CN212691051U - Support frame for installing building water and electricity pipelines - Google Patents
Support frame for installing building water and electricity pipelines Download PDFInfo
- Publication number
- CN212691051U CN212691051U CN202021312697.3U CN202021312697U CN212691051U CN 212691051 U CN212691051 U CN 212691051U CN 202021312697 U CN202021312697 U CN 202021312697U CN 212691051 U CN212691051 U CN 212691051U
- Authority
- CN
- China
- Prior art keywords
- clamping piece
- hinge
- base
- support frame
- piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000005611 electricity Effects 0.000 title claims abstract description 10
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 10
- 238000009434 installation Methods 0.000 claims abstract description 11
- 238000005204 segregation Methods 0.000 abstract description 2
- 125000003003 spiro group Chemical group 0.000 abstract description 2
- 238000003466 welding Methods 0.000 description 4
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a support frame is used in building water and electricity pipeline installation, fixed unit including the mutual concatenation of a plurality of, fixed unit includes the base of "Z" type structure, weld in the bracing piece at base top, weld in the lower clamping piece at bracing piece top, through the hinge in the articulated clamping piece of clamping piece one end down, and the mutual joint of one end of hinge is kept away from to clamping piece and last clamping piece down, the lower one end of base is opened along the vertical direction has first spliced eye. The utility model discloses a plurality of fixed units are selected to the pipeline quantity of installing as required, pass through the bolt with a plurality of fixed units and splice each other on the back spiro union goes into ground or wall, can make up and split fixed unit as required, use in a flexible way, can fixed pipeline through last clamping piece and lower clamping piece, and upwards move the connecting rod with strength, can make the connecting rod produce deformation to make fixture block and trip alternate segregation, convenient to detach pipeline.
Description
Technical Field
The utility model relates to a pipeline supports technical field, especially relates to a support frame is used in building water and electricity pipeline installation.
Background
Need fix in the water and electricity pipeline installation use, consequently need carry out the centre gripping to the pipeline, in the prior art, pipeline clamping device is single clamping device or a plurality of clamping device, can not adjust wantonly.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a support frame for installing building water and electricity pipelines.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a support frame is used in installation of building water and electricity pipeline, includes the fixed unit of a plurality of mutual concatenations, fixed unit includes the base of "Z" type structure, welds in the bracing piece at base top, welds in the lower clamping piece at bracing piece top, through the hinge in the articulated clamping piece of clamping piece one end down, and the mutual joint of one end of hinge is kept away from to clamping piece and last clamping piece down, the lower one end of base is opened along the vertical direction has first spliced eye, and the higher one end of base is opened along the vertical direction has the second spliced eye, it has the bolt to peg graft in first spliced eye and the second spliced eye.
Preferably, the number of the support rods is two to four, and the support rods are equidistantly distributed at the bottom of the lower clamping piece.
Preferably, the lower clamping piece and the upper clamping piece are semicircular clamping pieces with opposite openings, and the lower clamping piece and the upper clamping piece form a complete circular structure.
Preferably, the outer wall of one end, far away from the hinge, of the upper clamping piece is welded with a connecting rod, and the bottom of the connecting rod is welded with a clamping hook.
Preferably, the clamping piece is kept away from the one end welding of hinge down and is had the fixture block, and fixture block and the mutual joint of trip.
Preferably, the connecting rod is an elastic plastic rod.
The utility model has the advantages that:
the utility model discloses in, a plurality of fixed units are selected to the pipeline quantity of installing as required, pass through the bolt with a plurality of fixed units each other splice back spiro union go into ground or wall on, can make up and split fixed unit as required, use in a flexible way, can fixed pipeline through last clamping piece and lower clamping piece, and upwards move the connecting rod with strength, can make the connecting rod produce deformation to make fixture block and trip alternate segregation, convenient to detach pipeline.
Drawings
FIG. 1 is a schematic view of a splicing structure of a support frame for installing a building water and electricity pipeline provided by the utility model;
fig. 2 is a schematic structural diagram of a portion a in fig. 1 according to the present invention.
In the figure: the clamping device comprises a base 1, a supporting rod 2, a lower clamping piece 3, an upper clamping piece 4, a first inserting hole 5, a second inserting hole 6, a bolt 7, a hinge 8, a connecting rod 9, a clamping hook 10 and a clamping block 11.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-2, a support frame is used in installation of building water and electricity pipeline, includes the fixed unit of the mutual concatenation of a plurality of, fixed unit includes base 1 of "Z" type structure, welds in bracing piece 2 at base 1 top, welds in the lower clamping piece 3 at bracing piece 2 top, through hinge 8 in lower clamping piece 3 one end articulated last clamping piece 4, and clamping piece 3 and last clamping piece 4 keep away from the mutual joint of one end of hinge 8 down, base 1 lower one end is opened along the vertical direction has first spliced eye 5, and base 1 higher one end is opened along the vertical direction has second spliced eye 6, first spliced eye 5 and the 6 interpolation of second spliced eye have bolt 7.
The utility model discloses in, the quantity of bracing piece 2 is two to four, and 2 equidistance distributions in lower clamping piece 3 bottoms of bracing piece, clamping piece 3 and last clamping piece 4 are the relative semicircle form clamping piece that sets up of opening down, and clamping piece 3 and last clamping piece 4 constitute complete circular structure down, it has connecting rod 9 to go up the welding on the one end outer wall that clamping piece 4 kept away from hinge 8, and the welding of the bottom of connecting rod 9 has trip 10, the one end welding that hinge 8 was kept away from to clamping piece 3 has fixture block 11 down, and fixture block 11 and the mutual joint of trip 10, connecting rod 9 is the elastic plastic pole.
The working principle is as follows: a plurality of fixed units are selected according to the quantity of pipelines to be installed as required, and a plurality of fixed units are spliced mutually through bolts 7 and then are screwed into the ground or the wall, so that the fixed units can be combined and disassembled as required, the use is flexible, the pipelines can be fixed through the upper clamping piece 4 and the lower clamping piece 3, the connecting rod 9 is moved upwards with force, the connecting rod 9 can be deformed, and therefore the clamping block 11 and the clamping hook 10 are separated from each other, and the pipelines are convenient to detach.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The utility model provides a support frame is used in building water and electricity pipeline installation, includes the fixed unit of a plurality of mutual concatenations, a serial communication port, fixed unit includes base (1) of "Z" type structure, welds in bracing piece (2) at base (1) top, welds in lower clamping piece (3) at bracing piece (2) top, through hinge (8) in lower clamping piece (3) one end articulated last clamping piece (4), and the mutual joint of one end of hinge (8) is kept away from to clamping piece (3) and last clamping piece (4) down, base (1) lower one end is opened along the vertical direction has first spliced eye (5), and base (1) higher one end is opened along the vertical direction has second spliced eye (6), it has bolt (7) to peg graft in first spliced eye (5) and second spliced eye (6).
2. The supporting frame for the installation of the building hydroelectric pipelines as claimed in claim 1, wherein the number of the supporting rods (2) is two to four, and the supporting rods (2) are equidistantly distributed at the bottom of the lower clamping piece (3).
3. The support frame for the installation of the building hydroelectric pipelines according to claim 1, wherein the lower clamping piece (3) and the upper clamping piece (4) are semicircular clamping pieces with openings arranged oppositely, and the lower clamping piece (3) and the upper clamping piece (4) form a complete circular structure.
4. The support frame for the installation of the building hydroelectric pipelines according to claim 1, wherein the outer wall of one end of the upper clamping piece (4) far away from the hinge (8) is welded with a connecting rod (9), and the bottom of the connecting rod (9) is welded with a clamping hook (10).
5. The supporting frame for the installation of the building hydroelectric pipelines as claimed in claim 1, wherein a clamping block (11) is welded at one end of the lower clamping piece (3) far away from the hinge (8), and the clamping block (11) and the clamping hook (10) are mutually clamped.
6. A support frame for the installation of building hydroelectric pipelines according to claim 4 in which the connecting rods (9) are elastic plastic rods.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021312697.3U CN212691051U (en) | 2020-07-07 | 2020-07-07 | Support frame for installing building water and electricity pipelines |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021312697.3U CN212691051U (en) | 2020-07-07 | 2020-07-07 | Support frame for installing building water and electricity pipelines |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212691051U true CN212691051U (en) | 2021-03-12 |
Family
ID=74896089
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021312697.3U Expired - Fee Related CN212691051U (en) | 2020-07-07 | 2020-07-07 | Support frame for installing building water and electricity pipelines |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212691051U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114992394A (en) * | 2022-07-08 | 2022-09-02 | 中国建筑土木建设有限公司 | Rainwater concrete pipe connection positioning device |
-
2020
- 2020-07-07 CN CN202021312697.3U patent/CN212691051U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114992394A (en) * | 2022-07-08 | 2022-09-02 | 中国建筑土木建设有限公司 | Rainwater concrete pipe connection positioning device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212691051U (en) | Support frame for installing building water and electricity pipelines | |
CN210685485U (en) | Strutting arrangement is used in civil engineering construction | |
CN108739574B (en) | Copper alloy net equipment method for deep sea rigid frame supporting culture device and culture device thereof | |
CN107508535B (en) | Photovoltaic solar installation aerial work support and system | |
CN216112547U (en) | Mounting structure for air pipe support and hanger of suspended ceiling | |
CN104818995A (en) | Method for assembling confined concrete arch frames | |
CN210344543U (en) | Fixing device for water conservancy and hydropower buried pipe | |
CN205224074U (en) | Power generating equipment on water and installation basis thereof | |
CN211596427U (en) | Pier top assembly type triangular bracket | |
CN209909315U (en) | Piping lane support is used in municipal administration pipeline installation | |
CN204401904U (en) | A kind of siphon rain pipe fastening devices | |
CN210141020U (en) | A assembled building room roof beam supports steelframe for green building | |
CN214833287U (en) | Drainage is with electric melting connection polymer inspection shaft | |
CN220389226U (en) | Auxiliary processing device for offshore wind power jacket | |
CN217323170U (en) | Wind-powered electricity generation hoist and mount tower machine bearing convenient to transition | |
CN215926867U (en) | Frock is built to V of falling | |
CN211126455U (en) | Boats and ships distribution board protection device | |
CN205986726U (en) | Tension elasticity photovoltaic support device | |
CN219834014U (en) | Single support column of flexible photovoltaic bracket system | |
CN220668595U (en) | Pipeline fixing frame for increasing new pipeline crossing capacity by utilizing existing pipeline | |
CN218613808U (en) | Auxiliary device is assembled to steel bifurcated pipe and steel pipe stiffening ring | |
CN219877861U (en) | Water conservancy water and electricity construction is with show shelf | |
CN214879472U (en) | Pipeline is to mouthful supplementary mounting bracket | |
CN213299079U (en) | One-way supporting and hanging device for building machine electricity | |
CN216340355U (en) | Steel space frame of compatible multi-functional steel mesh |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210312 |