the prior device, when the worker maintains the box body, the worker needs to enter the box body, which brings great hidden danger to the personal safety of the worker and is easy to have the defect of electric shock accidents, thereby effectively enhancing the protection effect on the working personnel, effectively enhancing the safety of the device, the stability of the device is effectively enhanced by the arrangement of the substrate 2, and the supporting plate 4 can support the bottom plate 9 by arranging the supporting plate 4, therefore, the stability of the device is effectively enhanced, and the safety of the device is effectively enhanced, so that the device has certain practicability.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (7)

1. A semi-buried preassembled transformer substation comprises a foundation (1), and is characterized in that: a base (2) is arranged inside the foundation (1), a containing bin (3) is fixedly connected to the top of the base (2), a supporting plate (4) is fixedly connected to the top of the containing bin (3), a pre-buried box (5) is arranged inside the containing bin (3), a transformer body (6) is arranged inside the pre-buried box (5), and an electric push rod (7) is fixedly connected to the inside of the pre-buried box (5);
the bottom of the electric push rod (7) is fixedly connected with a base (8), the electric push rod (7) is fixedly connected with the pre-buried box (5) through the base (8), the top of the electric push rod (7) is fixedly connected with a bottom plate (9), one end, close to the bottom plate (9), of the electric push rod (7) is fixedly connected with a fixing plate (10), and the electric push rod (7) is fixedly connected with the bottom plate (9) through the fixing plate (10);
and a transformer substation box body (11) is arranged at the top of the bottom plate (9).
2. A semi-buried pre-installed substation according to claim 1, characterized in that: the base (2) is made of reinforced concrete, and the length and the width of the base (2) are respectively greater than those of the accommodating bin (3).
3. A semi-buried pre-installed substation according to claim 1, characterized in that: the accommodating bin (3) and the supporting plate (4) are built by a plurality of bricks, and the length and the width of the supporting plate (4) are respectively the same as those of the bottom plate (9).
4. A semi-buried pre-installed substation according to claim 1, characterized in that: the pre-buried box (5) is made of stainless steel.
5. A semi-buried pre-installed substation according to claim 1, characterized in that: the number of the electric push rods (7) is two, the electric push rods (7) are respectively arranged on two sides of the transformer body (6), and the electric push rods (7) are not in contact with the transformer body (6) completely.
6. A semi-buried pre-installed substation according to claim 1, characterized in that: first screw holes are formed in the base (8) and the embedded box (5), first fixing screws are connected to the inner threads of the screw holes, and the base (8) is fixedly connected with the embedded box (5) through the first fixing screws.
7. A semi-buried pre-installed substation according to claim 1, characterized in that: the fixing plate (10) and the bottom plate (9) are internally provided with second screw holes, bolts are fixedly connected to the inner portions of the second screw holes, and the fixing plate (10) is fixedly connected with the bottom plate (9) through the bolts.
CN202021828557.1U 2020-08-26 2020-08-26 Semi-buried prefabricated substation Active CN212784493U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021828557.1U CN212784493U (en) 2020-08-26 2020-08-26 Semi-buried prefabricated substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021828557.1U CN212784493U (en) 2020-08-26 2020-08-26 Semi-buried prefabricated substation

Publications (1)

Publication Number Publication Date
CN212784493U true CN212784493U (en) 2021-03-23

Family

ID=75055341

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021828557.1U Active CN212784493U (en) 2020-08-26 2020-08-26 Semi-buried prefabricated substation

Country Status (1)

Country Link
CN (1) CN212784493U (en)

Similar Documents

Publication Publication Date Title
CN204927913U (en) Transformer substation
CN212784493U (en) Semi-buried prefabricated substation
CN204858370U (en) Prefabricated storehouse of 110kV integrated transformer substation of formula
CN210142852U (en) Environment-friendly prepackage type box-type substation
CN107965170A (en) Distribution box protection canopy with assembling type base
CN205377435U (en) Light stores up and charges and side slope protection integration tunnel power supply system
CN110311319B (en) Combined box-type substation
CN215452294U (en) Box transformer substation with steel structure foundation
CN112086861A (en) Transformer substation lightning rod capable of serving as 5G base station antenna tower
CN205790968U (en) A kind of wind farm substation T-shaped arrangement of 220kV power distribution equipment
CN204835327U (en) Integrated transformer substation of half open -type of 110kV
CN214478721U (en) Base structure of box-type substation
CN104821613A (en) Charging system based on novel electric vehicle
CN211818319U (en) Machine cabinet with communication holding pole
CN210273645U (en) Transformer substation box body with high stability
CN211701208U (en) Compact structure's prepackage type transformer substation
CN215497928U (en) Low-voltage prefabricated substation
CN217720416U (en) Underground combined transformer of semi-buried transformer substation
CN217783040U (en) Safe and efficient integrated mobile MCC (China Mobile computer) room
CN220358580U (en) Rainproof device of box-type transformer substation
CN218175641U (en) Novel town road current-limiting device
CN221041976U (en) Dustproof protection structure for box-type substation
CN213573367U (en) Wind-powered electricity generation field case becomes safety protection rail
CN219144816U (en) Assembled transformer substation foundation structure
CN217079812U (en) Security fence fixing device suitable for steel construction transformer substation roofing construction

Legal Events

Date Code Title Description
GR01 Patent grant