CN212683801U - Pipeline installation appurtenance - Google Patents

Pipeline installation appurtenance Download PDF

Info

Publication number
CN212683801U
CN212683801U CN202021521539.9U CN202021521539U CN212683801U CN 212683801 U CN212683801 U CN 212683801U CN 202021521539 U CN202021521539 U CN 202021521539U CN 212683801 U CN212683801 U CN 212683801U
Authority
CN
China
Prior art keywords
fixedly connected
fixing
sliding
pipeline
pipeline installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021521539.9U
Other languages
Chinese (zh)
Inventor
吴义明
徐杨
徐旭锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hongrun Construction Group Co Ltd
Original Assignee
Hongrun Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hongrun Construction Group Co Ltd filed Critical Hongrun Construction Group Co Ltd
Priority to CN202021521539.9U priority Critical patent/CN212683801U/en
Application granted granted Critical
Publication of CN212683801U publication Critical patent/CN212683801U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a pipeline installation appurtenance relates to pipeline installation technical field, including casing, second fixed plate and receiver, the upper surface of second fixed plate is seted up flutedly, and the spout has all been seted up to the front and back both sides face of recess inner wall, and sliding connection has first slider in the spout, and the equal joint of opposite face of two first sliders has the second bearing, has cup jointed the second pivot in the second bearing. The utility model discloses, through setting up spout, first slider and universal wheel, utilize the universal wheel can change pipeline transport's horizontal position at will, through setting up second pivot and second bearing, can remove the casing to the right-hand member of fixed plate, then utilize the second pivot at the second bearing internal rotation, fall the casing in the recess, reduced the shared volume of supplementary mounting tool after the installation, make pipeline transportation process safety and stability more through setting up second fixed establishment.

Description

Pipeline installation appurtenance
Technical Field
The utility model relates to a pipeline installation technical field, concretely relates to pipeline installation appurtenance.
Background
The pipeline is used under many conditions in the current society, the use of the pipeline is more and more popular, so the installation of the pipeline is particularly important, a convenient, quick and safe auxiliary tool for pipeline installation is necessary, the auxiliary tool for pipeline installation in family life or industrial construction is often used, according to the auxiliary device for boiler pipeline installation provided by Chinese patent (patent number: CN201920268412.1), the proposal describes that a movable column is sleeved on a fixed sleeve, the outer wall of the fixed sleeve is connected with a locking bolt in a threaded manner, one end of the movable column is welded with a V-shaped pressing plate, the bottom end of the V-shaped pressing plate is bonded with an anti-skidding cushion, the boiler pipeline to be connected can be placed on a pipeline supporting table board, then the movable column is pressed to enable the V-shaped pressing plate to be tightly attached to the outer wall of the boiler pipeline, then the locking bolt is rotated to limit and fix the movable column, further ensuring the stability of the boiler pipeline, facilitating the connection of people to the pipeline, simultaneously playing a certain protection role by the antiskid cushion, avoiding the pressure loss of the V-shaped pressing plate to the pipeline, having strong applicability, and 'installing a sleeve at the center of the top end of the supporting bottom plate, the sleeve being connected with an adjusting bolt, and the top end of the sleeve being connected with a telescopic column, one end of the telescopic column being welded with the bottom end face of the pipeline supporting table, manually adjusting the adjusting bolt to enable the telescopic column to freely extend and retract, enabling the boiler pipeline on the pipeline supporting table to be at a proper height, playing a good auxiliary role in the installation of the boiler pipeline', but in daily family life, the pipeline is very inconvenient to install, the pipeline needs to be moved to any position, then the pipeline is transported to the vicinity of workers in high-place construction from a low position, and the auxiliary tool has a certain height, resulting in larger volume and large occupied space, is inconvenient to transport and use.
SUMMERY OF THE UTILITY MODEL
The purpose of the utility model is to solve the shortcoming that exists among the prior art, if: the pipeline installation auxiliary tool aims to solve the problems that the pipeline cannot be moved to any required position when the pipeline is installed indoors, and after the pipeline is installed, the pipeline installation auxiliary tool occupies a larger volume and cannot be stored in time.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
an auxiliary tool for installing pipeline is composed of a casing, second fixed plate and receiver, the upper surface of second fixed plate is seted up flutedly, the spout has all been seted up to the front and back both sides face of recess inner wall, sliding connection has first slider in the spout, the equal joint of opposite face of two first sliders has the second bearing, the second pivot has been cup jointed in the second bearing, the last fixed surface of second pivot is connected with the casing, the last fixed surface of casing is connected with the fixing base, the left surface fixedly connected with motor of fixing base, the output shaft of motor run through the upper surface of casing and with the inside lifting mechanism fixed connection of casing, the through-hole has been seted up to the right flank of casing, lifting mechanism passes through-hole and first fixed plate fixed connection, the last fixed surface of first fixed plate is connected with the support frame, fixedly connected with receiver on the support frame, set up second fixed establishment in the receiver, the first fixed establishment.
Further, a plurality of fixed orificess have been seted up to the lower surface of recess inner wall, and a plurality of fixed orificess turn right evenly distributed from a left side.
Further, first fixed establishment includes first screw thread post and fixed block, and first screw thread post runs through the fixed block and extends to in the fixed orifices, and fixed block fixed connection is at the right flank of casing.
Further, second fixed establishment includes sliding sleeve, slide bar, spring, grab handle and supports the board, and the back joint of receiver has the sliding sleeve, and sliding connection has the slide bar in the sliding sleeve, and the one end fixedly connected with of slide bar supports the board, supports the inner wall laminating of board and receiver.
Further, the lifting mechanism comprises a second sliding block, a threaded cap, a second threaded column, a first rotating shaft and a first bearing, the top end of the second threaded column is fixedly connected with an output shaft of the motor, the threaded cap is connected with the outer surface of the second threaded column in a threaded manner, the second sliding block is fixedly connected with the right side face of the threaded cap, and the first fixing plate is fixedly connected with the right side face of the second sliding block.
Furthermore, four corners of the lower surface of the second fixing plate are fixedly connected with universal wheels.
Furthermore, the other end fixedly connected with grab handle of slide bar, the surface of slide bar has cup jointed the spring, and the both ends of spring fixed connection respectively are in the front of sliding sleeve and the back of supporting the board.
Further, the lower surface fixedly connected with first pivot of second screw thread post, first pivot cup joints in first bearing, and first bearing joint is at shells inner wall's upper surface.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the utility model discloses a set up spout, first slider and universal wheel, utilize the universal wheel can change pipeline transport's horizontal position at will, when meetting special topography, for example lean on the position of wall, when the universal wheel supported the unable removal in corner, the position of removing first slider can change pipeline transport's the position of controlling equally, and the rethread sets up lifting mechanism and can transports the eminence by the low with the pipeline, makes things convenient for the workman of eminence to carry out the installation of pipeline.
(2) The utility model discloses a set up second pivot and second bearing, after finishing the installation, can remove the rightmost end of fixed plate with the casing, then utilize the second pivot at the second bearing internal rotation, fall the casing in the recess, reach the effect of accomodating, reduced the shared volume of supplementary mounting tool after the installation.
(3) The utility model discloses a set up the fixed pipeline of putting into and holding in the box that second fixed establishment can be better, make pipeline transportation process safety and stability more.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of a pipeline installation auxiliary tool of the present invention;
fig. 2 is a schematic side sectional structural view of the auxiliary tool for pipeline installation according to the present invention;
fig. 3 is a schematic structural diagram of the auxiliary tool for pipeline installation of the present invention.
The list of components represented by the various reference numbers in the figures is as follows: 1-a first securing mechanism; 101-a first threaded post; 102-fixed block; 2-a fixed seat; 3-a second fixing mechanism; 301-a sliding sleeve; 302-a slide bar; 303-a spring; 304-a resisting plate; 305-a handle; 4-a storage box; 5-a support frame; 6-a first slide block; 7-a through hole; 8-a first fixing plate; 9-a lifting mechanism; 901-second slider; 902-a screw cap; 903-a second threaded post; 904-first shaft; 905-a first bearing; 10-a housing; 11-a motor; 12-a second bearing; 13-a second shaft; 14-a fixation hole; 15-a second fixing plate; 16-a chute; 17-universal wheel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-3, a pipeline installation auxiliary tool comprises a housing 10, a second fixing plate 15 and a storage box 4, wherein a groove is formed in the upper surface of the second fixing plate 15, sliding grooves 16 are formed in the front side surface and the rear side surface of the inner wall of the groove, first sliding blocks 6 are slidably connected in the sliding grooves 16, second bearings 12 are respectively clamped on the opposite surfaces of the two first sliding blocks 6, second rotating shafts 13 are sleeved in the second bearings 12, the housing 10 is fixedly connected to the upper surface of the second rotating shafts 13, a fixed seat 2 is fixedly connected to the upper surface of the housing 10, a motor 11 is fixedly connected to the left side surface of the fixed seat 2, an output shaft of the motor 11 penetrates through the upper surface of the housing 10 and is fixedly connected with a lifting mechanism 9 inside the housing 10, a through hole 7 is formed in the right side surface of the housing 10, the lifting mechanism 9 penetrates through the through hole 7 and, fixedly connected with receiver 4 on the support frame 5 sets up second fixed establishment 3 in the receiver 4, the first fixed establishment 1 of right flank fixedly connected with of casing 10.
Specifically, as shown in fig. 1 and 3, a plurality of fixing holes 14 are formed in the lower surface of the inner wall of the groove, the fixing holes 14 are uniformly distributed from left to right, the shell 10 is conveniently fixed at a plurality of positions by arranging the fixing holes 14, and the pipeline is conveniently conveyed to hands of workers at different positions.
Specifically, as shown in fig. 1, the first fixing mechanism 1 includes a first threaded post 101 and a fixing block 102, the first threaded post 101 penetrates through the fixing block 102 and extends into the fixing hole 14, the fixing block 102 is fixedly connected to the right side surface of the housing 10, and by arranging the fixing block 102 and the first threaded post 101, the first threaded post 101 penetrates through the fixing block and is inserted into the fixing hole 14, so as to fix the housing 10.
Specifically, as shown in fig. 1 and fig. 3, second fixed establishment 3 includes sliding sleeve 301, slide bar 302, spring 303, grab handle 305 and support board 304, the back joint of receiver 4 has sliding sleeve 301, sliding sleeve 301 sliding connection has slide bar 302, the one end fixedly connected with of slide bar 302 supports board 304, support board 304 and the laminating of receiver 4's inner wall, through setting up grab handle 305, pulling grab handle 305 drives slide bar 302 and slides in sliding sleeve 301, outwards stimulate grab handle 305 and make support board 304 rearward movement, reach the purpose that can put into receiver 4 with the pipeline.
Specifically, as shown in fig. 1-2, the lifting mechanism 9 includes a second slider 901, a screw cap 902, a second screw column 903, a first rotating shaft 904 and a first bearing 905, the top end of the second screw column 903 is fixedly connected to an output shaft of the motor 11, the outer surface of the second screw column 903 is in threaded connection with the screw cap 902, the right side of the screw cap 902 is fixedly connected to the second slider 901, the right side of the second slider 901 is fixedly connected to a first fixing plate 8, the motor 11 is used to drive the second screw column 903 to rotate, the rotation of the second screw column 903 is used to drive the screw cap 902 to move up and down, and then the up and down movement of the screw cap 902 is used to drive the up and down movement of the second slider 901, so as to transport the pipeline from the lower position to the higher position, and facilitate the installation of the pipeline by a worker at the higher position.
Specifically, as shown in fig. 1, the four corners of the lower surface of the second fixing plate 15 are fixedly connected with universal wheels 17, and the pipeline can be moved to any position by the universal wheels 17, so that the pipeline can be transported conveniently.
Specifically, the other end of the sliding rod 302 is fixedly connected with a grab handle 305, the outer surface of the sliding rod 302 is sleeved with a spring 303, two ends of the spring 303 are respectively and fixedly connected to the front surface of the sliding sleeve 301 and the back surface of the resisting plate 304, the grab handle 305 is loosened after the placement is completed through the arrangement of the spring 303, the resisting plate 304 moves to the original position again to be propped against the pipeline by means of the elastic force of the spring 303, and the clamping effect on the pipeline is achieved.
Specifically, as shown in fig. 1-2, the lower surface of the second threaded column 903 is fixedly connected with a first rotating shaft 904, the first rotating shaft 904 is sleeved in a first bearing 905, the first bearing 905 is clamped on the upper surface of the inner wall of the housing 10, and by arranging the first rotating shaft 904 and rotating in the first bearing 905 by using the first rotating shaft 904, the position of the second threaded column 903 in the housing 10 can be fixed, so that the second threaded column cannot move left or right.
In the utility model, when the device is used and the pipeline is needed to be conveyed to any position during the installation of the pipeline, the pipeline is firstly put into the storage box 4, the second fixing mechanism 3 is used for fixing the pipeline, and then the pipeline is moved through the universal wheel 17, when the pipeline is installed indoors, if the universal wheel 17 is resisted to be incapable of moving in case of special terrain, the position of pipeline transportation can be changed by moving the first slide block 6 left and right, the shell 10 is fixed by the first fixing mechanism 1, and then the motor 11 is controlled to work to drive the second slider 901 to move up and down, so that the pipeline at the lower part is transported to the high part, the pipeline installation by workers at the high part is convenient, when the pipeline is not needed to be used, after the pipeline transportation is completed, the first threaded column 101 is pulled out, the casing 10 is moved to the rightmost end, and then the casing 10 is placed in the groove under the action of the second rotating shaft 13 and the second bearing 12, so that the casing 10 is completely accommodated.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not exhaustive and do not limit the invention to the precise embodiments. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (8)

1. A pipeline installation auxiliary tool comprises a shell (10), a second fixing plate (15) and a storage box (4), and is characterized in that a groove is formed in the upper surface of the second fixing plate (15), sliding grooves (16) are formed in the front side surface and the rear side surface of the inner wall of the groove, first sliding blocks (6) are connected in the sliding grooves (16) in a sliding mode, second bearings (12) are connected to opposite surfaces of the two first sliding blocks (6) in a clamping mode, second rotating shafts (13) are sleeved in the second bearings (12), the shell (10) is fixedly connected to the upper surface of each second rotating shaft (13), fixing seats (2) are fixedly connected to the upper surface of the shell (10), motors (11) are fixedly connected to the left side surfaces of the fixing seats (2), output shafts of the motors (11) penetrate through the upper surface of the shell (10) and are fixedly connected with lifting mechanisms (9) inside the shell (10), through holes (7), lifting mechanism (9) pass through-hole (7) and first fixed plate (8) fixed connection, and the last fixed surface of first fixed plate (8) is connected with support frame (5), fixedly connected with receiver (4) on support frame (5), sets up second fixed establishment (3) in receiver (4), the first fixed establishment (1) of right flank fixedly connected with of casing (10).
2. The auxiliary tool for pipeline installation according to claim 1, wherein the lower surface of the inner wall of the groove is provided with a plurality of fixing holes (14), and the plurality of fixing holes (14) are uniformly distributed from left to right.
3. The auxiliary tool for pipeline installation according to claim 1, wherein the first fixing mechanism (1) comprises a first threaded column (101) and a fixing block (102), the first threaded column (101) penetrates through the fixing block (102) and extends into the fixing hole (14), and the fixing block (102) is fixedly connected to the right side face of the shell (10).
4. The auxiliary tool for pipeline installation according to claim 1, wherein the second fixing mechanism (3) comprises a sliding sleeve (301), a sliding rod (302), a spring (303), a grab handle (305) and a resisting plate (304), the sliding sleeve (301) is connected to the back surface of the storage box (4) in a clamping mode, the sliding rod (302) is connected in the sliding sleeve (301) in a sliding mode, the resisting plate (304) is fixedly connected to one end of the sliding rod (302), and the resisting plate (304) is attached to the inner wall of the storage box (4).
5. The auxiliary tool for pipeline installation according to claim 1, wherein the lifting mechanism (9) comprises a second sliding block (901), a threaded cap (902), a second threaded column (903), a first rotating shaft (904) and a first bearing (905), the top end of the second threaded column (903) is fixedly connected with an output shaft of the motor (11), the threaded cap (902) is connected to the outer surface of the second threaded column (903) in a threaded manner, the second sliding block (901) is fixedly connected to the right side surface of the threaded cap (902), and the first fixing plate (8) is fixedly connected to the right side surface of the second sliding block (901).
6. The auxiliary tool for pipeline installation according to claim 1, wherein universal wheels (17) are fixedly connected to four corners of the lower surface of the second fixing plate (15).
7. The auxiliary tool for pipeline installation according to claim 4, wherein a handle (305) is fixedly connected to the other end of the sliding rod (302), a spring (303) is sleeved on the outer surface of the sliding rod (302), and two ends of the spring (303) are respectively and fixedly connected to the front surface of the sliding sleeve (301) and the back surface of the abutting plate (304).
8. The auxiliary tool for pipeline installation according to claim 5, wherein a first rotating shaft (904) is fixedly connected to the lower surface of the second threaded column (903), the first rotating shaft (904) is sleeved in a first bearing (905), and the first bearing (905) is clamped on the upper surface of the inner wall of the housing (10).
CN202021521539.9U 2020-07-22 2020-07-22 Pipeline installation appurtenance Expired - Fee Related CN212683801U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021521539.9U CN212683801U (en) 2020-07-22 2020-07-22 Pipeline installation appurtenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021521539.9U CN212683801U (en) 2020-07-22 2020-07-22 Pipeline installation appurtenance

Publications (1)

Publication Number Publication Date
CN212683801U true CN212683801U (en) 2021-03-12

Family

ID=74901678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021521539.9U Expired - Fee Related CN212683801U (en) 2020-07-22 2020-07-22 Pipeline installation appurtenance

Country Status (1)

Country Link
CN (1) CN212683801U (en)

Similar Documents

Publication Publication Date Title
CN212683801U (en) Pipeline installation appurtenance
CN213163544U (en) Tool base that can convenient angle regulation
CN210672632U (en) Bookshelf stable structure in library
CN215547386U (en) Oil pan deburring mechanism
CN110979417B (en) Portable carrying device
CN214520022U (en) Three-dimensional operation panel convenient to dismouting
CN210407414U (en) Novel slide case and bag
CN114871939A (en) Magnetic polishing equipment for aerospace part processing and polishing method thereof
CN210581582U (en) Computer desk with multi-angle adjusting function
CN113038756A (en) Multimedia instrument based on art design
CN215126575U (en) Meeting exhibition reception desk convenient to remove
CN220734799U (en) File storage cabinet
CN215150653U (en) Efficient fluting device for building construction water and electricity layout design
CN214295371U (en) Art education is with folding drawing board
CN208192439U (en) Slide plate fold locking mechanisms and slide plate luggage
CN217620474U (en) Portable LED lamp assembling machine table
CN216098786U (en) Movable steel mould platform with combined function
CN213576456U (en) Vertical display screen fixing device
CN214493941U (en) Storage basket with fastening tool function for engineering cost
CN211902245U (en) Computer case rotating seat
CN218182392U (en) Portable power supply
CN211608663U (en) Enterprise management is with theftproof document case cabinet
CN209435669U (en) A kind of locking panel applied to drawing-aid device
CN215014638U (en) Be applied to architectural design's special drawing appurtenance
CN215488741U (en) BIM-based VR display system platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210312

Termination date: 20210722

CF01 Termination of patent right due to non-payment of annual fee