CN212718439U - Novel supercharger oil return elbow assembly - Google Patents

Novel supercharger oil return elbow assembly Download PDF

Info

Publication number
CN212718439U
CN212718439U CN202021225429.8U CN202021225429U CN212718439U CN 212718439 U CN212718439 U CN 212718439U CN 202021225429 U CN202021225429 U CN 202021225429U CN 212718439 U CN212718439 U CN 212718439U
Authority
CN
China
Prior art keywords
pipe
straight tube
oil
straight pipe
straight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021225429.8U
Other languages
Chinese (zh)
Inventor
孔祥德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jining Yanzhou Hengsheng Machinery Co ltd
Original Assignee
Jining Yanzhou Hengsheng Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jining Yanzhou Hengsheng Machinery Co ltd filed Critical Jining Yanzhou Hengsheng Machinery Co ltd
Priority to CN202021225429.8U priority Critical patent/CN212718439U/en
Application granted granted Critical
Publication of CN212718439U publication Critical patent/CN212718439U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lubrication Details And Ventilation Of Internal Combustion Engines (AREA)

Abstract

The utility model discloses a novel booster oil return elbow assembly, including oil pipe, snap ring and flange, its characterized in that, oil pipe includes first straight tube, second straight tube, return bend and long straight tube, first straight tube with the snap ring is connected, the one end of first straight tube with the second straight tube is connected, the one end of second straight tube with the one end of return bend is connected, the one end of return bend with the one end of long straight tube is connected, the one end of long straight tube with flange joint, first straight tube the second straight tube the return bend with long straight tube is the nonrust steel pipe of integration, just the length of first straight tube is less than the length of long straight tube, just oil pipe is the U-shaped, just first straight tube the second straight tube the return bend with long straight tube passes through welded connection. The utility model discloses useful department: the oil tank is convenient to return to the oil return hole of the oil pump and the oil return hole of the spray head, and the oil return pipe of the oil pump and the oil pump are convenient to disassemble and assemble.

Description

Novel supercharger oil return elbow assembly
Technical Field
The utility model relates to an oil return pipe assembly particularly, relates to a novel booster oil return pipe assembly.
Background
Most of the existing automobiles are provided with an oil return pipe, oil is supplied to an engine by a fuel pump, certain pressure is formed, except for the condition that the oil is normally supplied to a fuel nozzle for oil injection, the rest fuel oil is returned to an oil tank through an oil return pipeline, and the rest gasoline steam collected by a carbon tank is returned to the oil return pipe of the oil tank through the oil return pipe, so that the rest oil can be returned to the oil tank, the pressure for discharging the gasoline can be achieved, and the oil consumption can be reduced. The arrangement of the return line on the vehicle is particularly unusual and causes various unexpected malfunctions if the return line leaks or jams. The oil return pipe is a 'window' for eliminating engine faults, and a plurality of faults of the engine can be skillfully checked and judged through the oil return pipe, and the basic checking method is as follows: the oil return pipe is disassembled for checking, the working condition of the fuel system is judged quickly, whether the fuel pressure of the fuel system of the electronic injection engine is normal or not is required to be known, the judgment can be indirectly carried out by observing the oil return condition of the oil return pipe under the condition that a fuel pressure gauge is not available or the fuel pressure gauge is difficult to access to a fuel pipeline, but basically most of vehicles only with large horsepower are provided with the oil return pipeline, so that all vehicles can not be used, and the checking and the disassembling are extremely inconvenient.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel booster oil return bend assembly possesses application method's advantage, has solved the vehicle that the horsepower is little and also can use the oil return bend and dismantle convenient easy clearance of examining.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a novel booster oil return elbow assembly, includes oil pipe, snap ring and flange, its characterized in that, oil pipe includes first straight tube, second straight tube, return bend and long straight tube, first straight tube with the snap ring is connected, the one end of first straight tube with the second straight tube is connected, the one end of second straight tube with the one end of return bend is connected, the one end of return bend with the one end of long straight tube is connected, the one end of long straight tube with flange joint.
Furthermore, the first straight pipe, the second straight pipe, the bent pipe and the long straight pipe are all integrated stainless steel pipes, the length of the first straight pipe is smaller than that of the long straight pipe, the oil pipe is U-shaped, and the first straight pipe, the second straight pipe, the bent pipe and the long straight pipe are connected through welding.
Furthermore, the clamping ring is positioned at one end of the surfaces of the first straight pipe and the long straight pipe, and the clamping ring is connected to the surfaces of the first straight pipe and the long straight pipe through buckle welding.
Furthermore, the flange is connected to one end of the first straight pipe through welding, two ends of the flange are semicircular, two ends of the flange are respectively provided with a straight pipe opening, the middle of the flange is provided with one straight pipe opening, the maximum diameter of the straight pipe opening is equal to the outer diameter of the first straight pipe, and the first straight pipe is connected with the straight pipe opening through threads.
Furthermore, a clamping groove is formed in one side of the flange.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model discloses in, be the U type through oil pipe, made things convenient for get back to the oil tank in oil pump oil return and the shower nozzle oil gallery.
2. The utility model discloses in, through having the snap ring that oil pipe both ends set up, make things convenient for the oil pump to return the dismantlement installation of oil pipe and oil pump.
3. The utility model discloses in, make oil pipe's structure more stable through the flange.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a front view of a novel supercharger return elbow assembly according to an embodiment of the present disclosure;
fig. 2 is a flange structure diagram of a novel booster return elbow assembly according to the utility model discloses an embodiment.
Reference numerals:
1. a snap ring; 2. a flange; 3. a first straight pipe; 4. a second straight pipe; 5. bending the pipe; 6. a long straight pipe; 7. an oil pipe; 8. a straight pipe orifice; 9. a clamping groove.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative work belong to the protection scope of the present invention based on the embodiments of the present invention.
In the description of the present invention, it should be noted that the terms "top", "bottom", "one side", "the other side", "front", "back", "middle part", "inside", "top", "bottom", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, which is only for the convenience of description and simplification of the description, but does not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance; furthermore, unless expressly stated or limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, as they may be fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-2, according to the embodiment of the present invention, a novel oil-return elbow assembly for a supercharger includes an oil pipe 7, a snap ring 1 and a flange 2, wherein the oil pipe 7 includes a first straight pipe 3, a second straight pipe 4, an elbow pipe 5 and a long straight pipe 6, the first straight pipe 3 is connected to the snap ring 1, one end of the first straight pipe 3 is connected to the second straight pipe 4, one end of the second straight pipe 4 is connected to one end of the elbow pipe 5, one end of the elbow pipe 5 is connected to one end of the long straight pipe 6, one end of the long straight pipe 6 is connected to the flange 2, the first straight pipe 3, the second straight pipe 4, the elbow pipe 5 and the long straight pipe 6 are all integrated stainless steel pipes, the length of the first straight pipe 3 is smaller than that of the long straight pipe 6, the oil pipe 7 is U-shaped, and the first straight pipe 3, the second straight pipe 4, the elbow pipe 5 and the long straight, Second straight tube 4 the return bend 5 with long straight tube 6 passes through welded connection, snap ring 1 is located first straight tube 3 with long straight tube 6's surface one end, just snap ring 1 is in through buckle welded connection first straight tube 3 with long straight tube 6's surface, flange 2 is in through welded connection the one end of first straight tube 3, just the both ends of flange 2 are semi-circular, just the both ends of flange 2 respectively are provided with straight mouth of pipe 8, the middle part of flange 2 is provided with one straight mouth of pipe 8, straight mouth of pipe 8's maximum diameter with first straight tube 3's external diameter equals, first straight tube 3 with straight mouth of pipe 8 links to each other through the screw thread, flange 2 one side is provided with draw-in groove 9.
Principle of operation
Use the utility model discloses the time, need return oil pipe and return oil pipe assembly one-to-one installation, the oil tank is got back to from oil pump oil return and shower nozzle oil gallery to the U-shaped structure convenience, and the oil pipe assembly is returned to the convenient fixed oil pipe that returns of connecting plate of 6 one sides on the long straight tube, sets up at oil pipe's both ends and has snap ring 1 and flange 2, and the oil pump of being convenient for returns oil pipe and oil pump dismantlement and installation.
Through the above technical scheme of the utility model, solved the vehicle that the horsepower is little and also can use the return bend and dismantle convenient clearance of easily examining.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. The utility model provides a novel booster oil return elbow assembly, includes oil pipe (7), snap ring (1) and flange (2), its characterized in that, oil pipe (7) include first straight tube (3), second straight tube (4), return bend (5) and long straight tube (6), first straight tube (3) with snap ring (1) are connected, the one end of first straight tube (3) with second straight tube (4) are connected, the one end of second straight tube (4) with the one end of return bend (5) is connected, the one end of return bend (5) with the one end of long straight tube (6) is connected, the one end of long straight tube (6) with flange (2) are connected.
2. The novel supercharger oil return bent pipe assembly according to claim 1, wherein the first straight pipe (3), the second straight pipe (4), the bent pipe (5) and the long straight pipe (6) are all integrated stainless steel pipes, the length of the first straight pipe (3) is smaller than that of the long straight pipe (6), the oil pipe (7) is in a U shape, and the first straight pipe (3), the second straight pipe (4), the bent pipe (5) and the long straight pipe (6) are connected by welding.
3. The novel supercharger oil return elbow assembly according to claim 1, wherein the snap ring (1) is located at one end of the surfaces of the first straight pipe (3) and the long straight pipe (6), and the snap ring (1) is connected to the surfaces of the first straight pipe (3) and the long straight pipe (6) through snap welding.
4. The novel supercharger oil return elbow assembly according to claim 1, wherein the flange (2) is connected to one end of the first straight pipe (3) by welding, two ends of the flange (2) are semicircular, two ends of the flange (2) are respectively provided with a straight pipe orifice (8), the middle part of the flange (2) is provided with one straight pipe orifice (8), the maximum diameter of the straight pipe orifice (8) is equal to the outer diameter of the first straight pipe (3), and the first straight pipe (3) is connected with the straight pipe orifice (8) by threads.
5. The novel oil return elbow assembly for the supercharger according to claim 1, wherein a clamping groove (9) is formed in one side of the flange (2).
CN202021225429.8U 2020-06-29 2020-06-29 Novel supercharger oil return elbow assembly Active CN212718439U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021225429.8U CN212718439U (en) 2020-06-29 2020-06-29 Novel supercharger oil return elbow assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021225429.8U CN212718439U (en) 2020-06-29 2020-06-29 Novel supercharger oil return elbow assembly

Publications (1)

Publication Number Publication Date
CN212718439U true CN212718439U (en) 2021-03-16

Family

ID=74963957

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021225429.8U Active CN212718439U (en) 2020-06-29 2020-06-29 Novel supercharger oil return elbow assembly

Country Status (1)

Country Link
CN (1) CN212718439U (en)

Similar Documents

Publication Publication Date Title
JP5863107B2 (en) Terminal structure of high-pressure fuel piping for direct injection engines
CN212718439U (en) Novel supercharger oil return elbow assembly
CN208168955U (en) Plastic fuel tank of automobile integrated urea liquid supply system
EP2497938A1 (en) Fuel delivery pipe
CN209990565U (en) Self-stretching returns oil pipe
EP2728160A1 (en) Delivery pipe, pipe, and method of producing a delivery pipe
CN211976202U (en) Shale gas transportation pipeline connection structure convenient to installation
CN219139236U (en) Integrated fuel oil return pipeline
CN111120170A (en) High-pressure fuel oil distributor for double-fuel-supply-pump fuel oil system
CN209848441U (en) Filter element assembly for garbage truck
CN215927622U (en) Fuel pipe structure and engine
CN214701360U (en) Liquid storage device
CN207093189U (en) Diesel pump combining structure
CN220168852U (en) Novel water pipe structure convenient to installation
CN218536595U (en) Lateral oil circuit connecting support in automobile engine compartment
CN220319710U (en) Novel switching structure of sealed pipeline
CN205013083U (en) Gasoline engine booster advances oil pipe
CN218151200U (en) Oil return pipe of automobile pressure regulating valve
CN217762484U (en) Clamp formula water flow indicator
CN220134907U (en) Liquid reservoir and vehicle-mounted battery thermal management system
CN210661758U (en) Plastic loose joint convenient to disassemble and assemble
CN216811954U (en) Internal combustion engine air inlet common rail system suitable for multi-point injection
CN205578111U (en) Novel antidetonation booster returns oil pipe
CN220749398U (en) Corrosion-resistant stainless steel flange
CN210138676U (en) Single-line rotary push flow reactor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Kong Xiangtai

Inventor before: Kong Xiangde

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A new type of return elbow assembly for turbocharger

Effective date of registration: 20210630

Granted publication date: 20210316

Pledgee: Shandong Jining Yanzhou Rural Commercial Bank Co.,Ltd.

Pledgor: Jining Yanzhou Hengsheng Machinery Co.,Ltd.

Registration number: Y2021990000570

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220628

Granted publication date: 20210316

Pledgee: Shandong Jining Yanzhou Rural Commercial Bank Co.,Ltd.

Pledgor: Jining Yanzhou Hengsheng Machinery Co.,Ltd.

Registration number: Y2021990000570

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A new oil return elbow assembly of supercharger

Effective date of registration: 20220628

Granted publication date: 20210316

Pledgee: Shandong Jining Yanzhou Rural Commercial Bank Co.,Ltd.

Pledgor: Jining Yanzhou Hengsheng Machinery Co.,Ltd.

Registration number: Y2022990000377

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230625

Granted publication date: 20210316

Pledgee: Shandong Jining Yanzhou Rural Commercial Bank Co.,Ltd.

Pledgor: Jining Yanzhou Hengsheng Machinery Co.,Ltd.

Registration number: Y2022990000377

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A New Type of Turbocharger Return Pipe Assembly

Effective date of registration: 20230626

Granted publication date: 20210316

Pledgee: Shandong Jining Yanzhou Rural Commercial Bank Co.,Ltd.

Pledgor: Jining Yanzhou Hengsheng Machinery Co.,Ltd.

Registration number: Y2023110000258

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20210316

Pledgee: Shandong Jining Yanzhou Rural Commercial Bank Co.,Ltd.

Pledgor: Jining Yanzhou Hengsheng Machinery Co.,Ltd.

Registration number: Y2023110000258