CN212671352U CN202020768060.9U CN202020768060U CN212671352U CN 212671352 U CN212671352 U CN 212671352U CN 202020768060 U CN202020768060 U CN 202020768060U CN 212671352 U CN212671352 U CN 212671352U
Authority
CN
China
Prior art keywords
groove
guard
bolt
fixed
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020768060.9U
Other languages
Chinese (zh)
Inventor
蒲金贺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panjin Hongtongda Industrial Co ltd
Original Assignee
Chuzhou Yijian Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chuzhou Yijian Construction Engineering Co ltd filed Critical Chuzhou Yijian Construction Engineering Co ltd
Priority to CN202020768060.9U priority Critical patent/CN212671352U/en
Application granted granted Critical
Publication of CN212671352U publication Critical patent/CN212671352U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The utility model discloses a rail guard for building engineering with prevent structure that inclines, including rail guard, water pump and second bolt, first recess has been seted up on the surface of rail guard, and the fixed surface of first recess has first fixed block, the inboard of first fixed block is inserted and is equipped with first dwang, and the surface of first dwang has cup jointed the fixed bolster, the inside of fixed bolster is inserted and is equipped with first bolt, the second recess has been seted up on the surface of rail guard, and the inboard of second recess is fixed with the second dwang, the surface of second dwang has cup jointed the commentaries on classics board, the third recess has been seted up on the surface of rail guard, and the bottom mounting of third recess has the water pump. The utility model discloses be provided with first bolt and fixed bolster, make the device can not take place the slope, through water pump and atomizing gondola water faucet, make the device can the dust fall.

Description

Rail guard for building engineering with prevent structure that inclines
Technical Field
The utility model relates to an engineering apparatus technical field specifically is a rail guard for building engineering with prevent inclining structure.
Background
With the continuous development of modern society, city construction is an indispensable part in city development, and in order to ensure the construction safety of construction engineering, various protective guards for engineering produced by engineering equipment companies are continuously optimized.
Although the existing protective guard has a certain separation effect, the existing protective guard has poor stability, is easy to incline, is easy to tilt under strong wind blowing, generates a large amount of dust during engineering construction, and is difficult to isolate, so that a protective guard for building engineering with an anti-inclination structure is needed to solve the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a rail guard for building engineering with prevent structure that inclines to the easy slope that provides in solving above-mentioned background art and the problem of dust fall.
In order to achieve the above object, the utility model provides a following technical scheme: a protective guard for building engineering with an anti-tilting structure comprises a protective guard, a water pump and a second bolt, wherein a first groove is formed in the surface of the protective guard, a first fixing block is fixed on the surface of the first groove, a first rotating rod is inserted into the inner side of the first fixing block, a fixing support is sleeved on the surface of the first rotating rod, the first bolt is inserted into the fixing support, a second groove is formed in the surface of the protective guard, a second rotating rod is fixed on the inner side of the second groove, a rotating plate is sleeved on the surface of the second rotating rod, a third groove is formed in the surface of the protective guard, the water pump is fixed at the bottom end of the third groove, a second fixing block is fixed on the left side of the top end of the protective guard, a sixth groove is formed in the inner side of the second fixing block, an atomization sprinkler is fixed on the surface of the top end of the protective guard, a fourth groove is formed in the right, and a fifth groove is formed in the top end of the right side of the guard rail.
Preferably, the surface of the first bolt and the inner side of the fixed support are both provided with threads, and the first bolt is rotatably connected with the fixed support through the threads.
Preferably, five groups of the second grooves are uniformly formed in the second groove, the five groups of the second grooves are distributed on the surface of the guard rail side by side, and a water tank is fixedly mounted inside the middle group of the second grooves.
Preferably, the water pump has seted up the inlet outlet in the inside of rail guard, the water inlet of water pump is connected with the water tank, the delivery port of water pump is connected with the atomizing gondola water faucet.
Preferably, the left side of the second fixing block is the same as the inner side of the fifth groove in size, and the second fixing block is inserted into the fifth groove.
Preferably, the bottom end of the second bolt is the same as the inner side of the fourth groove in size, the bottom end of the second bolt is the same as the inner side of the sixth groove in size, and the second bolt is inserted into the sixth groove through the fourth groove.
Compared with the prior art, the beneficial effects of the utility model are that: the device is provided with first bolt and fixed bolster, makes the device can not take place the slope, through water pump and atomizing gondola water faucet, makes the device can the dust fall.
(1) The device is provided with first bolt and fixed bolster, makes the device can not take place the slope, puts down the fixed bolster, passes the fixed bolster with first bolt again and nails ground into, because the both sides of rail guard all have fixed bolster and first bolt, all nail the first bolt of both sides into, make the rail guard fixed, greatly increased device stability, under the ground that first bolt was nailed into can not become flexible, the device can not remove in what circumstances.
(2) The device passes through water pump and atomizing gondola water faucet, makes the device can the dust fall, under the water pump effect, makes the water tank outwards spray water through atomizing gondola water faucet, degrades outside dust, greatly reduced environmental pollution, messenger's rail guard has the effect of keeping apart the dust, makes passerby who passes by can not cause the health discomfort because of inhaling the dust, the protection is healthy.
Drawings
FIG. 1 is a schematic sectional view of the front view of the structure of the present invention;
FIG. 2 is a schematic front view of the structure of the present invention;
FIG. 3 is a schematic side view of the structure of the present invention;
fig. 4 is a schematic top view of the structure of the present invention.
In the figure: 1. protecting the fence; 2. a first groove; 3. a first fixed block; 4. a first rotating lever; 5. fixing a bracket; 6. a first bolt; 7. a second groove; 8. a second rotating lever; 9. rotating the plate; 10. a third groove; 11. a water pump; 12. a second fixed block; 13. atomizing the shower head; 14. a fourth groove; 15. a second bolt; 16. a fifth groove; 17. a water tank; 18. and a sixth groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides an embodiment:
a guard rail with an anti-tilting structure for building engineering comprises a guard rail 1, a water pump 11 and second bolts 15, wherein a first groove 2 is formed in the surface of the guard rail 1, a first fixing block 3 is fixed on the surface of the first groove 2, a first rotating rod 4 is inserted into the inner side of the first fixing block 3, a fixing support 5 is sleeved on the surface of the first rotating rod 4, a first bolt 6 is inserted into the fixing support 5, threads are formed in the surface of the first bolt 6 and the inner side of the fixing support 5, the first bolt 6 is rotatably connected with the fixing support 5 through the threads, the first bolt 6 is inserted into the ground through the fixing support 5, the stability of the device is improved, the device cannot tilt, a second groove 7 is formed in the surface of the guard rail 1, a second rotating rod 8 is fixed on the inner side of the second groove 7, five groups of second grooves 7 are uniformly formed in the second groove 7, and the five groups of second grooves 7 are distributed on the surface of the guard rail 1 side by, a water tank 17 is fixedly installed inside the middle group of second grooves 7, the second grooves 7 can be opened when wind is strong, and the wind is shunted when the wind blows over the surface of the guard rail 1, so that the pressure of the wind on the guard rail 1 is reduced.
The surface of the second rotating rod 8 is sleeved with a rotating plate 9, the surface of the guard rail 1 is provided with a third groove 10, the bottom end of the third groove 10 is fixed with a water pump 11, the water pump 11 is provided with a water inlet and a water outlet inside the guard rail 1, the water inlet of the water pump 11 is connected with a water tank 17, the water outlet of the water pump 11 is connected with an atomizing shower 13, under the action of the water pump 11, the water tank 17 sprays water outwards through the atomizing shower 13 to reduce dust on the outside and reduce environmental pollution in the construction process, the left side of the top end of the guard rail 1 is fixed with a second fixing block 12, the inside of the second fixing block 12 is provided with a sixth groove 18, the left side of the second fixing block 12 is the same as the inner side of a fifth groove 16, the second fixing block 12 is inserted inside the fifth groove 16, so that the two guard rails 1 are better fixed and can not be separated, the bottom end of a, the bottom end of the second bolt 15 is the same as the inner side of the sixth groove 18 in size, the second bolt 15 is inserted into the sixth groove 18 through the fourth groove 14, so that the two guard rails 1 are more stably fixed and cannot be easily separated, separation of the guard rails 1 caused by accidental collision of pedestrians is avoided, the atomization shower head 13 is fixed on the surface of the top end of the guard rail 1, the fourth groove 14 is formed in the right side of the top end of the guard rail 1, and the fifth groove 16 is formed in the top end of the right side of the guard rail 1.
The working principle is as follows: will the utility model discloses when using in the input operational environment, put fixed bolster 5 down, make 5 bottoms of fixed bolster inconsistent with ground, nail into ground first bolt 6 through fixed bolster 5 again, be provided with four group's fixed bolsters 5 on the rail guard 1, positive and negative two sides respectively set up two sets ofly, make rail guard 1 fix on ground, when natural environment does not have strong wind well, can rotate commentaries on classics board 9 to perpendicular to rail guard 1, make strong wind pierce through second recess 7 rail guard 1, can be when wind is big, the wind that blows to rail guard 1 surface is shunted, reduce rail guard 1's pressure, how install device stability, insert fifth recess 16 with second fixed block 12, insert sixth recess 18 through fourth recess 14 with second bolt 15 again, it is fixed to enable between two rail guards 1, stability is increased, it is more convenient to assemble.
Water pump 11 pumps the inside water of water tank 17, pump to atomizing gondola water faucet 13, spout via atomizing gondola water faucet 13, the hole has all evenly been seted up around atomizing gondola water faucet 13, carry out the dust fall to both sides around rail guard 1, make the dust that produces in the work progress can not cross rail guard 1, fly to the outside, produce the pollution to the environment, it is also not good to the pedestrian of crossing, when needs mobile device, extract first bolt 6 and second bolt 15, in binding up first recess 2 with fixed bolster 5 again, removal rail guard 1 that can be convenient.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a rail guard for building engineering with prevent structure that inclines, includes rail guard (1), water pump (11) and second bolt (15), its characterized in that: the surface of the guard rail (1) is provided with a first groove (2), the surface of the first groove (2) is fixed with a first fixing block (3), the inner side of the first fixing block (3) is inserted with a first rotating rod (4), the surface of the first rotating rod (4) is sleeved with a fixing support (5), the inside of the fixing support (5) is inserted with a first bolt (6), the surface of the guard rail (1) is provided with a second groove (7), the inner side of the second groove (7) is fixed with a second rotating rod (8), the surface of the second rotating rod (8) is sleeved with a rotating plate (9), the surface of the guard rail (1) is provided with a third groove (10), the bottom end of the third groove (10) is fixed with a water pump (11), the left side of the top end of the guard rail (1) is fixed with a second fixing block (12), and the inside of the second fixing block (12) is provided with a sixth groove (18), the atomizing shower head (13) is fixed on the surface of the top end of the protective guard (1), a fourth groove (14) is formed in the right side of the top end of the protective guard (1), and a fifth groove (16) is formed in the top end of the right side of the protective guard (1).
2. The guard rail for construction engineering having an anti-tilting structure according to claim 1, wherein: the surface of the first bolt (6) and the inner side of the fixed support (5) are both provided with threads, and the first bolt (6) is rotatably connected with the fixed support (5) through the threads.
3. The guard rail for construction engineering having an anti-tilting structure according to claim 1, wherein: five groups are uniformly formed in the second grooves (7), the five groups of second grooves (7) are distributed on the surface of the guard rail (1) side by side, and a water tank (17) is fixedly arranged in the middle of one group of second grooves (7).
4. The guard rail for construction engineering having an anti-tilting structure according to claim 1, wherein: the water pump (11) is provided with a water inlet and a water outlet in the protective guard (1), the water inlet of the water pump (11) is connected with the water tank (17), and the water outlet of the water pump (11) is connected with the atomizing shower head (13).
5. The guard rail for construction engineering having an anti-tilting structure according to claim 1, wherein: the left side of the second fixing block (12) is the same as the inner side of the fifth groove (16), and the second fixing block (12) is inserted into the fifth groove (16).
6. The guard rail for construction engineering having an anti-tilting structure according to claim 1, wherein: the bottom end of the second bolt (15) is the same as the inner side of the fourth groove (14), the bottom end of the second bolt (15) is the same as the inner side of the sixth groove (18), and the second bolt (15) is inserted into the sixth groove (18) through the fourth groove (14).
CN202020768060.9U 2020-05-11 2020-05-11 Rail guard for building engineering with prevent structure that inclines Expired - Fee Related CN212671352U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020768060.9U CN212671352U (en) 2020-05-11 2020-05-11 Rail guard for building engineering with prevent structure that inclines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020768060.9U CN212671352U (en) 2020-05-11 2020-05-11 Rail guard for building engineering with prevent structure that inclines

Publications (1)

Publication Number Publication Date
CN212671352U true CN212671352U (en) 2021-03-09

Family

ID=74814384

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020768060.9U Expired - Fee Related CN212671352U (en) 2020-05-11 2020-05-11 Rail guard for building engineering with prevent structure that inclines

Country Status (1)

Country Link
CN (1) CN212671352U (en)

Similar Documents

Publication Publication Date Title
CN205688377U (en) A kind of municipal administration gardens multifunctional guard railing
CN110670520A (en) Traffic road fence cleaning equipment
CN212671352U (en) Rail guard for building engineering with prevent structure that inclines
CN1295423C (en) High-pressure gas-flow jet spraying and dust-reducing apparatus
CN107519719A (en) A kind of construction site cleaner
CN2640611Y (en) High pressure airflow injection spraying dust removing appts.
CN208346702U (en) A kind of highway isolating device
CN209523528U (en) A kind of safe enclosing of afforestation
CN109338946A (en) A kind of road guard facilitating environment purification
CN205032325U (en) Dust fall sprayer
CN209243654U (en) A kind of sprinkling truck water pot
CN213038265U (en) Perforated plate guardrail with spray dust removal function
CN206680864U (en) A kind of bridge protection network
CN212562774U (en) Protective net for highway engineering construction
CN205461521U (en) Dust device of building construction usefulness
CN217974204U (en) Detachable dust removal fog gun machine with water tank
CN206934997U (en) A kind of Horizental showering tower apparatus
CN204735062U (en) Building site presses down dirt system terminal with little fog
CN216320783U (en) Building site control dust collecting equipment
CN216440271U (en) Civil engineering construction is with hindering dirt device
CN214939781U (en) Guardrail convenient to adjust for spray truck
CN218580438U (en) Joint cutting device is used in municipal administration road and bridge construction
CN217526845U (en) Spray dust-settling system and dust-settling field
CN218150181U (en) Energy-concerving and environment-protective rail guard for highway construction
CN217041834U (en) Environment-friendly road surface engineering construction is with green dust fall device of making an uproar that inhales

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210716

Address after: 124000 tl-a12, Internet venture building, 33 Gongye street, Xinglongtai District, Panjin City, Liaoning Province

Patentee after: Panjin hongtongda Industrial Co.,Ltd.

Address before: 239000 room 15, 151 Langya ancient road, Langya District, Chuzhou City, Anhui Province

Patentee before: Chuzhou Yijian Construction Engineering Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210309