CN212688607U - SMC (sheet molding compound) floor tile for blind sidewalks and road warning lines - Google Patents

SMC (sheet molding compound) floor tile for blind sidewalks and road warning lines Download PDF

Info

Publication number
CN212688607U
CN212688607U CN202021098952.9U CN202021098952U CN212688607U CN 212688607 U CN212688607 U CN 212688607U CN 202021098952 U CN202021098952 U CN 202021098952U CN 212688607 U CN212688607 U CN 212688607U
Authority
CN
China
Prior art keywords
layer
brick body
body layer
smc
tile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021098952.9U
Other languages
Chinese (zh)
Inventor
袁春
袁筱月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huasheng New Material Technology Co ltd
Original Assignee
Jiangsu Huasheng New Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huasheng New Material Technology Co ltd filed Critical Jiangsu Huasheng New Material Technology Co ltd
Priority to CN202021098952.9U priority Critical patent/CN212688607U/en
Application granted granted Critical
Publication of CN212688607U publication Critical patent/CN212688607U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a SMC ceramic tile for blind road and road warning line, it includes: a brick layer; the convex layer is arranged on the upper surface of the brick body layer and is connected with the brick body layer; the bottom surface layer is arranged on the lower surface of the brick body layer and is connected with the brick body layer. The floor tile is made of SMC novel materials, is light in weight, good in strength and toughness, excellent in drainage performance, safe, environment-friendly, long in service life, low in production and maintenance cost, capable of realizing mass production, and widely applied to laying of blind roads and road warning lines.

Description

SMC (sheet molding compound) floor tile for blind sidewalks and road warning lines
Technical Field
The utility model relates to a municipal works construction field, specifically speaking relates to a SMC ceramic tile for blind road and road warning line.
Background
The blind road brick is a road paving material which is designed for the blind, raised marks are designed on the surface of the blind road brick, so that the blind can safely walk on a special sidewalk, the blind can walk without barriers, the blind is a special facility for the blind to walk, the road warning brick is a floor tile for warning pedestrians, and the surface of the blind road brick is provided with various raised marks for reminding the pedestrians of road conditions. At present, four types of floor tiles are mainly used for the blind road and the road warning line, namely cement, stainless steel, plastic and ceramic, and the cement tiles are low in price, low in compressive strength and short in service life; the stainless steel brick is thin and easy to deform, has a smooth surface after being used for a long time, and is easy to cause potential safety hazards to pedestrians; the plastic brick has the advantages of thin brick body, no rolling resistance, easy frost cracking and deformation, short service life, good performance of the ceramic brick, higher cost and fewer manufacturers.
Therefore, there is a need for a floor tile that can ensure sufficient mechanical strength, excellent drainage performance, high safety factor, and is easy to manufacture, reusable, and low in cost.
SUMMERY OF THE UTILITY MODEL
In order to solve the problems, the utility model discloses an SMC floor tile for blind road and road warning line, which adopts SMC novel material, has light weight, good strength and toughness, excellent drainage performance, safety, environmental protection, long service life and low production and maintenance cost, can realize mass production and is widely used for laying blind road and road warning line; it includes:
a brick layer;
the convex layer is arranged on the upper surface of the brick body layer and is connected with the brick body layer;
the bottom surface layer is arranged on the lower surface of the brick body layer and is connected with the brick body layer.
Preferably, the brick layer, the convex layer and the bottom surface layer are all made of SMC materials.
Preferably, the brick layer, the protruding layer and the bottom layer are of an integrally formed structure.
Preferably, the bump layer includes:
and the bulges are arranged at intervals to form any preset pattern and are connected with the upper surface of the brick body layer.
Preferably, the sole layer comprises:
and the ribs are arranged in the bottom surface layer at intervals and are connected with the brick body layer.
Preferably, the ribs are arranged in parallel along the paving direction of the floor tile, and the length of each rib is smaller than that of the tile body layer.
Preferably, the brick layer comprises:
the side groove and the side convex block are arranged at the side end of the adjacent brick body layer, the side groove is arranged at the position close to the bottom end of the side end of the brick body layer, the height of the side groove is smaller than the thickness of the brick body layer, and the side convex block is matched with the side groove.
Preferably, when the floor tile is laid, the side grooves and the adjacent floor tile side bumps are connected in a clamping mode along the laying direction, and the side grooves and the side bumps are in clearance fit.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a side view of the structure of the present invention;
fig. 3 is a bottom view of the structure of the present invention;
fig. 4 is a schematic view of the present invention.
In the figure: 1. a brick layer; 1-1. side grooves; 1-2. side bumps; 2. a raised layer; 2-1, convex; 3. a bottom surface layer; 3-1, ribs.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the accompanying drawings, and it should be understood that the described embodiments are only some embodiments, but not all embodiments, of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
The present invention will be further described with reference to the accompanying drawings.
As shown in fig. 1 and fig. 2, the SMC floor tile for a blind sidewalk and a road warning line according to the present embodiment includes:
a brick layer 1;
the protruding layer 2 is arranged on the upper surface of the brick body layer 1, and the protruding layer 2 is connected with the brick body layer 1;
and the bottom surface layer 3 is arranged on the lower surface of the brick body layer 1 and is connected with the brick body layer 1.
The utility model discloses a theory of operation and beneficial effect do:
the utility model provides a SMC ceramic tile for blind road and road warning line adopts the SMC material to make, 1 clamp in brick layer is located between protruding layer 2 and bottom surface layer 3, adopts SMC material high temperature high pressure suppression integrated into one piece, and during the use, adjacent ceramic tile is laid and is passed through 1 block in brick layer is connected, protruding layer 2 sets up arbitrary form's arch 2-1 according to the design for guide direction and warning pedestrian, bottom surface layer 3 adopts interval bead structure, guarantees installation and drainage. Compared with the prior art, the utility model discloses the quality is light, and intensity and toughness are good, and drainage performance is good, and safety ring protects, and long service life can realize mechanized mass production.
In one embodiment, the tile body layer 1, the raised layer 2 and the bottom surface layer 3 are made of SMC material.
The working principle and the beneficial effects of the technical scheme are as follows:
the SMC floor tile for the blind road and the road warning line is made of an SMC material, wherein the SMC is a sheet molding compound for short, and is an unsaturated polyester glass fiber composite material prepared by taking unsaturated polyester resin as a binder, adding glass fiber, filler, pigment and other auxiliaries, impregnating glass fiber yarns and covering two sides with films. The antiskid performance is excellent, and the safety performance is higher; the wear resistance is excellent, and the service life is long; the method is safe, environment-friendly and reusable; easy cleaning and low maintenance; the floor is flame-retardant and burn-resistant, and the surface of the floor cannot be damaged; can be laid indoors and outdoors, and has wide application range.
In one embodiment, the tile body layer 1, the projection layer 2 and the bottom surface layer 3 are of an integrally formed structure.
The working principle and the beneficial effects of the technical scheme are as follows:
the traditional floor tiles for the blind sidewalks and the road warning lines are of a layered structure, the tile body layer 1 is formed independently, the protruding layer 2 and the bottom surface layer 3 are connected with the tile body layer 1 through filling of curing materials, the material continuity is poor, and the tiles are prone to fracture and failure when external force is applied. The brick body layer 1, the protruding layer 2 and the bottom surface layer 3 are integrally formed at high temperature and high pressure, no seam exists among layers, safety and environmental protection are achieved, and the manufactured floor tile is good in overall continuity, high in size precision, excellent in mechanical property and convenient to install and use.
In one embodiment, the bump layer 2 includes:
the brick body layer comprises a plurality of protrusions 2-1, wherein the protrusions 2-1 are arranged at intervals to form any preset pattern and are connected with the upper surface of the brick body layer 1.
The working principle and the beneficial effects of the technical scheme are as follows:
when the SMC floor tile for the blind sidewalk and the road warning line is used, the pattern of the protrusions 2-1 is designed according to use requirements, the protrusions 2-1 are any one or a plurality of combinations of circles, long strips, arcs, characters and marks, the heights of the protrusions 2-1 are consistent, the floor tile is obviously distinguished from common floor tiles according to the pattern of the protrusions 2-1 while having attractiveness, the blind sidewalk guiding and safety warning effects are achieved, meanwhile, accumulated water can be gathered in gaps formed by the protrusions 2-1, the accumulated water is prevented from splashing, the anti-skidding effect is achieved, and the safe traveling of pedestrians is guaranteed.
As shown in fig. 3, in one embodiment, the bottom surface layer 3 includes:
the brick body layer is characterized by comprising a plurality of ribs 3-1, and the ribs 3-1 are arranged in the bottom surface layer 3 at intervals and connected with the brick body layer 1.
The working principle and the beneficial effects of the technical scheme are as follows:
the SMC floor tile for the blind sidewalk and the road warning line is connected with the ground through the bottom surface layer 3, the floor tile is influenced by unevenness of the ground when being installed, a plurality of convex edges 3-1 are arranged in the bottom surface layer 3 at intervals to form concave-convex lines, the contact area of the floor tile and the ground is reduced, the structure quality is light, the load bearing effect is good, the installation stability is guaranteed, and meanwhile, ponding splashing caused by loose connection of the floor tile is prevented.
In one embodiment, a plurality of the ribs 3-1 are arranged in parallel along the paving direction of the floor tile, and the length of the ribs 3-1 is smaller than that of the tile body layer 1.
The working principle and the beneficial effects of the technical scheme are as follows:
the plurality of the convex edges 3-1 are arranged in parallel along the paving direction of the floor tiles, a transverse water guiding groove is formed between every two adjacent convex edges 3-1, and when the adjacent floor tiles are paved, a longitudinal water guiding groove can be formed because the length of the convex edges 3-1 is smaller than that of the tile body layer 1 and a gap is formed between the convex edges 3-1 of the adjacent floor tiles. Therefore, the floor tiles can be communicated through the water guide grooves when being spliced in parallel and vertically, the retained water in gaps between the bottom of each floor tile and the adjacent floor tiles can be effectively discharged, meanwhile, the reverse seepage of the upward underground water can be blocked and discharged, and the road surface is prevented from being wet and slippery.
As shown in fig. 4, in one embodiment, the brick layer 1 comprises:
the brick body layer comprises side grooves 1-1 and side protrusions 1-2, wherein the side grooves 1-1 and the side protrusions 1-2 are arranged at the side ends of the adjacent brick body layer 1, the side grooves 1-1 are arranged at the positions, close to the bottom end, of the side ends of the brick body layer 1, the height of the side grooves 1-1 is smaller than the thickness of the brick body layer 1, and the side protrusions 1-2 are matched with the side grooves 1-1.
The working principle and the beneficial effects of the technical scheme are as follows:
the lateral side of the brick body layer 1 is provided with a plurality of lateral grooves 1-1 and lateral protrusions 1-2, the lateral grooves 1-1 and the lateral protrusions 1-2 are arranged at the position, close to the bottom end, of the lateral side of the brick body layer 1, the groove height of the lateral grooves 1-1 is smaller than the thickness of the brick body layer 1, the height of the lateral protrusions 1-2 is equal to the groove height of the lateral grooves 1-1, the lateral grooves 1-1 are connected with the lateral protrusions of the adjacent floor tiles in a clamping mode, horizontal and vertical displacement of the brick body layer 1 is effectively limited, and the upper surfaces of the adjacent brick body layers 1 are flush. The floor tile has the advantages of simple connection form, high flatness, stable and smooth connection, no obvious concave-convex feeling at the joint and convenience in walking.
In one embodiment, the side grooves 1-1 and the adjacent side bumps 1-2 of the floor tile are connected in a snap fit manner along the laying direction, and the side grooves 1-1 and the side bumps 1-2 are in clearance fit.
The working principle and the beneficial effects of the technical scheme are as follows:
the side grooves 1-1 and the side protrusions 1-2 are in clearance fit, when water is accumulated above the floor tiles, the accumulated water can flow to the water guide groove formed by the bottom surface layer 3 along the assembly clearance from the clearance between the side grooves 1-1 and the side protrusions 1-2, so that the accumulated water can be conveniently discharged, and meanwhile, after the floor tiles are integrally laid, the assembly stress among the floor tiles can be favorably eliminated, and the uneven and raised phenomenon of the floor tiles caused by over-tight assembly can be prevented.
It should be understood that the above examples are only for clarity of illustration and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And obvious variations or modifications therefrom are within the scope of the invention.

Claims (4)

1. The utility model provides a SMC ceramic tile for blind road and road warning line which characterized in that includes:
a brick layer (1);
the protruding layer (2) is arranged on the upper surface of the brick body layer (1) and connected with the brick body layer (1);
the bottom layer (3) is arranged on the lower surface of the brick body layer (1) and connected with the brick body layer (1);
the brick body layer (1), the protruding layer (2) and the bottom surface layer (3) are all made of SMC materials;
the brick layer (1) comprises: the brick body layer is characterized by comprising side grooves (1-1) and side lugs (1-2), wherein the side grooves (1-1) and the side lugs (1-2) are arranged at the side ends of the adjacent brick body layers (1), the side grooves (1-1) are arranged at the positions, close to the bottom ends, of the side ends of the brick body layers (1), the groove heights of the side grooves (1-1) are smaller than the thickness of the brick body layers (1), and the side lugs (1-2) are matched with the side grooves (1-1);
the bump layer (2) includes: the bulges (2-1) are arranged at intervals to form any preset pattern and are connected with the upper surface of the brick body layer (1);
the floor layer (3) includes: the brick body layer is characterized by comprising a plurality of ribs (3-1), wherein the ribs (3-1) are arranged in the bottom surface layer (3) at intervals and connected with the brick body layer (1).
2. An SMC floor tile for blind sidewalks and road warning lines according to claim 1, wherein the tile body layer (1), the convex layer (2) and the bottom surface layer (3) are of an integrated structure.
3. An SMC tile for blind sidewalks and road warning lines according to claim 1, wherein a plurality of the ribs (3-1) are arranged in parallel along the tile laying direction, and the length of the ribs (3-1) is less than that of the tile body layer (1).
4. An SMC floor tile for a blind sidewalk and a road warning line according to claim 1, wherein when the floor tile is laid, the side grooves (1-1) and the adjacent side projections (1-2) of the floor tile are in snap connection along the laying direction, and the side grooves (1-1) and the side projections (1-2) are in clearance fit.
CN202021098952.9U 2020-06-15 2020-06-15 SMC (sheet molding compound) floor tile for blind sidewalks and road warning lines Active CN212688607U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021098952.9U CN212688607U (en) 2020-06-15 2020-06-15 SMC (sheet molding compound) floor tile for blind sidewalks and road warning lines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021098952.9U CN212688607U (en) 2020-06-15 2020-06-15 SMC (sheet molding compound) floor tile for blind sidewalks and road warning lines

Publications (1)

Publication Number Publication Date
CN212688607U true CN212688607U (en) 2021-03-12

Family

ID=74890513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021098952.9U Active CN212688607U (en) 2020-06-15 2020-06-15 SMC (sheet molding compound) floor tile for blind sidewalks and road warning lines

Country Status (1)

Country Link
CN (1) CN212688607U (en)

Similar Documents

Publication Publication Date Title
US9545771B2 (en) Multi-component tiles
DE202010002641U1 (en) Optically attractive motion joint profiles with excellent tread-resistant tread, durable abrasion resistance and high load capacity
CN107237232B (en) high-durability cement concrete pavement expansion joint structure and construction method thereof
CN212688607U (en) SMC (sheet molding compound) floor tile for blind sidewalks and road warning lines
KR200435457Y1 (en) Rubber mat capable of preventing a slip for a steep grade pavement
KR101156419B1 (en) Footpath block of crosswalk with a sliding safety function
CN211256561U (en) Anti-fracture pavement floor tile
CN211498338U (en) Cement asphalt concrete pavement structure
KR101145816B1 (en) Retroreflection Type Rugged Pavement and Method for Consructing the Same
CN115559170B (en) Friendly intelligent sidewalk pavement disposal structure and construction method thereof
CN2325457Y (en) Luminous and slipping-proof plastic web for stairs decoration
CN220014247U (en) Pavement plate with warning edge
CN215564148U (en) Oil-proof pollution-resistant floor
CN219032822U (en) Environment-friendly pavement brick
CN216040491U (en) Double-layer embedded water-permeable interlocking splash-proof sidewalk slab
CN209958166U (en) Floating-point type basalt asphalt pavement structure
CN214831653U (en) High-strength asphalt track
CN220746479U (en) Waterlogging-preventing water permeable brick
CN220521838U (en) Anti-slip ceramic tile
KR101406295B1 (en) Boundary stone
CN215668801U (en) Infiltration brick with side connection structure
CN204551163U (en) A kind of anti-skid surface brick with noctilucence
CN216904231U (en) Cable trench cover plate for slope
CN210507036U (en) Modular prevention of seepage water pavement board
CN219909755U (en) Waterproof and anti-slip structure for ground

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant