CN212671013U - Auxiliary tool for controlling main reinforcement interval through PC reinforcement binding - Google Patents
Auxiliary tool for controlling main reinforcement interval through PC reinforcement binding Download PDFInfo
- Publication number
- CN212671013U CN212671013U CN202021149744.7U CN202021149744U CN212671013U CN 212671013 U CN212671013 U CN 212671013U CN 202021149744 U CN202021149744 U CN 202021149744U CN 212671013 U CN212671013 U CN 212671013U
- Authority
- CN
- China
- Prior art keywords
- bayonet socket
- bayonet
- steel sheet
- location
- vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
The utility model discloses a PC reinforcement control owner muscle interval's auxiliary fixtures, including two parallel arrangement's lower margin steel sheet, respectively the vertical support steel sheet of fixedly connected with on two lower margin steel sheets, be equipped with movable bayonet socket respectively on the top of two support steel sheets, be connected with the location steel sheet between two activity bayonet sockets, the both ends card of location steel sheet is in movable bayonet socket the location steel sheet on equidistant opening have a plurality of main muscle location bayonet sockets, main muscle location bayonet socket including vertical bayonet socket and upper and lower two slope bayonet sockets of being connected with vertical bayonet socket, slope bayonet socket to the downside slope of same direction, distance between two adjacent vertical bayonet sockets equals with two horizontal direction's main muscle interval, distance between two upper and lower slope bayonet sockets equals with two vertical direction's main muscle interval. The utility model discloses the difficult problem that reinforcement efficiency is low, main muscle interval error is big has been successfully solved to realize that production efficiency and component quality follow-up in step.
Description
Technical Field
The utility model relates to an assembly type structure prefabricated component manufacturing technical field especially relates to an auxiliary fixtures of PC reinforcement control owner muscle interval.
Background
The prefabricated member production of assembly type building is different from the traditional building mode, and the manufacturing of factory PC components improves the reuse rate of lost articles such as moulds, auxiliary fixtures and the like. But the binding of the reinforcing steel bars in the mould on the component site greatly influences the construction efficiency, and the damage to the previous working procedure can also occur. The efficiency is low, and meanwhile, the hidden danger of the quality of finished products is greatly increased. The production mode of assembled component is different from the actual production of traditional building mode far away, and on-spot prefabricated ligature steel reinforcement cage often appears the protective layer not enough, main muscle positional deviation, sleeve positional deviation scheduling problem and appears in the in-service use, and this kind of condition has influenced mill production efficiency, can not reach corresponding flowing water beat.
At present, through on-site practical application, the ordinary steel bar on-site binding cannot be suitable for the production efficiency of a factory building, special research is carried out aiming at low steel bar binding efficiency, and the auxiliary tool for controlling the main bar spacing through PC steel bar binding is designed.
SUMMERY OF THE UTILITY MODEL
The utility model discloses the purpose is exactly in order to compensate prior art's defect, provides a supplementary frock of PC reinforcement control owner muscle interval.
The utility model discloses a realize through following technical scheme:
the utility model provides a supplementary frock of PC reinforcement control owner muscle interval, is including two parallel arrangement's lower margin steel sheet, the vertical support steel sheet of fixedly connected with respectively on two lower margin steel sheets, is equipped with movable bayonet socket respectively on the top of two support steel sheets, is connected with the location steel sheet between two activity bayonet sockets, the both ends card of location steel sheet in the activity bayonet socket location steel sheet equidistant opening have a plurality of main muscle location bayonet sockets, main muscle location bayonet socket including vertical bayonet socket and upper and lower two slope bayonet sockets with vertical bayonet socket connection, slope bayonet socket to the downside slope of same direction, distance between two adjacent vertical bayonet sockets equals with two horizontal direction's main muscle interval, distance between two upper and lower slope bayonet sockets equals with two vertical direction's main muscle interval.
And the foundation steel plate is provided with a foundation screw hole.
And two ends of the positioning steel plate are respectively provided with a carrying lifting hole.
The utility model has the advantages that: the utility model discloses simple structure, convenient operation, great improvement reinforcement's work efficiency reduces the hidden danger problem of finished product quality, has successfully solved the difficult problem that reinforcement is efficient, main muscle interval error is big to realize that production efficiency and component quality follow-up in step.
Drawings
FIG. 1 is a schematic view of the auxiliary tool for controlling the spacing between main bars in steel bar binding.
Fig. 2 is a schematic structural diagram of the present invention.
Detailed Description
As shown in figure 2, the auxiliary tool for controlling the spacing between the main bars in PC steel bar binding comprises two parallel foundation steel plates 1, the two foot margin steel plates 1 are respectively and fixedly connected with a vertical bracket steel plate 2, the top ends of the two bracket steel plates 2 are respectively provided with a movable bayonet 3, a positioning steel plate 4 is connected between the two movable bayonets 3, two ends of the positioning steel plate 4 are clamped in the movable bayonets 3, a plurality of main rib positioning bayonets 5 are arranged on the positioning steel plate 4 at equal intervals, the main rib positioning bayonets 5 comprise a vertical bayonet 51 and an upper inclined bayonet 52 and a lower inclined bayonet 52 which are connected with the vertical bayonet 51, the inclined bayonets 52 incline to the lower side in the same direction, the distance between two adjacent vertical bayonets 51 is equal to the distance between the two main ribs 6 in the horizontal direction, and the distance between the two upper and lower inclined bayonets 52 is equal to the distance between the two main ribs 6 in the vertical direction.
And the foundation steel plate 1 is provided with a foundation screw hole 7.
And the two ends of the positioning steel plate 4 are respectively provided with a carrying lifting hole 8.
As shown in figure 1, the PC steel bar binding structure is characterized in that four main bars 6 are placed in a square shape, a steel bar sleeve 9 is sleeved at the end part of each main bar 6, and the steel bar sleeve 9 and the main bars 6 are bound through a plurality of square stirrups 10.
The binding working process comprises the following steps:
1. before the reinforcing bar auxiliary fixtures are used, the steel reinforcement cage to be processed is lofted on the concrete ground according to the size, and the overall size requirements of the steel frame cage are marked.
2. According to the size boundary line of the early-stage lofting, the auxiliary tool foundation steel plate 1 with the PC steel bars bound and the main bar spacing controlled is fixed with the ground through expansion bolts.
3. And adjusting another foundation steel plate 1 according to the width of the steel reinforcement cage to be used, and reinforcing the foundation steel plate with the ground.
4. And placing the carrying lifting hole 8 and the main reinforcement positioning bayonet positioning steel plate 4 which are cut in advance according to drawings and drawing sets into a movable bayonet reserved on the support steel plate.
5. And (4) fixing a support steel plate of the auxiliary tool for controlling the main reinforcement spacing by binding the PC steel bars according to the lofting size in the step 1.
6. And (4) placing the upper main reinforcement into the upper main reinforcement positioning bayonet, and arranging the number of stirrups according to the project drawing.
7. And (5) putting the lower main reinforcement, and adjusting the distance between the stirrups for binding. And taking out the reinforcement cage after the binding is finished, and finishing the manufacture of the reinforcement cage binding on site.
Claims (3)
1. The utility model provides an auxiliary fixtures of PC reinforcement control owner muscle interval which characterized in that: including two parallel arrangement's lower margin steel sheet, the vertical support steel sheet of fixedly connected with respectively on two lower margin steel sheets is equipped with movable bayonet socket respectively on the top of two support steel sheets, is connected with the location steel sheet between two activity bayonet sockets, the both ends card of location steel sheet in the activity bayonet socket the location steel sheet on equidistant opening have a plurality of main muscle location bayonet sockets, main muscle location bayonet socket including vertical bayonet socket and upper and lower two slope bayonet sockets with vertical bayonet socket connection, slope bayonet socket to the downside slope of same direction, distance between two adjacent vertical bayonet sockets equals with two horizontal direction's main muscle interval, distance between two upper and lower slope bayonet sockets equals with two vertical direction's main muscle interval.
2. The auxiliary tool for controlling the spacing between the main bars in PC steel bar binding according to claim 1, is characterized in that: and the foundation steel plate is provided with a foundation screw hole.
3. The auxiliary tool for controlling the spacing between the main bars in PC steel bar binding according to claim 1, is characterized in that: and two ends of the positioning steel plate are respectively provided with a carrying lifting hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021149744.7U CN212671013U (en) | 2020-06-19 | 2020-06-19 | Auxiliary tool for controlling main reinforcement interval through PC reinforcement binding |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021149744.7U CN212671013U (en) | 2020-06-19 | 2020-06-19 | Auxiliary tool for controlling main reinforcement interval through PC reinforcement binding |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212671013U true CN212671013U (en) | 2021-03-09 |
Family
ID=74822815
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021149744.7U Active CN212671013U (en) | 2020-06-19 | 2020-06-19 | Auxiliary tool for controlling main reinforcement interval through PC reinforcement binding |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212671013U (en) |
-
2020
- 2020-06-19 CN CN202021149744.7U patent/CN212671013U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103266900A (en) | Integrated quick moving formwork for tunnel multi-longitudinal cable trough construction | |
CN106499173A (en) | Based on the aluminum alloy mould plate mechanism that BIM technology is used for building floor construction | |
CN212671013U (en) | Auxiliary tool for controlling main reinforcement interval through PC reinforcement binding | |
CN102828614A (en) | Building template system capable of being quickly detached and installed and installation method thereof | |
CN116851591A (en) | Processing method of precast beam steel rib frame | |
CN110629782B (en) | Adjusting method of anchor bolt offline assembly device | |
CN203161251U (en) | Tunnel multiple longitudinal channel cable trough construction integrated rapid movable mould frame | |
CN101338619B (en) | Mould for manufacturing methane tank | |
CN206690311U (en) | Mold for tie with reinforcing bar | |
CN112536910B (en) | Manufacturing method of prefabricated part | |
CN210561745U (en) | Box girder reinforcing steel bar jig processing structure | |
CN211850824U (en) | Supporting unit and supporting device | |
CN211395731U (en) | Foundation bolt off-line assembly device | |
CN210105302U (en) | Supporting-free adjustable combined die for sealing die of post-cast joint of prefabricated primary and secondary beams | |
CN214942553U (en) | Be used for vice cage production bed-jig of pile foundation | |
CN214353111U (en) | Hollow batten die with adjustable beam column cross section | |
CN212375718U (en) | Pier shaft reinforcing bar integral connection fixed die | |
CN220848727U (en) | Combined steel frame beam template | |
CN220928690U (en) | Detachable steel mould frame for special-shaped concrete roof of greenhouse | |
CN218621876U (en) | Bridge floor three-wall steel bar positioning tire fixture device | |
CN220226279U (en) | Node mould steel bar frame | |
CN220574588U (en) | Small-sized steel bar automatic bending machine | |
CN216839484U (en) | Adjustable integral concrete support template | |
CN218053179U (en) | Universal assembled prefabricated stair steel formwork | |
CN218875808U (en) | Steel template device for manufacturing batch concrete cushion blocks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |