CN212743878U - Blasting drilling equipment is used in high gas district tunnel construction - Google Patents
Blasting drilling equipment is used in high gas district tunnel construction Download PDFInfo
- Publication number
- CN212743878U CN212743878U CN202021474124.0U CN202021474124U CN212743878U CN 212743878 U CN212743878 U CN 212743878U CN 202021474124 U CN202021474124 U CN 202021474124U CN 212743878 U CN212743878 U CN 212743878U
- Authority
- CN
- China
- Prior art keywords
- motor
- fixed mounting
- drilling
- blasting
- high gas
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
- Drilling And Boring (AREA)
Abstract
The utility model discloses a high gas district tunnel construction is with blasting drilling equipment, including drilling equipment mounting panel, pivot and install bin, the bottom fixed mounting of drilling equipment mounting panel has the pivot, the utility model discloses the beneficial effect who reaches is: the utility model discloses compact structure, convenient to use, the function is practical, the utility model discloses can carry out automatic rotation at the in-process of drilling, make the staff need not to rotate equipment with the hand, just the utility model discloses can remove at the horizontal direction, improve the practicality of device, and easy operation, through the removal of the universal wheel device of being convenient for motion in the tunnel, labour saving and time saving, and fixed mounting has arresting gear to brake the universal wheel on the universal wheel, can greatly improve work efficiency, can be according to operation personnel's actual height, to well extrusion stick of holding in the handle, make two stick contractions of holding, then with the card post card of tip downthehole at the card of suitable height, thereby make things convenient for operation personnel thrust unit to advance.
Description
Technical Field
The utility model relates to a drilling equipment, in particular to high gas district tunnel construction is with blasting drilling equipment belongs to drilling equipment technical field.
Background
The construction process of the high gas section tunnel mainly comprises the work of tunnel planning, surveying, designing, through control measurement, construction and the like. In the tunnel excavation construction process, when blasting excavation construction is carried out, blast holes distributed annularly are drilled on a blasting surface, explosive bags are configured according to preset blasting parameters and then placed into the blast holes, and then blasting is carried out, so that the blasting construction is completed. At present, when blasting process is carried out in the tunnel excavation work progress, all adopt measuring tool to confirm the hole site of each big gun hole usually earlier, later adopt rig or the equipment of chisel hole to set up the big gun hole on the country rock one by the manual work again, because the quantity of the big gun hole of opening on the blasting face is numerous, therefore the manpower and materials that need input are great, and the cost time is longer, influence tunnel construction cycle in the very big degree, need manual rotating device simultaneously, will touch equipment, make the error appear in the result of drilling.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome prior art's defect, provide a high gas district is blasting drilling equipment for tunnel construction.
In order to solve the technical problem, the utility model provides a following technical scheme:
the utility model relates to a blasting drilling device for high gas district tunnel construction, including drilling equipment mounting panel, pivot and install bin, the bottom fixed mounting of drilling equipment mounting panel has the pivot, the below fixed mounting of pivot has the install bin, the pivot is installed in the inside of install bin, the bottom fixed mounting of pivot has driven gear, the bottom fixed mounting of driven gear has the bearing frame, one side fixed mounting of driven gear has the driving gear, one side fixed mounting of driving gear has the first motor, first motor fixed mounting is in the outside one side of install bin, the bottom fixed mounting of install bin has spacing seat, the internally mounted of spacing seat has horizontal lead screw, horizontal lead screw passes the inside of install bin, the one end fixed mounting of horizontal lead screw has the second motor, the second motor fixed mounting is in the outside one side of spacing seat, a limiting rod is fixedly mounted on one side of the transverse screw rod and penetrates through the interior of the mounting box, a device base is fixedly mounted at the bottom of the limiting seat, universal wheels are fixedly mounted at the bottom of the device base, a device supporting rod is fixedly mounted on one side of the top of the device base, clamping holes are drilled in the surface of one side, opposite to the device supporting rod, of the device supporting rod, a handle is fixedly mounted on one side, two ends of the handle are fixedly mounted in the clamping holes, a drilling device shell is fixedly mounted at the top of the drilling device mounting plate, a third motor is fixedly mounted on one side of the drilling device shell, a drill rod is fixedly mounted on the other side of the drilling device shell, the drill rod penetrates through the interior of the drilling device shell, and a buffer spring is sleeved outside the drill rod;
and threads meshed with the transverse screw rod are arranged in the mounting box.
Preferably, the bottom of the device base is fixedly provided with a rubber pad, and anti-skid lines are carved on the rubber pad.
Preferably, the handle comprises two holding rods elastically connected through a spring, the two holding rods are axially connected in a sliding manner, clamping columns are arranged at the end parts of the holding rods, and clamping holes matched with the clamping columns are formed in the inner walls of the opposite sides of the supporting rod of the device.
Preferably, the first motor, the second motor and the third motor are all servo motors, the output end of the first motor is fixedly connected with the driving gear, the output end of the second motor is fixedly connected with the transverse screw rod, and the third motor is fixedly connected with the drill rod.
Preferably, the surface of the installation box is fixedly provided with a control panel, and the first motor, the second motor and the third motor are all electrically connected with the control panel.
Preferably, the driven gear is fixedly connected with the mounting box, and the driven gear is rotatably connected with the bearing seat.
The utility model discloses the beneficial effect who reaches is: the utility model discloses compact structure, convenient to use, the function is practical, the utility model discloses can carry out automatic rotation at the in-process of drilling, make the staff need not to rotate equipment with the hand, will arrive minimumly with the error, just the utility model discloses can remove at the horizontal direction, improve the practicality of device, and easy operation, through the removal of the device of being convenient for of universal wheel for move in the tunnel, labour saving and time saving, and fixed mounting has arresting gear to brake the universal wheel on the universal wheel, can greatly improve work efficiency, can be according to operation personnel's actual height, to well extrusion stick of holding in the handle, make two stick contractions of holding, then with the card post card of tip in the card hole of suitable height, thereby make things convenient for operation personnel thrust unit to advance.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural diagram of the present invention;
fig. 2 is a top view of the present invention;
fig. 3 is a schematic structural diagram of the installation box of the present invention.
In the figure, 1, a drilling device mounting plate; 2. a rotating shaft; 3. installing a box; 4. a driven gear; 5. a bearing seat; 6. a driving gear; 7. a first motor; 8. a drilling device housing; 9. a device base; 10. a transverse screw rod; 11. a second motor; 12. a third motor; 13. a buffer spring; 14. a drill stem; 15. a limiting seat; 16. a limiting rod; 17. a universal wheel; 18. a device support bar; 19. a clamping hole; 20. a handle.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
Examples
As shown in FIGS. 1-3, the utility model provides a blasting and drilling device for high gas section tunnel construction, which comprises a drilling device mounting plate 1, a rotating shaft 2 and a mounting box 3, wherein the bottom of the drilling device mounting plate 1 is fixedly provided with the rotating shaft 2, the mounting box 3 is fixedly arranged below the rotating shaft 2, the rotating shaft 2 is arranged in the mounting box 3, the bottom of the rotating shaft 2 is fixedly provided with a driven gear 4, the bottom of the driven gear 4 is fixedly provided with a bearing seat 5, one side of the driven gear 4 is fixedly provided with a driving gear 6, one side of the driving gear 6 is fixedly provided with a first motor 7, the first motor 7 is fixedly arranged at one side of the outer part of the mounting box 3, the surface of the mounting box 3 is fixedly provided with a control panel, and the first motor 7, a second motor 11 and a third motor 12 are all electrically connected with the control panel, thereby facilitating the control device, the bottom of, a transverse screw rod 10 is arranged in a limiting seat 15, the transverse screw rod 10 penetrates through the inside of an installation box 3, threads meshed with the transverse screw rod 10 are arranged in the installation box 3, the device can move in the horizontal direction, the transverse screw rod 10 penetrates through the inside of the installation box 3, a second motor 11 is fixedly arranged at one end of the transverse screw rod 10, the second motor 11 is fixedly arranged at one side of the outer part of the limiting seat 15, a limiting rod 16 is fixedly arranged at one side of the transverse screw rod 10, the limiting rod 16 penetrates through the inside of the installation box 3, a device base 9 is fixedly arranged at the bottom of the limiting seat 15, a universal wheel 17 is fixedly arranged at the bottom of the device base 9, a device supporting rod 18 is fixedly arranged at one side of the top of the device base 9, clamping holes 19 are drilled in the surface of the opposite side of the device supporting rod 18, a handle 20 is fixedly arranged at the opposite side of the device supporting rod 18, the top of the drilling device mounting plate 1 is fixedly provided with a drilling device shell 8, one side of the drilling device shell 8 is fixedly provided with a third motor 12, the other side of the drilling device shell 8 is fixedly provided with a drill rod 14, the drill rod 14 penetrates through the inside of the drilling device shell 8, the outside of the drill rod 14 is sleeved with a buffer spring 13, a handle 20 comprises two holding rods which are elastically connected through springs, the two holding rods are axially and slidably connected, the end parts of the holding rods are provided with clamping columns, the inner wall of the opposite side of a device supporting rod 18 is provided with clamping holes 19 matched with the clamping columns, the height of the device can be adjusted according to the actual height of an operator, the first motor 7, the second motor 11 and the third motor 12 are all servo motors, the output end of the first motor 7 is fixedly connected with the driving gear 6, the output end of the second motor 11 is fixedly connected with the transverse screw rod 10, the device achieves the effect of rotating the drilling device;
the mounting box 3 is internally provided with threads which are engaged with the transverse screw rod 10, so that the device can move in the horizontal direction.
Furthermore, the bottom of the device base 9 is fixedly provided with a rubber pad, and anti-skid lines are carved on the rubber pad, so that the device is protected during working, and the service life of the device is prolonged.
Further, the handle 20 comprises two holding rods which are elastically connected through a spring, the two holding rods are axially and slidably connected, clamping columns are arranged at the end parts of the holding rods, clamping holes 19 matched with the clamping columns are formed in the inner walls of the opposite sides of the device supporting rod 18, and the height of the device can be adjusted according to the actual height of an operator.
Furthermore, the first motor 7, the second motor 11 and the third motor 12 are all servo motors, the output end of the first motor 7 is fixedly connected with the driving gear 6, the output end of the second motor 11 is fixedly connected with the transverse screw rod 10, and the third motor 12 is fixedly connected with the drill rod 14, so that the device achieves the effect of rotating the drilling device.
Further, the fixed surface of install bin 3 installs control panel, and first motor 7, second motor 11 and third motor 12 all with control panel electric connection, make things convenient for controlling means.
Further, driven gear 4 and install bin 3 fixed connection, and driven gear 4 rotates with bearing frame 5 to be connected, optimizes overall structure.
Specifically, when the utility model is used, firstly, the holding rods in the handle 20 can be extruded inwards according to the actual height of the operator, so that the two holding rods contract, then the clamping columns at the end part are clamped in the clamping holes 19 with proper height, thereby facilitating the operator to push the device to advance, then the equipment is pushed to a designated position, the universal wheels 17 are fixed, then the second motor 11 is started through the control panel, the second motor 11 drives the transverse lead screw 10 to rotate, the transverse lead screw 10 passes through the inside of the installation box 3, the inside of the installation box 3 is provided with a thread meshed with the transverse lead screw 10, the drilling device is moved in the horizontal direction by matching with the limiting rod 16, after the position is adjusted, the first motor 7 is started through the control panel to output, the driving gear 6 is driven to rotate, the driven gear 4 is driven to rotate, and then the drilling device installation plate 1 above is driven to rotate, after the position is adjusted, the third motor 12 is opened through the control panel to drill, and the buffer spring 13 is sleeved outside the drill rod 14, so that the drilling accuracy is improved.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (6)
1. The utility model provides a high gas district is blasting drilling equipment for tunnel construction, includes drilling equipment mounting panel (1), pivot (2) and install bin (3), its characterized in that: the drilling device is characterized in that a rotating shaft (2) is fixedly mounted at the bottom of the drilling device mounting plate (1), a mounting box (3) is fixedly mounted below the rotating shaft (2), the rotating shaft (2) is mounted inside the mounting box (3), a driven gear (4) is fixedly mounted at the bottom of the rotating shaft (2), a bearing seat (5) is fixedly mounted at the bottom of the driven gear (4), a driving gear (6) is fixedly mounted at one side of the driven gear (4), a first motor (7) is fixedly mounted at one side of the driving gear (6), the first motor (7) is fixedly mounted at one side of the outer portion of the mounting box (3), a limiting seat (15) is fixedly mounted at the bottom of the mounting box (3), a transverse lead screw (10) is mounted inside the limiting seat (15), and the transverse lead screw (10) penetrates through the inside of the mounting box (3), one end fixed mounting of horizontal lead screw (10) has second motor (11), second motor (11) fixed mounting is in outside one side of spacing seat (15), one side fixed mounting of horizontal lead screw (10) has gag lever post (16), gag lever post (16) pass the inside of install bin (3), the bottom fixed mounting of spacing seat (15) has device base (9), the bottom fixed mounting of device base (9) has universal wheel (17), top one side fixed mounting of device base (9) has device bracing piece (18), the relative side surface of device bracing piece (18) has all been dug a hole (19), the relative one side fixed mounting of device bracing piece (18) has handle (20), the both ends fixed mounting of handle (20) is in the inside of calorie hole (19), the top fixed mounting of drilling equipment mounting panel (1) has drilling equipment shell (8), a third motor (12) is fixedly installed on one side of the drilling device shell (8), a drill rod (14) is fixedly installed on the other side of the drilling device shell (8), the drill rod (14) penetrates through the interior of the drilling device shell (8), and a buffer spring (13) is sleeved outside the drill rod (14);
and threads meshed with the transverse screw rod (10) are arranged in the mounting box (3).
2. The blasting and drilling device for the construction of the tunnel in the high gas area according to claim 1, wherein a rubber pad is fixedly installed at the bottom of the device base (9), and anti-skid lines are carved on the rubber pad.
3. The blasting and drilling device for high gas district tunnel construction according to claim 1, characterized in that the handle (20) comprises two holding rods elastically connected by a spring, the two holding rods are axially and slidably connected, the ends of the holding rods are provided with fastening columns, and the inner walls of the opposite sides of the device support rod (18) are provided with fastening holes (19) matched with the fastening columns.
4. The blasting and drilling device for the tunnel construction in the high gas area according to claim 1, wherein the first motor (7), the second motor (11) and the third motor (12) are all servo motors, the output end of the first motor (7) is fixedly connected with the driving gear (6), the output end of the second motor (11) is fixedly connected with the transverse screw rod (10), and the third motor (12) is fixedly connected with the drill rod (14).
5. The blasting and drilling device for the tunnel construction in the high gas section according to claim 1, wherein a control panel is fixedly installed on the surface of the installation box (3), and the first motor (7), the second motor (11) and the third motor (12) are electrically connected with the control panel.
6. The blasting and drilling device for the tunnel construction of the high gas section according to claim 1, wherein the driven gear (4) is fixedly connected with the installation box (3), and the driven gear (4) is rotatably connected with the bearing seat (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021474124.0U CN212743878U (en) | 2020-07-23 | 2020-07-23 | Blasting drilling equipment is used in high gas district tunnel construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021474124.0U CN212743878U (en) | 2020-07-23 | 2020-07-23 | Blasting drilling equipment is used in high gas district tunnel construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212743878U true CN212743878U (en) | 2021-03-19 |
Family
ID=75022816
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021474124.0U Expired - Fee Related CN212743878U (en) | 2020-07-23 | 2020-07-23 | Blasting drilling equipment is used in high gas district tunnel construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212743878U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113266275A (en) * | 2021-06-26 | 2021-08-17 | 云南省水利水电工程有限公司 | Blasting drilling equipment is used in blasting construction |
-
2020
- 2020-07-23 CN CN202021474124.0U patent/CN212743878U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113266275A (en) * | 2021-06-26 | 2021-08-17 | 云南省水利水电工程有限公司 | Blasting drilling equipment is used in blasting construction |
CN113266275B (en) * | 2021-06-26 | 2023-12-15 | 云南省水利水电工程有限公司 | Blasting drilling device for blasting construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110656949B (en) | Profiling tunneling system and method for model test tunnel excavation of any shape | |
CN114371027B (en) | Geological environment monitoring device | |
CN212743878U (en) | Blasting drilling equipment is used in high gas district tunnel construction | |
CN207662659U (en) | A kind of efficient screw type aeration zone sample sampler in hard sandy soil area | |
CN102278064A (en) | Pneumatic wagon drill | |
CN212958447U (en) | Geotechnical engineering reconnaissance is with high-efficient probing device | |
CN212364290U (en) | Detection device for detecting environmental geological soil | |
CN216284414U (en) | Sampling device for geological mining | |
CN202108417U (en) | Pneumatic drill rig | |
CN215672022U (en) | Portable drilling device for underground geological prospecting | |
CN213683955U (en) | Wheeled mountain drilling machine for geological exploration | |
CN212337172U (en) | Drilling rig for geotechnical engineering investigation | |
CN211201746U (en) | Tunnel engineering is with chisel wall device | |
JPH0420693A (en) | Excavation method of deep hole and device thereof | |
CN218546222U (en) | Road building soil sampling device | |
CN218991517U (en) | Mining drilling machine | |
CN219570021U (en) | Non-excavation equipment guider | |
CN221320882U (en) | Soil sampling equipment for municipal highway construction | |
CN221119854U (en) | Prospecting device for geological mineral survey | |
CN220226714U (en) | Blasting drilling device for tunnel blasting construction | |
CN219101230U (en) | Auxiliary device for drilling surrounding rock at high place | |
CN220725079U (en) | Anchor rod construction device | |
CN220469788U (en) | Full-hydraulic tunnel drilling machine for underground geological prospecting | |
CN215761486U (en) | Crawler-type direct-push drilling machine and static sounding all-in-one machine | |
CN220398933U (en) | Sampling device for metal strip mine detection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210319 Termination date: 20210723 |