CN212669189U CN202021344217.1U CN202021344217U CN212669189U CN 212669189 U CN212669189 U CN 212669189U CN 202021344217 U CN202021344217 U CN 202021344217U CN 212669189 U CN212669189 U CN 212669189U
Authority
CN
China
Prior art keywords
fixedly connected
discharging pipe
drainage
rod
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021344217.1U
Other languages
Chinese (zh)
Inventor
刘向
廖崇波
张翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Leishen Environmental Protection Technology Co ltd
Original Assignee
Hunan Leishen Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Leishen Environmental Protection Technology Co ltd filed Critical Hunan Leishen Environmental Protection Technology Co ltd
Priority to CN202021344217.1U priority Critical patent/CN212669189U/en
Application granted granted Critical
Publication of CN212669189U publication Critical patent/CN212669189U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Repair (AREA)

Abstract

The utility model provides a road waterproof sealant production facility relates to pitch production technical field, including total support and drainage device, the upper end fixedly connected with staving of total support, the fixed surface of staving is connected with the discharging pipe, the fixed surface of discharging pipe is connected with the control valve, the downside of discharging pipe is equipped with drainage device, drainage device is including the drainage pole, drainage pole fixed connection is in the orificial lower extreme of discharging pipe, the surface cover of discharging pipe has three lantern ring, the lantern ring and discharging pipe fixed connection, be close to the downside fixedly connected with connecting rod of the orificial lantern ring of discharging pipe, the lower fixed surface of connecting rod is connected with the U-shaped pole, the lower extreme fixedly connected with groove block of U-shaped pole. The utility model discloses, solved the switching between two new buckets and can cause the drippage of pitch, solved not only to cause the waste of resource, because pitch viscosity is higher to be leaded to, pitch drips the problem that is difficult to the clearance on new bucket or ground.

Description

Waterproof sealed production facility that glues of road
Technical Field
The utility model relates to a pitch production technical field especially relates to a road waterproof sealant production facility.
Background
The emulsified asphalt is a black brown complex mixture composed of hydrocarbons with different molecular weights and nonmetal derivatives thereof, is one of high-viscosity organic liquids, is in a liquid state, has a black surface, and is soluble in carbon disulfide.
When asphalt is barreled after asphalt is processed by asphalt production equipment, emulsified asphalt is in a fluid state, and when the emulsified asphalt is loaded into a new barrel by workers, the asphalt is dripped due to switching between the two new barrels, so that the waste of resources is caused, and the asphalt is difficult to clean due to the fact that the viscosity of the asphalt is high.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a road waterproof sealant production device.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a waterproof sealed production facility that glues of road, includes main support and drainage device, the upper end fixedly connected with staving of main support, the fixed surface of staving is connected with the discharging pipe, the fixed surface of discharging pipe is connected with the control valve, the downside of discharging pipe is equipped with drainage device, drainage device is including the drainage pole, drainage pole fixed connection is in the orificial lower extreme of discharging pipe, the surface cover of discharging pipe has three lantern ring, the surface and the discharging pipe fixed connection of the lantern ring, the downside fixedly connected with connecting rod of the lantern ring, the lower fixed surface of connecting rod is connected with the U-shaped pole, and the lower extreme fixedly connected with recess piece of U-shaped pole, the one end fixedly connected with drainage piece that the recess piece is close to the staving, the drainage piece is the flat groove structure of front end point.
Preferably, the lower side of the discharging pipe close to the barrel body is provided with a connecting block, the surface of the connecting block is fixedly connected with the lantern ring, one side of the connecting block, far away from the discharging pipe, is fixedly connected with a U-shaped block, and the box body is fixedly connected between the U-shaped blocks.
Preferably, a semicircular hole is formed in the surface of one side, away from the barrel body, of the box body, the size of the semicircular hole is matched with the size of the groove face of the groove block, and the groove block is placed on the inner wall of the semicircular hole in the box body.
Preferably, the inside storage device that is equipped with of box body, storage device includes the dead lever, dead lever fixed connection is in the inner wall of box body, the surperficial sliding connection of dead lever has the slider, the slider is kept away from a side surface of discharging pipe and has been seted up the rectangular channel, dead lever sliding connection is in the inner wall of rectangular channel, the slider is kept away from the fixed surface of dead lever and is connected with the pull rod.
Preferably, the surface of slider has seted up the circular port, the inner wall sliding connection of circular port has the cask, the upper end fixedly connected with baffle of cask, the slider is hugged closely the position of circular port bilateral symmetry and is seted up spacing hole.
Preferably, the surface of the fixed rod is sleeved with a spring, and the spring is fixedly connected between the bottom wall of the rectangular groove of the sliding block and the end face of the fixed rod.
Compared with the prior art, the utility model has the advantages and positive effects that,
1. in the utility model, by arranging the drainage device, a new barrel is placed at the lower end of the discharge port, the control valve is opened, asphalt is filled into the new barrel, when the control valve is closed to switch the new barrel, the dropped asphalt can slide on the groove block at the lower end of the drainage rod along the drainage rod, the other side of the groove block is clamped in the semicircular hole, the groove block is connected through the connecting rod fixed by the lantern ring, the asphalt on the groove block can slide down into the box body along the drainage block, the box body is fixed through the U-shaped block sleeved on the connecting block connected by the lantern ring of the discharge pipe, so that the box body is more firmly fixed, the scattering of the asphalt caused by the deflection of the box body is effectively prevented, the collection of the dropped asphalt is completed, the asphalt is prevented from dropping on the side wall of the new barrel, the problem that the asphalt drops caused by the switching between two new barrels is solved, the waste of resources is solved, and the, the asphalt is difficult to clean when dropping on a new barrel or the ground.
2. The utility model discloses in, through setting up storage device, the pitch of drippage drips in the cask along the drainage piece, when the pitch piece in the cask is filled with, the pulling pull rod is with the slider roll-off, the dead lever has the effect that the restriction slider removed and prevents skew about the slider, put into spacing downthehole cask of taking out with the finger, pour the pitch in the cask into in the new bucket, put the cask to the circular hole of slider downthehole blocking again, loosen the pull rod, the slider receives the elasticity bullet of spring to the box body in, the effect to the taking in of the emulsified asphalt of drippage and the processing of accomodating the pitch has been reached.
Drawings
FIG. 1 is a schematic view of the three-dimensional structure of a road waterproof sealant production facility provided by the utility model;
FIG. 2 is a schematic structural view of the drainage device shown in FIG. 1 in the road waterproof sealant production equipment provided by the utility model;
FIG. 3 is a schematic structural view of the road waterproof sealant production equipment of the utility model, showing the round barrel in FIG. 2 taken out;
FIG. 4 is a schematic view of a part of the structure at the position A in FIG. 1 in the production equipment of the waterproof sealant for road of the utility model;
fig. 5 is the utility model provides a part of B department's of fig. 3 schematic structure view in the waterproof sealed glue production facility of road.
Illustration of the drawings: 1. a main frame; 2. a barrel body; 3. a control valve; 4. a discharge pipe; 5. a drainage device; 51. a drainage rod; 52. a collar; 53. connecting blocks; 54. a U-shaped block; 55. a box body; 56. a connecting rod; 57. a groove block; 58. a semicircular hole; 59. a drainage block; 6. a storage device; 61. a barrel; 62. a slider; 63. a pull rod; 64. a spring; 65. a limiting hole; 66. fixing the rod; 67. a circular hole.
Detailed Description
In order to make the above objects, features and advantages of the present invention more clearly understood, the present invention will be further described with reference to the accompanying drawings and examples. It should be noted that the embodiments and features of the embodiments of the present application may be combined with each other without conflict.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, however, the present invention may be practiced in other ways than those specifically described herein, and therefore the present invention is not limited to the limitations of the specific embodiments of the present disclosure.
Embodiment 1, as shown in fig. 1-5, the utility model provides a road waterproof sealant production facility, including main support 1, drainage device 5 and storage device 6, the upper end fixedly connected with staving 2 of main support 1, the fixed surface of staving 2 is connected with discharging pipe 4, and the fixed surface of discharging pipe 4 is connected with control valve 3, and the downside of discharging pipe 4 is equipped with drainage device 5, and the inside storage device 6 that is equipped with of box body 55.
The specific arrangement and function of the drainage device 5 and the receiving device 6 will be described in detail below.
As shown in fig. 1 and 4, the drainage device 5 comprises a drainage rod 51, the drainage rod 51 is fixedly connected to the lower end of the nozzle of the discharge pipe 4, the surface of the discharge pipe 4 is sleeved with three lantern rings 52, the lantern rings 52 are fixedly connected with the discharge pipe 4, a connecting rod 56 is fixedly connected to the lower side of the lantern ring 52 close to the nozzle of the discharge pipe 4, a U-shaped rod is fixedly connected to the lower surface of the connecting rod 56, the lower end of the U-shaped rod is fixedly connected with a groove block 57, one end of the groove block 57 close to the barrel body 2 is fixedly connected with a drainage block 59, the drainage block 59 is a groove structure with a pointed front end and a flat rear end, the lower sides of the two lantern rings 52 of the barrel body 2 close to the discharge pipe 4 are fixedly connected with a connecting block 53, one side of the connecting block 53 far away from the discharge pipe 4 is fixedly connected with a U-shaped block 54, a box body 55 is fixedly, the notch block 57 is placed on the inner wall of the upper semicircular hole 58 of the case 55.
The whole drainage device 5 has the effects that by arranging the drainage device 5, a new barrel is placed at the lower end of a discharge hole, a control valve 3 is opened, asphalt is filled into the new barrel, when the control valve 3 is closed to switch the new barrel, the dropped asphalt can slide along the drainage rod 51 onto the groove block 57 at the lower end of the drainage rod 51, the other side of the groove block 57 is clamped in the semicircular hole 58, the groove block 57 is connected through the connecting rod 56 fixed by the lantern ring 52, the asphalt on the groove block 57 can slide along the drainage block 59 into the box body 55, the box body 55 is fixed through the U-shaped block 54 sleeved on the connecting block 53 connected by the lantern ring 52 of the discharge pipe 4, so that the box body 55 is more firmly fixed, the asphalt is effectively prevented from scattering caused by the deflection of the box body 55, the collection of the dropped asphalt is completed, the asphalt is prevented from dropping on the side wall of the new barrel, the problem that the asphalt drops caused by the switching between two new barrels is solved, the problem of not only cause the waste of resource, because pitch viscosity is higher leads to, pitch drips and all is difficult to clear up on new bucket or ground is solved.
As shown in fig. 2 and 3, storage device 6 includes dead lever 66, dead lever 66 fixed connection is in the inner wall of box body 55, the surperficial sliding connection of dead lever 66 has slider 62, slider 62 keeps away from a side surface of discharging pipe 4 and has seted up the rectangular channel, dead lever 66 sliding connection is in the inner wall of rectangular channel, slider 62 keeps away from the fixed surface of dead lever 66 and is connected with pull rod 63, circular port 67 has been seted up on slider 62's surface, the inner wall sliding connection of circular port 67 has cask 61, the upper end fixedly connected with baffle of cask 61, slider 62 hugs closely the position of circular port 67 bilateral symmetry and sets up spacing hole 65, the surperficial cover of dead lever 66 has spring 64, spring 64 fixed connection is between the diapire.
The effect that its whole storage device 6 reached does, through setting up storage device 6, the pitch of drippage drips in cask 61 along drainage piece 59 drippage, when the pitch piece in cask 61 was filled with, pulling pull rod 63 was with the slider 62 roll-off, dead lever 66 has the effect that restriction slider 62 removed and prevents the skew about slider 62, put into spacing hole 65 with the finger and take out cask 61, pour the pitch in cask 61 into in the new barrel, put cask 61 again and block in the circular port 67 of slider 62, loosen pull rod 63, slider 62 receives spring 64's elasticity bullet to the box body 55 in, reached the effect to the accomodating of the emulsified asphalt that drips and to the processing of accomodating the pitch.
The whole working principle is that by arranging the drainage device 5, a new barrel is placed at the lower end of the discharge port, the control valve 3 is opened, asphalt is filled into the new barrel, when the control valve 3 is closed to switch the new barrel, the dropped asphalt can slide on the groove block 57 at the lower end of the drainage rod 51 along the drainage rod 51, the other side of the groove block 57 is clamped in the semicircular hole 58, the groove block 57 is connected through the connecting rod 56 fixed by the lantern ring 52, the asphalt on the groove block 57 can slide into the box body 55 along the drainage block 59, the box body 55 is fixed through the U-shaped block 54 sleeved on the connecting block 53 connected by the lantern ring 52 of the discharge pipe 4, so that the box body 55 is more firmly fixed, the asphalt is effectively prevented from spilling due to the deflection of the box body 55, the collection of the dropped asphalt is completed, the asphalt is prevented from dropping on the side wall of the new barrel, the problem that the asphalt drops due to the switching between two new barrels is solved, and the storage device 6 is arranged, the pitch of drippage drips in cask 61 along drainage piece 59, when the pitch piece in cask 61 was filled up, pulling pull rod 63 was with the slide block 62 roll-off, dead lever 66 had the effect that the removal of restriction slide block 62 prevented slide block 62 from controlling the skew, put into spacing hole 65 with the finger and take out cask 61, pour the pitch in cask 61 into the new barrel, put cask 61 to block in the circular port 67 of slide block 62 again, unclamp pull rod 63, slide block 62 receives spring 64's elasticity bullet to the box body 55 in.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in other forms, and any person skilled in the art may use the above-mentioned technical contents to change or modify the equivalent embodiment into equivalent changes and apply to other fields, but any simple modification, equivalent change and modification made to the above embodiments according to the technical matters of the present invention will still fall within the protection scope of the technical solution of the present invention.

Claims (6)

1. The utility model provides a waterproof sealed production facility that glues of road, includes main support (1) and drainage device (5), its characterized in that: the upper end of the main support (1) is fixedly connected with a barrel body (2), the surface of the barrel body (2) is fixedly connected with a discharge pipe (4), the surface of the discharge pipe (4) is fixedly connected with a control valve (3), the lower side of the discharge pipe (4) is provided with a drainage device (5), the drainage device (5) comprises a drainage rod (51), the drainage rod (51) is fixedly connected with the lower end of the opening of the discharge pipe (4), the surface of the discharge pipe (4) is sleeved with three lantern rings (52), the surface of the lantern rings (52) is fixedly connected with the discharge pipe (4), the lower side of the lantern rings (52) is fixedly connected with a connecting rod (56), the lower surface of the connecting rod (56) is fixedly connected with a U-shaped rod, the lower end of the U-shaped rod is fixedly connected with a groove block (57), one end of the groove block (57) close to the barrel body, the flow guide block (59) is of a groove structure with a pointed front end and a flat rear end.
2. The road waterproof sealant production equipment according to claim 1, characterized in that: discharging pipe (4) are close to the downside of staving (2) and are equipped with connecting block (53), the surface and the lantern ring (52) fixed connection of connecting block (53), one side fixedly connected with U-shaped piece (54) of discharging pipe (4) is kept away from in connecting block (53), two fixedly connected with box body (55) between U-shaped piece (54).
3. The road waterproof sealant production equipment according to claim 2, characterized in that: the barrel body (2) is arranged on the inner wall of the upper half round hole (58) of the box body (55), a semicircular hole (58) is formed in the surface of one side, away from the barrel body (2), of the box body (55), the size of the semicircular hole (58) is matched with the size of the groove face of the groove block (57), and the groove block (57) is placed on the inner wall of the upper half round hole (58) of the box body (55).
4. The road waterproof sealant production equipment according to claim 2, characterized in that: the utility model discloses a storage device for the internal portion of box body (55), storage device (6) are including dead lever (66), dead lever (66) fixed connection is in the inner wall of box body (55), the surperficial sliding connection of dead lever (66) has slider (62), the rectangular channel has been seted up to a side surface that discharging pipe (4) were kept away from in slider (62), dead lever (66) sliding connection is in the inner wall of rectangular channel, the surperficial fixed connection that dead lever (66) were kept away from in slider (62) has pull rod (63).
5. The road waterproof sealant production equipment according to claim 4, characterized in that: circular port (67) have been seted up on the surface of slider (62), the inner wall sliding connection of circular port (67) has cask (61), the upper end fixedly connected with baffle of cask (61), spacing hole (65) are seted up to the position that circular port (67) bilateral symmetry is hugged closely in slider (62).
6. The road waterproof sealant production equipment according to claim 4, characterized in that: the surface of the fixed rod (66) is sleeved with a spring (64), and the spring (64) is fixedly connected between the bottom wall of the rectangular groove of the sliding block (62) and the end face of the fixed rod (66).
CN202021344217.1U 2020-07-10 2020-07-10 Waterproof sealed production facility that glues of road Expired - Fee Related CN212669189U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021344217.1U CN212669189U (en) 2020-07-10 2020-07-10 Waterproof sealed production facility that glues of road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021344217.1U CN212669189U (en) 2020-07-10 2020-07-10 Waterproof sealed production facility that glues of road

Publications (1)

Publication Number Publication Date
CN212669189U true CN212669189U (en) 2021-03-09

Family

ID=74838587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021344217.1U Expired - Fee Related CN212669189U (en) 2020-07-10 2020-07-10 Waterproof sealed production facility that glues of road

Country Status (1)

Country Link
CN (1) CN212669189U (en)

Similar Documents

Publication Publication Date Title
CN212669189U (en) Waterproof sealed production facility that glues of road
CN107024367A (en) A kind of portable anti-adjustable deep siphon sampling apparatus of turbulent flow and the method for sampling
CN204323948U (en) A kind of glass bottle
CN216971999U (en) Oil gas recovery oil filling riser sealing device
CN207712737U (en) A kind of environmental and ecological garbage bin for gardens
CN208307353U (en) A kind of liquid nitrogen pail
CN209467458U (en) A kind of asphalt barrel convenient for reuse
CN204434524U (en) Oil content analyzer tetracol phenixin retrieving arrangement
CN206838004U (en) A kind of blend tank fixed mount
CN220263730U (en) Disposable liquid barrel cover
CN206121794U (en) Volumetric bottle supporting device
CN106268193B (en) High-sulfur naphtha desulfurization anti-reflux device
CN208187940U (en) It is a kind of can side liquid feeding metal protection device
CN207389863U (en) A kind of Multifunctional oil paint can
CN209410423U (en) Brick tea automatic packing mechanism
CN207712598U (en) A kind of automatic open and close bottle cap of gravity
CN218212087U (en) Sampler
CN209451871U (en) Anti-splashing devil liquor recovery bottle suitable for superclean bench
CN210162590U (en) A separator for environmental protection is useless admittedly
CN209911044U (en) Asphalt layered sampler
CN206407324U (en) A kind of chemical industry charging basket
CN208856102U (en) A kind of weaving chemical industry charging basket
CN220885515U (en) Lubricating oil container
CN211122156U (en) Detachable settlement collection device
CN205499963U (en) Liquid ring guarantor type garbage bin

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210309