CN212772445U - Reinforced structure of municipal administration piping lane - Google Patents
Reinforced structure of municipal administration piping lane Download PDFInfo
- Publication number
- CN212772445U CN212772445U CN202021420469.8U CN202021420469U CN212772445U CN 212772445 U CN212772445 U CN 212772445U CN 202021420469 U CN202021420469 U CN 202021420469U CN 212772445 U CN212772445 U CN 212772445U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- pipe gallery
- pipe
- reinforced structure
- piping lane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000002689 soil Substances 0.000 claims abstract description 10
- 238000013016 damping Methods 0.000 claims description 30
- 230000008093 supporting effect Effects 0.000 claims description 23
- 230000007246 mechanism Effects 0.000 claims description 6
- 230000002265 prevention Effects 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 239000010410 layer Substances 0.000 abstract description 38
- 230000009471 action Effects 0.000 abstract description 9
- 239000002344 surface layer Substances 0.000 abstract description 7
- 238000001125 extrusion Methods 0.000 abstract description 5
- 230000000694 effects Effects 0.000 description 11
- 230000006872 improvement Effects 0.000 description 8
- 238000010586 diagram Methods 0.000 description 4
- 230000002633 protecting effect Effects 0.000 description 4
- 230000003139 buffering effect Effects 0.000 description 3
- 230000006835 compression Effects 0.000 description 3
- 238000007906 compression Methods 0.000 description 3
- 238000005381 potential energy Methods 0.000 description 3
- 230000035939 shock Effects 0.000 description 3
- 239000013013 elastic material Substances 0.000 description 2
- 238000010030 laminating Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model belongs to the technical field of pipe gallery, in particular to a reinforced structure of a municipal pipe gallery, which comprises a device main body, a pipe gallery, a road surface layer and a concrete layer, wherein the inside top of the device main body is fixedly connected with the road surface layer, the inside middle part of the device main body is fixedly connected with the pipe gallery, the inside bottom of the device main body is fixedly connected with the soil layer, two ends of the inside of the pipe gallery are fixedly connected with connecting rods, the other side of each connecting rod is movably connected with a spring, the other end of each connecting rod is fixedly connected with a clamping block, when the spring rebounds, the spring can act on the clamping block to clamp the pipe in the clamping block pipe gallery, so that the pipe in the clamping block pipe gallery is clamped and fixed, the pipe can not be directly stressed under the extrusion action of external force, force is required to be applied to the clamping block to the pipe firstly, the pipe in the pipe gallery further plays a, has wide development prospect in the future.
Description
Technical Field
The utility model relates to a piping lane technical field specifically is a reinforced structure of municipal administration piping lane.
Background
The pipe gallery is an underground urban pipeline comprehensive corridor, namely a tunnel space is built underground in a city, various engineering pipelines such as electric power, communication, gas, heat supply, water supply and drainage and the like are integrated, a special overhaul port, a lifting port and a monitoring system are arranged, unified planning, unified design, unified construction and management are implemented, and the pipe gallery is an important infrastructure and a 'lifeline' for guaranteeing urban operation.
Current municipal administration piping lane's reinforced structure, the inside pipe of piping lane that can not be fine protects, thereby makes the road surface take place to warp under powerful pressure effect and extrudees the piping lane of ground bottom, leads to the piping lane problem that warp to appear, leads to the inside pipe to take place the problem of damage, and the problem that subsides takes place to prevent that the piping lane that simultaneously current municipal administration piping lane's reinforced structure can not be fine takes place.
Therefore, how to design a reinforced structure of the municipal pipe gallery becomes a problem to be solved at present.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a reinforced structure of municipal administration piping lane to solve the problem that the pipe protected and can not be fine in the piping lane prevents subsiding that the reinforced structure of a municipal administration piping lane that provides is not convenient for among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a reinforced structure of a municipal pipe gallery comprises a device main body, a pipe gallery, a pavement layer and a concrete layer, wherein the pavement layer is fixedly connected to the top inside the device main body, the pipe gallery is fixedly connected to the middle inside the device main body, a soil layer is fixedly connected to the bottom inside the device main body, supporting bases are fixedly connected to the middle parts of two sides of the soil layer, pins are embedded and connected to the tops of the supporting bases, connecting rods are fixedly connected to two ends inside the pipe gallery, springs are movably connected to the other sides of the connecting rods, clamping blocks are fixedly connected to the other ends of the connecting rods, a supporting frame is fixedly connected to the middle inside of the supporting base, a connecting seat is fixedly connected to the other side of the supporting base, a damping plate is fixedly connected to the top of the other side of the connecting seat, and damping springs are movably, the bottom fixedly connected with bearing seat of shock attenuation board, the bottom fixedly connected with concrete layer of pavement layer, the bottom fixedly connected with spine portion of pin.
Preferably, a top plate is fixedly connected to the top of the pin.
Preferably, the middle part of the top of the soil layer is fixedly connected with a buffer plate, and the top of the inside of the buffer plate is embedded and connected with a water inlet hole.
Preferably, the other side of the clamping block is tightly attached with a rubber pad.
Preferably, the clamping block, the connecting rod, the spring and the buffer plate are combined together to form a convenient protection mechanism.
Preferably, the damping plate, the damping spring, the bearing seat and the support base are combined together to form the settlement prevention mechanism.
Compared with the prior art, the beneficial effects of the utility model are that:
1. this kind of reinforced structure of municipal administration piping lane, because of the spring of nestification on the connecting rod is in compression state when the buffer board does not damage, breaks away from on the buffer board at buffer board fracture back connecting rod, the phenomenon of kick-backing can take place for the spring under the compression state, extrudees to the inside pipe of piping lane to press from both sides tightly fixedly to the pipe, further pipe has played the guard action in the piping lane, has improved device's protecting effect.
2. This kind of reinforced structure of municipal administration piping lane, when the piping lane takes place to subside, the piping lane can use on the shock attenuation board, has good elastic potential energy because of damping spring, so can be fine offset the pressure that forms through damping spring in the back is used the shock attenuation inboard at the piping lane to make the buffer board can be fine slow down pressure, the effectual settlement that has slowed down the piping lane.
Drawings
FIG. 1 is a schematic diagram of the main structure of the device of the present invention;
FIG. 2 is a schematic diagram of an enlarged structure at A of the present invention;
FIG. 3 is a schematic diagram of an enlarged structure at B of the present invention;
fig. 4 is a schematic diagram of the pin structure of the present invention.
The labels in the figure are: 1. the device main part, 2, piping lane, 3, pavement layer, 4, concrete layer, 5, soil horizon, 6, inlet opening, 7, supporting pedestal, 8, pin, 9, roof, 10, buffer board, 11, connecting rod, 12, spring, 13, clamp splice, 14, rubber pad, 15, support frame, 16, damper plate, 17, connecting seat, 18, damper spring, 19, bearing seat, 20, spine portion.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative work belong to the protection scope of the present invention based on the embodiments of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a reinforced structure of a municipal pipe gallery comprises a device main body 1, a pipe gallery 2, a pavement layer 3 and a concrete layer 4, wherein the pavement layer 3 is fixedly connected to the top inside the device main body 1, the pipe gallery 2 is fixedly connected to the middle inside the device main body 1, the soil layer 5 is fixedly connected to the bottom inside the device main body 1, supporting bases 7 are fixedly connected to the middle parts of two sides of the soil layer 5, pins 8 are embedded and connected to the tops of the supporting bases 7, connecting rods 11 are fixedly connected to two ends inside the pipe gallery 2, springs 12 are movably connected to the other sides of the connecting rods 11, clamping blocks 13 are fixedly connected to the other ends of the connecting rods 11, a supporting frame 15 is fixedly connected to the middle inside of the supporting bases 7, a connecting seat 17 is fixedly connected to the other side of the supporting bases 7, a damping plate 16 is fixedly connected to the top of the other side of, the bottom of the damping plate 16 is fixedly connected with a bearing seat 19, the bottom of the pavement layer 3 is fixedly connected with a concrete layer 4, and the bottom end of the pin 8 is fixedly connected with a spine part 20.
Preferably, the top fixedly connected with roof 9 of pin 8 can oppress pavement layer 3 when the car goes from pavement layer 3, and is not good because of pavement layer 3's supporting effect to can lead to pavement layer to take place to warp under receiving powerful pressure effect, consequently the user can strengthen concrete layer 4 and pavement layer 3's supporting effect through roof 9 through the roof 9 that sets up, great improvement the device's support nature.
Preferably, top middle part fixedly connected with buffer board 10 of dirt bed 5, the inside top embedding of buffer board 10 is connected with inlet opening 6, after carrying out ponding on the surface course, ponding through setting up inlet opening 6 on buffer board 10 with forming is discharged, after ponding passes through buffer board 10, buffer board 10 can be with the buffering of the pressure that receives on the surface course 3, the pressure that receives simultaneously can transmit to support base 7 on, thereby fine slowed down the problem that piping lane 2 takes place to subside under the effect that receives pressure, great improvement the device's buffering effect.
Preferably, the opposite side of clamp splice 13 is closely laminated with rubber pad 14, receive pressure effect when piping lane 2, can make the pipe in the piping lane 2 break under the great pressure extrusion, thereby the phenomenon of damage appears, consequently, the user can be through the rubber pad 14 that sets up, because of rubber pad 14 comprises better elastic material, so when rubber pad 14 laminating is at the pipe outer wall, can be fine protect the pipe, avoided piping lane 2 to receive the problem that the extrusion lower pipe takes place to damage, great improvement the device's protecting effect.
Preferably, the clamping blocks 13, the connecting rods 11, the springs 12 and the buffer boards 10 are combined together to form a convenient protection mechanism, when the pavement layer 3 and the concrete layer 4 are under the action of pressure exceeding the bearing range, the pavement layer 3 and the concrete layer 4 can deform, and meanwhile, the pressure can be applied to the buffer boards 10, although the buffer boards 10 can well offset part of the pressure, the buffer boards 10 can be broken or deformed when the pressure is too high, so that the pipe gallery 2 is not under other protection measures, the pipe gallery 2 can be damaged by larger pressure, therefore, a user can use the connecting rods 11 arranged on the inner side of the buffer boards 10, because the springs 12 embedded on the connecting rods 11 are in a compressed state when the buffer boards 10 are not damaged, after the buffer boards 10 are broken, the connecting rods 11 are separated from the buffer boards 10, and because the connecting rods 11 do not have a fixing effect, spring 12 under the compression state can take place the phenomenon of resilience, extrudees to the inside pipe of piping lane 2 to press from both sides tight fixedly through clamp splice 13 to the inside pipe of piping lane 2, make the pipe can not directly exert pressure under the squeezing action of external force, need exert force earlier to clamp splice 13 and just can use to the pipe on, further pipe has played the guard action in 2 to the piping lane, great improvement the device's protecting effect.
Preferably, the damping plate 16, the damping spring 18, the bearing seat 19 and the support base 7 are combined together to form a settlement prevention mechanism, when the pavement layer 3 and the concrete layer 4 are deformed under strong pressure, a great pressure can cause the pipe gallery 2 to sink, so when the pipe gallery 2 sinks, the pipe gallery 2 can act on the damping plate 16, the damping spring 18 has good elastic potential energy, the formed pressure can be well offset through the damping spring 18 after the pipe gallery 2 acts in the damping plate 16, meanwhile, the bearing seat 19 arranged at the bottom of the damping plate 16 can support the pipe gallery 2, so that the pipe gallery 2 cannot sink, and the support base 7, the bearing plate 19 and the pin 8 are fixedly connected together, so after the pin 8 is fixed in the support base 7, the support function of the damping plate 10 can be improved, thereby make buffer board 10 can be fine slow down pressure, the effectual settlement that slows down pipe gallery 2.
The working principle is as follows: at first, through being provided with roof 9, can oppress road surface layer 3 when the car goes from road surface layer 3, it is not good because of road surface layer 3's supporting effect to can lead to the road surface layer to take place to warp under receiving powerful pressure effect, consequently the user is through roof 9 that sets up, can strengthen concrete layer 4 and road surface layer 3's supporting effect through roof 9, great improvement the device's support nature.
Then, through being provided with buffer board 10, the inside top embedding of buffer board 10 is connected with inlet opening 6, after carrying out ponding on the surface course, through setting up ponding that inlet opening 6 on buffer board 10 will form and discharging, behind ponding through buffer board 10, buffer board 10 can be with the buffering of the pressure that receives on the surface course 3, the pressure that receives simultaneously can transmit to support base 7 on, thereby fine slowed down the problem that pipeline corridor 2 takes place to subside under the effect that receives pressure, great improvement the device's cushioning effect.
Then, through being provided with rubber pad 14, when piping lane 2 receives pressure effect, can make the pipe in the piping lane 2 break under the extrusion of great pressure to the phenomenon of damage appears, consequently the user can be through the rubber pad 14 that sets up, because of the rubber pad 14 comprises better elastic material, so when the rubber pad 14 laminating is at the pipe outer wall, can be fine protect the pipe, avoided piping lane 2 to receive the problem that the pipe takes place to damage under the extrusion, great improvement the device's protection effect.
Next, by providing the clamping blocks 13, under the action of the pressure exceeding the bearing range on the pavement layer 3 and the concrete layer 4, the pavement layer 3 and the concrete layer 4 will deform, and at the same time, the pressure will act on the buffer board 10, although the buffer board 10 can well offset a part of the pressure, when the pressure is too high, the buffer board 10 will break or deform, so that the pipe gallery 2 will be damaged under the condition that no other protective measures are provided, and therefore, a user can break the pipe gallery 2 through the connecting rod 11 arranged inside the buffer board 10, because the spring 12 embedded in the connecting rod 11 is in a compressed state when the buffer board 10 is not damaged, after the buffer board 10 breaks, the connecting rod 11 is separated from the buffer board 10, and because the connecting rod 11 has no fixing effect, the spring 12 in the compressed state will rebound, extrude to 2 inside pipes in piping lane to press from both sides tightly fixedly through 13 inside pipes in piping lane 2 of clamp splice, make under the squeezing action of external force the pipe can not by direct applied pressure, need exert force earlier to clamp splice 13 and just can will use the pipe on, further has played the guard action to 2 interior pipes in the piping lane, great improvement the device's protecting effect.
Finally, by arranging the damping plate 16, after the pavement layer 3 and the concrete layer 4 are deformed under the strong pressure, the pipe gallery 2 can sink under the action of larger pressure, so when the pipe gallery 2 sinks, the pipe gallery 2 can act on the damping plate 16, and because the damping spring 18 has good elastic potential energy, the formed pressure can be well offset by the damping spring 18 after the pipe gallery 2 acts in the damping plate 16, meanwhile, the pipe gallery 2 can be supported by the bearing seat 19 arranged at the bottom of the damping plate 16, so that the pipe gallery 2 cannot sink, and because the supporting base 7 is fixedly connected with the bearing plate 19 and the pin 8, the supporting function of the damping plate 10 can be improved after the pin 8 is fixed in the supporting base 7, thereby the damping plate 10 can well relieve the pressure, the effectual settlement that slows down pipe gallery 2, this kind of municipal administration pipe gallery's reinforced structure's theory of operation.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. The utility model provides a reinforced structure of municipal administration piping lane, includes device main part (1), piping lane (2), pavement layer (3) and concrete layer (4), its characterized in that: the device comprises a device body (1), wherein a pavement layer (3) is fixedly connected to the top of the interior of the device body (1), a pipe gallery (2) is fixedly connected to the middle of the interior of the device body (1), a soil layer (5) is fixedly connected to the bottom of the interior of the device body (1), supporting bases (7) are fixedly connected to the middle of two sides of the soil layer (5), pins (8) are embedded and connected to the tops of the supporting bases (7), connecting rods (11) are fixedly connected to two ends of the interior of the pipe gallery (2), springs (12) are movably connected to the other sides of the connecting rods (11), clamping blocks (13) are fixedly connected to the other ends of the connecting rods (11), a supporting frame (15) is fixedly connected to the middle of the interior of the supporting bases (7), a connecting seat (17) is fixedly connected to the other side of the supporting bases (7), and a damping, the damping plate (16) is movably connected with a damping spring (18), and the bottom of the damping plate (16) is fixedly connected with a bearing seat (19).
2. The reinforced structure of a municipal pipe gallery according to claim 1, wherein: the bottom fixedly connected with concrete layer (4) of surface course (3), the bottom fixedly connected with spine portion (20) of pin (8).
3. The reinforced structure of a municipal pipe gallery according to claim 1, wherein: the top of the pin (8) is fixedly connected with a top plate (9).
4. The reinforced structure of a municipal pipe gallery according to claim 1, wherein: the middle part of the top of the soil layer (5) is fixedly connected with a buffer plate (10), and the top of the inner part of the buffer plate (10) is embedded and connected with a water inlet hole (6).
5. The reinforced structure of a municipal pipe gallery according to claim 1, wherein: and a rubber pad (14) is tightly attached to the other side of the clamping block (13).
6. The reinforced structure of a municipal pipe gallery according to claim 1, wherein: the clamping block (13), the connecting rod (11), the spring (12) and the buffer plate (10) are combined together to form a convenient protection mechanism.
7. The reinforced structure of a municipal pipe gallery according to claim 1, wherein: the damping plate (16), the damping spring (18), the bearing seat (19) and the support base (7) are combined together to form a settlement prevention mechanism.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021420469.8U CN212772445U (en) | 2020-07-20 | 2020-07-20 | Reinforced structure of municipal administration piping lane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021420469.8U CN212772445U (en) | 2020-07-20 | 2020-07-20 | Reinforced structure of municipal administration piping lane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212772445U true CN212772445U (en) | 2021-03-23 |
Family
ID=75027867
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021420469.8U Expired - Fee Related CN212772445U (en) | 2020-07-20 | 2020-07-20 | Reinforced structure of municipal administration piping lane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212772445U (en) |
-
2020
- 2020-07-20 CN CN202021420469.8U patent/CN212772445U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110725335B (en) | Underground structure protection system with dynamic and static load shock absorption protection system arranged at top end | |
CN212772445U (en) | Reinforced structure of municipal administration piping lane | |
CN207685858U (en) | A kind of prefabricated assembled underground pipe gallery | |
CN212077796U (en) | Hydraulic engineering flood control baffle | |
CN213452121U (en) | Antidetonation support protection device | |
CN105113642A (en) | Steel structural joint member | |
CN210002993U (en) | anti-seismic power transmission tower | |
CN211571225U (en) | Town road reinforced structure | |
CN212427209U (en) | Utility tunnel prevention of seepage shock attenuation protection architecture | |
CN211622078U (en) | Beam column damping structure | |
CN204940553U (en) | A kind of steel structure node component | |
CN112411364A (en) | Civil engineering construction bridge beam supports | |
CN210117739U (en) | Vertical shock attenuation underground pipe gallery | |
CN210594825U (en) | Waterproof elevator structure | |
CN208886263U (en) | A kind of concrete pump damping device | |
CN208105499U (en) | A kind of multidirectional energy-dissipating and shock-absorbing support of granulated | |
CN208105033U (en) | A kind of modified shock resistance shock isolating pedestal | |
CN110873228A (en) | Installation method of pipeline limiting damping buttress used in comprehensive pipe gallery | |
CN214940376U (en) | Piping lane composite waterproof structure | |
CN211735672U (en) | Novel line type escape canal | |
CN214573073U (en) | Roadbed convenient to lay in low-fill shallow-excavation road section gravel | |
CN214574739U (en) | Basement outer wall waterproof protection structure | |
CN210086429U (en) | Pre-buried sleeve for building water supply and drainage | |
CN214425280U (en) | Pipeline U type antidetonation support | |
CN221504166U (en) | Space-saving underground comprehensive pipe rack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210323 |