CN212773540U - High-rise building construction discharge apparatus - Google Patents

High-rise building construction discharge apparatus Download PDF

Info

Publication number
CN212773540U
CN212773540U CN202020610282.8U CN202020610282U CN212773540U CN 212773540 U CN212773540 U CN 212773540U CN 202020610282 U CN202020610282 U CN 202020610282U CN 212773540 U CN212773540 U CN 212773540U
Authority
CN
China
Prior art keywords
fixedly connected
building
bracing piece
tops
connecting plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020610282.8U
Other languages
Chinese (zh)
Inventor
候健彤
赵云蕾
高亮
曲守丰
李源
姜武
张帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202020610282.8U priority Critical patent/CN212773540U/en
Application granted granted Critical
Publication of CN212773540U publication Critical patent/CN212773540U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Auxiliary Methods And Devices For Loading And Unloading (AREA)

Abstract

The utility model relates to a building construction technical field just discloses a high-rise building construction discharge apparatus, including the building roof, building roof top is provided with the building bottom plate, building roof top is provided with two bracing pieces, two bracing piece bottom left side is equallyd divide do not contact with two building roof tops, two fixed cover is equallyd divide do not contact with the bracing piece, two fixed cover top equal fixedly connected with connecting rod. The utility model discloses a be provided with the cylinder at the connecting rod top, can make the cylinder upwards rise through control cylinder to drive two upward movements of connecting plate and make the rubber pad contact with building bottom plate top, thereby can make fixed cover block the bracing piece, support the bracing piece, prevent to make dangerous the emergence because the too big lifting rope fracture that leads to of pressure, great enhancement the stability of platform of unloading, avoided dangerous emergence when transportation and transported materials.

Description

High-rise building construction discharge apparatus
Technical Field
The utility model relates to a construction technical field specifically is a high-rise building construction discharge apparatus.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, also is the process of changing various lines on design drawings into real objects in designated places, in the building construction, the lifting between floors of some materials is required, the materials are placed on an unloading platform in the prior art, and the unloading platform is a temporary operation platform and an operation frame which are usually erected on a construction site and are generally used for material turnover.
The high-rise building construction unloading device is generally connected and supported only through the lifting rope, a device for fastening the unloading platform for construction is not purposefully arranged, and once the loaded material is too heavy, the stress is uneven, the lifting rope is broken, the phenomenon that the unloading platform is overturned easily occurs, so that certain potential safety hazards are brought to workers, and the high-rise building construction unloading device is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a high-rise building construction discharge apparatus reaches the better purpose of messenger's discharge apparatus fixity.
In order to achieve the above object, the utility model provides a following technical scheme: a high-rise building construction discharging device comprises a building top plate, wherein a building bottom plate is arranged at the top of the building top plate, two supporting rods are arranged at the top of the building top plate, the left sides of the bottoms of the two supporting rods are respectively contacted with the tops of the two building top plates, the two fixing sleeves are respectively contacted with the supporting rods, the tops of the two fixing sleeves are respectively and fixedly connected with a connecting rod, the tops of the two connecting rods are respectively and fixedly connected with a first connecting plate, the tops of the two connecting plates are respectively and fixedly connected with a cylinder, the tops of the two connecting plates are respectively and fixedly connected with a second connecting plate, the tops of the four cylinders are respectively and fixedly connected with the bottoms of the two connecting plates, the tops of the two connecting plates are respectively and fixedly connected with a rubber pad, two one side that the bracing piece right-hand member was kept away from each other all welds there is the lifting rope, two the one end that the respective bracing piece was kept away from to the lifting rope is equallyd divide and is do not connected with two solid fixed rings, two one side fixedly connected with backup pad that the bracing piece is close to each other, two the equal fixedly connected with baffle one in bracing piece top, two the equal fixedly connected with baffle two in bracing piece right-hand member top, the backup pad top is provided with the transport vechicle, the transport vechicle right side contacts with baffle two, one side that baffle two were kept away from to the transport vechicle is connected with the handle, the equal fixedly connected with wheel in transport vechicle bottom four corners, two gag lever posts of transport vechicle bottom fixedly connected with, the equal fixedly connected with dead.
Preferably, the top of the building top plate is provided with a building bottom plate, and the building top plate and the building bottom plate are arranged in parallel.
Preferably, two the bracing piece right-hand member all does not all contact with the building roof, and two bracing piece left ends all are provided with fixed cover, and the shape and the bracing piece shape size looks adaptation of two fixed covers.
Preferably, the length of the supporting plate is smaller than that of the supporting rod.
Preferably, the second baffle is perpendicular to the first two baffles, and two ends of the second baffle are fixedly connected with the first two baffles.
Preferably, two the gag lever post is equallyd divide and is set up and two with two bracing pieces are perpendicular gag lever post length and transport vechicle looks adaptation.
Preferably, the middle end of the supporting plate is provided with a groove, and the bottom of the groove is fixedly connected with a telescopic rod.
Preferably, the left end and the right end of the limiting plate are respectively contacted with one side, close to the two limiting rods, of the limiting plate.
The utility model provides a high-rise building construction discharge apparatus. The method has the following beneficial effects:
(1) the utility model discloses a be provided with the cylinder at the connecting rod top, can make the cylinder upwards rise through control cylinder to drive two upward movements of connecting plate and make the rubber pad contact with building bottom plate top, thereby can make fixed cover block the bracing piece, support the bracing piece, prevent because pressure leads to the lifting rope fracture greatly to make dangerous the emergence, great enhancement platform of unloading's stability has avoided dangerous emergence when transporting and transporting the material.
(2) The utility model discloses a start the telescopic link and make the telescopic link drive the limiting plate and descend to make the transport vechicle can remove and unload, the material shifts and finishes, pushes the backup pad top with the transport vechicle again, makes the transport vechicle and two contact backs of baffle, thereby starts the telescopic link and makes the limiting plate upwards rise, fixes the transport vechicle, thereby has reduced constructor's danger coefficient by a wide margin, labour saving and time saving, and material transport is convenient, has realized the quick transport of material.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a top view of the support rod of the present invention;
fig. 3 is an enlarged schematic view of the present invention a.
In the figure: 1 building roof, 2 building bottom plates, 3 bracing pieces, 4 connecting rods, 5 fixed sleeves, 6 connecting plates I, 7 cylinders, 8 connecting plates II, 9 rubber pads, 10 fixed rings, 11 lifting ropes, 12 supporting plates, 13 baffle I, 14 baffle II, 15 transport vehicles, 16 handles, 17 wheels, 18 telescopic rods, 19 fixed rods, 20 limiting plates and 21 limiting rods.
Detailed Description
As shown in fig. 1-3, the utility model provides a technical solution: a high-rise building construction discharging device comprises a building top plate 1, wherein a building bottom plate 2 is arranged at the top of the building top plate 1, the building top plate 1 and the building bottom plate 2 are arranged in parallel, the building bottom plate 2 is arranged at the top of the building top plate 1, two supporting rods 3 are arranged at the top of the building top plate 1, the right ends of the two supporting rods 3 are not in contact with the building top plate 1, fixing sleeves 5 are arranged at the left ends of the two supporting rods 3, the shapes of the two fixing sleeves 5 are matched with the shapes and sizes of the supporting rods 3, the left sides of the bottoms of the two supporting rods 3 are respectively in contact with the tops of the two building top plates 1, the two fixing sleeves 5 are respectively in contact with the supporting rods 3, connecting rods 4 are fixedly connected to the tops of the two fixing sleeves 5, connecting plates 6 are respectively fixedly connected, the tops of the four cylinders 7 are fixedly connected with the bottoms of the two connecting plates II 8 respectively, the tops of the two connecting plates II 8 are fixedly connected with rubber pads 9 respectively, the tops of the two rubber pads 9 are contacted with the bottom of the building bottom plate 2 respectively, the cylinders 7 are arranged at the tops of the connecting rods 4, the cylinders 7 can be controlled to lift upwards, so that the connecting plates II 8 are driven to move upwards to enable the rubber pads 9 to be contacted with the top of the building bottom plate 2, the fixing sleeves 5 can clamp the supporting rods 3 to support the supporting rods 3, the danger caused by the breakage of the lifting ropes 11 due to overlarge pressure is prevented, the stability of the unloading platform is greatly enhanced, the danger during material transportation and transfer is avoided, the two fixing rings 10 are fixedly connected at the right end of the building bottom plate 2, the lifting ropes 11 are welded on the sides, far away from each other, one ends of two lifting ropes 11 far away from the support rods 3 are respectively connected with two fixing rings 10, one sides of the two support rods 3 close to each other are fixedly connected with a support plate 12, the length of the support plate 12 is smaller than that of the support rods 3, the middle end of the support plate 12 is provided with a groove, the bottom of the groove is fixedly connected with a telescopic rod 18, the tops of the two support rods 3 are respectively fixedly connected with a baffle plate I13, the tops of the right ends of the two support rods 3 are respectively fixedly connected with a baffle plate II 14, the baffle plate II 14 is respectively and vertically arranged with the two baffle plates I13, the two ends of the baffle plate II 14 are respectively and fixedly connected with the two baffle plates I13, the top of the support plate 12 is provided with a transport cart 15, the right side of the transport cart 15 is in contact with the baffle plate II 14, one side of the transport cart 15, the two limiting rods 21 are respectively and vertically arranged with the two support rods 3, the length of the two limiting rods 21 is matched with the transport vehicle 15, the left and right ends of the telescopic rod 18 are respectively and fixedly connected with a fixed rod 19, the two fixed rods 19 are respectively and fixedly connected with the two sides of the groove, the top of the telescopic rod 18 is fixedly connected with a limiting plate 20, the left and right ends of the limiting plate 20 are respectively and respectively contacted with one side of the two limiting rods 21 which are close to each other, the telescopic rod 18 is started to drive the limiting plate 20 to descend, so that the transport vehicle 15 can move to unload materials, the transport vehicle 15 is pushed into the top of the support plate 12 after the materials are transferred, after the transport vehicle 15 is contacted with the second baffle plate 14, the telescopic rod 18 is started, so that the limiting plate 20 is lifted upwards, fix transport vechicle 15 to reduced constructor's danger coefficient by a wide margin, labour saving and time saving, material transport is convenient, has realized the quick transport of material.
When using, through be provided with cylinder 7 at connecting rod 4 top, can rise to make two 8 drive rubber pads 9 of connecting plate contact 2 tops of building bottom plate through control cylinder 7, thereby can make fixed cover 5 block bracing piece 3, support bracing piece 3, put into 15 inside backs of transport vechicles with the material from the eminence, make the telescopic link 18 drive limiting plate 20 and withdraw through starting telescopic link 18, thereby make transport vechicle 15 can remove, pulling handle 16 removes transport vechicle 15 to 1 top of building roof, the material shifts and finishes, push into backup pad 12 tops with transport vechicle 15 again, make transport vechicle 15 and two 14 contacts of baffle, thereby restart telescopic link 18 makes limiting plate 20 upwards rise, fix.
To sum up, the utility model can be obtained by arranging the cylinder 7 at the top of the connecting rod 4, the cylinder 7 can be upwards lifted by controlling the cylinder 7, so as to drive the connecting plate II 8 to upwards move to enable the rubber pad 9 to contact with the top of the building bottom plate 2, thereby enabling the fixed sleeve 5 to clamp the supporting rod 3 and support the supporting rod 3, preventing the danger caused by the breakage of the lifting rope 11 due to the overlarge pressure, greatly enhancing the stability of the unloading platform, avoiding the danger in the process of transporting and transferring materials, enabling the telescopic rod 18 to drive the limiting plate 20 to descend by starting the telescopic rod 18, thereby enabling the transport vehicle 15 to move to unload, completing the material transfer, pushing the transport vehicle 15 into the top of the supporting plate 12, enabling the telescopic rod 18 to upwards lift the limiting plate 20 after the transport vehicle 15 contacts with the baffle II 14, and fixing the transport vehicle 15, thereby reduced constructor's danger coefficient by a wide margin, labour saving and time saving, material transport is convenient, has realized the quick transport of material.

Claims (7)

1. The utility model provides a high-rise building construction discharge apparatus, includes building roof (1), its characterized in that: the building roof (1) is provided with a building bottom plate (2) at the top, the building roof (1) is provided with two support rods (3) at the top, the left sides of the bottoms of the two support rods (3) are equally divided and are respectively contacted with the tops of the two building roofs (1), the two fixing sleeves (5) are equally divided and are respectively contacted with the support rods (3), the tops of the two fixing sleeves (5) are respectively and fixedly connected with connecting plates (4), the tops of the two connecting plates (4) are respectively and fixedly connected with connecting plates I (6), the tops of the two connecting plates I (6) are respectively and fixedly connected with cylinders (7), the tops of the two connecting plates I (6) are respectively provided with connecting plates II (8), the tops of the four cylinders (7) are respectively and fixedly connected with the bottoms of the two connecting plates II (8), the tops of the two connecting plates II (8) are respectively and fixedly connected with rubber pads (, the building bottom plate (2) right-hand member fixedly connected with two solid fixed rings (10), two lifting ropes (11) are all welded to one side that bracing piece (3) right-hand member kept away from each other, two one ends that lifting ropes (11) keep away from bracing piece (3) respectively are equallyd divide and are connected with two solid fixed rings (10), two one side fixedly connected with backup pad (12) that bracing piece (3) are close to each other, two bracing piece (3) top all fixedly connected with baffle one (13), two bracing piece (3) right-hand member top all fixedly connected with baffle two (14), the backup pad (12) top is provided with transport vechicle (15), transport vechicle (15) right side and baffle two (14) contact, one side that baffle two (14) were kept away from in transport vechicle (15) is connected with handle (16), transport vechicle (15) bottom four corners all fixedly connected, two gag lever posts (21) of transport vechicle (15) bottom fixedly connected with, recess and recess bottom fixedly connected with telescopic link (18) are seted up to backup pad (12) middle-end, and equal fixedly connected with dead lever (19) in both ends are controlled to telescopic link (18), two dead lever (19) are equallyd divide do not with recess both sides fixed connection, telescopic link (18) top fixedly connected with limiting plate (20).
2. The high-rise building construction discharging device according to claim 1, wherein: the building roof (1) is provided with a building bottom plate (2) on the top, and the building roof (1) is arranged in parallel with the building bottom plate (2).
3. The high-rise building construction discharging device according to claim 1, wherein: two bracing piece (3) right-hand member all is not with building roof (1) contact, and two bracing piece (3) left ends all are provided with fixed cover (5), and the shape of two fixed covers (5) and bracing piece (3) shape size looks adaptation.
4. The high-rise building construction discharging device according to claim 1, wherein: the length of the supporting plate (12) is less than that of the supporting rod (3).
5. The high-rise building construction discharging device according to claim 1, wherein: the second baffle (14) is perpendicular to the first two baffles (13), and two ends of the second baffle (14) are fixedly connected with the first two baffles (13).
6. The high-rise building construction discharging device according to claim 1, wherein: two gag lever post (21) are equallyd divide and are respectively with two bracing pieces (3) perpendicular setting and two gag lever post (21) length and transport vechicle (15) looks adaptation.
7. The high-rise building construction discharging device according to claim 1, wherein: the left end and the right end of the limiting plate (20) are respectively contacted with one side, close to the two limiting rods (21), of the limiting plate.
CN202020610282.8U 2020-04-21 2020-04-21 High-rise building construction discharge apparatus Active CN212773540U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020610282.8U CN212773540U (en) 2020-04-21 2020-04-21 High-rise building construction discharge apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020610282.8U CN212773540U (en) 2020-04-21 2020-04-21 High-rise building construction discharge apparatus

Publications (1)

Publication Number Publication Date
CN212773540U true CN212773540U (en) 2021-03-23

Family

ID=75065609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020610282.8U Active CN212773540U (en) 2020-04-21 2020-04-21 High-rise building construction discharge apparatus

Country Status (1)

Country Link
CN (1) CN212773540U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115492405A (en) * 2022-10-20 2022-12-20 中国十七冶集团有限公司 Super high-rise building construction unloading device and use method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115492405A (en) * 2022-10-20 2022-12-20 中国十七冶集团有限公司 Super high-rise building construction unloading device and use method thereof
CN115492405B (en) * 2022-10-20 2024-02-02 中国十七冶集团有限公司 Super high-rise building construction unloading device and application method thereof

Similar Documents

Publication Publication Date Title
CN201474315U (en) Moveable hoisting brick clamp
CN212773540U (en) High-rise building construction discharge apparatus
CN108516228A (en) A kind of prefabricated components stack, the method for transport, turnover device and stacking, transport, overturning
CN109291963A (en) A kind of hoisting type electric pole transportation wooden handcart
CN102674212B (en) Simple detachable lifting and unloading beam equipment and construction method thereof
CN107640612B (en) Bailey steel bridge ex-warehouse method
CN212712384U (en) Building templates hoist device
CN215055466U (en) Discharging platform for high-rise building
CN209522051U (en) Piling bin for prefabricated components
CN204778565U (en) Well lid handling device
CN203794050U (en) Transport tool for transferring large equipment in nuclear power engineering
CN112392245A (en) Assembly type cantilever I-shaped steel beam operation device capable of being turned over without wall penetration and operation method thereof
CN207192654U (en) A kind of bridge construction scene upending frame
CN218754748U (en) Transport device for demolishing materials of ancient buildings
CN109515977A (en) Piling bin and its manufacture craft and stacking method for prefabricated components
CN202322084U (en) Vehicle-mounted detachable brick loading and unloading machine
CN213622850U (en) Eccentric column turnover device and hoisting structure
CN220334542U (en) Large stone carrier
CN220056051U (en) Special tool for turning over laminated plate girder on site
CN207631380U (en) A kind of unmanned truck
CN214028789U (en) Pipe transportation equipment for building construction
CN217756530U (en) Lifting device for floor without back jacking
CN218539107U (en) Equipment installation device applied to narrow chamber
CN204624101U (en) Log skeletal container
CN218661914U (en) Transfer device for hot-rolled ribbed steel bar for concrete

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant