CN201657963U - Clamp capable of absorbing paint brushes - Google Patents
Clamp capable of absorbing paint brushes Download PDFInfo
- Publication number
- CN201657963U CN201657963U CN2010201349341U CN201020134934U CN201657963U CN 201657963 U CN201657963 U CN 201657963U CN 2010201349341 U CN2010201349341 U CN 2010201349341U CN 201020134934 U CN201020134934 U CN 201020134934U CN 201657963 U CN201657963 U CN 201657963U
- Authority
- CN
- China
- Prior art keywords
- clamp
- adsorbable
- clip
- paintbrush
- lugs
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Clamps And Clips (AREA)
Abstract
The utility model provides a clamp capable of absorbing paint brushes, which mainly comprises a first clamp piece and a second clamp piece which respectively form a clamping portion at one end and a forcing portion at the other end, an elastic support and a positioning pin. A holding portion with a magnetic absorption function is disposed on the surface of a forcing portion of the first clamp piece and used for magnetic absorption of a paint brush, the elastic support is provided with an upper vane and a lower vane integrally extended from the forcing portions of the two clamp pieces, and a bridge portion with an elongated hole is arranged at the connection of the two vanes, and the positioning pin transversely penetrates through a pivot of the two clamp pieces and the elongated hole of the bridge portion so as to pivotally connect the two integrally formed pieces and the elastic support.
Description
Technical field
A kind of anchor clamps of the utility model relate in particular to a kind of anchor clamps that have paintbrush absorption storing function concurrently.
Background technology
The indoor wall of buildings in general, perhaps outdoor exterior wall surface whitewashes, and all need be dependent on paint, by motley paint tone, satisfies each one architectural style.
Yet, paint is evenly coated metope, but saw through the drum-type paintbrush that large tracts of land is whitewashed before this, thin portion or corner can't supply cylinder paintbrush position, seeing through general paintbrush again whitewashes, certainly, except constructor's technology, more need the omnidistance general paintbrush that uses in order to make the wall plaster effect better.
Yet, the general common problem of paintbrush, be whitewashing to midway, in the time of must stopping rest, speckle with the bristle of paint, if place ground arbitrarily, can attach the dust on ground, cause and continue when whitewashing metope, metope adheres to dust and influences overall appearance.
If the oil recovery brush holder places object (for example painting brush holder), bristle is vacant state away from object, lacks though can overcome the dust that attaches of above-mentioned means existence, can cause the aqueous paint on hairbrush surface to drip to dirty and messy problem completely.
At the problems referred to above, there is industry to utilize two L shaped clamps of tool pivot then, cooperate a torque spring grafting pivot, but form the anchor clamps that a fuel feeding painting brush holds by this, and the magnetic assembly is set, the absorption of fuel feeding painting brush in a L shaped clamp surface of this paint folder; Make the paintbrush front bristles, because of the front end folder portion clamping paint tube of L shaped clamp inclination, thus can make the paint that is adsorbed in chucking surface tilt to splash into paint tube, to overcome the existing problem of above-mentioned whitewashing.
But, utilize two L shaped clamps to cooperate the paint folder of torque spring, the shortcoming of existence is:
The first, torque spring articulates two L shaped clamps, then easily because of torque spring uses for a long time repeatedly, causes the pin fatigue fracture of torque spring grafting pivot.
The second, articulate, support two L shaped clamps and be dependent on independently torque spring, obviously exist structure assembling speed shortcoming consuming time.
For this reason, the paint folder that present stage utilizes two L clamps to cooperate torque spring to assemble, certain space that architecture advances is still arranged can't be promoted to problems such as ultimate attainment in the hope of overcoming structural rigidity and assembling speed.
The utility model content
The purpose of this utility model is to provide a kind of two clamps and the integrated clamp body of elastic support.Quick, the long service life of this anchor clamps assembling.
For achieving the above object, the anchor clamps that the utility model provides comprise: one first clamp and one second clamp, two clamp front and back ends are square greater than 90 ° of angles to wait, form a folder portion and a force section, the force section of two clamps and subtend are extended the lug of mutual socket, the axis hole that lug then offers connection is done the pivot of pivot joint, and the surface, force section of first clamp is provided with a positioning part, but the fuel feeding painting brush is firmly put; One elastic support, have from first, second clamp force section, upper panel and lower panel that one is extended, upper and lower fin junction then forms a bridge part, this bridge part laterally runs through the elongated hole of a connection pivot, and the elongated hole two ends then define a primary importance and the second place; An and alignment pin that runs through two clamp pivots and elastic support elongated hole, this is positioned at the alignment pin of elongated hole primary importance, when compressing upper and lower fin with first, second clamp start, bridge part then can be towards folder portion direction microdisplacement, order is resisted against the alignment pin of elongated hole primary importance, then be resisted against the second place of elongated hole, but with the folder portion that reaches anchor clamps launch to make it can the clamping clamping object.
Two clamps are formed with the hole of the module demoulding between the lug of pivot, two clamps, elastic support can be implemented integrally moulded moulding according to said structure.
Other reach the core technology means of above-mentioned intended purposes about the utility model, and the preferable structure space form utilization of these anchor clamps, are described as follows with the specific embodiment with reference to the accompanying drawings.
Description of drawings
Fig. 1 is the structure explosive view of the described anchor clamps of the utility model specific embodiment;
Fig. 2 is the side schematic view of anchor clamps shown in first figure;
Fig. 3 is the combination stereo appearance figure of the described anchor clamps of the utility model specific embodiment;
Fig. 4 is the side schematic view of anchor clamps shown in Figure 3;
Fig. 5 is the deployed condition schematic perspective view of the described anchor clamps of the utility model specific embodiment;
Fig. 6 is the side schematic view of anchor clamps shown in Figure 5;
Fig. 7 is located in paint tube for the described anchor clamps of the utility model specific embodiment and puts the schematic diagram of paintbrush;
Fig. 8 forms pertusate schematic diagram for disclosing described first clamp of the utility model specific embodiment;
Fig. 9 forms pertusate schematic diagram for disclosing described second clamp of the utility model specific embodiment.
Description of reference numerals:
1: anchor clamps 24: folder portion
12: force section 26: projection
1242: barricade 262 after the metal embedded part: concave arc groove
1244: barricade 28 before the metal embedded part: lug
126: magnet assembly 282: axis hole
14: folder portion 30: elastic support
142: tooth portion 32: upper panel
16: lug 34: lower panel
162: axis hole 36: bridge part
164: arc surface 362: elongated hole
22: force section 40: alignment pin
222: sheet metal
The specific embodiment
Present embodiment provides a kind of anchor clamps, at first cooperate referring to figs. 1 through shown in Figure 3, the anchor clamps 1 that this plastic-steel material is made are by integrated first clamp 10, second clamp 20 and connect the elastic support 30 that supports first, second clamp cooperates an alignment pin 40 pivot joints to form; Wherein:
This first clamp 10 has a force section 12, and these force section 12 front ends are to wait greater than 90 ° of angle modes, and one is extended a folder portion 14 of inclination; These force section 12 vicinity folder portion end surfaces, then be provided with a positioning part, the usefulness (referring to Fig. 7) of the metal framework absorption of fuel feeding painting brush 50, this positioning part comprises a metal embedded part, an and magnet assembly 126 (for example magnet) that is installed with in this embedded part, the corresponding at least grip part of this embedded part length direction, be convexly equipped with one a little more than before 12 surfaces, force section, the back barricade 1244,1242, this forward and backward barricade and a little more than the magnet assembly that is installed with in it, by this forward and backward barricade, the paintbrush that is subjected to magnet assembly 126 absorption is provided, more firm against, anti-defence line, second road of dropping; Folder portion 14 inner surfaces then are provided with continuously arranged tooth portion 142, to increase the steadiness of clamping; This first clamp, 10 force sections, 12 dual-sides in addition, the then vertical down pivot that is connected that extends, pivot shown in the schematic diagram is meant that two lugs, 16, two lugs, 16 free ends with axis hole 162 then form an arc surface 164, and 16 of two lugs define one first inboard spacing.As Fig. 8, first clamp 10 is the icon of device metal embedded part and magnet assembly 126 not as yet, first clamp 10 that shows this two lug 16 is formed with and the wide hole 300 of the first inboard spacing, the demoulding is constituted this hole by module, module defines the first inboard spacing first, then provides clamp, lug and elastic support 30 can implement integrally moulded moulding effect according to this in addition.
This second clamp 20, one end is force section 22, and this force section front end is to be equal to or greater than 90 ° of angle modes, and one is extended the folder portion 24 of inclination, different folder portion end then coats a sheet metal 222 that extends to the circular arc camber in the outside, and wherein folder portion 24 inner surfaces then are provided with continuously arranged tooth portion 242; The dual-side of the other second clamp force section 22 (closely folder portion), extend first-class left and right two projections 26 of being wider than first clamp, 10 lugs, 16 fabric widths inwardly, two projections, 26 surfaces then are formed with a concave arc groove 262, when supporting for 20 liang of lug 16 pivots of first clamp, can by arc surface 164 and concave arc groove 262 mutually against, first clamp support effect that relative second clamp pivots is provided; Left and right again limit two convex bodys 26, the then relative force section 22 of adjacent inner side edge, extend the axial region that is interconnected vertically upward, this axial region is the same with first clamp, two lugs 28 for tool axis hole 282,28 of this two lugs then form one second inboard spacing, and two lugs 28 of second clamp just are located in the second inboard spacing of second clamp; As the 9th figure, second clamp 20 of this two lug 28 also is formed with and the wide hole 400 of the second inboard spacing, and also the demoulding is constituted this hole by module, and its effect is equal to aforesaid hole 300.
This elastic support 30, have fin 32 and lower panel 34 on first, second clamp force section 12,22 one are extended, this is the upper and lower fin junction of く font, then form a bridge part 36 that is installed with in the second inboard spacing of 28 of two lugs of second clamp, this bridge part 36 also laterally runs through an elongated hole 362, and the elongated hole 362 shown in the schematic diagram is offered the breach 3626 of this elongated hole of connection UNICOM.
With reference to Fig. 3, shown in Figure 4, be the force section 12,22 of first, second clamp of normality, because of being subjected to the separated attitude of support with the integrated upper and lower fin 32,34 of clamp, force folder portion 14,24 to be closed form simultaneously; Laterally run through the alignment pin 40 that articulates first, second clamp and elastic support this moment, just is resisted against to be distal in breach 3626 elongated holes 362, and this place then is defined as primary importance;
Continuous with reference to Fig. 5, shown in Figure 6, the subtend pressing power that the user grips force section 12,22 is during greater than the support force of upper and lower fin, the subtend of first, second clamp near and compress upper and lower fin, force bridge part 36 towards the direction displacement of folder portion, be positioned at the alignment pin 40 of primary importance this moment, be bordering in the elongated hole 362 of breach 3626 then be resisted against bridge part, this place then is defined as the second place, and the folder portion closed with season is deployed condition;
Then as shown in Figure 7, the folder portion that launches is clamped on paint tube 60 edge mouths 62, the force section 12 of paintbrush first clamp, the edge mouth 62 of paint tube is an angle of inclination relatively, the metal framework 54 for the treatment of the urgent bristle 52 of paintbrush 50 frames contacts magnetic with the magnet assembly 126 of positioning part, the paint that attaches on the bristle 52, because of tilting towards with in the paint tube 60, so can reach the whitewashing halfway stops operation under the situation, the paint that the paintbrush bristle attaches can arbitrarily not be dropped in ground, and bristle 52 attaches problems such as dust when perhaps placing ground.
Present embodiment utilizes first, second clamp to be the one ejection forming technique with the elastic support that is connected two clamps, and the advantage that possesses is as follows:
First: compared to utilizing torque spring winding two clamps, and two clamp resiliency supported are provided, the design that resets, this creation is equal to the elastic support of torque spring, because one-body molded with two clamps, has then exempted complicated number of assembling steps, significantly promotes production capacity; More can reduce the torque spring pin untrue fraction defective shortcoming of pegging graft.
Second: utilize trickle pin to be plugged in the pivot wall of two clamps compared to torque spring, the elastic support of present embodiment, be to utilize bridge part as pivoting point, utilize the elongated hole of hollow out to wear group again for alignment pin, resiliency supported with reset, then be dependent on large-area upper and lower fin, then highlight the less trouble advantage of elastic support compared to torque spring.
The 3rd: as in the previous paragraph, present embodiment forms breach design with the elongated hole of bridge part especially, and this breach is pushed in the process in two clamp force section subtends, is playing the part of the problem of stress concentration that lowers elastic support, allows the life-span of elastic support prolong by this.
The the 4th: the anchor clamps of present embodiment, except utilizing the powerful adsorbed oil painting brush of magnet assembly, for making the paintbrush that tilts to be adsorbed in the first clamp positioning part more firm, especially metal embedded part front and back ends is formed the forward and backward barricade that a dimpling goes out the surface, force section, the metal framework that paintbrush is provided against usefulness, to form the anti-defence line of dropping, two roads, allow the attached paintbrush of being stained with a large amount of paint on the bristle, can be from the positioning part landing of tilting yet.
The the 5th: the anchor clamps of present embodiment, be formed with the hole that constitutes lug (pivot) in clamp, the demoulding is constituted this hole by module, and module defines the inboard spacing between two lugs first, then provides clamp, lug and elastic support can implement integrally moulded moulding effect according to this in addition.
The person only is in order to explain the preferred embodiment of this creation from the above mentioned; be not that attempt is done any pro forma restriction to this creation according to this; so, all have following of identical design be relevant any modification of the present utility model or change person, all must be included in the utility model intention protection category.
The utility model in structural design, use on practicality and the cost benefit, it is required to meet on the industry development really fully, and the creation of disclosed structure also is unprecedented innovation structure, wishes that Patent Office examines early, and affirms.
Claims (10)
1. the clip of an adsorbable paintbrush is characterized in that, the clip of described adsorbable paintbrush comprises:
One first clamp and one second clamp, this first clamp and this second clamp, one end are folder portion, and the other end is the force section, between the folder portion and force section of this first and second clamp, be formed with a pivot that is connected, and this first clamp surface is provided with the positioning part that the fuel feeding painting brush is placed;
One elastic support has the upper panel and the lower panel that extend from first, second clamp force section one, and upper and lower fin junction forms a bridge part, and this bridge part laterally runs through the elongated hole of a connection pivot; And an alignment pin, described alignment pin runs through the pivot of first and second clamp and the elongated hole of elastic support, makes first, second integrally formed clamp and elastic support articulate into anchor clamps mutually.
2. the clip of adsorbable paintbrush according to claim 1, it is characterized in that the pivot of described first, second clamp is meant that the clamp dual-side forms two lugs of tool axis hole, be an inboard spacing between two lugs, this clamp is formed with and the wide hole of this inboard spacing.
3. the clip of adsorbable paintbrush according to claim 1 and 2 is characterized in that, two lugs of described first clamp are to be extended down by the clamp dual-side, and two lugs of second clamp are to be extended up by the clamp dual-side; The bridge part of described elastic support is an elongated hole; Inboard spacing between wherein said first clamp, two lugs supplies two lugs of second clamp ccontaining just, the inboard spacing of second clamp, two lugs, the space that is installed with for the bridge part of elastic support.
4. the clip of adsorbable paintbrush according to claim 3, it is characterized in that, the described second clamp dual-side forms the left and right projection that a grade is wider than the first clamp lug width between inboard two lugs, and left and right lug surface then is formed with the concave arc groove of corresponding lug arc surface.
5. the clip of adsorbable paintbrush according to claim 1 is characterized in that, the surface of described storing position contiguous folder portion in the force section comprises metal embedded part and and is installed with magnet assembly in this embedded part.
6. the clip of adsorbable paintbrush according to claim 5 is characterized in that, the corresponding grip part of described metal embedded part length direction is convexly equipped with a forward and backward barricade that is higher than the surface, grip part, and described forward and backward barricade also is higher than the magnet assembly that is installed with in it.
7. the clip of adsorbable paintbrush according to claim 1 is characterized in that, described bridge part is offered the breach of a connection elongated hole.
8. according to the clip of the described adsorbable paintbrush of claim 1, it is characterized in that a sheet metal is protruded in the force section of described second clamp.
9. the clip of adsorbable paintbrush according to claim 1 is characterized in that, described alignment pin normality is to be positioned at the primary importance that folder portion is the elongated hole of clamping state, treats that folder portion is pushed when launching by the force section, then can move to the second place by primary importance.
10. the clip of adsorbable paintbrush according to claim 1 is characterized in that, the folder portion surface of described first, second clamp is formed with continuously arranged tooth portion.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201349341U CN201657963U (en) | 2010-02-10 | 2010-02-10 | Clamp capable of absorbing paint brushes |
DE202010012724U DE202010012724U1 (en) | 2009-09-30 | 2010-09-16 | Clamp for attaching a brush |
FR1057948A FR2950514B3 (en) | 2009-09-30 | 2010-09-30 | PINCE CAPABLE OF ATTRACTING A BRUSH |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201349341U CN201657963U (en) | 2010-02-10 | 2010-02-10 | Clamp capable of absorbing paint brushes |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201657963U true CN201657963U (en) | 2010-12-01 |
Family
ID=43228369
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010201349341U Expired - Fee Related CN201657963U (en) | 2009-09-30 | 2010-02-10 | Clamp capable of absorbing paint brushes |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201657963U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012126397A1 (en) * | 2011-03-23 | 2012-09-27 | 深圳市福智软件技术有限公司 | Clamp for media player |
-
2010
- 2010-02-10 CN CN2010201349341U patent/CN201657963U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012126397A1 (en) * | 2011-03-23 | 2012-09-27 | 深圳市福智软件技术有限公司 | Clamp for media player |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110331786B (en) | Steel structure connecting piece | |
CN201657963U (en) | Clamp capable of absorbing paint brushes | |
CN214280328U (en) | Fixing seat for charging plug of electric automobile | |
CN210949444U (en) | Inclined support pin | |
CN213653788U (en) | Reinforced steel structure node | |
CN211491119U (en) | Universal abrasive paper frame for decoration | |
CN204410740U (en) | A kind of magic besom | |
CN210939006U (en) | Filter core ware spanner that suitability is high | |
CN218149472U (en) | Assembled floor capable of being clamped in sliding manner | |
CN210086496U (en) | Assembly type building socket device | |
CN205625793U (en) | A device for cleaning burglary -resisting window | |
CN211364297U (en) | Intelligent charging cabinet main cabinet | |
CN216940362U (en) | Based on mounting fixture for mechanical assembly | |
CN210377408U (en) | Screwless touch panel installation device | |
CN209770306U (en) | Carpet hair sticking device | |
CN210591697U (en) | Double lower trim cover of automobile back row | |
CN214227898U (en) | Accomodate integral type support seat that charges | |
CN208801230U (en) | Crocodile mouth shape workpiece holding fixture | |
CN214590270U (en) | Photovoltaic cable collection line anchor | |
CN217791902U (en) | Brush with separable brush head and brush handle | |
CN220079904U (en) | Composite geomembrane convenient to connect | |
CN218073951U (en) | Handle rotation type cleaning brush | |
CN219343884U (en) | Wall positioning rib plastering device | |
CN219920951U (en) | Accessory rack for hair collector | |
CN218176311U (en) | Connecting structure of aluminum veneer and keel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101201 Termination date: 20130210 |