CN212689548U - Template for building engineering construction - Google Patents
Template for building engineering construction Download PDFInfo
- Publication number
- CN212689548U CN212689548U CN202020848615.0U CN202020848615U CN212689548U CN 212689548 U CN212689548 U CN 212689548U CN 202020848615 U CN202020848615 U CN 202020848615U CN 212689548 U CN212689548 U CN 212689548U
- Authority
- CN
- China
- Prior art keywords
- template
- wall
- seted
- groove
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model belongs to building construction material field, especially, template for building engineering construction is not convenient for assemble to current template for building engineering construction, and stability after the equipment is relatively poor, can not satisfy the problem of user demand, now proposes following scheme, and it includes first equipment template and second equipment template, two locating plates of one side fixedly connected with of first equipment template, two constant head tanks have been seted up to one side of second equipment template, and the locating plate clamps mutually with the constant head tank, and the side channel has been seted up to one side of second equipment template, has all seted up the restricted hole on the top inner wall of side channel and the bottom inner wall, and slidable mounting has the limiting plate in the restricted hole, and the limited groove has all been seted up to one side that two locating plates are close to each other, and the limiting plate clamps mutually with the limited groove. The utility model discloses the practicality is good, conveniently assembles first equipment template and second equipment template, and the stability after the equipment is better, can satisfy the use needs.
Description
Technical Field
The utility model relates to a construction material technical field especially relates to a template is used in building engineering construction.
Background
The construction templates adopted in the current building engineering mainly comprise steel templates, bamboo glue templates, wood templates, glued templates and the like.
At present, the template for construction engineering is inconvenient to assemble, has poor stability after assembly, and can not meet the use requirement.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving and having the template for the building engineering construction among the prior art and be not convenient for assemble, the stability after the equipment is relatively poor, can not satisfy the shortcoming that needs of use, and the template for the building engineering construction that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a template for construction engineering comprises a first assembly template and a second assembly template, wherein one side of the first assembly template is fixedly connected with two positioning plates, one side of the second assembly template is provided with two positioning grooves, the positioning plates are clamped with the positioning grooves, one side of the second assembly template is provided with a side groove, the top inner wall and the bottom inner wall of the side groove are respectively provided with a limiting hole, a limiting plate is arranged in the limiting hole in a sliding manner, one sides, close to each other, of the two positioning plates are respectively provided with a limiting groove, the limiting plates are clamped with the limiting grooves, one sides, close to each other, of the two limiting plates are respectively welded with a first triangular plate, one sides, far away from each other, of the two first triangular plates are respectively welded on the top inner wall and the bottom inner wall of the side groove, one side inner wall of the side groove is provided with two sliding grooves, and a sliding plate is arranged in the sliding grooves, one side welding of two slides has same mounting panel, the bolt groove has been seted up on one side inner wall of side groove, bolt inslot threaded connection has the bolt, the mounting hole has been seted up on the mounting panel, fixedly connected with bearing in the mounting hole, bolt fixed mounting is in the inner circle of bearing, the second set-square has all been welded to the top and the bottom of mounting panel, two spread grooves have been seted up to the front side of second equipment template, slidable mounting has the connecting plate in the spread groove, the same shrouding of one side fixedly connected with that two connecting plates are close to each other, the welding of one side of connecting plate has the second spring, the one end of second spring.
Preferably, an operation hole is formed in the inner wall of the front side of the side groove, and the sealing plate is in sealing contact with the front side opening of the operation hole to shield the front side opening of the operation hole.
Preferably, the outer side of the bolt is fixedly sleeved with a rubber sleeve, so that the bolt can be conveniently held and rotated.
Preferably, a sealing ring is arranged on the side wall of the limiting groove, and the limiting plate is in sliding sealing contact with the inner side of the sealing ring, so that the stability of the limiting plate after being clamped into the limiting groove is improved.
Preferably, the first assembly template and the second assembly template are in contact.
Preferably, the second triangular plate is in contact with the inclined surface of the first triangular plate.
The utility model discloses in, a template for building engineering construction, when needs are assembled first equipment template and second equipment template, go into the constant head tank with the locating plate card, the pulling shrouding, the shrouding drives the connecting plate and removes, connecting plate extrusion second spring, expose the opening of handle hole, then stretch into the hand and hold the rubber sleeve on the bolt in the handle hole, the rotation bolt, the bolt rotates and removes forward, the bolt drives the mounting panel through the bearing and removes, the mounting panel drives the second set-square and removes, the first set-square of second set-square extrusion drives first set-square and removes, first set-square extrusion first spring, make the limiting plate card go into the limiting groove, the convenience is assembled first equipment template and second equipment template, stability after the equipment is better.
The utility model discloses the practicality is good, conveniently assembles first equipment template and second equipment template, and the stability after the equipment is better, can satisfy the use needs.
Drawings
Fig. 1 is a schematic sectional structure view of a form for construction of construction engineering according to the present invention;
fig. 2 is a schematic structural view of a form for construction of building engineering according to the present invention;
fig. 3 is the utility model provides a part A's schematic structure of template for building engineering construction.
In the figure: 1. a first assembly template; 2. a second assembly template; 3. positioning a plate; 4. a limiting plate; 5. a first set square; 6. a first spring; 7. a slide plate; 8. mounting a plate; 9. a bolt; 10. a bearing; 11. a second set square; 12. and (7) closing the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a template for construction engineering construction comprises a first assembly template 1 and a second assembly template 2, wherein one side of the first assembly template 1 is fixedly connected with two positioning plates 3, one side of the second assembly template 2 is provided with two positioning grooves, the positioning plates 3 are clamped with the positioning grooves, one side of the second assembly template 2 is provided with side grooves, the top inner wall and the bottom inner wall of each side groove are respectively provided with a limiting hole, a limiting plate 4 is slidably arranged in each limiting hole, one side, close to each other, of each positioning plate 3 is provided with a limiting groove, each limiting plate 4 is clamped with the limiting groove, one side, close to each other, of each limiting plate 4 is welded with a first triangular plate 5, one side, far away from each other, of each first triangular plate 5 is welded with a first spring 6, one end, far away from each first spring 6, is welded on the top inner wall and the bottom inner wall of each side groove respectively, two spouts have been seted up on one side inner wall of side channel, slidable mounting has slide 7 in the spout, one side welding of two slides 7 has same mounting panel 8, the bolt groove has been seted up on one side inner wall of side channel, bolt inslot threaded connection has bolt 9, the mounting hole has been seted up on the mounting panel 8, fixedly connected with bearing 10 in the mounting hole, bolt 9 fixed mounting has the inner circle of bearing 10, second set-square 11 has all been welded to the top and the bottom of mounting panel 8, two spread grooves have been seted up to the front side of second equipment template 2, slidable mounting has the connecting plate in the spread groove, the same shrouding 12 of one side fixedly connected with that two connecting plates are close to each other, the welding of one side of connecting plate has the second spring, the.
In this embodiment, the operation hole has been seted up on the front side inner wall of side groove, and shrouding 12 shelters from the front side opening of operation hole with the front side opening sealing contact of operation hole.
In this embodiment, the outer side of the bolt 9 is fixedly sleeved with a rubber sleeve, which is convenient for holding the bolt 9 and rotating the bolt 9.
In this embodiment, the side wall of the limiting groove is provided with the sealing ring, and the limiting plate 4 is in sliding sealing contact with the inner side of the sealing ring, so that the stability of the limiting plate 4 clamped in the limiting groove is improved.
In this embodiment, the first assembling template 1 and the second assembling template 2 are in contact.
In this embodiment, the second set square 11 is in contact with the inclined surface of the first set square 5.
In the utility model, when the first assembling template 1 and the second assembling template 2 need to be assembled, the positioning plate 3 is clamped into the positioning groove, the closing plate 12 is pulled, the closing plate 12 drives the connecting plate to move, the connecting plate extrudes the second spring to expose the opening of the operation hole, then a hand is inserted into the operation hole to hold the rubber sleeve on the bolt 9, the bolt 9 is rotated and moves forward, the bolt 9 drives the mounting plate 8 to move through the bearing 10, the mounting plate 8 drives the second triangular plate 11 to move, the second triangular plate 11 extrudes the first triangular plate 5 to drive the first triangular plate 5 to move, the first triangular plate 5 extrudes the first spring 6, the first triangular plate 5 drives the limiting plate 4 to move, so that the limiting plate 4 is clamped into the limiting groove, the first assembling template 1 and the second assembling template 2 are convenient to be assembled, the stability after being assembled is better, can meet the use requirement.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (6)
1. The template for building engineering construction comprises a first assembly template (1) and a second assembly template (2), and is characterized in that two positioning plates (3) are fixedly connected to one side of the first assembly template (1), two positioning grooves are formed in one side of the second assembly template (2), the positioning plates (3) are clamped with the positioning grooves, side grooves are formed in one side of the second assembly template (2), limiting holes are formed in the top inner wall and the bottom inner wall of each side groove, limiting plates (4) are slidably mounted in the limiting holes, limiting grooves are formed in the sides, close to each other, of the two positioning plates (3), the limiting plates (4) are clamped with the limiting grooves, first triangular plates (5) are welded to the sides, close to each other, of the two limiting plates (4), first springs (6) are welded to the sides, far away from each other, one ends, far away from each other, of the two first springs (6) are welded to the top inner wall and the bottom inner wall of each side groove respectively, two spouts have been seted up on one side inner wall of side channel, slidable mounting has slide (7) in the spout, one side welding of two slide (7) has same mounting panel (8), the bolt groove has been seted up on one side inner wall of side channel, bolt groove female connection has bolt (9), the mounting hole has been seted up on mounting panel (8), fixedly connected with bearing (10) in the mounting hole, bolt (9) fixed mounting is in the inner circle of bearing (10), second set-square (11) have all been welded to the top and the bottom of mounting panel (8), two spread grooves have been seted up to the front side of second equipment template (2), slidable mounting has the connecting plate in the spread groove, the same shrouding of one side fixedly connected with (12) that two connecting plates are close to each other, the welding of one side of connecting plate has the second spring, the one.
2. The form panel for construction of building engineering according to claim 1, wherein the side groove has an operation hole opened on a front inner wall thereof, and the closing plate (12) is in sealing contact with a front opening of the operation hole.
3. The formwork for constructional engineering construction as claimed in claim 1, wherein a rubber sleeve is fixedly sleeved on the outer side of the bolt (9).
4. A formwork for construction of building engineering according to claim 1, wherein the side wall of the delimiting groove is provided with a sealing ring, and the delimiting plate (4) is in sliding sealing contact with the inner side of the sealing ring.
5. A form for constructional engineering as claimed in claim 1 wherein the first assembled form (1) and the second assembled form (2) are in contact.
6. A form for constructional engineering as claimed in claim 1 wherein the second set square (11) is in contact with the inclined surface of the first set square (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020848615.0U CN212689548U (en) | 2020-05-20 | 2020-05-20 | Template for building engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020848615.0U CN212689548U (en) | 2020-05-20 | 2020-05-20 | Template for building engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212689548U true CN212689548U (en) | 2021-03-12 |
Family
ID=74887489
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020848615.0U Expired - Fee Related CN212689548U (en) | 2020-05-20 | 2020-05-20 | Template for building engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212689548U (en) |
-
2020
- 2020-05-20 CN CN202020848615.0U patent/CN212689548U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209868023U (en) | Involute spline shaft drilling self-positioning device | |
CN212689548U (en) | Template for building engineering construction | |
CN209904363U (en) | Three check setting-out devices of four-wire of english teaching usefulness | |
CN205995741U (en) | A kind of fixture for making guard rail mopping smooth | |
CN209393449U (en) | Skis glue stations | |
CN215899175U (en) | Building engineering management file sealing device of signing a tender | |
CN209843040U (en) | Sand table for professional development planning management | |
CN210490039U (en) | A location structure that is used for automatic kludge that pencil connects | |
CN213120506U (en) | Laser range finder for house construction engineering | |
CN209988242U (en) | Special mark device that pastes of domestic membrane element | |
CN211647189U (en) | Ceramic tile seam beautifying tool | |
CN210947190U (en) | Novel assembled building wallboard connect device | |
CN217281980U (en) | Fixing device convenient to assemble for threading pipe | |
CN201195526Y (en) | Car brush | |
CN213629170U (en) | Split type instrument ball valve of high life | |
CN210067798U (en) | Connecting structure of auxiliary frame and door frame | |
CN213927612U (en) | Indoor wall paint supplementing device | |
CN201657963U (en) | Clamp capable of absorbing paint brushes | |
CN205271820U (en) | Cold drawing bonding anchor clamps | |
CN218060301U (en) | Positioner is used in pile foundation construction | |
CN114412037B (en) | Compression-resistant hyperbolic aluminum veneer | |
CN221399661U (en) | Splicing mechanism of double-sided decoration particle board | |
CN219144992U (en) | Cable connector lug that sealed effectual | |
CN214351854U (en) | Mounting fixture is used in auto-parts production | |
CN219451340U (en) | Spliced aluminum veneer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210312 |