CN210685485U - Strutting arrangement is used in civil engineering construction - Google Patents
Strutting arrangement is used in civil engineering construction Download PDFInfo
- Publication number
- CN210685485U CN210685485U CN201921509311.5U CN201921509311U CN210685485U CN 210685485 U CN210685485 U CN 210685485U CN 201921509311 U CN201921509311 U CN 201921509311U CN 210685485 U CN210685485 U CN 210685485U
- Authority
- CN
- China
- Prior art keywords
- supporting
- long
- connecting rod
- unit body
- civil engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 25
- 238000009434 installation Methods 0.000 claims abstract description 12
- 239000007787 solid Substances 0.000 claims description 11
- 238000003780 insertion Methods 0.000 claims description 7
- 230000037431 insertion Effects 0.000 claims description 7
- 238000000034 method Methods 0.000 abstract description 3
- 210000004027 cell Anatomy 0.000 description 12
- 230000002093 peripheral effect Effects 0.000 description 5
- 238000009435 building construction Methods 0.000 description 3
- 210000005056 cell body Anatomy 0.000 description 3
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000011982 device technology Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a strutting arrangement for civil engineering construction, including supporting element A and supporting element B, supporting element A installs the left end at supporting element B, when a supporting system needs to be assembled, can place the support post on the disc base, put four triangle fixed plates on the outer wall all around of support post lower extreme, fix with scute fixing bolt, the roof installation cover that the roof lower extreme is connected is overlapped in the upper end of support post again, fix with the mounting bolt, other supporting element bodies are assembled to the same method, align each supporting element body and place corresponding support position, then overlap joint between each supporting element body with the scissors frame can, not only can the exclusive use, and can free subassembly form the supporting system, improve structural stability, and the operation of putting up is simple and convenient, the practicability of the supporting device is greatly improved.
Description
Technical Field
The utility model belongs to the technical field of civil engineering construction is relevant, concretely relates to strutting arrangement for civil engineering construction.
Background
In modern civil engineering construction, it is necessary to use a large number of support devices, such as: fence support devices, wall support devices, formwork support devices and the like on the periphery of a construction site, and as is well known, a construction engineering support device is equipment for auxiliary support in construction engineering, is widely used in various construction engineering, and particularly plays an important role in temporary support for installation of other components.
The prior supporting device for civil engineering construction has the following problems: strutting arrangement for civil engineering construction is mostly overall structure, and the big quality of size is heavy, and it is very hard to carry, when needs a plurality of strutting arrangement uses jointly, does not have the relation between each strutting arrangement moreover to bearing structure stability is not strong.
Disclosure of Invention
An object of the utility model is to provide a strutting arrangement for civil engineering construction to solve the heavy transport of the big quality of size that proposes in the above-mentioned background art and get up very hard, do not have the contact problem between each strutting arrangement.
In order to achieve the above object, the utility model provides a following technical scheme: a supporting device for civil engineering building construction comprises a supporting unit body A and a supporting unit body B, wherein the supporting unit body A is installed at the left end of the supporting unit body B, the supporting unit body A is fixedly connected with the supporting unit body B through a shear holder, a connecting long rod a is arranged on the shear holder, a connecting long rod B is arranged at the front side of the connecting long rod a, the connecting long rod a is fixedly connected with the connecting long rod B through a long rod connecting piece, long rod fixing clamping plates are connected at the left end and the right end of the connecting long rod a and the connecting long rod B, movable insertion rods which transversely penetrate are arranged inside the circumference of each long rod fixing clamping plate, the long rod fixing clamping plates are fixedly connected with the movable insertion rods through U-shaped fixing insertion pins, supporting upright columns are arranged on the supporting unit body A, and top plate installing sleeves are sleeved outside the circumferences of the upper ends of the supporting upright columns, the top plate mounting sleeve is fixedly connected with the supporting stand column through mounting bolts, the upper end of the top plate mounting sleeve is connected with the supporting top plate, the lowest end of the supporting stand column is connected with the disc base, triangular fixing plates are arranged on the outer walls of the periphery of the supporting stand column on the upper side of the disc base, and the triangular fixing plates are fixedly connected with the supporting stand column and the disc base through angle plate fixing bolts.
Preferably, the supporting unit body a and the supporting unit body B have the same shape and size.
Preferably, the long connecting rod a and the long connecting rod b are the same in shape and size, and the sum of the circumferential diameters of the long connecting rod a and the long connecting rod b is smaller than the distance between the opposite inner walls of the front end and the rear end of the long rod connecting piece.
Preferably, the supporting unit body A is provided with eight long rod fixing clamping plates, eight long rod fixing clamping plates are identical in shape and size, and the distance between opposite inner walls of the eight long rod fixing clamping plates is larger than the diameter of the circumference of the left end and the right end of the long connecting rod a and the long connecting rod b.
Preferably, the distance of both ends inner wall is greater than the horizontal width of stock solid fixed splint about U type fixing bolt, the vertical length of U type fixing bolt is greater than the vertical width of stock solid fixed splint, the circumference diameter size at both ends is less than the circumference inner wall diameter size at both ends about the activity inserted bar about U type fixing bolt.
Preferably, the transverse length and the width of the supporting upright post are smaller than those of the inner wall of the perimeter of the top plate mounting sleeve, four triangular fixing plates are arranged on the supporting unit body A, the four triangular fixing plates are identical in shape and size, and the supporting upright post, the supporting top plate and the disc base are kept in a relatively vertical state.
Compared with the supporting device technology for the construction of the existing civil engineering building, the utility model provides a supporting device for the construction of civil engineering building possesses following beneficial effect:
1. the utility model discloses a cup jointed the roof installation cover that is connected with the supporting roof in the upper end of support post, rethread construction bolt is connected, and be connected with the disc base through four triangle fixed plates at the lower extreme of support post, make by the supporting roof, the support post, the supporting unit body homoenergetic that the disc base constitutes can be dismantled and reassemble, thereby more conveniently support the transport and the installation of unit body, both ends have set up stock solid fixed splint all around again on the outer wall about the support post, make two adjacent supporting unit body A and supporting unit body B be connected through the shear holder, thereby form a support system, the structural stability has been improved.
2. The utility model discloses when a support system is assembled to needs, can place the support post on the disc base, put four triangle fixed plates on the support post lower extreme outer wall all around again, fix with scute fixing bolt, the roof installation ways that the roof lower extreme is connected is again in the upper end of support post, fix with mounting bolt, other support cell bodies have been assembled to same method, align each support cell body and place corresponding supported position, then with the scissors frame with each support cell body between the overlap joint can, not only can the exclusive use, and can freely the subassembly form support system, improve structural stability, and the easy operation of putting up is convenient, strutting arrangement's practicality has been improved greatly.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description, do not constitute a limitation of the invention, in which:
fig. 1 is a schematic structural view of a supporting device for civil engineering construction provided by the utility model;
fig. 2 is a schematic structural view of a supporting unit body a provided by the present invention;
fig. 3 is a schematic structural view of a long rod fixing splint provided by the present invention;
fig. 4 is a schematic view of the connection structure of the long connecting rod a and the long connecting rod b according to the present invention;
in the figure: 1. a supporting unit body A; 2. a supporting unit body B; 3. connecting a long rod a; 4. a long rod connecting piece; 5. a scissor rack; 6. connecting a long rod b; 7. the long rod is fixed with the clamp plate; 8. a movable inserted link; 9. a U-shaped fixing bolt; 10. supporting a top plate; 11. a top plate mounting sleeve; 12. installing a bolt; 13. supporting the upright post; 14. a triangular fixing plate; 15. a disc base; 16. the angle plate fixes the bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a strutting arrangement for civil engineering construction, including support cell cube A1 and support cell cube B2, support cell cube A1 installs the left end at support cell cube B2, support cell cube A1 is the same with the shape size of support cell cube B2, support cell cube A1 is the basic unit of two support systems with support cell cube B2, each support cell cube can the exclusive use, also can freely match between the cell cube and establish a support system, thereby conveniently when the building site construction operation, carry out the supporting role to wall or other buildings, and stable in structure, the equipment is simple and convenient, support cell cube A1 and support cell cube B2 through scissors frame 5 fixed connection, be provided with connection stock A3 on scissors frame 5, the front side of connecting stock A3 is provided with connection stock B6, the shape size of connecting stock A3 is the same with the connection stock B6, the sum of circumference diameter of connecting stock A3 and connection stock B6 is less than the opposite direction inner wall's front and back both ends inner wall's shape size is less than the long stock B6, the difference of connection stock B364 The distance between the long connecting rod a3 and the long connecting rod B6 can be constructed into a scissor frame 5 through a long rod connecting piece 4, the left and right two supporting unit bodies A1 and the supporting unit body B2 are fixedly lapped to form a supporting system, the structural stability is improved, the long connecting rod a3 and the long connecting rod B6 are fixedly connected through the long rod connecting piece 4, the left and right ends of the long connecting rod a3 and the long connecting rod B6 are connected with long rod fixing splints 7, the supporting unit bodies A1 are provided with eight long rod fixing splints 7 in total, the eight long rod fixing splints 7 are the same in shape and size, the distance between the opposite inner walls of the eight long rod fixing splints 7 is larger than the circumferential diameter of the left and right ends of the long connecting rod a3 and the long connecting rod B6, the eight long rod fixing splints 7 are respectively arranged on the peripheral outer walls of the upper and lower ends of the supporting upright post 13, the eight long rod fixing splints 7 can be connected with the long connecting rod, the diversity of the supporting system is increased.
A supporting device for civil engineering building construction comprises a movable inserted bar 8 transversely penetrating through the circumference of a long bar fixing clamp plate 7, the long bar fixing clamp plate 7 is fixedly connected with the movable inserted bar 8 through a U-shaped fixing bolt 9, the distance between the inner walls of the left end and the right end of the U-shaped fixing bolt 9 is larger than the transverse width of the long bar fixing clamp plate 7, the vertical length of the U-shaped fixing bolt 9 is larger than the vertical width of the long bar fixing clamp plate 7, the circumferential diameter of the left end and the right end of the U-shaped fixing bolt 9 is smaller than that of the inner walls of the left end and the right end of the movable inserted bar 8, the U-shaped fixing bolt 9 can stretch across the outer part of the perimeter of the long bar fixing clamp plate 7, the left end and the right end of the U-shaped fixing bolt 9 penetrate through insertion holes on the movable inserted bar 8, so that one end of a connecting long bar a3 and a connecting long bar B6 is, the supporting unit body A1 is provided with a supporting upright post 13, and the upper end circumference of the supporting upright post 13 is sleeved with a top plate installation sleeve 11.
A supporting device for civil engineering building construction comprises a top plate mounting sleeve 11 fixedly connected with a supporting upright post 13 through a mounting bolt 12, the upper end of the top plate mounting sleeve 11 is connected with a supporting top plate 10, the lowest end of the supporting upright post 13 is connected with a disc base 15, the peripheral outer wall of the supporting upright post 13 on the upper side of the disc base 15 is provided with a triangular fixing plate 14, the triangular fixing plate 14 is fixedly connected with the supporting upright post 13 and the disc base 15 through an angle plate fixing bolt 16, the transverse length and the width of the supporting upright post 13 are smaller than the transverse length and the width of the peripheral inner wall of the top plate mounting sleeve 11, the supporting unit body A1 is provided with four triangular fixing plates 14, the four triangular fixing plates 14 are same in shape and size, the supporting upright post 13, the supporting top plate 10 and the disc base 15 are kept in a relatively vertical state, the top plate mounting sleeve 11, and the supporting upright column 13 is connected with the disc base 15 through four triangular fixing plates 14, and the supporting top plate 10, the supporting upright column 13 and the disc base 15 can be disassembled and assembled, so that the supporting unit bodies are convenient to carry and install.
The utility model discloses a theory of operation and use flow: after the utility model is installed, because the top end of the supporting upright post 13 is sleeved with the top plate installation sleeve 11 connected with the supporting top plate 10 and then connected with the disc base 15 through the installation bolt 12, and the lower end of the supporting upright post 13 is connected with the disc base 15 through the four triangular fixing plates 14, the supporting unit body composed of the supporting top plate 10, the supporting upright post 13 and the disc base 15 can be disassembled and reassembled, thereby being more convenient for carrying and installing the supporting unit body, the long rod fixing splints 7 are arranged on the peripheral outer walls of the upper and lower ends of the supporting upright post 13, so that the adjacent two supporting unit bodies A1 and the supporting unit body B2 can be connected through the scissor bracket 5, thereby forming a supporting system, improving the structural stability, when the supporting system is required to be assembled, the supporting upright post 13 can be placed on the disc base 15, and then the four triangular fixing plates 14 are placed on the peripheral outer walls of the lower end of the supporting upright post, fixing the supporting units by angle plate fixing bolts 16, sleeving the top plate mounting sleeve 11 connected with the lower end of the supporting top plate 10 on the upper end of the supporting upright post 13, fixing the supporting upright post by mounting bolts 12, assembling other supporting unit bodies by the same method, aligning and placing each supporting unit body to a corresponding supporting position, and then overlapping each supporting unit body by using the scissor frame 5.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a strutting arrangement for civil engineering construction, includes supporting element A (1) and supporting element B (2), its characterized in that: the supporting unit body A (1) is installed at the left end of the supporting unit body B (2), the supporting unit body A (1) is fixedly connected with the supporting unit body B (2) through a scissor frame (5), a long connecting rod a (3) is arranged on the scissor frame (5), a long connecting rod B (6) is arranged at the front side of the long connecting rod a (3), the long connecting rod a (3) is fixedly connected with the long connecting rod B (6) through a long rod connecting piece (4), long rod fixing clamping plates (7) are connected with the left end and the right end of the long connecting rod a (3) and the long connecting rod B (6), movable insertion rods (8) which transversely penetrate through are arranged inside the circumference of the long rod fixing clamping plates (7), the long rod fixing clamping plates (7) are fixedly connected with the movable insertion rods (8) through U-shaped fixing insertion pins (9), supporting upright columns (13) are arranged on the supporting unit body A (1), the outer portion of the circumference of the upper end of the supporting column (13) is sleeved with a top plate installation sleeve (11), the top plate installation sleeve (11) is fixedly connected with the supporting column (13) through an installation bolt (12), the upper end of the top plate installation sleeve (11) is connected with a supporting top plate (10), the lowest end of the supporting column (13) is connected with a disc base (15), triangular fixing plates (14) are arranged on the outer wall of the periphery of the supporting column (13) on the upper side of the disc base (15), and the triangular fixing plates (14) are fixedly connected with the supporting column (13) and the disc base (15) through corner plate fixing bolts (16).
2. The supporting device for civil engineering construction according to claim 1, wherein: the supporting unit body A (1) and the supporting unit body B (2) are the same in shape and size.
3. The supporting device for civil engineering construction according to claim 1, wherein: the long connecting rod a (3) and the long connecting rod b (6) are the same in shape and size, and the sum of the circumferential diameters of the long connecting rod a (3) and the long connecting rod b (6) is smaller than the distance between the opposite inner walls of the front end and the rear end of the long rod connecting piece (4).
4. The supporting device for civil engineering construction according to claim 1, wherein: support cell cube A (1) is provided with eight stock solid fixed splint (7) altogether, eight the shape size of stock solid fixed splint (7) is the same, eight distance between stock solid fixed splint (7) the subtend inner wall is greater than the circumference diameter size of controlling both ends of connecting long-pole a (3) and connecting long-pole b (6).
5. The supporting device for civil engineering construction according to claim 1, wherein: the distance of both ends inner wall is greater than the horizontal width of stock solid fixed splint (7) about U type solid fixed bolt (9), the vertical length of U type solid fixed bolt (9) is greater than the vertical width of stock solid fixed splint (7), the circumference diameter size at both ends is less than the circumference inner wall diameter size at both ends about U type solid fixed bolt (9) movable inserted bar (8).
6. The supporting device for civil engineering construction according to claim 1, wherein: the horizontal length and the width of the supporting upright post (13) are smaller than those of the inner wall of the perimeter of the top plate mounting sleeve (11), four triangular fixing plates (14) are arranged on the supporting unit body A (1), the shapes and the sizes of the triangular fixing plates (14) are the same, and the supporting upright post (13), the supporting top plate (10) and the disc base (15) are kept in a relatively vertical state.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921509311.5U CN210685485U (en) | 2019-09-11 | 2019-09-11 | Strutting arrangement is used in civil engineering construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921509311.5U CN210685485U (en) | 2019-09-11 | 2019-09-11 | Strutting arrangement is used in civil engineering construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210685485U true CN210685485U (en) | 2020-06-05 |
Family
ID=70894970
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921509311.5U Expired - Fee Related CN210685485U (en) | 2019-09-11 | 2019-09-11 | Strutting arrangement is used in civil engineering construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210685485U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111981998A (en) * | 2020-07-22 | 2020-11-24 | 山东电力设备有限公司 | Transformer oil tank deformation measuring assembly, measuring system and measuring method |
| CN112360186A (en) * | 2020-10-13 | 2021-02-12 | 广州华立科技职业学院 | Steel structure supporting and fixing truss device for building |
| CN112963019A (en) * | 2021-02-08 | 2021-06-15 | 中国十七冶集团有限公司 | Building engineering post-cast strip strutting arrangement |
-
2019
- 2019-09-11 CN CN201921509311.5U patent/CN210685485U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111981998A (en) * | 2020-07-22 | 2020-11-24 | 山东电力设备有限公司 | Transformer oil tank deformation measuring assembly, measuring system and measuring method |
| CN112360186A (en) * | 2020-10-13 | 2021-02-12 | 广州华立科技职业学院 | Steel structure supporting and fixing truss device for building |
| CN112963019A (en) * | 2021-02-08 | 2021-06-15 | 中国十七冶集团有限公司 | Building engineering post-cast strip strutting arrangement |
| CN112963019B (en) * | 2021-02-08 | 2022-04-26 | 中国十七冶集团有限公司 | Building engineering post-cast strip strutting arrangement |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN210685485U (en) | Strutting arrangement is used in civil engineering construction | |
| CN205852606U (en) | Three dimensions tubular truss assembly moulding bed | |
| CN208885048U (en) | An integral support device for an assembled composite beam | |
| CN220599187U (en) | Adjustable shaping template support with vertical haunching structure | |
| CN215484876U (en) | Auxiliary frame for replacing connecting rod of bolt ball net rack | |
| CN203640390U (en) | Hard safety rail capable of being quickly assembled and disassembled | |
| CN212689651U (en) | A wall reinforcement device used in ancient buildings | |
| CN215367848U (en) | Assembly structure of assembled steel structure building | |
| CN111335357B (en) | A pipe gallery formwork support system and construction method thereof | |
| CN110565820A (en) | assembled concrete-filled steel tube combined node | |
| CN210423968U (en) | Assembled support and hanger and building using same | |
| CN214834924U (en) | Pipe truss assembly jig frame | |
| CN111395855A (en) | Wire pole auxiliary stay device | |
| CN222864830U (en) | A kind of assembled mobile temporary lighting lamp stand for building construction | |
| CN209244248U (en) | A kind of scaffold connecting elements | |
| CN209780409U (en) | Suspension type enclosure with prefabricated foundation | |
| CN219732853U (en) | Protective structure | |
| CN218335115U (en) | Novel fireproof cable bridge splicing structure | |
| CN215407542U (en) | Building safety protection net convenient to dismouting | |
| CN219158614U (en) | Protective frame for building construction | |
| CN212295911U (en) | Rail guard for construction | |
| CN218581208U (en) | Adjustable space reticulated shell abnormal-shaped block assembling jig frame | |
| CN213906181U (en) | Cable supporting rod for electric power construction and installation | |
| CN213420146U (en) | Convenient fixed antidetonation piping lane gallows | |
| CN216866265U (en) | Assembled light steel structure fence |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200605 Termination date: 20210911 |