CN217526845U - Spray dust-settling system and dust-settling field - Google Patents
Spray dust-settling system and dust-settling field Download PDFInfo
- Publication number
- CN217526845U CN217526845U CN202221050705.0U CN202221050705U CN217526845U CN 217526845 U CN217526845 U CN 217526845U CN 202221050705 U CN202221050705 U CN 202221050705U CN 217526845 U CN217526845 U CN 217526845U
- Authority
- CN
- China
- Prior art keywords
- unit
- spray
- water supply
- water
- spraying
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
Spray dust fall system and dust fall place relates to dust fall technical field, sprays dust fall system, including water supply unit, spray unit, drainage unit and water purification unit, water supply unit with spray the unit connection, water supply unit connection has a plurality of units that spray, it is in to spray the unit setting the top of drainage unit, drainage unit with the water purification unit connection, the water purification unit with water supply unit connects. The dust fall place, include the dust fall system and the construction place that spray, the construction place with the dust fall headtotail sprays. The utility model discloses simple structure, the dust fall is effectual, and can the cyclic utilization water resource, practices thrift the environmental protection.
Description
Technical Field
The utility model relates to a dust fall technical field specifically is spray dust fall system and dust fall place.
Background
At present, the pace of the infrastructure of domestic highways is getting bigger, and with the development of national economy, the requirement on environment-friendly green construction is also increased to a new level. The water-stable mixing station is used as one of 'three-concentration' places of highway engineering, is a place for producing water-stable mixed materials, is mainly arranged at a position close to a road, and is likely to be close to residents at the periphery of the mixing station.
The traditional treatment method generally adopts a sprinkling truck to reduce dust or a water pipe sprayer installed in a partial area to reduce dust in a construction field, the sprinkling truck can only sprinkle water on the ground, the field is muddy, the dust reduction effect is poor, the cost is higher, the pertinence of the locally installed sprayer is not strong, the effects on positions such as an inlet and an outlet which are extremely easy to generate dust are limited, water resources cannot be recycled, and the effect is poor.
Therefore, a spraying dust-settling system with a simple structure and a dust-settling field need to be developed to solve the problems in the prior art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a spray dust fall system and dust fall place can spray the dust fall, but the cyclic utilization water resource, and simple structure, and the cost is lower to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme:
spray dust fall system, including water supply unit, spray the unit, drainage unit and water purification unit, water supply unit with spray the unit connection, water supply unit is connected with a plurality of units that spray, spray the unit setting and be in drainage unit's top, drainage unit with water purification unit connects, water purification unit with water supply unit connects.
Further, the water supply unit comprises a water reservoir and a water supply pipe, wherein the water reservoir is connected with the water supply pipe.
Further, the water supply pipe is sloped.
Further, the spraying unit comprises a spray head, a spray pipe and a spraying base, the spray head is connected with the spray pipe, the spray pipe is connected with the spraying base, and the water supply pipe is connected with the spray pipe.
Further, the drainage unit includes the escape canal, the escape canal has the slope, the escape canal with the water purification unit is connected.
Further, the drain unit further includes a trench cover connected to the drain.
Further, the water purification unit includes sedimentation tank and sewage treatment module, the sedimentation tank with the sewage treatment module is connected, the escape canal with the sedimentation tank is connected, the sewage treatment module with the cistern is connected.
The dust fall place, include the dust fall system and the construction place that spray, the construction place with the dust fall headtotail sprays.
Furthermore, a wall is arranged on the construction site, and the water supply pipe and the spraying unit are arranged on the wall.
Further, the construction site comprises an operation cabin and an inlet and an outlet, enclosing walls are arranged at the positions of the inlet and the outlet, partition walls are further arranged on the operation cabin, the water supply pipe and the spraying units are also arranged on the partition walls, and the water supply pipe and the spraying units are also arranged on the enclosing walls at the positions of the inlet and the outlet.
Compared with the prior art, the beneficial effects of the utility model are that: only through water supply unit, spray unit, drainage unit and water purification unit, can realize spraying the dust fall, and simple structure, low in cost has reduced the cost of dust fall, easy operation, convenient to use. And through setting up a plurality of spray units, showing and reducing the dust pollution that the construction site caused to the resident and the resident of peripheral passing, the environmental protection. And the spraying unit is arranged above the drainage unit, is matched with the drainage unit and then is used for realizing the cyclic utilization of water resource energy, improving the water resource recycling rate and saving resources through the water purification unit.
Other features and advantages of the present invention will be disclosed in more detail in the following detailed description and the accompanying drawings.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is an enlarged view of a portion of the structure of the present invention;
FIG. 3 is a schematic diagram of spraying at an inlet and an outlet of a dustfall site;
fig. 4 is a spraying schematic diagram of the spraying unit at the position of the partition wall.
The symbols in the figure illustrate: 11. a reservoir; 12. a water supply pipe; 2. a spraying unit; 21. a spray head; 22. a spray pipe; 23. a spray base; 3. a drainage unit; 41. a sedimentation tank; 42. a sewage treatment module; 5. a pressurized water pump.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the present invention, unless otherwise explicitly specified or limited, the terms "mounted," "connected," "secured," and the like are to be construed broadly, e.g., as being fixedly connected, detachably connected, or integrated; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or may be connected through the use of two elements or the interaction of two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
The spraying dust-settling system comprises a water supply unit, a spraying unit 2, a drainage unit 3 and a water purification unit as shown in figures 1 to 2, wherein the water supply unit is connected with the spraying unit 2 and is connected with a plurality of spraying units 2; the spraying unit 2 is arranged above the drainage unit 3, the drainage unit 3 is connected with the water purification unit, and the water purification unit is connected with the water supply unit.
The water supply unit comprises a water storage tank 11 and a water supply pipe 12, wherein the water storage tank 11 is connected with the water supply pipe 12, a pressure water pump 5 is arranged in the water storage tank 11, and the water storage tank 11 supplies water through the pressure water pump 5 to the water supply pipe 12. Optionally, the pressurized water pump 5 is connected to the water reservoir 11, and the pressurized water pump 5 is connected to the water supply pipe 12. Optionally, the reservoir 11 is provided with a water outlet, at which the pressurized water pump 5 is arranged. Optionally, the supply pipe 12 is sloped such that the height of the front end of the supply pipe 12 is greater than or equal to the height of the rear end of the supply pipe 12. Optionally, the gradient is 1% to 3%, and preferably, the gradient is 2%.
The spraying device comprises a spray head 21, a spraying pipe 22 and a spraying base 23, wherein the spray head 21 is connected with the spraying pipe 22, the spraying pipe 22 is connected with the spraying base 23, and the water supply pipe 12 is connected with the spraying pipe 22. The spraying base 23 is used for fixing the spraying unit 2.
The drainage unit 3 includes the escape canal, the escape canal has the slope, the escape canal with the water purification unit is connected. Optionally, the gradient is 1% to 3%, and preferably, the gradient is 2%. The drain is provided near the spray unit 2. The drainage ditch is located below the spray unit 2 so that water sprayed from the spray unit 2 can flow into the drainage ditch.
The drainage unit 3 further includes a gutter cover connected to the drainage gutter. The trench cover may be square steel. Preferably, the trench cover is provided with a drain hole.
The water purification unit includes sedimentation tank 41 and sewage treatment module 42, sedimentation tank 41 with sewage treatment module 42 connects, the escape canal with sedimentation tank 41 connects, sewage treatment module 42 with cistern 11 is connected. The sedimentation tank 41 is provided with a pressure water pump 5. The pressurized water pump 5 is used for conveying water in the sedimentation tank 41 to the sewage treatment module 42, so that water can be purified conveniently. Preferably, the sedimentation tank 41 is a third-stage sedimentation tank 41.
When in use, water enters the water supply pipe 12 from the water storage tank 11 through the pressurized water pump 5, is sprayed out of the spraying unit 2, then flows into the drainage unit 3, and then is converged into the sedimentation tank 41 from the drainage unit 3; the precipitated water is treated by sewage and finally flows into the reservoir 11.
The dust fall place, include the dust fall system and the construction place that spray, the construction place with the dust fall headtotail sprays.
Be equipped with the enclosure on the construction site, preferably, the enclosure encircles the construction site. The construction site comprises an operation bin and an inlet and an outlet, a fence is arranged near the inlet and the outlet, and the operation bin is further provided with a partition wall. As shown in fig. 3 and 4, the water supply pipe 12 and the spraying units 2 are disposed on the wall, and the interval between the spraying units 2 is 3m to 7m, preferably, the interval between the spraying units 2 is 5m. The water supply pipe 12 and the spraying units 2 are also arranged on the partition wall, and the spraying units 2 are respectively arranged at two ends and/or the middle position of the partition wall, so that on one hand, dust generated by raw materials per se is reduced, and on the other hand, dust generated in the material loading and unloading process is reduced. The enclosing wall of the inlet and outlet positions is also provided with the water supply pipe 12 and the spraying unit 2. The spray pipes 22 of the spray unit 2 comprise straight lines and right-angle shapes.
The utility model provides a spray dust fall system and dust fall place only through the water supply unit, spray unit 2, drainage unit 3 and water purification unit, can realize spraying the dust fall, and simple structure, low in cost has reduced the cost of dust fall, easy operation, convenient to use, the reliability is high. And through setting up a plurality of spray unit 2, showing and reducing the dust pollution that the construction site caused to the resident and the resident family of peripheral passing, the environmental protection. And the spraying unit 2 is arranged above the drainage unit 3, the spraying unit 2 is matched with the drainage unit 3, and then the water purification unit realizes cyclic utilization of water resource energy, improves the water resource recovery rate and saves resources.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (10)
1. Spray dust fall system, its characterized in that, including water supply unit, spray the unit, drainage unit and water purification unit, water supply unit with spray the unit connection, water supply unit is connected with a plurality of units that spray, spray the unit setting and be in drainage unit's top, drainage unit with water purification unit connects, water purification unit with water supply unit connects.
2. The spray dust suppression system of claim 1, wherein the water supply unit comprises a water reservoir and a water supply pipe, the water reservoir being connected to the water supply pipe.
3. The spray dedusting system of claim 2, wherein the water supply pipe is sloped.
4. The spraying dust suppression system according to claim 2 or 3, wherein the spraying unit comprises a spray head, a spray pipe and a spraying base, the spray head is connected with the spray pipe, the spray pipe is connected with the spraying base, and the water supply pipe is connected with the spray pipe.
5. The spray dedusting system of claim 2, wherein the drain unit comprises a drain that is sloped and is connected to the water purification unit.
6. The spray dustfall system of claim 5, wherein said drain unit further comprises a gutter cover, said gutter cover being connected to said drain.
7. The spray dust suppression system of claim 5, wherein the water purification unit comprises a sedimentation tank and a sewage treatment module, the sedimentation tank is connected with the sewage treatment module, the drainage ditch is connected with the sedimentation tank, and the sewage treatment module is connected with the reservoir.
8. A dust fall site, characterized in that, including the spraying dust fall system of any one of claims 1-7 and construction site, the construction site with spray dust fall system is connected.
9. The dust-settling field according to claim 8, wherein a wall is arranged on the construction field, and a water supply pipe and the spraying unit are arranged on the wall.
10. The dust-settling field according to claim 9, wherein the construction site comprises an operation cabin and an inlet and an outlet, the inlet and the outlet are provided with enclosing walls, the operation cabin is further provided with a partition wall, the water supply pipe and the spraying unit are also arranged on the partition wall, and the water supply pipe and the spraying unit are also arranged on the enclosing walls at the inlet and the outlet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221050705.0U CN217526845U (en) | 2022-05-05 | 2022-05-05 | Spray dust-settling system and dust-settling field |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221050705.0U CN217526845U (en) | 2022-05-05 | 2022-05-05 | Spray dust-settling system and dust-settling field |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217526845U true CN217526845U (en) | 2022-10-04 |
Family
ID=83432988
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221050705.0U Active CN217526845U (en) | 2022-05-05 | 2022-05-05 | Spray dust-settling system and dust-settling field |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217526845U (en) |
-
2022
- 2022-05-05 CN CN202221050705.0U patent/CN217526845U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101172740B (en) | Sanitary sewage photocatalysis and multi- medium advanced treatment system for single family in countryside | |
CN210561558U (en) | Urban road rainwater is collected and high-efficient system of utilizing | |
CN206279487U (en) | A kind of construction streets watering device | |
CN207986847U (en) | A kind of water resource suitable for construction site recycles spray dust's system | |
CN208293922U (en) | A kind of ecological roof in sponge city | |
CN210905421U (en) | Building site encloses fender and sprays dust fall system | |
CN210202765U (en) | Afforestation is with irrigating water jet equipment | |
CN203246439U (en) | Vehicle tyre cleaning system | |
CN217526845U (en) | Spray dust-settling system and dust-settling field | |
CN202728180U (en) | Vehicle cleaning pool on construction site | |
CN216007962U (en) | Green water supply and drainage building structure of municipal landscape | |
CN210610316U (en) | Vertical greening rainwater comprehensive utilization system based on sponge city construction | |
CN210194373U (en) | Road drainage structure is recycled to water resource | |
CN113951098A (en) | Mine restoration is rainwater recycle system for compound green | |
CN208159619U (en) | A kind of road cleaning and green area irrigation integration apparatus | |
CN206376226U (en) | A kind of accessible all standing dust falling system of contrary sequence method platform | |
CN206757891U (en) | A kind of environmental protection and energy saving traffic indicating equipment | |
CN218680775U (en) | Rainwater recycling device utilizing ejector | |
CN218558806U (en) | Transport vehicle flushing system | |
CN215979459U (en) | Mine return airway dust collector | |
CN217773696U (en) | Dust collector is used in building engineering construction | |
CN214329095U (en) | Urban and rural area rainwater cyclic utilization system | |
CN212270805U (en) | Road construction is with spraying dust keeper | |
CN214982002U (en) | Energy-concerving and environment-protective type water circulating system of stirring station | |
CN212271082U (en) | Building engineering rainwater collection and utilization device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |